3_160711_-_ECH_FAT_Event_Design_Plan_DRAFT.pdf
PDF 653 KB Posted
- Attached to
- Enhanced Combat Helmet (ECH)
- Solicitation number
- M67854-16-R-1122
- Issued by
-
United States Marine Corps
About this file
(Document Originally Posted 19 July 2016) ECH Draft First Article Test Event Design Plan
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
First Article Test (FAT) Event Design Plan for the
Enhanced Combat Helmet
Submitted By
ECH Engineer
Program Manager Infantry Combat
Equipment
Date
ECH Team Lead
Approval
First Article Test (FAT) Event Design Plan
For Enhanced Combat Helmet
Coordination with
U.S. Marine Corps Operational Test and
Evaluation Activity
Deputy Under Secretary of the Army
Test and Evaluation
Staff Specialist
Director, Live Fire Test and Evaluation
Record of Change
Version Date Paragraph Comment Approval
- TBD N/A Initial Release See signature page
DRAFT as of 08 Jul 16
ECH FAT Event Design Plan
1. Part I -- System Introduction
a. Mission Description. The Enhanced Combat Helmet (ECH) will assist Marines, soldiers and sailors by providing head protection as they close with and destroy the enemy through fire and maneuver. Missions include the entire range of military operations.
b. Measures of Effectiveness and Suitability. TABLE 1 lists the operational effectiveness and suitability capabilities required by the U.S. Marine Corps Urgent Statement of Need
(USON), dated 02 March 2009, Change 1 dated 29 June 2010, Change
2 dated 11 August 2010, Change 3 dated June 2012, and Change 4 dated 24 March 2014.
TABLE 1. ECH Operational Capabilities
Operational Effectiveness
Weight
The overall weight of each ECH
(including the shell, suspension, and retention systems, and necessary attachment hardware) shall not exceed 5% of the weight of the current Lightweight Helmet
(LWH) in the same configuration
(T); less than the LWH (O).
USON
Attribute 1
Small Arms
Protection
The ECH shall provide greater protection against small arms than the current LWH (T), using V50 as the metric.
USON
Attribute 2
Fragmentation
Protection
The ECH shall provide at least 35% better fragmentation protection when compared to the LWH (T) and
100% better fragmentation protection (O).
Attribute 3
Flammability
The ECH shall be noncombustible and flame resistant to flash fire situation and not drip.
Attribute 6
Operational Suitability
Ergonomics
The ECH shall ergonomically accommodate the 2nd percentile female through the 98th percentile male of Marines (T=O)
USON
Attribute 4
MC Fit
Policy
Operational
Conditions
The ECH shall be as durable as the
LWH (T) and will operate in all weather and environment conditions
(T=O).
Attribute 7
Integration
The ECH shall not degrade or interfere with current equipment employed by the Marine on the battlefield.
Attribute 5
Note: T - Threshold and O - Objective
d. System Description. The ECH will provide Marines, soldiers and sailors improved ballistic protection over the current LWH and ACH. The ECH is intended to have the same size, shape and weight as the ACH. As a helmet, the ECH will provide an increased level of fragmentation protection as well as increased small arms protection (the 9 mm protection requirement remains the same). Each helmet consists of a finished shell, suspension system, retention system, and necessary attachment hardware.
FIGURE 1. ECH with IRS Retention System
e. Enhanced Combat Helmet Components. The helmet assembly shall meet the design requirements of the ECH Purchase
Description (PD) Version L, referenced drawings, and parts lists. The ECH assembly shall be in four sizes: Small (S), Medium (M), Large (L), Extra-Large (XL). A complete helmet assembly typically consists of the following components:
- Helmet Shell
- Suspension Hook Disks
- Suspension Pads (3/4 - inch thick) (mandatory source)
- Improved Retention Assembly (IRS) (mandatory source)
- Attaching Hardware
- Edging, Finish, and Labels
f. Critical Technical Parameters. The ECH PD (Reference 1) specifies the technical requirements and associated evaluation criteria. A spreadsheet that summarizes the ECH PD requirements for FAT and includes the associated evaluation criteria and FAT test article quantities is provided in Appendix A.
