Exhibit_B_-_Engineering_Contract_Data_Requirements_List_(B001-B017).docx

DOCX document 122 KB Posted

Attached to
M870 ECP Pre-Solicitation Notice Federal contract opportunity
Solicitation number
M67854-19-R-0013
Issued by
United States Marine Corps

About this file

This Contract Data Requirements List outlines 17 data items required under an engineering contract for upgrading the suspension system on the M870A2-S Medium Heavy Equipment Transporter. Key requirements include delivery of receipt reports for government materials on a quarterly basis, status reports for government furnished equipment and information, engineering drawings and models to support competitive procurement and maintenance, a corrosion prevention and control plan, a contractor configuration management plan, engineering change proposals, audit reports, and a technical data package. Submission methods, distribution statements, and points of contact are provided for each data item.

This pre-solicitation notice is for a small business set-aside contract to produce and install an upgraded suspension system for 308 M870A2-S Medium Heavy Equipment Transporters used by the United States Marine Corps. The selected contractor must be capable of supplying equipment, training, and spare parts support. The Marine Corps intends to award a single indefinite delivery/indefinite quantity firm-fixed-price contract with cost reimbursable contract line items based on best value. The final request for proposal is expected to be released soon, with proposals due within 45 days and contract award anticipated in fiscal year 2019. The place of performance will be at the contractor's facility within the United States.

Exhibit B - Engineering CDRLs

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

TBD

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

RECEIPT OF GOVERNMENT MATERIAL REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80389B

5. CONTRACT REFERENCE

SOW Paragraph(s): 5.3.1

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

QTRLY

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – Consolidated report shall be submitted 15 calendar days after the end of each quarter. The Government requires 15 calendar days to review and comment. Final report will be provided to the Government within 5 calendar days after receipt of Government comments.

BLK 13 – Subsequent submissions shall be submitted 15 calendar days after the end of each quarter ending in March, June, September and December. The Government requires 15 calendar days to review and comment. Final report will be provided to the Government within 5 calendar days after receipt of Government comments.

BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite in an approved Contractor format. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV) 2200 Lester Street, Quantico, VA 22134-6050

COR - lulu.rodriguez-king@usmc.mil

15. TOTAL ---------

G. PREPARED BY

Mrs. Lulu Rodriguez-King

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

STATUS OF GOVERNMENT FURNISHED EQUIPMENT (GFE) /INFORMATION DEFICIENCY REPORTS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80269 / DI-MGMT-80596

5. CONTRACT REFERENCE

SOW Paragraph(s): 5.3.1

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 –Reports shall be submitted 10 calendar days after identification of GFE/GFI deficiency. The Government requires 15 calendar days to review and comment. Final report will be provided to the Government within 5 calendar days after receipt of Government comments.

BLK 13 – Subsequent submissions shall be submitted 30 calendar days after Government request. The Government requires 15 calendar days to review and comment. Final report will be provided to the Government within 5 calendar days after receipt of Government comments.

BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite in an approved Contractor format. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000

5. CONTRACT REFERENCE

SOW Paragraph(s): 6.4, 6.5

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

Product Drawings/Models and Associated Lists provide engineering data to support competitive procurement and maintenance for items interchangeable with the original items. This data represents the highest level of design disclosure.

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – The Contractor shall provide the final TDP 10 calendar days after formal ECP approval.

BLK 13 – Subsequent submissions shall be provided to the Government 10 calendar days after formal ECP approval.

BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite in an approved Contractor format. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

ENGINEERING DRAWINGS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

MIL-STD-3100 / ASME Y14.24

5. CONTRACT REFERENCE

SOW Paragraph(s): 6.4, 6.5

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – The initial submission of the Engineering Drawing Package shall be presented at the CDR for each modernization effort. Government shall provide comments back to the Contractor within 15 calendar days. Final shall be delivered as part of the TDP.

BLK 13 – Subsequent submissions of the Engineering Drawing Package shall be presented at the CDR. Government shall provide comments back to the Contractor within 15 calendar days. Final shall be delivered as part of the TDP.

BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite in an approved Contractor format. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B005

2. TITLE OF DATA ITEM

CORROSION PREVENTION AND CONTROL PLAN

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MFFP-81403

5. CONTRACT REFERENCE

SOW Paragraph(s): 6.7

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – The contractor shall provide the requested document within 60 calendar days after contract award. The Government requires 15 calendar days to review and comment. Submit final, with Government comments incorporated, 10 calendar days after receipt of Government comments.

BLK 13 – Subsequent submissions shall be provided upon changes in materials, coatings, or corrosion prevention methods during the course of production. The contractor shall provide the requested document within 30 calendar days after changes are identified. The Government requires 15 calendar days to review and comment.

Submit final, with Government comments incorporated, 10 calendar days after receipt of Government comments.

BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite in an approved Contractor format. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B006

2. TITLE OF DATA ITEM

CONTRACTOR’S CONFIGURATION MANAGEMENT

PLAN

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80858B

5. CONTRACT REFERENCE

SOW Paragraph(s): 5.6.1.3, 8.1

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – The contractor shall provide the plan at the CM Start of Work Meeting. Updates shall be required after each CM process change. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.

BLK 13 – The Contractor shall provide subsequent revisions within 30 calendar days after the revision is identified. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.

BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite in an approved Contractor format. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B007

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80639

5. CONTRACT REFERENCE

SOW Paragraph(s): 6.7, 8.2, 10.1.7

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 10 – The Contractor shall provide an ECP for each modification or change.

BLK 12 – The Contractor shall submit the first ECP within 30 calendar days of formal request. Upon receipt of ECP, the Government shall have 2 calendar days to review an Emergency ECP, 5 calendar days to review an Urgent ECP and 14 calendar days to review a Routine ECP. The Contractor shall have 14 calendar days to resolve ECP discrepancies unless specified by the Government.

BLK 13 – Subsequent submissions, the Contractor shall submit the ECP within 30 calendar days of formal request. Upon receipt of ECP, the Government shall have 2 calendar days to review an Emergency ECP, 5 calendar days to review an Urgent ECP and 14 calendar days to review a Routine ECP. The contractor shall have 14 calendar days to resolve ECP discrepancies unless specified by the Government.

ECP identifying numbers shall be assigned by the Government. The numbering sequence shall run consecutively and shall not total over 15 characters, to include any dashes or revision identifiers. The ECP number shall be unique once assigned and retained for all subsequent submissions. The same ECP number may be used for related ECPs by adding a dash number to the basic number. The Contractor may submit revised ECPs by using the original number and adding a suffix of “R1”,”R2”…

BLK 14 - The submission shall utilize DD FORM 1692, which can be found at http://everyspec.com/DoD/DoD.../DD_FORM_1692_APR2016_55519/ to be delivered via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

TBD

F. CONTRACTOR

1. DATA ITEM NO.

B008

2. TITLE OF DATA ITEM

REQUEST FOR VARIANCE (RFV)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80640D

5. CONTRACT REFERENCE

SOW Paragraph(s): 8.2

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 10 – The Contractor shall provide an ECP for each modification or change.

BLK 12 – The Contractor shall submit the first RFV when the requirement for a variation is first identified. Upon receipt of RFV, the Government shall have 2 calendar days to review a Major RFV, 5 calendar days to review a Minor RFV. The Contractor shall have 14 calendar days to resolve RFV discrepancies unless specified by the Government.

BLK 13 – Subsequent submissions, the Contractor shall submit the RFV when the deviation is identified. The Contractor shall submit the first RFV when the deviation is first identified. Upon receipt of RFV, the Government shall have 2 calendar days to review a Major RFV, 5 calendar days to review a Minor RFV. The Contractor shall have 14 calendar days to resolve RFV discrepancies unless specified by the Government.

RFV identifying numbers shall be assigned. The numbering sequence shall run consecutively and shall not total over 15 characters, to include any dashes or revision identifiers. The RFV number shall be unique once assigned and retained for all subsequent submissions. The Contractor may submit revised RFVs by using the original number and adding a suffix of “R1”,”R2”…

BLK 14 – The submission shall be prepared and delivered utilizing the electronic version of DD Form 1694, Request for Variance (RFV), which is available online at: http://www.dtic.mil/whs/directives/forms/index.htm. The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B009

2. TITLE OF DATA ITEM

NOTICE OF REVISION (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-80642D

5. CONTRACT REFERENCE

SOW Paragraph(s): 8.2, 10.1.7

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 - The Contractor shall submit the first NOR when the revision is first identified. Upon receipt of NOR, the Government shall have 5 calendar days to comment. The Contractor shall have 14 calendar days to resolve NOR discrepancies unless specified by the Government.

BLK 14 – The submission shall be prepared and delivered utilizing the electronic version of DD Form 1695, Notice Of Revision (NOR) only, which is available online at: http://www.dtic.mil/whs/directives/forms/index.htm. The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B010

2. TITLE OF DATA ITEM

TECHNICAL REPORT - STUDY SERVICES

3. SUBTITLE

CONFIGURATION CHANGE DOCUMENT

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508

5. CONTRACT REFERENCE

SOW Paragraph(s): 8.2.1

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – The Contractor shall provide the requested report within 30 calendar days after required revisions. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.

BLK 13 – The Contractor shall provide subsequent revision within 30 calendar days after it is determined necessary. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.

BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B011

2. TITLE OF DATA ITEM

CONFIGURATION STATUS ACCOUNTING (CSA)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81253C

5. CONTRACT REFERENCE

SOW Paragraph(s): 8.3

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

MONTHLY

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – Initial submission shall be provided to the Government the first Friday of the month after completion of the first production unit of the items established to be tracked.

BLK 13 – Subsequent submissions shall be provided to the Government as changes occur to items established to be tracked or as new productions units are delivered to the Government. Report is due to the Government on the first Friday of the month. If a special request is requested by the Government, the Contractor will provide a response within 48 hours.

BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B012

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81804A

5. CONTRACT REFERENCE

SOW Paragraph(s): 8.4

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 – A Data Report profiling the embedded subassemblies, components, and parts shall be delivered at the time of inspection. The Data Report will be submitted as an electronic database in Contractor format.

The following field information shall be identified (at a minimum) for each subassembly item delivered per Parent End Item CLIN:

(1) Concatenated unique item identifier or DoD recognized unique identification equivalent of the PARENT ITEM delivered under a contract line, subline, or exhibit line item that contains the embedded subassembly, component, or part.

(2) Concatenated unique item identifier or DoD recognized unique identification equivalent of the (CHILD) embedded subassembly, component, or part.

(3) Unique item identifier type.**

(4) Issuing agency code (if concatenated unique item identifier is used).**

(5) Enterprise identifier (if concatenated unique item identifier is used).**

(6) Original part number.**

(7) Lot or batch number.**

(8) Current part number (if not the same as the original part number).**

(9) Current part number effective date.**

(10) Serial number.**

(11) Unit of measure.

(12) Description.

(13) Ship to location ** Once per item.

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – Delivery of Data Report will be concurrent with End Item inspection. Submission of Parent UII to IUID Registry must occur before Sub Assembly Data can be submitted. Sub Assembly Data must be loaded to IUID Registry upon Final Acceptance for Payment.

DFARS 252.211-7003 Section (f).

BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B013

2. TITLE OF DATA ITEM

SOURCE DATA FOR FORECASTING DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS)

3. SUBTITLE

INDENTURED BILLS OF MATERIAL (IBOM)

4. AUTHORITY (Data Acquisition Document No.)
DI-PSSS-81656

5. CONTRACT REFERENCE

SOW Paragraph(s): 8.4.3, 8.5

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

6TIMES

12. DATE OF 1ST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 – An IBOM profiling the embedded subassemblies, components and parts shall be delivered, as requested. The Data Report will be submitted as an electronic database in Contractor format. The following field information shall be identified (at a minimum):

· Original Equipment Manufacturer (OEM) and Subsequent Purchased Item

· Sub Supplier Item/Part Numbers/Revision Levels

· OEM Parent Part #

· OEM Child Assembly Part #

· Part Level Revision Number

· Level of Product Structure Indenture of the Part or Item

· Assigned National Stock Number (NSN) to the Item #, if known

· Item or Part CAGE #

· Part Nomenclature (to ensure the same nomenclature is used on all models, drawings, parts list, manuals, IBOM, ICD, etc.)

· Quantity of the Item or Part Required Per Assembly

· Unit of Measure of the Item or Part

· Next Higher Level Assembly #

· Next Lower Level Assembly # (if applicable)

· Next Higher Level Assembly CAGE #

· Next Lower Level Assembly CAGE # (if applicable)

· Drawing/Document #

· Drawings Number CAGE #

· Drawing Nomenclature

· Drawing Revision #

· Drawing Type (Assembly, Interface Control Diagram, etc.)

· Associated Mechanical Interface Diagram #(s)

· Associated Electrical Interface Diagram #(s)

· Contractor Assigned IUID #

· Software Identifier ID

· Firmware Identifier ID

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – The Contractor shall submit the IBOM to the Government 30 calendar days after receipt of contract award. The Government shall provide comments 30 calendar days. Final is due 15 calendar days after receipt of the Government comments.

BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B014

2. TITLE OF DATA ITEM

DATA ACCESSION LIST

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81453B

5. CONTRACT REFERENCE

SOW Paragraph(s): 8.5, 8.7

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION N/A

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 – Information may be submitted in Contractor's format or as shown below.

Effectivity Verification

1. THROUGH: Government Administrative Contracting Officer (ACO).

2. TO: Enter address of the procuring contracting officer or procuring agency to receive the submittal.

3. FROM: Enter name and address of the Contractor.

4. ECP/RFD No. Enter number of the approved change document (ECP/RFD) which authorized the change to the production line.

5. DESCRIPTION OF CHANGE: Provide brief description of change.

6. CONTRACT NO.: Provide current contract number.

7. MOD NO.: Provide contract modification number, which authorizes this change to the production line.

8. END ITEM AFFECTED: Identify model numbers of the vehicles this change affects.

9. PROPOSED CUT-IN: Identify the proposed serial number of effectivity cut-in, as provided on the approved change document.

10. ACTUAL CUT-IN: Identify actual serial number of effectivity cut-in for which this document is providing verification.

11. ACTUAL DATE: Provide date the actual effectivity cut-in took place.

12. QUANTITY TO BE PROCESSED: Provide number of vehicles to be affected by this cut in.

13. REMARKS: Provide additional remarks.

DATE: SIGNATURE (Contractor Official) DATE: SIGNATURE (Gov ACO) Signature blocks – to be completed by the Contractor personnel verifying actual cut-in and Government personnel verifying actual cut-in.

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 10 – 30 calendar days after each ECP/RFV approval of the Government.

BLK 12 – Provide 30 calendar days after Government approval of ECP/RFV.

BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

B

C. CATEGORY:

TDP _____ TM _____ OTHER __X__

D. SYSTEM/ITEM

M870 MHET

Suspension Upgrade

E. CONTRACT/PR NO.

M67854-19-R-0013

F. CONTRACTOR

1. DATA ITEM NO.

B015

2. TITLE OF DATA ITEM

CONFIGURATION AUDIT PLAN

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81646B

5. CONTRACT REFERENCE

SOW Paragraph(s): 8.5

6. REQUIRING OFFICE

PM MHTV

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.

BLK 12 – The contractor shall provide the requested document within 90 calendar days after contract award. The Government requires 15 calendar days to review and comment. Final shall be submitted within 15 calendar days upon receipt of Government comments.

BLK13- Subsequent record updates shall be submitted 30 calendar days as changes occur. Government requires 15 calendar days for review and comment. Final due 15 calendar days after receipt of Government comments.

BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:

PEO LS (Attn: PM MHTV)

15. TOTAL ---------

G. PREPARED BY

H. DATE

17 Apr 2019

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page ____ of _____ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .