Exhibit_A_-_Administrative_Management_Contract_Data_Requirements_List_(A001-A037).docx
DOCX document 236 KB Posted
- Attached to
- M870 ECP Pre-Solicitation Notice Federal contract opportunity
- Solicitation number
- M67854-19-R-0013
- Issued by
- United States Marine Corps
About this file
This pre-solicitation notice describes a forthcoming request for proposal from the United States Marine Corps for an upgraded suspension system for the M870A2-S Medium Heavy Equipment Transporter. The selected contractor will be required to supply equipment, training, and spare parts to upgrade approximately 308 M870A2-S trailers with an enhanced suspension enabling off-road operation with maximum payloads. The agency intends to award a single indefinite delivery indefinite quantity firm-fixed-price contract with some cost reimbursable elements to the best value bidder using a tradeoff evaluation. As a 100% small business set-aside conducted under full and open competition, proposals will be accepted for 45 days following release of the final request for proposal anticipated in the near future. Contract award is targeted for fiscal year 2019.
Exhibit A - Administrative CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6_GFP_Attachment_20May19.xlsx | XLSX spreadsheet | |
| Attachment_7_M67854-19-R-0013_-_Government_Responses_to_RFCs_-_30_May_2019.xlsx | XLSX spreadsheet | |
| Attachment_1_OverAboveInstruction.docx | DOCX document | |
| Attachment_4_DoD_Guidance_for_Reviewing_SSPs.pdf | ||
| Attachment_3_Contractor_CUI-SSP_Template.docx | DOCX document | |
| Attachment_5_Past_Performance_Questionnaire.docx | DOCX document | |
| Exhibit_D_-_Logistics_Contract_Data_Requirements_List_(D001-D014).docx | DOCX document | |
| Exhibit_C_-_Technical_Manual_Contract_Data_Requirements_List_(C001-C004).docx | DOCX document | |
| Solicitation_M67854-19-R-0013.docx | DOCX document | |
| Exhibit_B_-_Engineering_Contract_Data_Requirements_List_(B001-B017).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP ______TM ______ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
DATA MANAGEMENT PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82228
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.2
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9- The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – Draft delivered 30 calendar days after formal government request. Government requires 10 calendar days for review and comments. Final delivery 10 calendar days after receipt of Government comments.
The Contractor shall use any existing data provide by the Government, some of which may still be in development. The Contractor shall manage all data, Government provided or developed under this SOW; provide any updated information to the Government. Any electronic databases or applications used to store, track, share, transmit or display information pertaining to this contract shall be web-based. Government use of any data management system shall not require installation of client software on Government computer systems. Specific data management functions shall include schedule control for deliverables, maintenance of deliverables, approval of deliverable format, and distribution and delivery of data products. The data management system shall include facilities for storage of all data developed or utilized for this contract, and shall provide equal access to data by the Government
BLK 13 – Subsequent submissions will be delivered to the government within 30 calendar days after formal request. Government requires 10 calendar days for review and comments. Final delivery 10 calendar days after receipt of Government comments.
BLK 14 –The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV) 2200 Lester Street, Quantico, VA 22134-6050
COR - lulu.rodriguez-king@usmc.mil
15. TOTAL ---------
G. PREPARED BY
Mrs. Lulu Rodriguez-King
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
DATA MANAGEMENT REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.2
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
SEMIA
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The contractor shall provide the requested document within 90 calendar days after contract award. The Government requires 15 calendar days to review and comment. Final will be provided within 15 calendar days after receipt of Government comments.
BLK 13 – Subsequent submissions shall be submitted semi-annually in March and December. The Government requires 15 calendar days to review and comment. Final will be provided within 15 calendar days after receipt of Government comments.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __ X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
RISK MANAGEMENT STATUS REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81809
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.4
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
MTHLY
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The first Submission will be one month after contract award.
BLK 13 – Subsequent reports shall be submitted on the fifteenth (15th) of every month.
BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
INTEGRATED MASTER SCHEDULE (IMS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81650
5. CONTRACT REFERENCE
SOW Paragraph(s) 5.5, 5.6.4.1, 5.6.4.2, 5.6.4.4, 5.6.5.5, 7.1
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
MTHLY
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – Initial update shall be submitted to the Government 15 calendar days after completion of the start of work meeting.
BLK 13 – The contractor shall submit updates to the Government on a monthly basis no later than the 5th of each month.
BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
CONFERENCE AGENDA
3. SUBTITLE
4. AUTHORITY (Data Acquisition Doc.No.)
DI-ADMN-81249B
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.6, 5.6.1.1, 5.6.1.2, 5.6.1.3, 5.6.2, 5.6.3, 5.6.3.1, 5.6.4.1, 5.6.4.2, 5.6.4.3, 5.6.4.4, 5.6.4.5, 5.6.4.6
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
7. DD 250 REQ
LT
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
8. APP CODE
A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The Contractor shall submit Start of Work Agenda 10 calendar days prior to the Start of Work meeting. The Government requires 3 calendar days to review. Contractor shall submit final, with Government comments incorporated, 2 calendar days after receipt of Government comments.
For weekly meetings, the agenda shall be submitted to the Government Point of Contact at least 24 hours prior to the start of the meeting.
BLK 13 - All subsequent agendas shall be submitted 10 calendar days prior to each conference, meeting, audit, or review. The Government requires 3 calendar days to review. Contractor shall submit final, with Government comments incorporated, 2 calendar days after receipt of Government comments.
For subsequent weekly meetings, the agenda shall be submitted to the Government Point of Contact at least 24 hours prior to the start of the meeting.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
CONFERENCE MINUTES
3. SUBTITLE
4. AUTHORITY (Data Acquisition Doc.No.)
DI-ADMN-81250B
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.6, 5.6.1.1, 5.6.1.2, 5.6.1.3, 5.6.2, 5.6.3, 5.6.3.1, 5.6.4.1, 5.6.4.2, 5.6.4.3, 5.6.4.4, 5.6.4.5, 5.6.4.6
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
7. DD 250 REQ
LT
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
8. APP CODE
A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The Contractor shall submit Start of Work Agenda 10 calendar days prior to the Start of Work meeting. The Government requires 3 calendar days to review. Contractor shall submit final, with Government comments incorporated, 2 calendar days after receipt of Government comments.
For weekly meetings, the agenda shall be submitted to the Government Point of Contact at least 24 hours prior to the start of the meeting.
BLK 13 - All subsequent agendas shall be submitted 10 calendar days prior to each conference, meeting, audit, or review. The Government requires 3 calendar days to review. Contractor shall submit final, with Government comments incorporated, 2 calendar days after receipt of Government comments.
For subsequent weekly meetings, the agenda shall be submitted to the Government Point of Contact at least 24 hours prior to the start of the meeting.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X __
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
PROGRAM MANAGEMENT PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81797
5. CONTRACT REFERENCE
SOW Paragraph(s): 5, 5.6.1.1
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – Draft delivered at the Start of Work meeting. Government requires 10 calendar days for review and comments. Final delivery 10 calendar days after receipt of Government comments.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
CONTRACTOR MONTHLY STATUS REPORT
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227
5. CONTRACT REFERENCE
SOW Paragraph(s): 5, 5.6.1.1
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
MTHLY
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION MTHLY
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – Initial update shall be submitted to the Government 15 calendar days after completion of the start of work meeting.
BLK 13 – The contractor shall submit updates to the Government on a monthly basis no later than the 5th of each month.
BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X __
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
TECHNICAL REPORTS – STUDY/SERVICES
3. SUBTITLE
TECHNICAL PRESENTATIONS AND
ENGINEERING REPORTS
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Paragraph(s) 5.6.1.2
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
The Contractor shall provide data for the Systems Requirement Review and System Functional Review at the Start of Work meeting.
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The contractor shall provide the requested information within 5 calendar days before the Engineering Start of Work Meeting. The Contractor shall have 10 calendar days to incorporate Government comments from the meeting and submit final.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X __
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
TECHNICAL REPORT - STUDY SERVICES
3. SUBTITLE
PRELIMINARY DESIGN REVIEW (PDR) REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Paragraph(s) 5.6.4.1
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
1TIME
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The contractor shall provide the requested report within 30 calendar days after the formal request. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.