2. Part II -- Integrated FAT Program Summary
a. Integrated Test Program Schedule for FAT
FIGURE 2. ECH Integrated Program Schedule
(FRP = Full Rate Production; IOC = Initial Operational Capability)
b. Management. The Program Manager, Infantry Combat
Equipment (PM ICE), Body Armor and Load Bearing Equipment (BALB)
Team is responsible for providing oversight for all ECH Test and
Evaluation (T&E) events including FAT. The Team is responsible for establishing this FAT Event Design Plan (EDP) to outline required ballistic and non-ballistic tests and associated sampling (or test article) criteria. This FAT Event Design Plan has been reviewed and approved by the T&E Integrated Product
Team.
For FAT, responsibilities of the T&E WIPT include review of final detailed test plans and procedures, test protocols, test results and test reports. The ECH Team and T&E WIPT will be responsible for reviewing and adjudicating test issues and test results against the approved detailed FAT plans and test procedures approved by Director of Live Fire Test and Evaluation
(LFT&E) at the Office of the Secretary of Defense, Director of
Operational Test and Evaluation (DOT&E). A listing of the organizational membership to the T&E WIPT and the T&E FAT sub-
WIPT including the associated responsibilities for each organization are further defined in the Test and Evaluation
Strategy for Enhanced Combat Helmet (Reference 3) and the
Charter for the Enhanced Combat Helmet (ECH) Test and Evaluation
Working-level Integrated Product Team (T&E WIPT).
3. Part III – First Article Test and Evaluation Outline
a. Objectives
(1) To verify production helmets against the ECH PD
(Reference 1).
b. FAT and Evaluation. FAT will be conducted on helmet designs that are submitted by the contractor for production evaluation. To ensure that minimum performance requirements are met, testing and verification will be in accordance with the approved ECH PD for FAT (Reference 1). A spreadsheet that summarizes the ECH PD requirements for FAT and includes the associated evaluation criteria and FAT test article quantities is provided in Appendix A. All contractor-submitted FAT test articles, including spares, will be shipped to Aberdeen Test
Center (ATC) located in Aberdeen, MD for storage until FAT is completed and the final FAT report is issued. All testing will be conducted by ATC but may include other Government laboratories. All ballistic testing will be at ATC. Once testing begins, FAT is planned to be completed within 60 days thereafter. FAT will consist of two distinct test events: 1) ballistic testing and 2) non-ballistic testing. While testing is underway, ATC will make accommodations for Team witnesses.
There will be no Government Reference Testing during FAT with the exception of thickness measurements during environmental conditioning. This may include no Small Arms Backface Transient
Deformation (BTD) measurements or 45 degree V50 testing.
At the conclusion of FAT, ATC will provide FAT status of testing and preliminary FAT results for review to the BALB Team and T&E
WIPT members in preparation for a Data Assessment Conference
(DAC). Actions, findings and scoring decisions will be documented in the T&E WIPT DAC meeting minutes. The meeting minutes will then be forwarded to the ECH Team and T&E WIPT for review. After FAT is completed and the final ATC FAT report has been issued, at ECH Team direction, ATC will ship all test articles back to the appropriate submitting contractor.
(1) Ballistic Testing – FAT
(a) Test Planning. Under an established Statement of Work (SOW) and based on this approved FAT Event Design Plan, ATC will develop a FAT ballistic detailed test plan with a classified annex (if required) that the BALB Team and T&E WIPT, Program Manager, and DOT&E will review and approve. The detailed ballistic test plan will be in accordance with the ECH
PD (Reference 1), the DOT&E Military Combat Helmet Standard for
Ballistic testing, and the Test Operating Procedures (TOP 10-2-
217 Ballistic Testing of Helmets) (Reference 2) as approved for
FAT. A joint Test Readiness Review (TRR) will be conducted with
PM ICE, ATC, and DOT&E. The objective of the TRR will ensure all testing assets and resources are available for FAT.
(b) Objectives. To verify that the test articles submitted for the ECH program meet the ballistic contractual specifications outlined in the ECH PD. Subset objectives to the overall ballistic objective are as follows:
1. To verify that the ballistic performance of the submitted ECH system meets the fragmentation protection measured by V50 BL(P) requirements set forth in the ECH PD.
2. To verify that the submitted ECH (shell and hardware) meets the Resistance to Penetration (RTP) ballistic performance requirement against 9 mm bullets in the ECH PD as measured by RTP testing.
3. To verify that the submitted ECH meets the
BTD performance requirement against 9 mm bullets set forth in the ECH PD, as determined by back face deformation measurements.
4. To verify that the submitted ECH meets RTP ballistic performance requirement against small arms projectiles
(Threat M) in the ECH PD Classified Annex A.
5. To verify that the ballistic performance of the submitted ECH system meets the small arms protection (Threat
M) as measured by V50 BL(P) requirements set forth in the ECH PD
Classified Annex A.
(c) Execution. Testing will be in accordance with the ECH PD (Reference 1) and the TOP 10-2-217 Ballistic Testing of Helmets (Reference 2) as approved for FAT. All ballistic testing will be under the supervision of Government personnel and the ECH Team. ECH Team representative(s) will be present at the ballistic test events, as necessary.
(d) Reporting. Under an established SOW, ATC will execute the approved FAT ballistic detailed test plan and submit preliminary data, draft and final reports to the ECH Team on the results of the testing. Three calendar work days after testing is completed for any specific ballistic PD requirement has been completed, preliminary data from that testing will be submitted by ATC to the BALB Team for review. A follow-on draft report will be submitted by ATC to the BALB Team for review and comment within 14 calendar days after completion of all ballistic testing and will be used to adjudicate any test result discrepancies. An overall final ballistic test report will be submitted by ATC to the BALB Team within 45 days after overall ballistic test completion. ATC is responsible for assessing the test data in accordance with the criteria of the approved ECH PD
(Reference 1) and associated spreadsheet found in Appendix A.
If there are noted discrepancies between the DAC and the ATC report, the DAC will prepare a Memorandum for Record to address the discrepancies. [Note: Non-ballistic testing will be conducted concurrently with ballistic testing.]
(2) Non-Ballistic Testing – FAT
(a) Test Planning. Under an established SOW and based on this approved FAT EDP, ATC will develop a FAT non-ballistic detailed test plan that the T&E WIPT will review and approve. Testing will be in accordance with the ECH PD as approved for FAT and in accordance with applicable standards.
(b) Objectives. To verify that the test articles submitted for the ECH program meet the non-ballistic contractual specifications outlined in the ECH PD. Subset objectives to the overall non-ballistic objective are as follows.
1. To verify the test articles, upon delivery and prior to testing, are complete, undamaged, and ready for testing.
2. To verify overall system weight does not exceed performance requirements.
3. To verify the bump or blunt impact protection does not exceed performance requirements.
4. To verify the complete helmet assembly meets the design requirements of the ECH PD (i.e., size, shape, shell construction, shell thickness, shell uniformity, benchmarks, attachment holes, edging, coating, retention system, pad suspension system, hook disks, etc.).
5. To verify that helmet components are interchangeable and modular such that replacement of any component with another like-sized unit shall have no detrimental effect on any of the ECH PD requirements.
6. To verify infrared reflectance meets ECH PD requirements.
7. To verify specular gloss meets ECH PD requirements.
8. To verify that all helmet components are constructed in such that they can withstand various environmental extremes without degradation and meet operating environment requirements as specified in the ECH PD (i.e., seawater resistance, weatherometer resistance, field agent resistance, flame resistance, high temperature storage and use, cold temperature storage and use, temperature shock, altitude, vibration, impact resistance, compression resistance, salt fog, etc.).
9. To verify that the ECH is compatible with the NVG Bracket and that the contractor-supplied bolt meets requirements.
10. To verify ownership and support requirements as specified in the ECH PD (i.e., marking, barcode label, washability/colorfastness, accelerated aging/shelf life, health/safety, workmanship, etc.).
(c) Execution. All non-ballistic testing will be conducted by ATC in accordance with the ECH PD as approved for
FAT. All non-ballistic testing will be under the supervision of
Government personnel and the ECH Team. ECH Team representative(s) will be present at the non-ballistic test events, as necessary.
(d) Reporting. Under an established SOW, ATC will execute the approved FAT non-ballistic detailed test plan and submit preliminary data, draft and final reports to the ECH Team on the results of the testing. Three calendar work days after testing is completed for any specific non-ballistic PD requirement has been completed, preliminary data from that testing will be submitted by ATC to the ECH Team for review.
ATC will submit a follow-on draft report to the ECH Team for review and comment within 14 calendar days, and those comments will be used to adjudicate any test result discrepancies. ATC will submit an overall final non-ballistic test report to the
ECH Team within 45 days after overall non-ballistic test completion. ATC is responsible for assessing the test data in accordance with the criteria of the approved ECH PD (Reference
1) and associated spreadsheet found in Appendix A. If there are noted discrepancies between the DAC and the ATC report, the DAC will prepare a Memorandum for Record to address the discrepancies. [Note: Ballistic testing will be conducted concurrently with non-ballistic testing.]
4. Part IV -- FAT and Evaluation Resource Summary
a. Summary
TABLE 3. Quantity of FAT Test Articles
Test Event Unfinished
Shells
Finished
Shells
Finished
Helmets
FAT 24 171 273
(1) Test Articles. Test articles will be considered production-representative models and/or production-representative components. Test articles that are considered production-representative models will be configured as an unfinished shell, finished shell, or finished helmet according to the detailed FAT plans. Per the ECH PD, the test articles considered as production-representative models are defined as:
(a) Unfinished shell – a helmet shell that shall include the raw shell only, drilled with attachment holes (no primer, paint (coating), texturing aggregate, edging, edging adhesive, or hook disks).
(b) Finished shell - a helmet shell that shall include the unfinished shell, any primer, paint (coating) and texturing aggregate, all necessary attachment holes, any edging and adhesive to hold the edging, and labels.
(c) Finished helmet – a helmet that includes the finished shell, hook disks, a complete pad set (mandatory source), a complete retention system (mandatory source), and attaching hardware.
(2) Test Sites and Instrumentation. Test ranges/facilities to be used for each type of testing will be in accordance with the approved detailed FAT plans and the ATC IOP
PED-003 (Reference 2), other ATC Test Operating Procedures, and/or commercial standards. The PM ICE has a current SOW with
ATC.
(3) FAT Funding Requirements. Table 4 identifies the estimated funding required for the planned FAT. Totals assume four contractor designs submitted for FAT.
TABLE 4. FAT Funding Required
Event FY17($K)
FAT 375
A-1
Appendix A: FAT Helmet Quantities and Allocation
T es t N u m b er
E C
H R eq m n t
P a ss
/F a il ri te
V if ic a ti o n
M et h d
S m p li g n d it io
B ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
Interchangeabilit y
Any nonconformance to requirement constitutes test failure.
CoC NA NA NA
Shell
Design/Shape
Any nonconformance to measurement requirement constitutes test failure.
Test
(2 samples per each size)
Ambient NA 2 2 2 2
Shell
Construction
No critical defects. No more than 4% major and 12% minor defects.
Visual Exam
(5 samples per each size)
Ambient NA 5 5 5 5
Shell Thickness and Uniformity
No critical defects. No more than 4% major defects
Test / Visual
Exam
(3 samples per each size)
Ambient NA 3 3 3 3
5 Benchmarks No more than 12% minor defects
Test / Visual
Exam
(5 samples per each size)
Ambient NA 5 5 5 5
Attachment
Holes
No critical defects. No more than 4% major and 12% minor defects.
Test / Demo
(5 samples per each size)
Ambient NA 5 5 5 5
Retention System
Holes
Any nonconformance to requirement constitutes test failure.
Test
(5 samples per each size)
Ambient NA 5 5 5 5
Night Vision
Device Hole(s)
Any nonconformance to requirement constitutes test failure.
Test
(5 samples per each size)
Ambient NA 5 5 5 5
A-2
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
9 Edging No more than 4% major and
12% minor defects.
Visual Exam
/ Test
(5 samples per each size)
Ambient NA 5 5 5 5
10 Edging Adhesion
Any nonconformance to requirement constitutes test failure.
Test
(5 samples per each size)
Ambient NA 5 5 5 5
Edging Adhesion
After Heat Aging
Any nonconformance to requirement constitutes test failure.
Test
(1 sample per each size)
Ambient NA 1 1 1 1
12 Coating No more than 4% major and
12% minor defects.
Visual Exam
(5 samples per each size)
Ambient NA 5 5 5 5
Surface
Preparation Certificate of Compliance CoC NA Ambient NA
Texturing of
Coating Certificate of Compliance CoC NA Ambient NA
15 Sand Texturing Certificate of Compliance CoC NA Ambient NA
Walnut Shell
Flour Texturing Certificate of Compliance CoC NA Ambient NA
17 Color
Any nonconformance to requirement constitutes test failure.
Visual Exam
(5 samples per each size)
Ambient NA 5 5 5 5
Infrared
Reflectance See Below Test See Below Ambient NA
Infrared
Reflectance -
Texturing and
Any nonconformance to requirement constitutes test failure.
Test
(1 sample per each size)
Ambient NA 1 1 1 1
A-3
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
Coating of
Finished Shell
19 Specular Gloss
Any nonconformance to requirement constitutes test failure.
Test
(1 sample per each size)
Ambient NA 1 1 1 1
Adhesion of
Coating
Any nonconformance to requirement constitutes test failure.
Test
(3 random locations per sample)
Ambient NA 1
21 Retention System See AR-PD 12-01 Visual Exam
20 X-back, 20
IRS
(5 samples per each size)
Ambient NA
Retention System
Attachment
Points
Any nonconformance to requirement constitutes test failure.
Visual Exam
/ Test
20 X-back, 20
IRS
(5 samples per each size)
Ambient NA 5 5 5 5
Retention System
Attachment
Hardware*
No more than 4% major and
12% minor defects. See also
AR-PD 12-01
Visual Exam, Test
20 X-back, 20
IRS
(5 samples per each size)
Ambient NA 5 5 5 5
NVD Bracket and Attaching
Hardware
No more than 4% major and
12% minor defects.
Visual Exam, Test
(5 samples per each size)
Ambient NA 5 5 5 5
Pad Suspension
System
No more than 4% major and
12% minor defects.
Test
18 (6 samples per each pad type)
Ambient NA
A-4
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
26 Pad Construction No more than 4% major and
12% minor defects.
Test
18 (6 samples per each pad type)
Ambient NA
Inner Layer
Material
Any nonconformance to requirement constitutes test failure.
Test
5 specimens (1 in x 5 in size of each specimen)
Ambient NA
Padding Layer
Material
Any nonconformance to requirement constitutes test failure.
Test
6 (2 samples per each pad type)
Ambient NA
Outer Layer
Material
Any nonconformance to requirement constitutes test failure.
Test
6 (2 samples per each pad type)
Ambient NA
Pad Compression
Durability
Any nonconformance to requirement constitutes test failure.
Test
9 (3 samples per each pad type)
Ambient NA
31 Hook Disks No critical defects. No more than 12% minor defects.
Test
(1 sample per each size)
Ambient NA 1 1 1 1
Hook Disk Shape and Coverage
Any nonconformance to requirement constitutes test failure.
Test
(1 sample per each size)
Ambient NA 1 1 1 1
Hook Disk
Durability
Any nonconformance to requirement constitutes test failure.
Test
(1 sample per each size)
Ambient NA 1 1 1 1
Hook/Loop
Adhesion
Any nonconformance to requirement constitutes test failure.
Test 5 specimens tested
A-5
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
V50 Ballistic
Protection Limits
Failure to meet the minimum
V50 requirements in paragraph 3.10.1 shall constitute a test failure.
Test See DOTE
Protocol
Ambient, Hot, Cold, Seawater
Various
RCC
FSP
18 26 20 18
RTP - 9mm
(Shell) See DOTE Protocol Test
See DOTE
Protocol
Ambient, Hot, Cold, Seawater 9mm 12 12 12 12
BTD (9mm
Shell)*
See DOTE Protocol Quantity listed assumes no size or environment is a significant factor. If size and/or environment are significant, additional helmet samples will be required.
Test See DOTE
Protocol
Ambient, Hot, Cold, Seawater 9mm
In cl ab v e
In cl ab v e
RTP - 9mm
(Retention
System
Hardware)
See DOTE Protocol Test See DOTE
Protocol
Ambient, Hot, Cold, Seawater 9mm 8 9 8 8
RTP - 9mm
(NVD Hardware)
90% CL that 90% no penetration. Aggregated across all environmental conditions and sizes
Test
22 shots distributed among sizes and environments
Ambient, Hot, Cold, Seawater 9mm 5 6 6 5
RTP - Small
Arms (Threat M) See DOTE Protocol Test
See DOTE
Protocol
Ambient, Hot, Cold, Seawater
Small
Arms
(Threat
M)
16 17 16 16
A-6
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
41 Weight*
Any nonconformance to requirement constitutes test failure.
Test All finished helmet samples Ambient NA
Blunt Impact
Protection
90% of indentation measurements and accelerations are less than indentation, or fracture, or acceleration requirements at
90% CL. Indentation and acceleration CLs will be calculated separately.
Aggregated across all environmental conditions.
Test
(7 locations per finished helmet)
Ambient NA 1 1 1 1
Blunt Impact
Protection
90% of indentation measurements and accelerations are less than indentation, or fracture, or acceleration requirements at
90% CL. Indentation and acceleration CLs will be calculated separately.
Aggregated across all environmental conditions.
Test
(7 locations per finished helmet)
Extreme Hot
(130 deg F)
NA 1 1 1 1
A-7
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
Blunt Impact
Protection
90% of indentation measurements and accelerations are less than indentation, or fracture, or acceleration requirements at
90% CL. Indentation and acceleration CLs will be calculated separately.
Aggregated across all environmental conditions.
Test
(7 locations per finished helmet)
Extreme Cold
(14 deg F)
NA 1 1 1 1
Seawater
Resistance
Any nonconformance to requirement constitutes test failure.
Test
(random sizes) Ambient NA 1 1
Weatherometer
Resistance
Any nonconformance to requirement constitutes test failure.
Test
(random sizes) Ambient NA 1 1
Field Agent
Resistance
Any nonconformance to requirement constitutes test failure.
Test 1 test per agent Ambient NA 2 2 3 2
48 Flame Resistance
Any nonconformance to requirement constitutes test failure.
Test 6 crown, 6 edge Ambient NA 1 1 1
High
Temperature
Storage and Use
Any nonconformance to requirement constitutes test failure.
Test
(random sizes)
Extreme Hot
(160 deg F)
NA 1
Cold
Temperature
Storage and Use
Any nonconformance to requirement constitutes test failure.
Test
(random sizes)
Extreme Cold (-
60 deg F)
NA 1
A-8
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
Temperature
Shock
Any nonconformance to requirement constitutes test failure.
Test
( random sizes)
Extreme Hot
(160 deg F) to
Extreme Cold (-
60 deg F)
NA 1
Temperature
Shock
Any nonconformance to requirement constitutes test failure.
Test
(random sizes)
Extreme Cold (-
60 deg F) to
Extreme Hot
(160 deg F)
NA 1
53 Altitude
Any nonconformance to requirement constitutes test failure.
Test
(random sizes)
Altitude - Temp
& Pressure
NA 1 1
54 Vibration
Any nonconformance to requirement constitutes test failure.
Test
1 sample randomly selected
Ambient NA 1
Impact
Resistance
50% CL / 90% no deformation is less than requirement.
Test
(2 samples of each of four finished helmet sizes)
Ambient NA 2 2 2 2
Compression
Resistance (Top to Bottom)
50% CL / 90% no dimensional change is greater than requirement.
Test
(2 samples of each of four finished shell sizes)
Ambient NA 2 2 2 2
A-9
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
Compression
Resistance (Side to Side)
50% CL / 90% no dimensional change is greater than requirement.
Test
(2 samples of each of four finished shell sizes)
Ambient NA 2 2 2 2
58 Salt Fog
Any nonconformance to requirement constitutes test failure.
Test
1 randomly selected from range of four finished helmet sizes
Ambient NA 1
Marking of
Helmet Shell
Any nonconformance to requirement constitutes test failure.
Test
(1 sample from each of four finished helmet sizes)
Ambient NA 1 1 1 1
Marking of Pad
Suspension*
Any nonconformance to requirement constitutes test failure.
Visual Exam
(1 sample from each of four finished helmet sizes)
Ambient NA 1 1 1 1
61 Barcode Label*
Any nonconformance to requirement constitutes test failure.
Visual Exam
30 randomly selected
Packages of all arriving at test site
A-10
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
62 Washability No more than 4% major and
12% minor defects.
Test
1 randomly selected from range of four finished helmet sizes
Ambient NA 1
102 Colorfastness
Any nonconformance to requirement constitutes test failure.
Test
Textile materials used hook disks(without pads)
Ambient NA
Accelerated
Aging/Shelf
Life*
Any nonconformance to requirement constitutes test failure.
Test
(1 sample from each of four finished helmet sizes)
Ambient NA 1 1 1 1
104 Safety Certificate of Conformance CoC NA Ambient NA
105 Toxicity Certificate of Conformance CoC NA Ambient NA
Hazardous
Materials Certificate of Conformance CoC NA Ambient NA
IRS See AR-PD 12-01 12
For the ECH PD: List of materials required: 6 samples of each shape pad, 8 specimens (2 in x 6 in size of each specimen) of the loop material (inner layer), 8 specimens (1 in x 5
in) of the hook used in the hook disks, 8 specimens (25mm x 130mm) of the Pad Inner Material in the machine direction and 8 in the cross-machine direction, 2” x 6’ piece of hook disk material
A-11
T es t N u m
H R eq m n t
P a ss
/F te if ic a ti h m p li n d it ll is ti c
P ro je ct il e
Unfinished
Shell Finished Shell
Finished Helmet w/ IRS
S M L XL S M L
X
L S M L XL
For the IRS Retention System: List of materials required: in addition to the 12 medium ECH w/ IRS installed listed above: 4 loose IRS, 1 spool of thread, 60 ft of nylon webbing, 5 samples of laminated foam, and 5 each male and female side release buckles. Note that samples for the Hardware RTP ballistic test are listed in line 38.
RTP - 9mm NVD Hardware testing (item 39) requires 22 valid shots. 25 brackets and the corresponding number of sets of hardware shall be supplied.
Note that some helmets are used for multiple tests:
- Items 1 thru 8 use the same 20 helmets (5 each size, 4 sizes)
- Items 9, 10 and 12 use the same 20 helmets (5 each size, 4 sizes)
- Items 22 thru 24 use the same 20 helmets (5 each size, 4 sizes)
- Items 31 thru 33 use the same 4 helmets (1 each size, 4 sizes)
V50 ballistic testing quantities assume 2 helmets for the 2, 4, 16, and 17 grain tests, 4 for the 64 gr, and 6 for Threat M.
Sub-Total 5 5 5 5 38 45 40 36 58 73 61 57
Spares 1 1 1 1 3 3 3 3 6 6 6 6
Total
6 6 6 6 41 48 43 39 64 79 67 63
REFERENCES
References
1) ECH PD Revision L, 07 Jul 16
2) Draft DOTE ECH Protocol, 08 Jul 16
3) Test and Evaluation Strategy for Enhanced Combat Helmet
File details come from the government source that posted it. Updated .