Exhibit_A_Contract_Data_Requirements_List_(CDRL)_Package.docx

DOCX document 419 KB Posted

Attached to
Supporting Arms Virtual Trainer (SAVT)
Solicitation number
M67854-17-R-7823
Issued by

About this file

CDRL Package

View the file

Other files

File Type Posted
M67854-17-R-7823_0002.pdf PDF
Exhibit_A_-_Contract_Data_Requirement_List_(CDRL)_Package.pdf PDF
Attachment_J.2_PWS_TASK_ORDER_0001_CLS.pdf PDF
Attachment_J.3_PWS_TASK_ORDER_0002.pdf PDF
Attachment_J.1_Base_IDIQ_Contract_PWS.pdf PDF
Conformed_M67854-17-R-7823_0002.pdf PDF
J.11_M67854-17-R-7823_Questions_and_Answers.pdf PDF
Attachment_10_-_Digital_CAS_STIM_Drawing.pdf PDF
M67854-17-R-7823_0001.pdf PDF
Attachment_J.3___PWS_TASK_ORDER_0002.pdf PDF
Attachment_5_GFP.zip ZIP file
Attachment_J.6__Past_Performance_Questionnaire.docx DOCX document
M67854-17-R-7823.pdf PDF
Attachment_J.1__Base_IDIQ_Contract_PWS.pdf PDF
Attachment_J.2_PWS_TASK_ORDER_0001_CLS.pdf PDF
Attachment_J.4__System_Specification.pdf PDF
Attachment_J.8__Quality_Assurance_Surveillance_Plan_(QASP).pdf PDF
b_PWS_TASK_ORDER_1_CLS.pdf PDF
d_SAVT_TO2_SPEC__7_July_2017.pdf PDF
e_SAVT_QASP_update_30_June_2017.pdf PDF
Draft_M67854-17-R-7823.pdf PDF
a_1_10_2_SAVT_PWS.pdf PDF
c_1_10_2_SAVT_PWS_TASK_ORDER_2.pdf PDF
g_SAVT_TO2_SPEC_DRAFT__18_April_17.pdf PDF
e_SAVT_Consolidated_CDRL's.pdf PDF
c_PWS_TASK_ORDER_1_CLS__28_Mar_2017_gk.pdf PDF
CLIN_Structure.pdf PDF
f_SAVT_TO2_SOW_DRAFT.pdf PDF
b_1_10_2_SAVT_PWS_Working_28_MAR_2017.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LISTf (1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

M67854-17-R-7823

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Program-Unique Specification Documents

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SDMP-81493A

5. CONTRACT REFERENCE

PWS 3.2.1

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5:

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275”

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY

ONLY

15. TOTAL ---------
2
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

PWS: 3.1.1.14

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION: SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA. 3.2.4

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

TEST PROCEDURES

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80603A

5. CONTRACT REFERENCE

PWS 3.1.1.14

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA. 3.2.4

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

SOFTWARE REQUIREMENTS SPECIFICATION (SRS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81443A

5. CONTRACT REFERENCE

PWS:

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION: SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Interface Requirement Specification (IRS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81434A

5. CONTRACT REFERENCE

PWS:

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION: SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

DOD Risk Management Framework (RMF) Package Deliverables

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-82001

5. CONTRACT REFERENCE

PWS: 3.2.7

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Interface Design Description (IDD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81436A

5. CONTRACT REFERENCE

PWS:

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Database Design Description (DBDD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81437A

5. CONTRACT REFERENCE

PWS:

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Software Version Description (SVD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81442A

5. CONTRACT REFERENCE

PWS: 3.1.1.14

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA. 3.2.1.1;

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00A

2. TITLE OF DATA ITEM

Product Drawings/Models And Associated Lists

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000E

5. CONTRACT REFERENCE

PWS:

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00B

2. TITLE OF DATA ITEM

Engineering Change Proposal (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80639C

5. CONTRACT REFERENCE

PWS: 3.2.5

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00C

2. TITLE OF DATA ITEM

Request for Deviation

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80640C

5. CONTRACT REFERENCE

PWS: 3.2.5

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA. 3.3.1.4; 3.3.1.5; 3.3.1.6

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00D

2. TITLE OF DATA ITEM

Request for Waiver

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80640C

5. CONTRACT REFERENCE

PWS:

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00E

2. TITLE OF DATA ITEM

Trainer Facility Report (TFR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-FACR-80966

5. CONTRACT REFERENCE

PWS:

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE FROM THE GOVERNMENT.

5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN MICROSFT OFFICE WORD 2013 FORMAT.

NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.

PM TRASYS

1
1
SAVT PjM
1
1
1
SAVT ENG
1
1
1
PMTRASYS PCO
LTR ONLY
15. TOTAL ---------
3
3
3

G. PREPARED BY

LEE JENKINS

H. DATE

15 MAY 2017

I. APPROVED BY

WILLIAM VORHIES

J. DATE

15 MAY 2017

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page __ of __ Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

SEE BLK 16

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __

D. SYSTEM/ITEM

SAVT

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A00F

2. TITLE OF DATA ITEM

Software Product Specification (SPS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-IPSC-81441A

5. CONTRACT REFERENCE

PWS: 3.2.1.1

6. REQUIRING OFFICE

MCSC PM TRASYS

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

SEE BLK 16

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

N/A

11. AS OF DATE

SEE BLOCK 16

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

1. BLOCK 5: PARA.

2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE DELIVERABLE:

DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).

"WARNING - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275

3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE GOVERNMENT REQUIRES 30 DAYS TO REVIEW.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .