DI-QCIC-80553A.PDF

PDF 26 KB Posted

Attached to
MAGTF Common Handheld - M67854-18-R-2023
Solicitation number
M67854-18-R-2023
Issued by

About this file

This Data Item Description outlines the requirements for an Acceptance Test Plan deliverable under a federal contract. The Acceptance Test Plan must include an overview with flow diagrams of test objectives and milestones, personnel roles, and security measures. It must also include a master test list with the test facility, item number, test description, test parameters, equipment location, and any special tests for each location. The contractor must provide an equipment list with descriptions, nomenclatures, and serial numbers of all test, support, and special test equipment. The contractor must also provide a validation procedure for test results. The related federal contract opportunity is a solicitation from the United States Marine Corps for proposals on the MAGTF Common Handheld system, a modular, man-portable equipment suite allowing target acquisition and control of close air support, artillery, and naval fire in day, night, and all-weather conditions, as well as secure C2/SA information processing and display.

DiD

View the file

Other files

File Type Posted
Exhibit_1_Past_Performance_Questionnaire.docx DOCX document
Attachment_4_Pricing_Workbook_-_MCH_Amendment_0007.xlsx XLSX spreadsheet
Attachment_1_PWS_MCH_Amendment_0007.pdf PDF
RFCs_From_One_on_One_Exchange_-_tk.pdf PDF
RFP_M67854-18-R-2023_Amendment_0007.pdf PDF
M67854-18-R-2023_MCH_CDRL_B003.pdf PDF
RFP_M67854-18-R-2023_Amendment_0005.pdf PDF
M67854-18-R-2023_MCH_CDRL_B001.pdf PDF
Attachment_1_PWS_MCH_Amendment_0005.pdf PDF
RFP_Conformed_Copy_M67854-18-R-2023.pdf PDF
Attachment_4_Pricing_Worksheet_-_MCH.XLSX XLSX spreadsheet
M67854-18-R-2023_MCH_CDRL_B002.pdf PDF
RFCs_8_Mar_18_FINAL_-_tk.pdf PDF
M67854-18-R-2023_Amendment_0004.pdf PDF
Request_for_PSPEC_&_RCM.docx DOCX document
Amendment_0003_M67854-18-R-2023.pdf PDF
M67854-18-R-2023 MCH CDRL A00A.pdf PDF
DI-PSSS-81656B.pdf PDF
M67854-18-R-2023 Tailored LOG Attribute selection.docx DOCX document
Amendment_0001_M67854-18-R-2023.pdf PDF
RFP_MCH_M67854-18-R-2023.pdf PDF
M67854-18-R-2023 MCH CDRL D009.pdf PDF
DI-CMAN-80858B.pdf PDF
Attachment_2_DD254.pdf PDF
DI-MISC-81283.pdf PDF
M67854-18-R-2023 MCH CDRL B002.pdf PDF
DI-SESS-81248B.pdf PDF
M67854-18-R-2023 MCH CDRL A00E.pdf PDF
DI-IPSC-81430A.pdf PDF
M67854-18-R-2023 MCH CDRL A00D.pdf PDF
DI-MISC-80508B.pdf PDF
M67854-18-R-2023 MCH CDRL A00C.pdf PDF
DI-IPSC-81432A.pdf PDF
DI-MGMT-80894A.pdf PDF
DI-MISC-81356A.pdf PDF
M67854-18-R-2023 Tailored LOG Product Data Summaries.docx DOCX document
Attachment_1_PWS_MCH_.pdf PDF
DI-SESS-81759.pdf PDF
M67854-18-R-2023 MCH CDRL A003.pdf PDF
Attachment_4_Pricing_Worksheet_-_MCH.xlsx XLSX spreadsheet
M67854-18-R-2023 MCH CDRL A009.pdf PDF
M67854-18-R-2023 MCH CDRL D007.pdf PDF
DI-MGMT-81941 Tailored for M67854-18-R-2023 D007.pdf PDF
M67854-18-R-2023 MCH CDRL A001.pdf PDF
DI-SESS-81639.pdf PDF
Attachment_5_System_Volume_Pricing.xlsx XLSX spreadsheet
DI-MGMT-80368A.pdf PDF
DI-SAFT-80102C.pdf PDF
DI-MGMT-81948.pdf PDF
M67854-18-R-2023 MCH CDRL D008.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM DESCRIPTION

Title: Acceptance Test Plan

Number: DI-QCIC-80553A Approval Date: 14 Nov 2006 AMSC Number: 7641 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NS/DA02 Applicable Forms: N/A

Use/relationship: The Acceptance Test Plan details the criteria, performance objectives and list of tests to be performed by the contractor for acceptance tests on systems and equipments.

This Data Item Description (DID) contains format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is applicable to contracts requiring preparation of an acceptance test.

This DID supersede DI-QCIC-80553.

Requirements:

1. Reference documents. None.

2. Format. The plan shall be in contractor’s format.

3. Contents. The plan shall contain the following:

3.1 Overview. Consists of a brief description of the objectives of the acceptance test plan, including flow diagrams, milestones, personnel participation, and security requirements. This section shall include the following:

3.1.1 Flow diagram. A functional description of the acceptance test program using a block diagram portrayal of the functions that must be met to satisfy the total acceptance program. Functions shall be numbered 1.0, 2.0, 3.0, etc…

3.1.2 Milestones. Identifies the start and expected completion dates of each test to be performed.

3.1.3 Participation. Identifies the Government and Contractor participation roles and responsibilities.

Downloaded from http://www.everyspec.com

DI-QCIC-80553A

3.1.4 Security. Identify and state briefly any security measures of guidelines to be observed.

3.2 Master test list. Lists all test to be accomplished in the order they are to be performed. Separated listings for each location shall be provided. This listings shall be include the following:

3.3 Facility. Location where the acceptance test is to be performed.

3.4 Item number. Number for each piece of equipment or item, test will be performed.

3.5 Test description. Name and brief description of test to be performed.

3.6 Parameters. The number of cycles the test will be performed and selected parameters to be observed.

3.7 Equipment location. Current location of equipment to be tested or used in the acceptance test.

3.8 Special tests. Provides a list of special or unusual tests and examinations necessary to verify satisfactory equipment performance to specifications.

4. Equipment list. The equipment list shall list all equipment to be used in the acceptance test. The listing shall include the following:

4.1 Test equipment. List all test equipment by:

a. Description.

b. Nomenclature.

c. Serial number.

4.2 Support equipment. List all support equipment by.

a. Description.

b. Nomenclature.

c. Serial number.

4.3 Special test equipment. List all special test equipment required to be designed or constructed for use on the program by:

a. Description.

b. Nomenclature.

c. Date required.

5. Validation procedure. An overview of the procedures that the contractor will use to validate the test results.

6. END OF DI-QCIC-80553A