20161013_QA_From_ECH_Industry_Day.pdf

PDF 200 KB Posted

Attached to
Enhanced Combat Helmet (ECH)
Solicitation number
M67854-16-R-1122
Issued by

About this file

(Document Originally Posted 20 October 2016) Questions and Answers from ECH Industry Day

View the file

Other files

File Type Posted
170112_ECH_RFP_Questions_and_Answers_VII_Am9.pdf PDF
M67854-16-R-1122_Amendment_0009.pdf PDF
170110_ECH_RFP_Questions_and_Answers_VI_Am8.pdf PDF
M67854-16-R-1122_Amendment_0008.pdf PDF
161230_ECH_RFP_Questions_and_Answers_V_Am7.pdf PDF
M67854-16-R-1122_Amendment_0007.pdf PDF
Att_19_161130_-_ECH_Helmet_Bracket_MFR_Redacted.pdf PDF
Att_3_DD254_M16-R-1122_REV_1.pdf PDF
161207_ECH_RFP_Questions_and_Answers_IV_Am6.pdf PDF
M67854-16-R-1122_Amendment_0006.pdf PDF
161117_-_GL-PD-09-04_ECH_Purchase_Description_(Ver_N).pdf PDF
M67854-16-R-1122_Amendment_0005.pdf PDF
161117_ECH_RFP_Questions_and_Answers_III.pdf PDF
M67854-16-R-1122_Amendment_0004.pdf PDF
161109_ECH_RFP_Questions_and_Answers_II.pdf PDF
M67854-16-R-1122_Amendment_0003.pdf PDF
Ex_A_161028_-_Signed_CDRLs_M67854-16-R-1122_ECH.pdf PDF
M67854-16-R-1122_Amendment_0002.pdf PDF
161107_ECH_RFP_Questions_and_Answers_Word.pdf PDF
Att_1_161028_-_GL-PD-09-04_ECH_Purchase_Description_(Ver_M)_-_FINAL.pdf PDF
M67854-16-R-1122_Amendment_0001.pdf PDF
Att_10_Sample_FACAR_5Y_8D_Form.pdf PDF
Ex_A_160915_Signed_CDRLs_M67854-16-R-1122_ECH.pdf PDF
Att_3_DD254_M16-R-1122_080916.pdf PDF
Att_18_160914_ECH_Schedule_of_GFP_FBO_Ver.xlsx XLSX spreadsheet
Att_14_-_Past_Performance_Questionnaire.doc DOC document
Att_1_160914_-_GL-PD-ECH_Purchase_Description_(Ver_L)_-_FINAL.pdf PDF
Att_9_Helmet_Pad_Drawing_2-1-2566_Rev_A.pdf PDF
Ex_B_160912_-_ECH_VATEP_Evaluation_Process.pdf PDF
M67854-16-R-1122.pdf PDF
FY17_ECH_PreSolicitation_Notice_Amendment_01.doc DOC document
10_FY17_ECH_PPQ_25_July_16.pdf PDF
9_160727_-_ECH_AAO_Increase_Sections_L_and_M_PSN.pdf PDF
12_M16-R-1122_DD254.pdf PDF
11_07262016_ECH_DRAFT_CLIN_Structure.pdf PDF
1_GL-PD-09-04_ECH_Purchase_Description_(Ver_L)_DRAFT_070716.pdf PDF
5_ECH_LAT_Plan_v7_DRAFT_070716.pdf PDF
8_Sample_FACAR_5Y_8D_Form.pdf PDF
2_ECH_SOW_-_7.13.16.pdf PDF
4_ECH_LAT_Component_Plan_DRAFT_070816.pdf PDF
3_160711_-_ECH_FAT_Event_Design_Plan_DRAFT.pdf PDF
FY17_ECH_PreSolicitation_Notice.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enhanced Combat Helmet M67854-16-R-1122

Industry Day Questions & Answers

1. The language in Section M and the Statement of Work contradict one another regarding the requirement for the Facility Clearance. Does the Government require a facility clearance at time of proposal or to perform the contract?

a. The Government requires a facility clearance to respond to the solicitation (Section

L.3.2.1.1). The Government also requires a facility clearance to perform the contract

(Section C Paragraph 3.1.4).

2. After the VATEP evaluation has been conducted, what percentage reduction in weight will offerors be held to?

a. Per Section M.3.4.2, the awardee’s Government verified claimed weight will be incorporated into the Purchase Description (PD) and will become the threshold for contract performance

3. Do Source Selection Samples require a Night Vision Device (NVD) Mount? If so, are you going to weigh Source Selection Samples with the NVD Mount? If not, how will you be removing them and putting them back on?

a. Per Section L.3.2.1.3, each Source Selection helmet shall include both a retention system and a suspension system. Offeror’s shall submit four sets of NVD hardware; however the

NVD Mount is not required for Source Selection Samples. Per Section M.3.4.2, the

Government will weigh the Source Selection finished helmets, including the 7-pad

Retention System and Suspension System. The NVD Mount is not required for Source

Selection Samples and therefore will not be included in the evaluated weight of the helmet.

4. Is the evaluation of weight in Price or Technical factor?

a. Per Section M.1, the Government will evaluate an Offeror’s weight as a Go/No Go

Criteria (Criteria 4). The Government will also evaluate the Offeror’s weight under the

Factor 4 - Price Factor per Section M.3.4.2.

5. How will Government Purpose Rights (GPR) be evaluated?

a. Per Section M.3.1.4, Offerors who propose Government Purpose Rights for the NVD

Mount hardware design in accordance with DFARS 252.227-7013 will receive a Strength.

Offerors who do not propose GPR for the NVD Mount will remain eligible for award.

6. Is the Government open to mount designs other than those provided by the Government?

a. No. There is the potential for an ECP after contract has been awarded.

7. Is the Government open to a different pad solution?

a. No. Please refer to PD Paragraph 6.5 for the mandatory source for the Enhanced

Combat Helmet (ECH) Pad Suspension and Retention System.

8. What is the minimum quantity of 15,000 based on?

a. This quantity is based on anticipated FY17 funding.

9. What documents or information need to be provided for the Nation Institute of Justice (NIJ)

Laboratory Tests

a. Offerors shall provide a NIJ approved laboratory test report that clearly demonstrates the Offerors proposed ECH meets the threshold/minimum ECH PD requirements for

Enhanced Combat Helmet M67854-16-R-1122 those tests listed in Table 2 of Section L. The NIJ-approved laboratory test report must be unaltered in a pdf file with an official signature from the test laboratory.

10. What are the dollar values the Government associated with the TEP based on?

a. The dollar values represent the value to the Government for the associated weight reduction and are limited by the acceptable level of cost to the Government for the ECH.

11. Are offerors responsible for manufacturing the NVD mount?

a. Offerors are responsible for manufacturing the NVD mount per Paragraph 3 of the

Section C - Statement of Work. However, the NVD Mount will not be evaluated during

Source Selection, but will be evaluated during Post-Award First Article Testing with the successful offeror. The Source Selection Samples required by Section L.3.2.1.3 do not include the NVD Mount.

12. How does an Offeror ensure both backwards compatibility between the X-back retention system and the Improved Retention System and attain weight reduction (causing a thinner helmet), if the Offeror is required to use hardware designed for the old ECH version and not allowed bolt protrusion?

a. Per PD Paragraph 3.6.2, the bolt of the Improved Retention System attaching hardware may protrude thru the nut (post). The bolt of the X-back attaching hardware may protrude thru the post.

13. Is the Government open to different NVD hole diameters other than those specified by the

Government?

a. No.

14. Will the Government be providing the NVD Mount .stp file?

a. The NVD Mount .stp is Attachment 13 to the solicitation.