BLK 13 – The Contractor shall provide subsequent reports within 30 calendar days after the formal request. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
CRITICAL DESIGN REVIEW (CDR) REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.6.4.2
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
6. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The Contractor shall provide the requested report within 30 calendar days after the formal request. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.
BLK 13 – The Contractor shall provide subsequent reports within 30 calendar days after the formal request. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
PRODUCTION READINESS REVIEW (PRR) REPORT
4. AUTHORITY (Data Acquisition Document No.)
MIL-HDBK-896
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.6.4.5
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The Contractor shall provide the requested report within 30 calendar days after the formal request. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.
BLK 13 – Subsequent submissions will be delivered to the government within 30 calendar after any changes occur. Government requires 10 calendar days for review and comments. Final delivery 10 calendar days after receipt of Government comments.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
MANUFACTURING PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81889A
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.6.4.5
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION ASREQ
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – Draft delivered at the Start of Work meeting. Government requires 10 calendar days for review and comments. Final delivery 10 calendar days after receipt of Government comments.
BLK 13 – Subsequent submissions will be delivered to the government within 30 calendar after any changes occur. Government requires 10 calendar days for review and comments. Final delivery 10 calendar days after receipt of Government comments.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
FIRST ARTICLE QUALIFICATION TEST PLAN AND PROCEDURES
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-81307A
5. CONTRACT REFERENCE
SOW Paragraph(s) 6.5.1
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – Submit draft 15 calendar days after contract award. The Government requires 10 calendar days for review and comment. Final due 30 calendar days after receipt of Government comments.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES)
3. SUBTITLE
REQUIREMENTS TRACEABILITY MATRIX (RTM)
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82133
5. CONTRACT REFERENCE
SOW Paragraph(s): 5.6.4.1, 5.6.4.2, 5.6.4.4, 6.3
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The contractor shall provide the requested matrix at technical reviews (PDR, CDR, SVR). The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.
BLK 13 – The Contractor shall provide subsequent reports within 30 calendar days after the formal request. The Government requires 15 calendar days to review and comment. The Contractor shall have 10 calendar days to incorporate Government comments and submit final.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDIES/SERVICES
3. SUBTITLE
FIRST ARTICLE INSPECTION REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW Paragraph(s): 6.5.2
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – Submit draft 90 calendar days prior to delivery and installation of upgrade/modification. The Government requires 30 calendar days for review and comment. Final due 30 calendar days after receipt of Government comments.
BLK13 - Subsequent record updates shall be submitted 90 calendar days prior to delivery of future upgrades or modifications. Government requires 30 calendar days for review and comment. Final due 30 calendar days after receipt of Government comments.
BLK 14 – The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _____ TM _____ OTHER __X__
D. SYSTEM/ITEM
M870 MHET
Suspension Upgrade
E. CONTRACT/PR NO.
M67854-19-R-0013
F. CONTRACTOR
1. DATA ITEM NO.
A017
2. TITLE OF DATA ITEM
QUALITY ASSURANCE PROGRAM PLAN
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81794
5. CONTRACT REFERENCE
SOW Paragraph(s): 6.6
6. REQUIRING OFFICE
PM MHTV
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – The following information shall be included on the deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors; Administrative or Operational Use, as of the date this CDRL was signed. Other requests for this document shall be referred to PEO LS (Attn: PM MHTV), 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 – The first Submission will be 30 calendar days after contract award.
BLK 13 – Subsequent submissions shall be submitted by Letter of Transmittal to the PCO as QAP is updated.
BLK 14 - The submission will be made via the Safe Access File Exchange (SAFE) web application. The SAFE web application can be accessed via https://safe.amrdec.army.mil/safe. The submission shall be prepared and delivered in current Microsoft Office Software Suite. SAFE Recipient E-mail address follows the addressee, below:
PEO LS (Attn: PM MHTV)
15. TOTAL ---------
G. PREPARED BY
H. DATE
17 Apr 2019
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page ____ of _____ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .