CONTRACT DATA REQUIREMENTS LISTf (1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
M67854-17-R-7823
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Program-Unique Specification Documents
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SDMP-81493A
5. CONTRACT REFERENCE
PWS 3.2.1
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
9. DIST
STATEMENT
C
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION SEE BLK 16 Draft
Final
Reg Repro
16. REMARKS
1. BLOCK 5:
2. BLOCK 9: THE FOLLOWING INFORMATION SHALL BE INCLUDED WITH THE
DELIVERABLE:
DISTRIBUTION STATEMENT C. Distribution authorized to U.S. Government agencies and their contractors (Reason: Critical Technology, Export Controlled) (Date of Determination: 31 Dec 2017).
"WARNING - This document contains technical data whose export is restricted by the Arms Export
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25."
OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE PROGRAM
MANAGER FOR TRAINING SYSTEMS, MARINE CORPS SYSTEMS COMMAND, PM
TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275”
3. BLOCK 12: 30 CALENDAR DAYS PRIOR TO TEST READINESS REVIEW. THE
GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN
MICROSFT OFFICE WORD 2013 FORMAT.
NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES
AND REQUIREMENTS.
PM TRASYS 1 1
SAVT PjM 1 1 1
SAVT ENG 1 1 1
PMTRASYS PCO LTR ONLY
ONLY 15. TOTAL --------- 2 3 3
G. PREPARED BY
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
15 MAY 2017
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page __ of __ Pages
CONTRACT DATA REQUIREMENTS LIST
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A002
TEST/INSPECTION REPORT
DI-NDTI-80809B
5. CONTRACT REFERENCE
PWS: 3.1.1.14
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
SUBMISSION: SEE BLK 16 Draft
Final
Reg Repro
16. REMARKS
1. BLOCK 5: PARA. 3.2.4
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
SAVT ENG 1 1 1
ONLY
15. TOTAL --------- 3 3 3
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A003
TEST PROCEDURES
DI-NDTI-80603A
5. CONTRACT REFERENCE
PWS 3.1.1.14
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Reg Repro
16. REMARKS
1. BLOCK 5: PARA. 3.2.4
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN
MICROSFT OFFICE WORD 2013 FORMAT.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A004
SOFTWARE REQUIREMENTS SPECIFICATION (SRS)
DI-IPSC-81443A
5. CONTRACT REFERENCE
PWS:
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
1. BLOCK 5: PARA.
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A005
Interface Requirement Specification (IRS)
DI-IPSC-81434A
5. CONTRACT REFERENCE
PWS:
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
PM TRASYS 1 1
SAVT PjM 1 1 1
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A006
DOD Risk Management Framework (RMF) Package Deliverables
DI-MGMT-82001
5. CONTRACT REFERENCE
PWS: 3.2.7
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A007
Interface Design Description (IDD)
DI-IPSC-81436A
5. CONTRACT REFERENCE
PWS:
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A008
Database Design Description (DBDD)
DI-IPSC-81437A
5. CONTRACT REFERENCE
PWS:
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A009
Software Version Description (SVD)
DI-IPSC-81442A
5. CONTRACT REFERENCE
PWS: 3.1.1.14
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
1. BLOCK 5: PARA. 3.2.1.1;
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00A
Product Drawings/Models And Associated Lists
DI-SESS-81000E
5. CONTRACT REFERENCE
PWS:
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
3. BLOCK 12:
THE FIRST SUBMISSION SHALL BE DUE AS ENGINEERING CHANGES ARE IDENTIFIED.
ECP’S SHALL BE SUBMITTED FOR ALL CHANGES WHICH AFFECT GOVERNMENT
ESTABLISHED BASELINES. THE OPPORTUNITY TO SUBMIT ECP’S SHALL EXTEND
THROUGH CONTRACT FINALIZATION. IN ADDITION, ECP’S SHALL BE SUBMITTED AT
THE REQUEST OF THE GOVERNMENT.
4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS ENGIEERING CHANGES
ARE IDENTIFIED.
THE GOVERNMNET SHALL HAVE 30 DAYS FOR REVIEW AND
ACCETPANCE/REJECTION.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00B
Engineering Change Proposal (ECP)
DI-CMAN-80639C
5. CONTRACT REFERENCE
PWS: 3.2.5
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
3. BLOCK 12: THE FIRST SUBMISSION SHALL BE DUE AS ENGINEERING CHANGES ARE
IDENTIFIED. ECP’S SHALL BE SUBMITTED FOR ALL CHANGES WHICH AFFECT
GOVERNMENT ESTABLISHED BASELINES. THE OPPORTUNITY TO SUBMIT ECP’S
SHALL EXTEND THROUGH CONTRACT FINALIZATION. IN ADDITION, ECP’S SHALL BE
SUBMITTED AT THE REQUEST OF THE GOVERNMENT.
4. BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS ENGIEERING CHANGES
ARE IDENTIFIED.
THE GOVERNMNET SHALL HAVE 30 DAYS FOR REVIEW AND
ACCETPANCE/REJECTION.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00C
Request for Deviation
DI-CMAN-80640C
5. CONTRACT REFERENCE
PWS: 3.2.5
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
1. BLOCK 5: PARA. 3.3.1.4; 3.3.1.5; 3.3.1.6
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
3. BLOCK 12/13:
DEVIATIONS SHALL BE SUBMITTED FOR ALL CHANGES WHICH AFFECT
GOVERNMENT ESTABLISHED BASELINES. THE OPPORTUNITY TO SUBMIT
DEVIATIONS SHALL EXTEND THROUGH CONTRACT FINALIZATION. IN ADDITION,
DEVIATIONS SHALL BE SUBMITTED AT THE REQUEST OF THE GOVERNMENT.
4. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00D
Request for Waiver
DI-CMAN-80640C
5. CONTRACT REFERENCE
PWS:
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
3. BLOCK 12/13: WAIVERS SHALL BE SUBMITTED FOR ALL CHANGES WHICH AFFECT
GOVERNMENT ESTABLISHED BASELINES. THE OPPORTUNITY TO SUBMIT WAIVERS
SHALL EXTEND THROUGH CONTRACT FINALIZATION. IN ADDITION, WAIVERS SHALL
BE SUBMITTED AT THE REQUEST OF THE GOVERNMENT.
4. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00E
Trainer Facility Report (TFR)
DI-FACR-80966
5. CONTRACT REFERENCE
PWS:
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00F
Software Product Specification (SPS)
DI-IPSC-81441A
5. CONTRACT REFERENCE
PWS: 3.2.1.1
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00G
Safety Assessment Report (SAR)
DI-SAFT-80102C
5. CONTRACT REFERENCE
PWS: 3.2.3
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
D
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
1. BLOCK 5: PARA. 4.1.2
DISTRIBUTION STATEMENT D. DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF
DEFENSE AND U.S. DOD CONTRACTORS ONLY (REASON: ADMINISTRATIVE OR
OPERATIONAL USE.)
A FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND REQUIREMENTS.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00H
Environmental Health and Safety Plan (HSP))
DI-ENVR-81375
5. CONTRACT REFERENCE
PWS: 3.2.3
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Reg Repro
16. REMARKS
1. BLOCK 5: PARA 4.1.2
OPERATIONAL USE.)
GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A
FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND
REQUIREMENTS.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ ENGINEERING DATA __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
A00J
Failure Analysis And Corrective Action Report (FACAR)
DI-SESS-81927
5. CONTRACT REFERENCE
PWS 3.1.1.6
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Reg Repro
16. REMARKS
1. BLOCK 5: PARA. 3.1.1.7; 3.1.1.9
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
GOVERNMENT REQUIRES 30 DAYS TO REVIEW. THE CONTRACTOR SHALL RESUBMIT A
FINAL 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.
4. BLOCK 13: 30 CALENDAR DAYS PRIOR TO JOINT FINAL INSPECTION. THE
GOVERNMENT REQUIRES 30 CALENDAR DAYS TO REVIEW. THE CONTRACTOR SHALL
INCORPORATE REQUIRED CHANGES BASED UPON GOVERNMENT COMMENTS AND
RESUBMIT 15 DAYS UPON RECEIPT OF GOVERNMENT COMMENTS. THIS REVIEW
CYCLE WILL CONTINUE UNTIL THE CONTRACTOR RECEIVES FORMAL ACCEPTANCE
FROM THE GOVERNMENT.
NOTE: SEE INDIVIDUAL CONTRACT TASK ORDER FOR SPECIFIC REMARKS, NOTES AND
REQUIREMENTS.
SAVT ENG 1 1 1
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
B001
Integrated Master Schedule (IMS)
DI-MGMT-81650
5. CONTRACT REFERENCE
PWS 2.9.1
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
B
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
1. BLOCK 5: PARA. 2.9.3; 3.2.1
DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government Agencies only
(Reason: Critical Technology, Export Controlled)(Date of Determination: 31 Dec 2017). Further releasable to: “Covered Government Support Contractors,” per DFARS 252.227-7013(b)(3)(iv)(A) and DFARS 252.227-7014(b)(3)(iii)(A).
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
3. BLOCK 12/13: FIRST SUBMISSION SHALL BE DUE THE 10TH DAY OF THE FIRST
MONTH AFTER CONTRACT AWARD AND SHALL BE COMBINED WITH THE
CONTRACTOR STATUS REPORT. SUBSEQUENT SUBMISSIONS SHALL BE DUE
MONTHLY THROUGH THE END OF THE CONTRACT.
4. THE GOVERNMENT SHALL HAVE 10 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
MICROSFT OFFICE PROJECT 2013 FORMAT.
15. TOTAL --------- 1 2 2
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
B002
Status Report
DI-MGMT-80368A
5. CONTRACT REFERENCE
PWS: 2.9
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
B
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
1. BLOCK 5: PARA. 3.1.1.1; 3.1.1.2; 3.1.1.3; 3.1.1.4; 3.1.1.5; 3.1.1.6; 3.1.1.7; 3.1.1.8; 3.1.1.9;
3.1.1.10 ; 3.1.1.11; 3.1.1.13; 4.3; 4.5.1
DISTRIBUTION STATEMENT B. Distribution authorized to U.S. Government Agencies only (Reason: Critical Technology, Export Controlled)(Date of Determination: 31 Dec 2017). Further releasable to: “Covered Government Support Contractors,” per DFARS 252.227-7013(b)(3)(iv)(A) and DFARS 252.227-7014(b)(3)(iii)(A).
Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq), as amended. Violations of these export laws are subject to severe criminal
CONTRACTOR STATUS REPORT. SUBSEQUENT SUBMISSIONS SHALL BE DUE
MONTHLY THROUGH THE END OF THE CONTRACT.
4. THE GOVERNMENT SHALL HAVE 10 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN
MICROSFT OFFICE WORD 2013 FORMAT.
6. QUALITY CONTROL PLAN SHALL BE SUBMITTED PER TASK ORDER WHEN
DIRECTED BY THE GOVERNMENT.
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
B003
Conference Minutes
DI-ADMIN-81250B
5. CONTRACT REFERENCE
PWS 2.9
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Reg Repro
16. REMARKS
1. BLOCK 5: PARA. 2.91; 2.92; 2.93; 3.2.1; 3.2.4
OPERATIONAL USE).
TRASYS, 12211 Science Drive, Partnership III-5th Floor, Orlando, FL 32826-3275.
CONTRACTOR STATUS REPORT. SUBSEQUENT SUBMISSIONS SHALL BE DUE
MONTHLY THROUGH THE END OF THE CONTRACT.
4. THE GOVERNMENT SHALL HAVE 10 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
5. BLOCK 14: THE CONTRACTOR SHALL DELIVER THIS CDRL VIA EMAIL/DVD IN
MICROSFT OFFICE 2013 FORMAT.
6. ACCEPTANCE OF ANY MINUTES, WHICH INCLUDES INFORMATION CONCERNING
CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS, DOES NOT
CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION
OF THE PROCURRING CONTRACTING OFFICER (PCO) CAN SUCH CHANGES BE MADE.
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
B004
Conference Agenda
DI-ADMN- 81249B
5. CONTRACT REFERENCE
PWS 2.9
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
1. BLOCK 5: PARA. 2.9.2; 2.9.3; 3.2.1; 3.2.5
OPERATIONAL USE)
CONTRACTOR STATUS REPORT. SUBSEQUENT SUBMISSIONS SHALL BE DUE
MONTHLY THROUGH THE END OF THE CONTRACT.
4. THE GOVERNMENT SHALL HAVE 10 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
B005
Presentation Materials
DI-ADMN-81373
5. CONTRACT REFERENCE
PWS: 2.9
6. REQUIRING OFFICE
MCSC PM TRASYS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
1. BLOCK 5: PARA. 3.2.1; 3.2.4
CONTRACTOR STATUS REPORT. SUBSEQUENT SUBMISSIONS SHALL BE DUE
MONTHLY THROUGH THE END OF THE CONTRACT.
4. THE GOVERNMENT SHALL HAVE 10 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
MICROSFT OFFICE 2013 FORMAT.
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __ __
D. SYSTEM/ITEM
SAVT
E. CONTRACT/PR NO.
C001
Logistic Product Data (LPD)
DI-SESS-81758A
5. CONTRACT REFERENCE
PWS: 2.11
6. REQUIRING OFFICE
PM TRASYS/ PdM ITS
7. DD 250 REQ
LT
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
Final
Reg Repro
16. REMARKS
1. BLOCK 5: 3.2.1; 4.3
OPERATIONAL USE.
CONTRACTOR STATUS REPORT. SUBSEQUENT SUBMISSIONS SHALL BE DUE
MONTHLY THROUGH THE END OF THE CONTRACT.
4. THE GOVERNMENT SHALL HAVE 10 DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION.
SAVT LOG 1 1 1
15. TOTAL ---------
LEE JENKINS
H. DATE
15 MAY 2017
I. APPROVED BY
WILLIAM VORHIES
J. DATE
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .