This solicitation notice is for an indefinite delivery indefinite quantity contract to upgrade the suspension system on 308 M870A2-S Medium Heavy Equipment Transporters for the United States Marine Corps. The selected contractor will design, produce, install, and support the upgraded suspension system as well as provide related equipment, training, and spare parts. The government intends to award a single small business set-aside contract with both firm-fixed-price and cost-reimbursable line items. The period of performance is expected to conclude in fiscal year 2019. Interested parties should monitor this website for release of the final request for proposal, which will include a 45-day response time and anticipated award in 2019. All communications regarding this notice should be directed to the identified point of contact.
M870 Suspension Upgrade Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6_GFP_Attachment_20May19.xlsx | XLSX spreadsheet | |
| Attachment_7_M67854-19-R-0013_-_Government_Responses_to_RFCs_-_30_May_2019.xlsx | XLSX spreadsheet | |
| Attachment_4_DoD_Guidance_for_Reviewing_SSPs.pdf | ||
| Attachment_3_Contractor_CUI-SSP_Template.docx | DOCX document | |
| Exhibit_C_-_Technical_Manual_Contract_Data_Requirements_List_(C001-C004).docx | DOCX document | |
| Exhibit_B_-_Engineering_Contract_Data_Requirements_List_(B001-B017).docx | DOCX document | |
| Exhibit_A_-_Administrative_Management_Contract_Data_Requirements_List_(A001-A037).docx | DOCX document | |
| Attachment_5_Past_Performance_Questionnaire.docx | DOCX document | |
| Exhibit_D_-_Logistics_Contract_Data_Requirements_List_(D001-D014).docx | DOCX document | |
| Attachment_1_OverAboveInstruction.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M6785419R0013
Section B - Supplies or Services and Prices
ORDERING PROCEDURES
B.1 Ordering Procedures Marine Corps Systems Command (MCSC) Program Executive Officer Land Systems (PEO LS) intends to award an Indefinite Delivery, Indefinite Quantity (IDIQ) contract with five (5) one-year ordering periods. The IDIQ will contain Firm Fixed Price (FFP) and Cost Contract Line Item Numbers (CLINs).
B.2 Delivery Order Issuance Delivery Orders will be placed against this contract by the Government using a DD Form 1155 and IAW DFARS 252.216-7006. In accordance with (IAW) DFARS clause 252.216-7006, orders may be issued by orally only if authorized in the Schedule. If mailed or transmitted by facsimile, a delivery order or task order is considered “issued” when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.
If issued electronically, the order is considered “issued” when a copy has been posted to the Electronic Document Access system, and notice has been sent to the Contractor. The pricing on delivery orders that cross ordering periods will be based upon the pricing that is effective at the time the order is issued, and will be effective throughout the period of performance for the delivery order.
Each delivery or task order will contain, among other information, the date of the order, the order number, delivery or performance, place of delivery or performance, any special shipping instructions, pricing, and accounting and appropriation data. Each delivery or task order shall be executed in accordance with the Statement of Work. Delivery and task orders shall incorporate all clauses of the contract.
B.3 Ordering Period Delivery Orders will be placed against the contract within a period of five (5) years after the award date of the base contract. Reference Section F for ordering period details.
B.4 Contract Minimum/Maximum The contract minimum order quantity required shall be the two (2) First Article Test (FAT) Assets (M870A2-S with upgraded suspension integrated) identified in CLIN 0001; one (1) stand-alone LVSR tractor ECP kit, and one (1) LVSR tractor with ECP kit installed as identified in CLIN 0002. The maximum value over the life of the contract shall not exceed $45,768,000.00.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
FAT Assets - M870 ECP
FFP
First Article Test Assets M870 Suspension Upgrade ECP- The Contractor shall design, produce, install and deliver the M870 FAT Assets IAW SOW 4, 5, 6.1, 6.2, 6.5.2.1. ORDERING PERIOD 1: date of award through 12 months.
FOB: Destination
PSC CD: 2330
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 2 |
| Each |
FAT Assets - LVSR ECP Kit
First Article Test Assets LVSR Interface ECP Kit - The Contractor shall design, produce, install and deliver the LVSR Interface ECP Kit FAT Assets IAW SOW 4, 5, 6.1, 6.2, 6.5.2.1. ORDERING PERIOD 1: date of award through 12 months.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
M870 Suspension Upgrade ECP
M870 Suspension ECP - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 1: date of award through 12 months.
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0003AA
| 361 |
| Each |
M870 ECP CONUS
M870 Suspension Upgrade Continental United States (CONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 1: date of award through 12 months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0003AB
| 361 |
| Each |
M870 ECP OCONUS
M870 Suspension Upgrade Outside Continental United States (OCONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 1: date of award through 12 months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
FRP LVSR Interface ECP Kit
Full Rate Production LVSR Interface ECP Kit - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 1: date of award through 12 months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0004AA
| 386 |
| Each |
FRP LVSR ECP Kit CONUS
Full Rate Production LVSR Interface ECP Kit Continental United States (CONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 1: date of award through 12 months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
0004AB
| 386 |
| Each |
FRP LVSR ECP Kit OCONUS
Full Rate Production LVSR Interface ECP Kit Outside Continental United States (OCONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 1: date of award through 12 months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
| OPTION |
| M870 Limited Reset |
COST
M870 Limited Reset – The Contractor shall perform partial reset in accordance with SOW 4, 11 and Attachment 1 (Over and Above Instructions). ORDERING PERIOD 1: date of award through 12 months.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
Contract Data Requirements List (CDRLs)
Contract Data Requirements List (CDRLs) IAW Exhibits A, B, C, and D. ORDERING PERIOD: date of award through 60 months. Not Seperately Priced.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
M870 Suspension Upgrade ECP
M870 Suspension Upgrade ECP - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 2: 13 Months through 24 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AA
| 361 |
| Each |
M870 ECP CONUS
M870 Suspension Upgrade ECP Continental United States (CONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 2: 13 Months through 24 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1001AB
| 361 |
| Each |
M870 ECP OCONUS
M870 Suspension Upgrade ECP Outside Continental United States (OCONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 2: 13 Months through 24 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
FRP LVSR Interface Kits
Full Rate Production LVSR Interface ECP Kit - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 2: 13 Months through 24 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1002AA
| 386 |
| Each |
FRP LVSR Kit CONUS
Full Rate Production LVSR Interface ECP Kit Continental United States (CONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 2: 13 Months through 24 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
1002AB
| 386 |
| Each |
FRP LVSR Kit OCONUS
Full Rate Production LVSR Interface ECP Kit Outside Continental United States (OCONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 2: 13 Months through 24 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
| OPTION |
| M870 Limited Reset |
COST
M870 Limited Reset – The Contractor shall perform partial reset in accordance with SOW 4, 11 and Attachment 1 (Over and Above Instructions). ORDERING PERIOD 2: 13 Months through 24 Months.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
M870 Suspension Upgrade ECP
M870 Suspension Upgrade ECP - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 3: 25 Months through 36 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AA
| 361 |
| Each |
M870 ECP CONUS
M870 Suspension Upgrade ECP Continental United States (CONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 3: 25 Months through 36 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2001AB
| 361 |
| Each |
M870 ECP OCONUS
M870 Suspension Upgrade ECP Outside Continental United States (OCONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 3: 25 Months through 36 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
FRP LVSR Interface Kits
Full Rate Production LVSR Interface ECP Kit - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 3: 25 Months through 36 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2002AA
| 386 |
| Each |
FRP LVSR ECP Kit (CONUS)
Full Rate Production LVSR Interface ECP Kit Continental United States (CONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 3: 25 Months through 36 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
2002AB
| 386 |
| Each |
FRP LVSR ECP Kit (OCONUS)
Full Rate Production LVSR Interface ECP Kit Outside Continental United States (OCONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 3: 25 Months through 36 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
| OPTION |
| M870 Limited Reset |
COST
M870 Limited Reset – The Contractor shall perform partial reset in accordance with SOW 4, 11 and Attachment 1 (Over and Above Instructions). ORDERING PERIOD 3: 25 Months through 36 Months.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
M870 Suspension Upgrade ECP
M870 Suspension Upgrade ECP - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 4: 37 Months through 48 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
3001AA
| 361 |
| Each |
M870 ECP CONUS
M870 Suspension Upgrade ECP Continental United States (CONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 4: 37 Months through 48 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
3001AB
| 361 |
| Each |
M870 ECP OCONUS
M870 Suspension Upgrade ECP Outside Continental United States (OCONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 4: 37 Months through 48 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
FRP LVSR Interface Kits
Full Rate Production LVSR Interface ECP Kit - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 4: 37 Months through 48 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
3002AA
| 386 |
| Each |
FRP LVSR ECP Kit CONUS
Full Rate Production LVSR Interface ECP Kit Continental United States (CONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 4: 37 Months through 48 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
3002AB
| 386 |
| Each |
FRP LVSR ECP Kit OCONUS
Full Rate Production LVSR Interface ECP Kit Outside Continental United States (OCONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 4: 37 Months through 48 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
| OPTION |
| M870 Limited Reset |
COST
M870 Limited Reset – The Contractor shall perform partial reset in accordance with SOW 4, 11 and Attachment 1 (Over and Above Instructions). ORDERING PERIOD 4: 37 Months through 48 Months.
MAX COST
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
M870 Suspension Upgrade ECP
M870 Suspension Upgrade ECP - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 5: 49 Months through 60 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
4001AA
| 361 |
| Each |
M870 ECP CONUS
M870 Suspension Upgrade ECP Continental United States (CONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 5: 49 Months through 60 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
4001AB
| 361 |
| Each |
M870 ECP OCONUS
M870 Suspension Upgrade ECP Outside Continental United States (OCONUS) - The Contractor shall produce, install and deliver the M870A2-S suspension upgrade ECP IAW SOW 4, 6.2. ORDERING PERIOD 5: 49 Months through 60 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
UNDEFINED
FRP LVSR Interface Kits
Full Rate Production LVSR Interface ECP Kit - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 5: 49 Months through 60 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
4002AA
| 386 |
| Each |
FRP LVSR ECP Kit CONUS
Full Rate Production LVSR Interface ECP Kit Continental United States (CONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 5: 49 Months through 60 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
4002AB
| 386 |
| Each |
FRP LVSR ECP Kit OCONUS
Full Rate Production LVSR Interface ECP Kit Outside Continental United States (OCONUS) - The Contractor shall produce and deliver Full Rate Production LVSR Interface ECP Kits IAW SOW 4. ORDERING PERIOD 5: 49 Months through 60 Months.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| UNDEFINED |
| Each |
| OPTION |
| M870 Limited Reset |
COST
M870 Limited Reset – The Contractor shall perform partial reset in accordance with SOW 4, 11 and Attachment 1 (Over and Above Instructions). ORDERING PERIOD 5: 49 Months through 60 Months.
MAX COST
Section C - Descriptions and Specifications
STATEMENT OF WORK (SOW)
1 OBJECTIVE
The objective of this project is to modify the M870A2-S Medium Heavy Equipment Transporter (hereinafter referred to as M870) to be capable of on/off-road line-haul transportation of equipment, supplies, and current Marine Corps Engineering Vehicles/equipment with payloads up to 40 tons in all terrain environments. This capability is required to be sustained for the foreseeable future, which will require long term sustainment to support an enduring requirement.
2 SCOPE
The scope of this project is to design, develop, produce and install a suspension upgrade solution onto 363 USMC provided [Government Furnished Equipment (GFE)] M870s that provides the ability to line-haul heavy equipment weighing 40 tons or less on and off-road in accordance with (IAW) the M870 specification. The on-road capability, characteristics, and Department of Transportation (DOT) compliance of the prime mover and M870 shall not be diminished to gain off-road capability. The solution must take into account the user interfaces necessary for M870 operations. The primary user is the engineer battalion; however, the M870 will support all manner of movement in on and off-road scenarios. The M870 will use the Logistics Vehicle System Replacement (LVSR) MKR-16 tractor as a prime mover to line-haul heavy equipment along unimproved road surfaces and rough terrain. The scope of this project includes development, production, kitting, and shipping of an LVSR interface Engineering Change Proposal (ECP). The M870 will use the Medium Tactical Vehicle Replacement (MTVR) MK31A1/AMK31A1 tractor as a secondary mover to line-haul heavy equipment (54,000 lb. max.) on improved (hard surface and gravel) road surfaces only. The upgraded M870 must maintain compatibility, at the existing capability documented in TM 11240-15, with the MTVR without requiring any modification to the MTVR.
2.1 BACKGROUND
The existing M870 requires improvements which will maintain the current on-road (paved and improved roads) profile and enhance the M870 off-road capability providing increased operational capabilities on unimproved roads and cross country. The required improvements to the existing M870 requirement is a result of a Capability Requirement Change (CRC) from Director, Capabilities Development Directorate.
3 APPLICABLE DOCUMENTS
The following documents form a part of the SOW to the extent specified herein. The most recent revision of the referenced documents at the time of contract shall be used unless otherwise specified. In the event of conflict between the applicable documents and this SOW, the SOW shall take precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
| 3.1 | MILITARY STANDARDS AND SPECIFICATIONS |
| MS75021E | |
| Connector, Receptacle, Electrical-12 Contact, Inter-vehicular, 28 Volt, Water-Proof |
| MIL-DTL-53022E |
| Primer, Epoxy Coating, Corrosion Inhibiting Lead and Chromate Free |
| MIL-DTL-53030D |
| Primer Coating, Epoxy, Water Reducible, Lead and Chromate Free |
| MIL-DTL-53039E |
| Coating, Aliphatic Polyurethane, Single Component, Chemical Agent Resistant |
| MIL-DTL-53072E |
| Chemical Agent Resistant Coating (CARC) System Application Procedures and Quality Control Inspection |
| MIL-DTL-53084B |
| Primer, Cathodic Electrodeposition, Chemical Agent Resistant |
MIL-DTL-64159B
MIL-DTL-28999C
MIL-HDBK-310
MIL-STD-209K
Camouflage Coating, Water Dispersible Aliphatic Polyurethane, Chemical Agent Resistant Preparation of Instruction-Type Technical Publications Global Climatic Data for Developing Military Products Interface Standard for Lifting and Tie-down Provisions
| MIL-STD-810G(1) |
| Environmental Engineering Considerations and Laboratory Tests |
| MIL-STD-913A |
| Requirements for the Certification of Sling Loaded Military Equipment for External Transportation by Department of Defense Helicopters |
| MIL-STD-1179E |
| Lamps, Reflectors and Associated Signaling Equipment for Military Vehicles |
| MIL-STD-1366E |
| Interface Standard for Transportability Criteria |
| MIL-STD-1472G |
| Human Engineering |
MIL-STD-40051-2
MIL-STD-882E
MIL-STD-130
Preparation of Digital Technical Information for Page-Based Technical Manuals (TMs) Standard Practice for System Safety Identification Marking of U.S. Military Property
3.2 FEDERAL STANDARDS
Federal Standard – Mandatory Compliance 1, Defense Federal Acquisition Regulation Supplement Clause 252.204-7012 (Safeguarding Unclassified Controlled Technical Information) Version 2.0 August 2015 Federal Standard – Mandatory Compliance 2, NIST Special Publication 800-171, Revision 1, Protecting Controlled Unclassified Information in Nonfederal Systems and Organizations Federal Standard – Technical Evaluation Criteria 1, NIST Special Publication 800-171A, Assessing Security Requirements for Controlled Unclassified Information Federal Information Processing Standards (FIPS) 140-2 Federal Motor Carrier Safety Administration Regulations (FMCSR)
| FMCSR 393.9 |
| Operable lamps |
| FMCSR 393.11 |
| Lighting Devices and Reflectors |
| FMCSR 393.17 |
| Lamps and Reflectors Combinations in Drive-away/Tow-away Operation |
| FMCSR 393.19 |
| Requirements for Hazard Warning Signals |
| FMCSR 393.20 |
| Clearance Lamps to Indicate Extreme Width and Height |
| FMCSR 393.22 |
| Combination of Lighting Devices and Reflectors |
| FMCSR 393.23 |
| Power Supply for Lamps |
| FMCSR 393.24 |
| Requirements for Head Lamps, Auxiliary Road Lighting Lamps, and Front Fog Lamps |
| FMCSR 393.25 |
| Requirements for Lamp Other than Head Lamps |
| FMCSR 393.26 |
| Requirements for Reflectors |
| FMCSR 393.27 |
| Wiring Specifications |
| FMCSR 393.28 |
| Wiring Systems |
| FMCSR 393.29 |
| Grounds |
| FMCSR 393.31 |
| Overload Protective Devices |
| FMCSR 393.32 |
| Detachable Electrical Connections |
| FMCSR 393.33 |
| Wiring, Installation |
| FMCSR 393.40 |
| Required Brake Systems |
| FMCSR 393.41 |
| Parking Brake System |
| FMCSR 393.42 |
| Brakes required on all Wheels |
| FMCSR 393.45 |
| Brake Tubing and Hose, Adequacy |
| FMCSR 393.46 |
| Brake Tubing and Hose Connections |
| FMCSR 393.47 |
| Brake Actuators, Slack Adjusters, Linings, Pads, and Drums/Rotors |
| FMCSR 393.48 |
| Brakes to be Operative |
| FMCSR 393.49 |
| Control Valves for Brakes |
| FMCSR 393.50 |
| Reservoirs required |
| FMCSR 393.52 |
| Brake Performance |
| FMCSR 393.53 |
| Automatic Brake Adjusters and Brake Adjustment Indicators |
| FMCSR 393.55 |
| Anti-Lock Brakes |
| FMCSR 393.70 |
| Coupling Devices and Towing Methods, Except for Drive-away/Tow-away Operations |
| FMCSR 393.75 |
| Tires |
| FMCSR 393.86 |
| Rear Impact Guards and Rear End Protection |
| FMCSR 393.100 |
| General Rules for Protection against Shifting or Falling Cargo |
| FMCSR 393.102 |
| Securement Systems |
Federal Motor Vehicle Safety Standards (FMVSS)
| FMVSS 105 |
| Hydraulic and Electric Brake Systems |
| FMVSS 106 |
| Brake Hoses |
| FMVSS 108 |
| Lamps Reflective Devices and Associated Equipment |
| FMVSS 119 |
| New Pneumatic Tires for Vehicles other than Passenger Cars |
| FMVSS 120 |
| Tire Selection and Rims for Motor Vehicles other than Passenger Cars |
| FMVSS 121 |
| Air Brake Systems |
| FMVSS 223 |
| Rear Impact Guards |
| FMVSS 224 |
| Rear Impact Protection |
| 3.3 | OTHER STANDARDS |
| Commercial or Industry Standards |
| (CID) A-A-1927D |
| Padlock |
| (CID) A-A-52474B |
| Electro-coating Primer |
| (CID) A-A-59133B |
| Cleaning Compound, High Pressure (Steam) Cleaner |
NATO Standardization Agreement (STANAG)
| STANAG 4007 |
| Electrical Connectors Between Tractors and Trailers |
STANAG 4009
STANAG 4101
Fifth Wheel Attachments and 3.5” NATO Kingpin Towing Attachments, dated 000221
| STANAG 4381 |
| Blackout Lighting Systems for Tactical Landing Vehicles |
International Organization for Standardization (ISO)
| ISO 668:2013 |
| Series I Freight Containers - Classification, Dimensions & Ratings |
| ISO 1161 |
| Series I Freight Containers - Corner Fittings Specification |
| ISO 1496-5 |
| Series 1 Freight Containers-Platform and Platform Based Containers |
Test Procedures
| AVTP 03-160W |
| Dynamic Stability |
| GM 9540P |
| Accelerated Corrosion Test, General Motors Co., dated 971201 |
| TOP 1-2-500w C1 |
| Transportability |
| TOP 2-2-612 |
| Deep Water Fording |
| TOP 2-2-610 |
| Gradeability and Side Slope |
| TOP 2-2-800 |
| Weight Distribution/Center of Gravity |
| TOP 2-2-608w C1-2 |
| Braking |
| TP-94-01 |
| Transportability Testing Procedures |
| TP-105-03 |
| Laboratory Test Procedure for FMVSS 105 Hydraulic and Electric Brake Systems |
| TP-106-10 |
| Laboratory Test Procedure for FMVSS 106 Brake Hoses |
| TP-108-13 |
| Laboratory Test Procedure for FMVSS 108 Lamps Reflective Devices and Associated Equipment |
| TP-119-04 |
| Laboratory Test Procedure for FMVSS 119 New Pneumatic Tires for Vehicles other than Passenger Cars |
| TP-120-03 |
| Laboratory Test Procedure for FMVSS 120 Tire Selection and Rims for Motor Vehicles other than Passenger Cars |
| TP-121-V05 |
| Laboratory Test Procedure for FMVSS 121 Air Brake Systems |
| TP-223-00 |
| Laboratory Test Procedure for FMVSS 223 Rear Impact Guards |
3.4 OTHER GOVERNMENT DOCUMENTS
NIST Special Publication 800-53
| N/A |
| M870 Performance Specification |
| SIAT-HDBK-001 |
| Systems Engineering Technical Review (SETR) Handbook |
| NAVMC 10284 (REV. 4-95) |
| Limited Technical Inspection – Motor Transportation (4730) |
| TB 750-93-1 |
| Functional Grouping Codes: Combat, Tactical, and Support Vehicles and Special Purpose Equipment |
| MTMCTEA PAM 55-19 |
| Tie-down Handbook for Rail Movements, dated May 2000 |
| MTMCTEA PAM 700-4 |
| Vessel Characteristics for Ship Loading |
| SDDC TEA 70-1 |
| Transportability for Better Strategic Mobility, Sept 2003 |
| TM 07862C-OI |
| System Operation and Maintenance with Repair Parts, Medium Heavy Equipment Transporter (MHET) Model M870A2/M870A2S |
| TM 55-2200-001-12 |
| General Rules Governing the Loading of Commodities on Open Top Cars, Association of American Railroads (AAR), dated 2000 |
TM 4795-34/2
TM 11240-15/B
Rust Proofing and Underbody Coating Procedures for Tactical Vehicles, Trailers, and Underbody Equipment Principle Technical Characteristics of U.S. Marine Corps Motor Transportation Equipment
TM 11316A/ 12493A-OD/1A
TM 11165A-OR/A
TM 4750-15/1
TM 4750 – 0D/2
LCAC SEA-OPS
DoD 4160.21M System Operational Manual with Components List for Truck, Tractor MKR16/AMKR 16 LVSR Technical Manual, System Operation Manual for Truck, Tractor, 7-Ton MK31 Painting and Registration Marking Painting and Registration Marking for Marine Corps Combat and Tactical Equipment Vehicle Loading Pocket Handbook, Volume IV, Revision 3, Part 2, dated 2004 Defense Material Disposition
| 3.5 | NON-GOVERNMENT DOCUMENTS |
| ASTM A 653/A/02 | |
| Standard Specification for steel, zinc-coated (galvanized), dated 020610 |
| ASTM G82-14 |
| Standard Guide for Development and Use of a Galvanic Series for Predicting Galvanic Corrosion Performance, dated 980910 |
ASTM D2000-12
ASTM D4169-01
Standard Classification System for Rubber Products in Automotive Applications, dated 001110 Standard Practice for Performance Testing of Shipping Containers and Systems, Acceptance
| ASTM D3951-10 |
| Standard Practice for Commercial Packaging, dated 980801 |
| AWS D1.1-02 |
| Welding Structural Welding Code- Steel |
| AWS D1.2/D1.2M |
| Welding Structural Welding Code-Aluminum |
| AWS D1.3-98 |
| Welding Structural Welding Code-Sheet Steels |
SAE GEIA-STD-0007-B
SAE GEIA-HB-0007
SAE J163
Logistics Product Data, Provisioning
Logistics Products Data Handbook
Low Tension Wiring and Cable Terminals and Splice Clips, dated 011201
| SAE J294 |
| Service Brake Structural Integrity Test Procedure—Vehicles over 4500 kg (10 000 lb.) GVWR, dated 2011-05-19 |
| SAE J684 |
| Trailer Couplings, Hitches, and Safety Chains, dated 2014-05-13 |
| SAE J318 |
| Air Brake Gladhand Service (Control) and Emergency (Supply) Line Couplers - Trucks, Truck-Tractors and Trailers, dated 2013-05-28 |
| SAE J682 |
| Rear Wheel Splash and Stone Throw Protection, dated 2011-05-17 |
| SAE J1292 |
| Automobile, Truck, Truck-Tractor, Trailer and Motor Coach Wiring, dated 2008-01-25 |
| SAE J1404 |
| Service Brake Structural Integrity Requirements - Vehicles over 10,000 lb. (4500 kg) GVWR, dated 2007-05-17 |
| SAE J2014 |
| Pneumatic Tires for Military Tactical Wheeled Vehicles, dated 2013-03-22 |
| SAE J2180 |
| A Tilt-table Procedure for Measuring the Static Rollover Threshold for Heavy Trucks, dated 2011-05-17 |
| SAE J2181 |
| Steady-State Directional Control Test Procedures for Passenger Cars and Light Trucks, Issued 2011-09-12 |
4 SPECIFIC REQUIREMENTS
For the purposes of this document, the M870 suspension upgrade and integration, and LVSR interface ECP shall be referred to as the, “Upgrades.” Any reference in this document to the “Upgrades” shall be construed to apply to the M870 suspension upgrade and integration and LVSR interface ECP unless expressly stated otherwise. In fulfilling the specified requirements, the Contractor shall:
1. Conduct a Limited Technical Inspection (LTI) of each Government provided M870 during induction (prior to disassembly) in order to establish the condition prior to the installation of the Off-Road upgrade solution and document the results utilizing NAVMC 10284 (REV. 4-95). The Contractor shall document any vehicle discrepancies that may impact or prevent successful modification and fielding of the M870. Through the delivery of CDRL A025, the Contractor shall notify the Government of the discrepancies and request guidance on how to resolve these discrepancies. The Contractor shall submit a cost proposal to the Government to perform the repairs identified during the LTI. The Government will review and provide a response. If the Government authorizes repairs, the Contractor will proceed with the Over and Above Process as outlined in Section 11.
1. Perform an LTI upon the receipt of the LVSR Tractor in accordance with TM 11316A/12493A-OD/1A and MTVR in accordance with TM 11165A-OR/A. The Contractor shall utilize NAVMC 10284 and provide a copy of the form to the Government.
1. Develop the M870 suspension upgrade IAW the Performance Specification (P-Spec).
1. Integrate the suspension upgrade solution onto the M870s in accordance with the Contractor-developed, Government-approved installation instructions (CDRL C004). Deliver two (2) upgraded M870s no later than six (6) months after contract award for Government First Article Testing. Upon approval of the M870 ECP and successful Physical Configuration Audit (PCA), the Contractor shall be capable of producing no fewer than eight (8) upgraded M870s per month. The Contractor shall determine and be responsible for the demilitarization and disposal of parts and components that are no longer required in the final product, with Government concurrence. Demilitarization will be performed in accordance with DoD 4160.21M.
1. Conduct a final inspection of each M870 after suspension upgrade installation and re-assembly prior to presentation to the Government inspector for acceptance. The results of the final inspection(s) shall be documented in the Final Inspection Record (FIR) (CDRL A026). The FIR shall document any vehicle discrepancies not related to the Upgrade installation that may have resulted from the disassembly, Upgrade installation, and reassembly process. The Contractor shall be responsible for correction of all such deficiencies at no cost to the Government. Upon successful final inspection, the Contractor shall be responsible for shipping the upgraded trailer to the final destination based on Government instruction.
1. Design, produce, kit, and ship the Government approved LVSR interface ECP IAW the P-Spec. Deliver two (2) LVSR interface ECPs, one installed on the LVSR and one not installed on an LVSR, no later than six (6) months after contract award for Government First Article Testing. Upon approval of the LVSR interface ECP and successful PCA, the Contractor shall produce 388 LVSR interface ECP kits within 12 months. The contractor shall be capable of producing no fewer than twenty five (25) LVSR interface ECP kits a month. This requirement includes development of Government-approved installation instructions.
CDRL A025 – LIMITED TECHNICAL INSPECTION
CDRL A026 – FINAL INSPECTION RECORD
CDRL C004 – PREPARATION OF DIGITAL TECHNICAL INFORMATION FOR PAGE BASED TECHNICAL MANUALS – INSTALLATION INSTRUCTIONS
5 PROGRAM MANAGEMENT
The Contractor shall establish and maintain program management practices throughout the period of performance.
CDRL A007 – PROGRAM MANAGEMENT PLAN
CDRL A008 – CONTRACTOR’S PROGRESS, STATUS AND MANAGEMENT REPORT
5.1 SUBCONTRACTOR MANAGEMENT
The Contractor shall be responsible for performance of requirements delineated in this SOW and shall institute appropriate management actions relative to any Subcontractor performance. Requirements that are contractually specified shall apply to Subcontractor performance; however, the Contractor shall be accountable for compliance of their Subcontractors and is responsible for ensuring all deliverable products comply with the contract requirements.
5.2 DATA MANAGEMENT
The Contractor shall provide a data management plan. The data management plan shall address the Contractor’s plan for maintaining documentation during the life of the contract; Integrated Master Schedule (IMS) updates, and delivery of documentation.
The Contractor shall provide a semi-annual report on the delivery of the following CDRLs.
CDRL A001 – CONTRACTOR’S DATA MANAGEMENT PLAN
CDRL A002 – TECHNICAL REPORT STUDY/SERVICES - DATA MANAGEMENT REPORT
5.3 GOVERNMENT FURNISHED EQUIPMENT (GFE) AND GOVERNMENT FURNISHED INFORMATION (GFI) The GFE/GFI is defined as tangible property in the form of Equipment (GFE) (including, but not limited to, the M870A2-S MHET, LVSR tractor and MTVR tractor) and Information (GFI) (including, but not limited to, technical data, manuals, course materials) that is owned by the U.S. Government and is subsequently made available to the Contractor. A list of applicable GFE/GFI will be provided in Section J. (List of Documents, Exhibits, and Other Attachments).
5.3.1 CONTRACTOR RECORDS
The Contractor shall maintain a record of GFE and GFI items. Data in GFE and GFI records should, at a minimum, include: item identifiers (nomenclature, quantity, National Stock Numbers (NSNs) and/or part number), date received, condition of item on receipt, date the item was returned to Government, and condition of the item when returned. The Contractor and the Government shall jointly review and reconcile their GFE and GFI records on a quarterly basis. The Contractor shall provide a copy of the receipt of the GFE/GFI delivery to the Government in accordance with CDRL B001 requirements.
The Government will notify the Contractor of the availability of GFE. Items shall be provided to the Contractor from existing inventory. The Contractor shall provide for accountability, security, and storage for the GFE provided. The Contractor shall inspect and inventory all GFE received under this contract. The Contractor shall identify and report any discrepancies, deficiencies, damages to the Government in accordance with CDRL B002. A complete GFE / GFI list will be provided at the post award conference.
CDRL B001 – RECEIPT OF GOVERNMENT MATERIEL REPORT
CDRL B002 – GOVERNMENT FURNISHED EQUIPMENT/INFORMATION DEFICIENCY REPORTS
5.4 RISK MANAGEMENT
The Contractor shall identify, manage, and mitigate any potential program risks affecting the design, testing, integration and delivery of the upgrades. The Contractor shall provide a Risk Management Report that will be used to monitor management, cost, and schedule of tasks relative to the upgrades. The Risk Management Report shall include reporting critical risks and associated mitigation actions.
CDRL A003 – RISK MANAGEMENT STATUS REPORT
5.5 SCHEDULE PLANNING
The Contractor shall maintain an accurate schedule of program events and recommended program schedules, including review and evaluation techniques. The Contractor shall notify the Government in writing of any anticipated or projected work stoppages or delays that shall impact schedules within five (5) calendar days of Contractor determination.
The Contractor shall develop an IMS which includes all significant events and depicts major tasks and events from start to completion of the contract. The Contractor shall incorporate the IMS into the quarterly Program Management Reviews.
CDRL A004 – INTEGRATED MASTER SCHEDULE (IMS)
5.6 MEETINGS/CONFERENCES/REVIEWS
The Contractor shall support required meetings, conferences, and reviews. Persons who are subject matter experts (SMEs) and are familiar with the issues to be discussed shall be in attendance. The Contractor shall have at least one representative in attendance at meetings who has the actual authority to address issues. The Contractor shall provide, agendas, meeting content, and meeting minutes associated with the meetings.
The Contractor shall submit an agenda, read-ahead package, and briefing charts not less than ten (10) calendar days prior to each meeting. All agendas shall be in a Government-approved Contractor format. All minutes shall be in Government approved Contractor format.
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
5.6.1 POST AWARD CONFERENCE (FAR 42.503)
The Contractor shall host a post award conference at its facility or at a Government approved location within thirty (30) calendar days after contract award. The Government shall be given at least fourteen (14) calendar days advance notice of the time, date, and location of the post award conference. The preferred method of notification is by email to the Contracting Officer (KO).
Discussions at the meeting shall include, but are not limited to: a complete review of all contract documents; the Contractor’s overall Program Management Plan; the Contractor’s IMS; the Contractor’s initial Manufacturing Plan; risk areas and mitigation plans; other technical area requirements, such as Engineering, Logistics and Quality Assurance (QA), and discussions of Contractor standard Cost and Software Data Reporting (CSDR) process. The KO will chair the post award conference.
5.6.1.1 PUBLICATIONS START OF WORK MEETING
In conjunction with the post award conference, the Contractor shall conduct a Publication Start of Work meeting at its facility. The purpose of this meeting is to review publications, contract requirements, and establish lines of communications.
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL A007 – PROGRAM MANAGEMENT PLAN
CDRL A008 – CONTRACTOR’S PROGRESS, STATUS AND MANAGEMENT REPORT
5.6.1.2 ENGINEERING START OF WORK MEETING
In conjunction with the post award conference, the Contractor shall conduct an Engineering Start of Work meeting at its facility. Discussions at the meeting will be Systems Requirements Review and System Functional Review. The Contractor shall present the engineering strategy to solve the technical requirements and meet the requirements in the performance specifications. Topics covered shall include but are not limited to those outlined in SIAT-HDBK-001, Appendices C and D.
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL A009 – TECHNICAL REPORT - STUDY/SERVICES - TECHNICAL PRESENTATIONS AND ENGINEERING REPORTS
5.6.1.3 CONFIGURATION MANAGEMENT (CM) START OF WORK MEETING
In conjunction with the Engineering Start of Work meeting, the Contractor shall conduct a CM start of work meeting. The Contractor shall, as a minimum, brief their draft CM Plan, schedules and key CM milestones, and required deliverables for the upgrades.
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL B006 – CONFIGURATION MANAGEMENT PLAN
5.6.2 PROGRAM MANAGEMENT REVIEWS (PMR)/PROGRAM STATUS REVIEWS (PSR)
The Contractor shall conduct quarterly PMRs/PSRs at its facility or a mutually agreed upon location. The initial PMR/PSR shall be held no later than six (6) months after contract award. Following the initial reviews, PMR/PSRs shall be held quarterly throughout the period of performance of the contract. The purpose of these reviews shall be to assess the Contractor's ongoing effort to meet the contract requirements. The focus at each subsequent PMR shall be on progress since the last PMR. At a minimum, the Contractor shall discuss the analysis of problem areas, evaluation of schedules; all risk areas and risk mitigation efforts, quality assurance management, and the status of all Integrated Logistic Support (ILS) elements.
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
5.6.3 PROVISIONING CONFERENCE
A provisioning conference will be held thirty (30) calendar days after the acceptance of CDRL D006, Engineering Data for Provisioning (EDFP). The Contractor shall host the conference at the Contractor’s facility. The focus of the conference is to "drill down" from the top level assembly to determine which level of maintenance for the Line Replaceable Unit (LRU) or maintenance tasks can be completed where and by whom. To that end, the Contractor shall provide and disassemble production equipment, as directed by the Government, to validate and verify all provisioning documentation for the upgrades.
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL D006 – ENGINEERING DATA FOR PROVISIONING (EDFP)
5.6.3.1 PROVISIONING GUIDANCE CONFERENCE (PGC)
The Contractor shall host the PGC in conjunction with the Production Readiness Review (PRR). The PGC shall identify the specific provisioning requirements to be implemented on the upgrade program. The Government will clarify any provisioning issues during the evolution of the data review process.
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
5.6.4 TECHNICAL REVIEWS
The Contractor shall participate, as required, in technical reviews for the upgrades. Formal reviews shall be event-driven and conducted as the upgrades are being developed. The Contractor and Government shall hold Technical Interchange Meetings (TIM’s) to brief, identify and discuss the program technical status. Technical Issues, accomplishments, problems and their mitigation solutions, and documentation on the technical maturity of the system are examples of topics to be discussed and reviewed. The TIM’s will serve as a forum for problem solving and information sharing and be held bi-weekly or at a minimum, once a month.
5.6.4.1 PRELIMINARY DESIGN REVIEW (PDR)
The Contractor shall conduct a PDR. The PDR shall establish the allocated baseline to ensure the upgrades have a reasonable expectation of being operationally effective and suitable. The PDR shall be conducted once the baseline supports detailed design of hardware. The Contractor shall provide a Requirements Traceability Matrix (RTM) that demonstrates the design provided at PDR meets or exceeds the performance requirements.
Topics covered at the PDR shall include but are not limited to those listed in SIAT-HDBK-001, Appendix F.
CDRL A004 – INTEGRATED MASTER SCHEDULE (IMS)
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL A010 – TECHNICAL REPORT - STUDY/SERVICES - PRELIMINARY DESIGN REVIEW (PDR) REPORT CDRL A015 –TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM)
5.6.4.2 CRITICAL DESIGN REVIEW (CDR)
The Contractor shall conduct a CDR. The CDR establishes the product baseline and ensures the detailed design is satisfactory to start initial manufacturing and integration. Configuration items of the initial product baseline shall be reviewed individually to ensure proper integration, system compatibility at the interface boundaries, and requirements compliance. The CDR shall be conducted once 90 percent of the product drawings and instructions are reviewed by the Government and deemed complete. The Contractor shall provide an RTM that demonstrates the design furnished at CDR meets or exceeds the performance requirements of the upgrades. Topics covered at the CDR shall include, but not be limited to, those listed in SIAT-HDBK-001, Appendix H.
CDRL A004 – INTEGRATED MASTER SCHEDULE (IMS)
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL A011 – TECHNICAL REPORT – STUDY/SERVICES - CRITICAL DESIGN REVIEW (CDR) REPORT CDRL A015 – TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM)
5.6.4.3 TEST READINESS REVIEW (TRR)
A TRR shall be held at a government approved location no later than thirty (30) calendar days prior to the start of Production Verification Test (PVT). The TRR shall ensure the test items are ready for test and confirm all test resources have been identified, made available and are coordinated to support testing. Discussions at the meeting shall include but are not limited to those listed in SIAT-HDBK-001, Appendix K.
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL A027 – CONTRACTOR TEST PLAN
0. SYSTEM VERIFICATION REVIEW (SVR)
The contractor shall conduct an SVR to formally evaluate that the upgrade requirements have been met and ensure the upgrades can enter production. The contractor shall identify all performance requirements and provide any performance metrics that have not been achieved. The SVR will occur once the upgrades have completed testing and documentation has been validated. Topics shall include but are not limited to those identified in SIAT-HDBK-001, Appendix L.
CDRL A004 – INTEGRATED MASTER SCHEDULE (IMS)
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL A015 –TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM) CDRL A033 – TECHNICAL REPORT – STUDY/SERVICES – SYSTEM VERIFICATION REVIEW (SVR) REPORT
5.6.4.5 PRODUCTION READINESS REVIEW (PRR)
The Contractor shall conduct a PRR at their facility to formally evaluate production readiness, identify existing or projected manufacturing problems, and identify areas of risk for the upgrades. The Production process will be evaluated against the System requirements to verify no production processes will degrade the systems performance. The Contractor shall identify any manufacturing changes between First Articles and Full Rate Production. The PRR shall be held when the system has been verified and all production documents are available. Topics to be covered at the PRR shall include but is not limited to those in SIAT-HDBK-001, Appendix M.
CDRL A004 – INTEGRATED MASTER SCHEDULE (IMS)
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
CDRL A012 – TECHNICAL REPORT - STUDY SERVICES – PRODUCTION READINESS REVIEW (PRR) REPORT
CDRL A013 – MANUFACTURING PLAN
5.6.4.6 SYSTEM SAFETY WORKING GROUP (SSWG)
The Contractor shall conduct a SSWG at the direction of the Government. The Government will chair and be a voting member of the SSWG. At least one (1) representative from the Contractor and any major Subcontractors shall be present at each SSWG. The SSWG’s primary function shall be to ensure all environmental, safety, and occupational health issues, as well as all identified hazards, are adequately addressed; to ensure the safe, manned operation of the vehicle(s) during Government testing and fielding. The SSWG meetings will be held via teleconference. The SSWG may address any issues related to System Safety. Typically these issues include but are not limited to:
| a. | Reviewing ESOH program status; |
| b. | Summarizing hazard analysis; |
| c. | Presenting incident assessments for system mishaps or malfunctions; |
| d. | Presenting status of assigned actions; and |
| e. | Identifying ESOH deficiencies requiring further test and evaluation. |
CDRL A005 – CONFERENCE AGENDA
CDRL A006 – CONFERENCE MINUTES
| 6 | ENGINEERING |
| 6.1 | DESIGN AND ENGINEERING |
The Contractor shall design the M870 suspension upgrade and corresponding LVSR interface ECP to fulfill the requirements in the P-Spec. Where feasible, the Contractor shall choose provisioned items to support the specifications provided in the P-Spec including products, practices and tools.
6.2 INTEGRATION
The Contractor shall integrate all production M870A2-S with the suspension upgrades in accordance with the M870 performance specification.
The Contractor shall provide two (2) First Article Test (FAT) assets (M870A2-S with upgraded suspension integrated), one (1) stand-alone LVSR tractor ECP kit and one (1) LVSR tractor with ECP kit installed to a test facility to be identified by the Government at a later date.
During first article testing phases, the Contractor shall be responsible for any design, installation, or instruction issues that occur during the initial integration of the upgrades.
CDRL C004 – PREPARATION OF DIGITAL TECHNICAL INFORMATION FOR PAGE BASED TECHNICAL MANUALS – INSTALLATION INSTRUCTIONS
6.3 REQUIREMENTS TRACEABILITY MATRIX (RTM)
The Contractor shall develop and deliver an RTM. The RTM uniquely identifies program requirements to ensure that the requirements can be traced and verified through the design, build, test, and verification phases of development. The RTM shall be updated with each approved analysis and test event.
CDRL A015 –TECHNICAL REPORT - STUDY SERVICES – REQUIREMENTS TRACEABILITY MATRIX (RTM)
6.4 SOURCE CONTROL AND VENDOR ITEM DRAWINGS
The Contractor shall prepare (IAW ASME Y14.24 and MIL-STD-31000) and deliver source control and vendor item drawings for the upgrades. Source control and vendor item drawings shall have two (2) or more sources of supply listed. The Contractor shall look for parts, components, subassembly or assemblies of currently existing sources of supply in the Governments supply system to determine if the Government part already exists. When choosing design solutions of items that have an established NSN, the Contractor shall validate that the solution meets all design specification reliability, performance, and space requirements.
CDRL B003 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
CDRL B004 – ENGINEERING DRAWINGS
6.5 REQUIREMENTS FOR SOURCE CONTROL DRAWINGS (SCDS)
Requirements for SCDs shall conform to the following:
| a. | Maximum use of commercially developed components is essential. First design choice should be the use of an existing Government item readily available in the Government supply system. |
| b. | In order to assure life cycle competition for Non-Developmental Items (NDI), use of SCDs shall be minimized. When it becomes apparent to the Contractor that an SCD or model is in the best interest of the Government, a recommendation shall be made to the Program Office’s CM Representative including the results of a market survey which led to the recommended selection. No SCD shall be prepared by the Contractor, nor shall the Contractor assume that the Government shall accept the source control recommendation, unless specific written approval is provided by the KO. |
| c. | The NDIs shall not be fully detailed unless it can be demonstrated by the Contractor that such detailing does not impair the life cycle competitiveness of the item. |
| d. | Provisioned parts for source controlled items shall be depicted on the models metadata attributes after a maintenance evaluation has been completed and repair part selection validated. In the event such maintenance evaluation has not been prescribed within the scope of this contract, even though the component is known to be repairable, no provisioned parts listing shall be shown on the drawings or models. |
| e. | All SCDs and models shall contain sufficient information, IAW ASME Y14.100, for the Government to procure and accept a part or component under a secondary item procurement contract and to qualify additional sources. Acceptance criteria and processes on any SCD and models shall, to the extent practical, be similar to what that supplement accomplishes when the item is purchased by other commercial or military agencies. |
CDRL B003 – PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS
CDRL B004 – ENGINEERING DRAWINGS
6.5.1 FIRST ARTICLE INSPECTION (FAI)
Prior to the beginning of the FAI, the Contractor shall prepare a recommended inspection plan for the First Article item(s) and submit for Government approval. As part of this plan, the Contractor shall provide a list and time schedule of the FAI including anticipated completion dates.
The production contract requirements that are to be validated during the FAI are as follows:
| a. | Manufacturing plan |
| b. | Quality planning |
| c. | Subcontractor and supplier quality assurance |
| d. | Subcontractor and supplier quality documentation |
| e. | Welding requirements |
The FAI plan shall evaluate instructions for the installation of the upgrades. The FAI shall be representative of items to be manufactured using the same process, facilities and procedures as will be used for full-rate production. Failure to submit a complete list and schedule to the Government will not relieve the Contractor of First Article Inspection. Delays in schedule as a result of the Contractor's failure to identify the FAI articles requiring FAI will be the responsibility of the Contractor.
The Contractor shall perform FAI on the Upgrades. The Government reserves the right to be present at any such inspection.