ACV_CDRLs_Combined_01082015.pdf
PDF 6 MB Posted
- Attached to
- Amphibious Combat Vehicle (ACV) 1. 1 Federal contract opportunity
- Solicitation number
- M67854-15-R-0001
- Issued by
- United States Marine Corps
About this file
_ACV CDRLs Combined 01082015
View the file
Other files for this federal contract opportunity
Show all 50
Amphibious Combat Vehicle (ACV) 1. 1 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0013, 2011, 3011, 4011, 5011, 6011
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
OPERATIONS SECURITY (OPSEC) PLAN
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80934C
5. CONTRACT REFERENCE
SOW PARA 3.1.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
60 DAC
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
Draft
Final
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE
CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT
DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR
DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE UNITED
STATES (U.S.) GOVERNMENT AGENCIES ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT
2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND
SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCK 13:
30 CALENDAR DAYS AFTER LOW-RATE INITIAL PRODUCTION (LRIP) (OPTION, IF EXERCISED), THEN ANNUALLY.
30 CALENDAR DAYS AFTER FULL-RATE PRODUCTION (FRP) (OPTION, IF EXERCISED), THEN
ANNUALLY.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
ELECTRONIC COPY TO THE CONTRACTING OFFICERS REPRESENTATIVE (COR) AND THE
ALTERNATE COR.
15. TOTAL
G. PREPARED BY
SCARLETO CIV ANGELO
H. DATE
[Prepared By Date]
I. APPROVED BY
LT COL MULLINS
J. DATE
[Approved By Date]
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
PROGRAM PROTECTION IMPLEMENTATION PLAN
(PPIP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
FIVE (5) TIMES
12. DATE OF FIRST
SUBMISSION
90 DAC
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: GUIDANCE FOR ADDRESSING THE OUTLINE AREAS OF THE GOVERNMENT'S
PROGRAM PROTECTION PLAN (PPP) IS PROVIDED IN THE PPP OUTLINE AND GUIDANCE,
VERSION 1.0 OF JULY 2011 (LINK: HTTP://WWW.ACQ.OSD.MIL/SE/DOCS/PPP-OUTLINE-AND-
GUIDANCE-V1-JULY2011.PDF).
BLOCK 8:
INITIAL SUBMISSION, PRELIMINARY DESIGN REVIEW (PDR)/CRITICAL DESIGN REVIEW (CDR):
THE GOVERNMENT WILL HAVE 67 CALENDAR DAYS TO REVIEW AND PROVIDE COMMMENTS
ON THE PDR/CDR ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE
CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT
DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR
DAYS TO ACCEPT THE SUBMISSION.
2ND SUBMISSION, VEHICLE ACCEPTANCE REVIEW (VAR): THE GOVERNMENT WILL HAVE 30
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE
IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS
TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE
GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
3RD SUBMISSION, SYSTEM VERIFICATION REVIEW (SVR): THE GOVERNMENT WILL HAVE 45
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE SVR ARTIFACT.
ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15
CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR
REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE
SUBMISSIONS.
4TH AND 5TH SUBMISSIONS, LOW-RATE INITIAL PRODUCTION (LRIP)/FULL-RATE
PRODUCTION (FRP) (OPTIONS, IF EXERCISED): THE GOVERNMENT WILL HAVE 21
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE
IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS
TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE
GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
McGowan CIV Steven J
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2
A. CONTRACT LINE ITEM NO.
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A002)
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE UNITED STATES (U.S.) GOVERNMENT AGENCIES ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND
SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., AND SEC 2751, ET SEQ) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH
PROVISIONS OF DOD DIRECTIVE 5230.25.
BLOCK 13:
2ND SUBMISSION (VAR): FIVE (5) CALENDAR DAYS AFTER FIRST VEHICLE COMPLETES ACCEPTANCE TEST.
3RD SUBMISSION (SVR): 60 CALENDAR DAYS FOLLOWING COMPLETION OF THE LAST SYSTEM VERIFICATION TEST IDENTIFIED IN THE GOVERNMENT INTEGRATED MASTER SCHEDULE AND COMMUNICATED TO THE CONTRACTOR AT THE PROGRAM MANAGEMENT
REVIEWS.
4TH AND 5TH SUBMISSIONS: 30 CALENDAR DAYS AFTER LRIP AND FRP (OPTIONS, IF EXERCISED).
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE CONTRACTING
OFFICERS REPRESENTATIVE (COR) AND THE ALTERNATE COR.
DD FORM 1423-1, FEB 2001 Page 2 of 2
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
PROGRAM PROTECTION INFORMATION PLAN (PPIP)
3. SUBTITLE
INFORMATION ASSURANCE (IA) PLAN AND
STATUS ASSESSMENTS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
QUARTERLY
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT WILL HAVE 45 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE
CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT
DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR
DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE UNITED
STATES (U.S.) GOVERNMENT AGENCIES ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT
2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND
SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED
BY THE ARMS EXPORT CONTROL ACT (TITLE 22, UNITED STATES CODE (U.S.C.), AND SEC
2751, ET SEQ) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,
U.S.C., APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS OF DEPARTMENT
OF DEFENSE (DoD) DIRECTIVE 5230.25.
BLOCK 13: INFORMATION ASSURANCE STATUS ASSESSMENTS SHALL BE PROVIDED 90
CALENDAR DAYS AFTER LRIP AND FRP (OPTIONS, IF EXERCISED).
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
ELECTRONIC COPY TO THE CONTRACTING OFFICERS REPRESENTATIVE (COR) AND THE
Kelley CIV Peter
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
PROGRAM PROTECTION IMPLEMENTATION PLAN
(PPIP)
3. SUBTITLE
ANTI-TAMPER PLAN
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81306
5. CONTRACT REFERENCE
SOW PARA 3.1.4.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
FIVE (5) TIMES
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
BLOCK 4: DI-ADMN-81306 GUIDANCE FOR ADDRESSING PREPARATION OF THE
CONTRACTOR'S ANTI-TAMPER PLAN CAN BE FOUND IN DEPARTMENT OF DEFENSE (DoD)
ANTI-TAMPER PLAN TEMPLATE, VERSION 3.0 OF 29 AUGUST 2011. REQUESTS FOR THE
TEMPLATE SHALL BE REFERRED TO THE PROGRAM EXECUTIVE OFFICE - LAND SYSTEMS
(PM AAA), 2200 LESTER STREET, QUANTICO, VA 22134-6050.
BLOCK 8:
INITIAL SUBMISSION, PRELIMINARY DESIGN REVIEW (PDR)/CRITICAL DESIGN REVIEW (CDR):
THE GOVERNMENT WILL HAVE 67 CALENDAR DAYS TO REVIEW AND PROVIDE COMMMENTS
ON THE PDR/CDR ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE
CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT
DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR
DAYS TO ACCEPT THE SUBMISSION.
2ND SUBMISSION, VEHICLE ACCEPTANCE REVIEW (VAR): THE GOVERNMENT WILL HAVE 30
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE
IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS
TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE
GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSIONS.
3RD SUBMISSION, SYSTEM VERIFICATION REVIEW (SVR): THE GOVERNMENT WILL HAVE 45
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE SVR ARTIFACT.
ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15
CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR
REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE
SUBMISSIONS.
4TH AND 5TH SUBMISSIONS, LOW-RATE INITIAL PRODUCTION (LRIP)/FULL-RATE
PRODUCTION (FRP) (OPTIONS, IF EXERCISED): THE GOVERNMENT WILL HAVE 21
CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE
IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS
TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE
GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO ACCEPT THE SUBMISSION.
McGowan CIV Steven J
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A004)
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE UNITED STATES (U.S.) GOVERNMENT AGENCIES ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND
SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, UNITED STATES CODE (U.S.C.), AND SEC 2751, ET SEQ) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN
ACCORDANCE WITH PROVISIONS OF DOD DIRECTIVE 5230.25.
BLOCK 13:
2ND SUBMISSION (VAR): FIVE (5) CALENDAR DAYS AFTER FIRST VEHICLE COMPLETES ACCEPTANCE TEST.
3RD SUBMISSION (SVR): 60 CALENDAR DAYS FOLLOWING COMPLETION OF THE LAST SYSTEM VERIFICATION TEST IDENTIFIED IN THE GOVERNMENT INTEGRATED MASTER SCHEDULE AND COMMUNICATED TO THE CONTRACTOR AT THE PROGRAM MANAGEMENT
REVIEWS.
4TH AND 5TH SUBMISSIONS: 30 CALENDAR DAYS AFTER LRIP AND FRP (OPTIONS, IF EXERCISED).
BLOCK 14: CLASSIFIED CDRL SUBMISSION REQUIRED, IN ACCORDANCE WITH PARAGRAPH 2.6.2 OF ATTACHMENT FOUR (4).
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
PROGRAM MANAGEMENT PLAN (PMP)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81797
5. CONTRACT REFERENCE
SOW PARA 3.2.2.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
THREE (3) TIMES
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE
CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT
DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR
DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT B: DISTRIBUTION AUTHORIZED TO THE UNITED
STATES (U.S.) GOVERNMENT AGENCIES ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT
2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND
SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCK 13: 2ND AND 3RD SUBMISSIONS SHALL BE 60 CALENDAR DAYS AFTER LOW-RATE
INITIAL PRODUCTION (LRIP) AND FULL-RATE PRODUCTION (FRP) (OPTIONS, IF EXERCISED).
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
Scarlato CIV Angelo D
H. DATE
[Prepared By Date]
I. APPROVED BY
Mullins LtCol Kirk D
A. CONTRACT LINE ITEM NO.
0013, 2011, 3011, 4011, 5011, 6011
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A005)
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
CONFERENCE AGENDA
3. SUBTITLE
MEETINGS/REVIEWS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81249A
5. CONTRACT REFERENCE
SOW PARA 3.2.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
AS REQUIRED
12. DATE OF FIRST
SUBMISSION
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT MAY PROVIDE COMMENTS WITH FOUR (4) DAYS FOR
INCORPORATION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
BLOCK 10: AS REQUIRED BY STATEMENT OF WORK (SOW) AND ATTACHMENT 03, MEETING
LIST.
BLOCK 12: SEVEN (7) CALENDAR DAYS PRIOR TO THE FIRST CONTRACT MEETING, THE
CONTRACTOR SHALL PROVIDE A CONFERENCE AGENDA.
BLOCK 13: DURING ENGINEERING, MANUFACTURING AND DEVELOPMENT (EMD), LOW-
RATE INITIAL PRODUCTION (LRIP) AND FULL-RATE PRODUCTION (FRP) (OPTIONS, IF
EXERCISED), THE CONTRACTOR SHALL PROVIDE CONFERENCE AGENDAS SEVEN (7)
CALENDAR DAYS PRIOR TO ANY MEETING.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
Scarlato CIV Angelo D
H. DATE
[Prepared By Date]
I. APPROVED BY
Mullins LtCol Kirk D
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
BRIEFING MATERIAL
3. SUBTITLE
PRELIMINARY DESIGN REVIEW (PDR)/CRITICAL
DESIGN REVIEW (CDR) PRESENTATION
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81605
5. CONTRACT REFERENCE
SOW PARA 3.3.1.2 / 3.4.2.1
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
ONE (1) TIME
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
N/A
Reg Repro
16. REMARKS
BLOCK 4: THE PDR/CDR PRESENTATION SHALL INCLUDE THE FOLLOWING AS IT PERTAINS
TO THE ACV DESIGN:
1. DESCRIPTION OF THE SYSTEM DESIGN ARCHITECTURE AND SYSTEMS INTEGRATION TO
INCLUDE RELATIONSHIPS TO WORK BREAKDOW STRUCTURE (WBS) ELEMENTS.
2. ALLOCATION OF REQUIREMENTS TO EACH OF THE HARDWARE CONFIGURATION ITEMS
(HWCI).
3. ALLOCATION OF REQUIREMENTS TO ANY SOFTWARE CONFIGURATION ITEM (SWCI)
HOSTED BY THE HWCI TO INCLUDE FIRMWARE, CALIBRATION AND LICENSES.
4. FINAL ASSESSMENT OF ESTABLISHED PRODUCT BASELINE AGAINST TIERED SYSTEM
SPECIFICATION REQUIREMENTS AND REQUIRED LOWER-TIER TRADES, ALONG WITH
SUPPORTING TRADE-OFF ANALYSES AND DATA.
5. WEIGHT ALLOCATION AND GROWTH ASSESSSMENT.
6. LOAD PLAN REVIEW AND ASSESSMENTS.
7. HUMAN SYSTEMS INTEGRATION ASSESSMENT, INCLUDING DISPLAYS.
8. ENVIRONMENT, SAFETY, AND OCCUPATIONAL HEALTH (ESOH) ASSESSMENT.
9. GOVERNMENT FURNISHED PROPERTY (GFP) PROGRAM MANAGEMENT AND STATUS.
10. ASSESSMENT OF ACHIEVING QUALITY, MAINTAINABILITY, AND RELIABILITY
REQUIREMENTS.
11. STANDARDIZATION CONSIDERATIONS.
12. CORROSION PREVENTION/CONTROL CONSIDERATIONS.
13. TRANSPORTABILITY, PACKAGING, AND HANDLING CONSIDERATIONS.
14. SURVIVABILITY/VULNERABILITY ASSESSMENT.
15. MANUFACTURING READINESS ASSESSMENT.
16. TECHNICAL AND TRAINING MANUALS ASSESSMENT.
17. PROGRAM PROTECTION, INFORMATION ASSURANCE, AND ANTI-TAMPER STATUS.
18. PRODUCT BASELINE OF THE AS-BUILT CONFIGURATION TO INCLUDE WBS
RELATIONSHIP AND IDENTIFICATION OF CONTRACTOR FURNISHED AND GOVERNMENT
FURNISHED EQUIPMENT
19. RISK ASSESSMENT AGAINST TECHNICAL, COST AND SCHEDULE, TO INCLUDE ESOH AND
HUMAN SYSTEM INTEGRATION.
20. COST ASSESSMENT OF ACV DESIGN.
21. PROGRAM MANAGEMENT STATUS.
Olree CIV Michael R
H. DATE
[Prepared By Date]
I. APPROVED BY
Was CIV Joseph E
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A007)
BLOCK 8: INITIAL SUBMISSION, PDR/ CDR: THE GOVERNMENT WILL HAVE 67 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON THE PDR/CDR ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO UPDATE THE TECHNICAL CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO
ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA 22135-6050.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE CONTRACTING
OFFICERS REPRESENTATIVE (COR) AND THE ALTERNATE COR.
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
CONFERENCE REPORTS
3. SUBTITLE
MEETING/REVIEWS
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81308
5. CONTRACT REFERENCE
SOW PARA 3.2.2
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
AS REQ
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
BLOCK 8: THE GOVERNMENT WILL HAVE SEVEN (7) CALENDAR DAYS TO REVIEW AND
PROVIDE COMMENTS ON THE ARTIFACT. ACCEPTANCE IS BASED ON TECHNICAL CONTENT.
THE CONTRACTOR SHALL HAVE THREE (3) CALENDAR DAYS TO UPDATE THE TECHNICAL
CONTENT DEFICIENCIES AND RESUBMIT FOR REVIEW. THE GOVERNMENT WILL HAVE FIVE
(5) CALENDAR DAYS TO ACCEPT THE SUBMISSION.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
BLOCK 10: AS REQUIRED BY STATEMENT OF WORK (SOW) AND ATTACHMENT 03, MEETING
LIST.
BLOCKS 12 AND 13: THE CONTRACTOR SHALL SUBMIT THE CONFERENCE MINUTES WITHIN
SEVEN (7) CALENDAR DAYS AFTER EACH MEETING/REVIEW.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
Scarlato CIV Angelo D
H. DATE
[Prepared By Date]
I. APPROVED BY
Mullins LtCol Kirk D
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED.
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
STATUS REPORT
3. SUBTITLE
MONTHLY PROGRESS STATUS REPORT
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80368A
5. CONTRACT REFERENCE
SOW PARA 3.2.3
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
MONTHLY
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
MONTHLY
BLOCK 4: DI-MGMT-80368A IS TAILORED AS FOLLOWS: EXCEPT CONTENT DESCRIBED IN
3.2.3 ITEMIZED MAN-HOURS AND COSTS.
BLOCK 8: THE CONTRACTOR WILL HAVE 10 CALENDAR DAYS TO INCORPORATE INTO NEXT
DELIVERABLE.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
BLOCK 10: THE MONTHLY PROGRESS STATUS REPORT SHALL BE DELIVERED TO THE
GOVERNMENT NO LATER THAN THE LAST BUSINESS DAY OF EACH MONTH.
BLOCK 13:
60 CALENDAR DAYS AFTER INITIAL SUBMISSION, THEN MONTHLY THROUGH THE END OF
THE BASE CONTRACT.
60 CALENDAR DAYS AFTER LRIP (OPTION, IF EXERCISED), THEN MONTHLY THROUGH THE
END OF LRIP OPTIONS.
60 CALENDAR DAYS AFTER FRP (OPTION, IF EXERCISED), THEN MONTHLY THROUGH THE
END OF FRP OPTIONS.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
Scarlato CIV Angelo D
H. DATE
[Prepared By Date]
I. APPROVED BY
Mullins LtCol Kirk D
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
INTEGRATED PROGRAM MANAGEMENT REPORT
(IPMR)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81861
5. CONTRACT REFERENCE
SOW PARA 3.2.4.1 / 3.2.4.2 / 3.2.4.3 / 3.2.6.2 /
3.2.6.3 / 3.2.6.4 / 3.2.13.1
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
BLOCK 8: THE GOVERNMENT WILL HAVE 21 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS. THE CONTRACTOR SHALL HAVE SEVEN (7) CALENDAR DAYS TO MAKE
CORRECTIONS AND RESUBMIT FOR APPROVAL.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
THE CONTRACTOR SHALL PROVIDE A MONTHLY IPMR PER DATA ITEM DESCRIPTION (DID) DI-
MGMT-81861 AND IT SHALL BE DEVELOPED IN ACCORDANCE WITH DoD INTEGRATED MASTER
PLAN (IMP) AND SCHEDULE GUIDE (V0.9 DATED 21 OCT 05), EXCEPT AS MODIFIED PER THE
FOLLOWING:
BLOCKS 10, 12, 13: INITIAL SUBMISSIONS, SUBSEQUENT SUBMISSIONS, & FREQUENCY:
FORMATS 1-5 SUBMISSIONS:
BLOCK 12:
• DRAFT SUBMISSIONS ARE DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH
OCCURS APPROXIMATELY 60 CALENDAR DAYS AFTER CONTRACT (DAC) AWARD.
• FINAL SUBMISSIONS ARE DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH
OCCURS APPROXIMATELY 90 CALENDAR DAC AWARD.
BLOCKS 10 AND 13:
• SHALL BE SUBMITTED MONTHLY NO LATER THAN 15 CALENDAR DAYS FOLLOWING THE
CONTRACTOR’S ACCOUNTING PERIOD CUTOFF DATE.
FORMAT 6 - CONTRACT IMP SUBMISSIONS:
BLOCK 12:
• DRAFT CONTRACT IMP SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD
WHICH OCCURS APPROXIMATELY 60 CALENDAR DAC AWARD.
• FINAL CONTRACT IMP SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD
WHICH OCCURS APPROXIMATELY 90 CALENDAR DAC AWARD.
FORMAT 6 - CONTRACT INTEGRATED MASTER SCHEDULE
Bradley CIV Walter M
H. DATE
[Prepared By Date]
I. APPROVED BY
Atkinson CIV Dustin J
J. DATE
[Approved By Date]
17. PRICE
GROUP
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 3
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A010)
BLOCKS 10 AND 13:
• AS REQUIRED:
FORMAT 6 – CONTRACT IMS SUBMISSIONS:
BLOCK 12:
• DRAFT CONTRACT IMS SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 60
CALENDAR DAC AWARD.
• FINAL CONTRACT IMS SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 90
CALENDAR DAC AWARD.
BLOCKS 10 AND 13:
• IMS SUBSEQUENT MONTHLY SUBMISSIONS SHALL BE PROVIDED 15 CALENDAR DAYS AFTER THE CLOSE OF BUSINESS OF THE
CONTRACTOR ACCOUNTING PERIOD.
FORMAT 6 - SCHEDULE RISK ASSESSMENT (SRA) SUBMISSIONS:
BLOCK 12:
• THE FIRST SRA SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 90 CALENDAR
DAC AWARD.
BLOCKS 10 AND 13:
• SRA SUBSEQUENT SUBMISSIONS SHALL BE PROVIDED QUARTERLY AFTER THE INITIAL SRA. THE SRA SHALL BE COMPLETED AND AVAILABLE FOR GOVERNMENT APPROVAL AND COMMENT 15 CALENDAR DAYS AFTER THE CLOSE OF BUSINESS OF EVERY THREE (3)
CONTRACTOR’S ACCOUNTING PERIODS (QUARTERLY).
FORMAT 7 SUBMISSIONS:
BLOCK 12:
• DRAFT SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 60 CALENDAR DAC
AWARD.
• FINAL SUBMISSION IS DUE AT THE CLOSE OF THE ACCOUNTING PERIOD WHICH OCCURS APPROXIMATELY 90 CALENDAR DAC
AWARD.
BLOCKS 10 AND 13:
• SHALL BE SUBMITTED ANNUALLY NO LATER THAN 15 CALENDAR DAYS FOLLOWING THE CONTRACTOR’S ACCOUNTING PERIOD
CUTOFF DATE IN JULY OF EACH YEAR.
FORMAT 1 INSTRUCTIONS:
• UNLESS OTHERWISE SPECIFIED, CONTRACT WORK BREAKDOWN STRUCTURE (WBS) ELEMENTS SHALL BE REPORTED TO LEVEL FOUR (4) OF THE WBS AS SHOWN IN THE “COST AND SOFTWARE DATA REPORTING (CSDR) PLAN,” CONTRACT ATTACHMENT 06.
• FORMAT 1 SHALL BE PROVIDED BY ELEMENT OF COST (EOC) AT THE WBS REPORTING LEVEL. ONLY THE FORMAT 1 (NON-EOC FORMAT PROVIDED AT THE REPORTING LEVEL) SHOULD BE UPLOADED TO THE DEFENSE COST ANALYSIS RESOURCE CENTER (DCARC)
REPOSITORY.
FORMAT 2 INSTRUCTIONS:
• USE ORGANIZATION (ORG) CATEGORIES. REPORT ANY CHANGES TO ORG STRUCTURE AND/OR MOVEMENT OF CONTROL ACCOUNT
TO A NEW ORG.
FORMAT 3 INSTRUCTIONS:
• FORMAT 3 SHALL CONTAIN BASELINE AND ESTIMATE TO COMPLETION (ETC) BY MONTH FOR COLUMNS 4-9, THEN BY THREE (3) MONTH PERIODS FOR COLUMNS 10-11, THEN BY 12 MONTH PERIODS FOR THE NEXT TWO (2) SUBSEQUENT PERIODS (COL 12 & 13) AND
THE REMAINDER OF THE CONTRACT FOR THE LAST PERIOD (COLUMN 14).
FORMAT 4 INSTRUCTIONS:
• THE CONTRACTOR’S ETC PROJECTIONS SHALL BE USED FOR TIMEPHASING OF EQUIVALENT PERSON MONTHS FOR EACH
ORGANIZATIONAL CATEGORY SPECIFIED IN FORMAT 2.
• STAFFING SHALL BE REPORTED IN HOURS.
DD FORM 1423-1, FEB 2001 Page 2 of 3
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
16. REMARKS (Continuation of A010)
FORMAT 5 INSTRUCTIONS:
• VARIANCE ANALYSIS SHALL BE REPORTED IN DOLLARS.
• THE FORMAT 5 NARRATIVE SHALL INCLUDE A SUMMARY, IMPACT TO IMMEDIATE TASKS, IMPACT TO OVERALL PROGRAM, CORRECTIVE ACTION AND IMPACT TO EAC.
• PROBLEM ANALYSIS AND NARRATIVE EXPLANATIONS SHALL BE REQUIRED FOR FORMAT 1 ELEMENTS WHICH MEET THE FOLLOWING
THRESHOLDS:
• EXCEEDING +/- $50K AND +/- 5% OF THE WBS REPORTING LEVEL CURRENT SCHEDULE VARIANCE (SV)
• EXCEEDING +/- $50K AND +/- 5% OF THE WBS REPORTING LEVEL CURRENT COST VARIANCE (CV)
• EXCEEDING +/- $200K AND +/- 5% OF THE WBS REPORTING LEVEL CUMMULATIVE SV
• EXCEEDING +/- $200K AND +/- 5% OF THE WBS REPORTING LEVEL CUMMULATIVE CV
• EXCEEDING +/- $200K AND +/- 5% OF THE WBS REPORTING LEVEL VAC
• AS REQUESTED PROVIDE OTHER COST AND SCHEDULE VARIANCES OR TECHNICAL PERFORMANCE ISSUES THAT ARE
CAUSING OR ARE LIKELY TO CAUSE SIGNIFICANT SCHEDULE DELAYS OR COST OVERRUNS.
• CHANGES IN FORMAT 4 WHICH REQUIRE EXPLANATIONS ARE THOSE THAT CHANGE THE ABSOLUTE VALUE OF THE PROJECTED TOTAL STAFF-MONTHS AT COMPLETION OF ANY ORGANIZATIONAL OR FUNCTIONAL CATEGORY BY MORE THAN +/-5,000
HOURS OF BASELINE BETWEEN REPORTING PERIODS.
• EXPLANATION OF DIFFERENCES BETWEEN MOST LIKELY, BEST AND WORST CASE EAC AS COMPARED TO EAC SHOWN ON
FORMAT 1 BLOCK 8E.
• EXPLANATION OF OVERHEAD (OH), COST OF MONEY (COM), GENERAL AND ADMINISTRATIVE (G&A) VARIANCES WITHIN THE
SUMMARY SECTION OF THE FORMAT 5.
• NARRATIVE EXPLANATIONS REQUIRED AND VARIANCE THRESHOLDS WILL BE REVIEWED PERIODICALLY.
• THE CONTRACTOR SHALL DELIVER A NARRATIVE REPORT WITH IMS ANALYSIS AND CRITICAL PATH DISCUSSION.
• ALL SRA INPUT DATA, METHODOLOGY AND ANALYSIS SHALL BE PROVIDED IN THE NARRATIVE REPORT.
OTHER SUPPLEMENTAL DOCUMENTATION:
• THE CONTRACT PERFORMANCE REPORT (CPR) SUBMISSION SHALL INCLUDE THE PROGRAM LOG WHICH WILL PROVIDE A DESCRIPTION FOR EACH CHANGE AS WELL AS THE BASELINE CHANGE REQUEST (BCR) IMPLEMENTING THE CHANGES AND THE
CONTROL ACCOUNTS AFFECTED BY THE CHANGES REPORTED IN FORMAT 3.
• CONTRACTOR SHALL PROVIDE ALL SUBCONTRACTOR CPR REPORTS WHICH ARE APPLICABLE AND SUPPORT THE MONTHLY CDRL SUBMISSION. CONTRACTOR IS NOT REQUIRED TO UPLOAD SUBCONTRACTOR REPORTS TO THE DCARC REPOSITORY.
FORMAT SIX (6) INSTRUCTIONS:
THE CONTRACT IMP:
• THE CONTRACT IMP SHALL TIE DIRECTLY TO THE GOVERNMENT PROVIDED PROGRAM IMP. ALL CONTRACTOR RECOMMENDED UPDATES TO THE PROGRAM IMP SHALL BE SUBMITTED AS REQUIRED FOR REVIEW AND APPROVAL BY THE GOVERNMENT.
• THE CONTRACT IMP SHALL BE DELIVERED USING THE COMMERCIAL OFF-THE-SHELF (COTS) SOFTWARE, MICROSOFT (MS) OFFICE
EXCEL 2010 OR LATER SUPPORTED VERSION.
THE CONTRACT IMS:
• THE CONTRACT IMS SHALL INCLUDE ALL DISCRETE WORK. SUBCONTRACTORS WITH FLOWDOWN SHALL BE INCORPORATED WITH
SUFFICIENT DETAIL TO DEVELOP A REALISTIC CRITICAL PATH.
• THE CONTRACTOR SHALL UPDATE THE IMS AT A MINIMUM ON A MONTHLY BASIS WITH A STATUS DATE AS OF THE LAST DAY OF THE
ACCOUNTING MONTH. THE CONTRACTOR SHALL CONDUCT MONTHLY STATUS REVIEWS.
• THE CONTRACT IMS SHALL BE DELIVERED USING THE COTS SOFTWARE, MS OFFICE PROJECT 2010 OR LATER SUPPORTED
VERSION.
THE SRA:
• THE PROJECT FILE INCLUDING SRA DATA FIELDS SHALL BE DELIVERED USING THE COTS SOFTWARE, MS OFFICE PROJECT 2010
VERSION OR LATER SUPPORTED VERSION.
BLOCK 14: ALL FORMATS SHALL BE SUBMITTED ELECTRONICALLY IN ACCORDANCE WITH THE DoD-APPROVED XML SCHEMAS, LOCATED IN THE EARNED VALUE MANAGEMENT (EVM) CENTRAL REPOSITORY (EVM-CR). REFER TO THE PERFORMANCE ASSESSMENT ROOT CAUSE ANALYSIS (PARCA) EVM WEBSITE FOR A LINK TO THE EVM-CR (HTTP://WWW.ACQ.OSD.MIL/EVM/). ADDITIONALLY, THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE CONTRACTING OFFICERS REPRESENTATIVE (COR) AND THE ALTERNATE
COR.
DD FORM 1423-1, FEB 2001 Page 3 of 3
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
CONTRACT WORK BREAKDOWN STRUCTURE
(CWBS)
3. SUBTITLE
CWBS INDEX AND DICTIONARY
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81334D
5. CONTRACT REFERENCE
SOW PARA 3.2.5 / 3.2.11
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLOCK 8: THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON ALL COST AND SOFTWARE DATA REPORTING (CSDR) SUBMISSIONS (TO
INCLUDE THE CWBS DICTIONARY AND STRUCTURE). THE CONTRACTOR SHALL REVIEW
AND INCORPORATE GOVERNMENT COMMENTS WITHIN SEVEN (7) CALENDAR DAYS AND
RESUBMIT TO THE GOVERNMENT.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
BLOCKS 10 , 12 AND 13: THE CONTRACTOR SHALL PREPARE THE CWBS IN ACCORDANCE
WITH DI-MGMT-81334D AND THE OFFICE OF THE SECRETARY OF DEFENSE (OSD) DEPUTY
DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED CONTRACT CSDR PLAN. THE DATA ITEM
DESCRIPTION (DID), DI-MGMT-81334D, IS AVAILABLE FROM THE DEFENSE COST AND
RESOURCE CENTER (DCARC) WEBSITE AT HTTP://DCARC.CAPE.OSD.MIL. THE CSDR PLAN
IS INCLUDED AS CONTRACT ATTACHMENT 06.
THE CONTRACTOR SHALL SUBMIT THE CWBS DICTIONARY AT FREQUENCIES SPECIFIED IN
THE OSD DDCA-APPROVED CONTRACT CSDR PLAN AND IN THE CONTRACT. THE
CONTRACT CSDR PLAN USES THE EVENT FIELD AS THE DRIVER FOR THE SUBMISSION OF
THE REPORTS, NOT THE "AS OF DATE." IF THE EVENT SLIPS, THE CONTRACTOR MUST
NOTIFY THE GOVERNMENT PROGRAM OFFICE THAT A DATE CHANGE IS NEEDED. IT IS THE
RESPONSIBILITY OF THE GOVERNMENT PROGRAM OFFICE TO SUBMIT A REQUEST FOR
CHANGE IN THE EVENT-DRIVEN DATE FOR REPORTING THROUGH THE CSDR SUBMIT-
REVIEW SYSTEM FOR DCARC APPROVAL BEFORE THE DATE REFLECTED IN THE OSD DDCA-
APPROVED CSDR PLAN.
BLOCK 14: THE CWBS DICTIONARY SHALL BE SUBMITTED ELECTRONICALLY USING THE
CSDR SUBMIT-REVIEW SYSTEM. DATA SUBMITTERS MUST REGISTER THROUGH THE
DCARC WEBSITE AND POSSESS A DOD-APPROVED EXTERNAL CERTIFICATION AUTHORITY
(ECA) DIGITAL CERTIFICATE OR A DoD-ISSUED COMMON ACCESS CARD (CAC) TO OBTAIN A
DCARC PORTAL ACCOUNT AND BE AUTHORIZED TO UPLOAD CSDR CONTENT. USERS CAN
OBTAIN ACCESS BY SUBMITTING USER INFORMATION ABOUT THEMSELVES AND THEIR
ORGANIZATIONS TO THE DCARC PORTAL AND REQUESTING A CSDR SUBMITTER USER
ROLE.
Myers CIV James A
H. DATE
I. APPROVED BY
Atkinson CIV Dustin J
DD FORM 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED.
C. CATEGORY:
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
16. REMARKS (Continuation of A011)
AFTER THE REGISTRATION INFORMATION HAS BEEN VERIFIED, THE DCARC SHALL AUTHORIZE THE USER ACCOUNT AND REQUESTED
ROLE. ALL DCARC PORTAL ACCOUNTS NEED TO BE RENEWED AT LEAST ANNUALLY.
SUBCONTRACTOR REPORTING: THE PRIME CONTRACTOR SHALL FLOW DOWN CSDR REQUIREMENTS CONTAINED IN THE PRIME CONTRACT TO ALL SUBCONTRACTORS WHO MEET THE REPORTING THRESHOLDS SPECIFIED IN THE DODI 5000.02, OR AS REQUIRED BY THE COST WORKING INTEGRATED PRODUCT TEAM (CWIPT). THIS INCLUDES REQUIRING SUBCONTRACTORS TO ELECTRONICALLY
REPORT DIRECTLY TO THE DCARC USING THE CSDR SUBMIT-REVIEW SYSTEM.
THE PRIME CONTRACTOR SHALL WORK WITH THE CWIPT AND ALL APPROPRIATE SUBCONTRACTORS TO PREPARE SEPARATE
SUBCONTRACT CSDR PLANS FOR SUBMISSION TO THE DCARC FOR DDCA APPROVAL.
EFFECTIVE JULY 1, 2014, ALL CONTRACTORS, DIRECT REPORTING SUBCONTRACTORS, AND OTHER ENTITIES REPORTING UNDER THE MAY 2011 DATA ITEM DESCRIPTIONS (DI-FNCL-81565C, DI-FNCL-81566C, DI-FNCL-81567C), ARE REQUIRED TO SUBMIT CCDRS AS STAND- ALONE EXCEL-COMPATIBLE FILES AND AS DCARC APPROVED EXTENSIBLE MARKUP LANGUAGE (XML) FILES TO THE DCARC’S SECURE WEB SITE USING THE CSDR SUBMIT-REVIEW SYSTEM. THE DIDS ALREADY REQUIRE THE TWO (2) FORMATS. THE DCARC IS NOW ENFORCING THE REQUIREMENT FOR THE XML FILE. THE XML FILES CAN BE GENERATED AUTOMATICALLY FROM THE EXCEL- COMPATIBLE FILES (OR VICE VERSA) WITH DCARC’S CPET SOFTWARE TOOL. ALL VALIDATIONS STARTING JULY 1, 2014 WILL BE CONDUCTED ON THE XML FILES. THE VALIDATIONS WILL COVER BOTH CONTENT AND FORMAT. FOR THE CWBS SUBMISSION ONLY; ALL CONTRACTORS, DIRECT REPORTING SUBCONTRACTORS, AND OTHER ENTITIES REPORTING CWBS DICTIONARIES ARE REQUIRED TO SUBMIT IN THE MICROSOFT EXCEL FILE FORMAT SPECIFIED IN DI-MGMT-81334D. NO XML FORMAT IS REQUIRED FOR CWBS SUBMISSIONS. THE CWBS TEMPLATE FORMAT CAN BE OBTAINED THROUGH DCARC’S CPET SOFTWARE TOOL. UPON CONTRACT AWARD, THE GOVERNMENT WILL PROVIDE THE PRIME CONTRACTOR WITH ALL APPLICABLE CSDR CPET FILES (INCLUDES THE PROGRAM PLAN AND THE CONTRACTOR PLANS) SO THAT THE CONTRACTOR CAN CONVERT THE CSDR DATA INTO XML FILE FORMATS.
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
TM: _____ TDP: _____ Other: __X__
D. SYSTEM/ITEM
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
EARNED VALUE MANAGEMENT SYSTEM (EVMS)
DESCRIPTION
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80711A
5. CONTRACT REFERENCE
SOW PARA 3.2.6.4
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
ONE (1)/R
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE.
BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT
OF DEFENSE (DoD) AND UNITED STATES (U.S.) DoD CONTRACTORS ONLY;
ADMINISTRATIVE/OPERATIONAL USE, 1 OCT 2014. OTHER REQUESTS SHALL BE REFERRED
TO PROGRAM EXECUTIVE OFFICER – LAND SYSTEMS (PM AAA), 2200 LESTER STREET,
QUANTICO, VA 22135-6050.
BLOCKS 10 AND 13: THE CONTRACTOR SHALL PROVIDE REVISIONS TO THE GOVERNMENT
FOR SIGNIFICANT CHANGES DURING THE ENGINEERING, MANUFACTURING AND
DEVELOPMENT (EMD) CONTRACT FOR THE FIXED PRICE INCENTIVE FEE (FPIF) CONTRACT
LINE ITEM NUMBERS (CLINS), AS THE CONTRACTOR DEEMS NECESSARY.
BLOCK 12: 60 CALENDAR DAYS PRIOR TO INTEGRATED BASELINE REVIEW (IBR) DURING
THE EMD CONTRACT.
BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN
ELECTRONIC COPY TO THE CONTRACTING OFFICERS REPRESENTATIVE (COR) AND THE
Myers CIV James A
H. DATE
[Prepared By Date]
I. APPROVED BY
Atkinson CIV Dustin J
Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
AMPHIBIOUS COMBAT VEHICLE (ACV)
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
COST DATA SUMMARY REPORT(CDSR) (DD FORM
1921)
3. SUBTITLE
N/A
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-81565C
5. CONTRACT REFERENCE
SOW PARA 3.2.8.1
6. REQUIRING OFFICE
PROGRAM MANAGER
ADVANCED AMPHIBIOUS
ASSAULT (PM AAA)
7. DD 250 REQ
LT
9.
DIST STATEMENT
REQUIRED
SEE BLOCK 16
10. FREQUENCY
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
Reg Repro
16. REMARKS
BLOCK 8: THE GOVERNMENT HAS 15 CALENDAR DAYS TO REVIEW AND PROVIDE
COMMENTS ON ALL COST AND SOFTWARE DATA REPORTING (CSDR) SUBMISSIONS. THE
CONTRACTOR SHALL REVIEW AND INCORPORATE GOVERNMENT COMMENTS WITHIN
SEVEN (7) CALENDAR DAYS AND RESUBMIT TO THE GOVERNMENT.
BLOCK 9:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .