Attachment_03_-_Meeting_List_150316.docx

DOCX document 51 KB Posted

Attached to
Amphibious Combat Vehicle (ACV) 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

Attachment 03 - Meeting List 150316

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle (ACV) 1. 1, newest first.
File Type Posted
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data_-_150130.pdf PDF
Attachment_02_-_COVER_150227.docx DOCX document
Attachment_16_-_Cover.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Attachment_15__-_ACV_Fielding_Table_(150129).docx DOCX document
Attachment_05_-_COVER.docx DOCX document
Attachment_10.1.xlsx XLSX spreadsheet
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_24_-_Reserved_for_Contract_Data_Assertion_List.docx DOCX document
3rd_Draft_RFP_Cover_Letter.pdf PDF
Attachment_28_-_COVER.docx DOCX document
Attachment_06.3_-_CSDR_Graphical_Representation.pptx PPTX presentation
Second_Draft_Attachment_09_-_Failure_Definition_Scoring_Criteria_(FDSC).docx DOCX document
Second_Draft_Attachment_10.1_-GFP-GFI_-__12-9-14_V2.docx DOCX document
Second_Draft_Attachment_06.1_-_ACV_CSDR_PLAN_EMD_Contract_Plan_N-14-G-C1.pdf PDF
Second_Draft_Attachment_10_-_COVER_-_GFP_GFI_List.docx DOCX document
Second_Draft_Attachment_05.1_-_ACV_1._1_Integrated_Master_Plan.pdf PDF
Second_Draft_Attachment_04_-_CDRL_Submission_Instructions.docx DOCX document
ACV_CDRLs_Combined_01082015.pdf PDF
Second_Draft_Attachment_17_-_Technical_Data_Package.docx DOCX document
Second_Draft_Cover_Letter.pdf PDF
Second_Draft_Attachment_05_-_COVER.docx DOCX document
Second_Draft_Attachment_01.1_-_MASTER_SOW_-_150108.docx DOCX document
Second_Draft_Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data.docx DOCX document
Second_Draft_Attachment_23_-_COVER.docx DOCX document
Second_Draft_Attachment_16_-_Technical_Manual_Contract_Requirement_(TMCR).docx DOCX document
SECTION_M_dated_6_Nov_2014_M.7_updated_-_Final.docx DOCX document
Attachment_23_-_COVER.docx DOCX document
Attachment_22_-_COVER.docx DOCX document
Attachment_06.2_ACV_CSDR_Contract_Plan_RDTEN_-_EMD_Phase.pdf PDF
Attachment_01_141105_-_MASTER_SOW_-_For_RFP_First_Draft_Release.docx DOCX document
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data.docx DOCX document
Attachment_18_-_COVER_-_Ships_Loading_Characteristics_Pamphlet_(SLCP).docx DOCX document
Attachment_24_-_COVER_-_RWS_ICD.docx DOCX document
Attachment_15__-_ACV_Fielding_Table.docx DOCX document
Attachment_04.1_-_CDRL_Submission_Instructions_(CDRL_List).xlsx XLSX spreadsheet
Attachment_04_-_CDRL_Submission_Instructions_.docx DOCX document
Attachment_20_-_Configuration_Management_Plan_(CMP).docx DOCX document
Attachment_22_-_ACV__Integrated_Program_Plan.pptx PPTX presentation
Attachment_06.1_ACV_CSDR_Program_Plan.pdf PDF
Attachment_16_-_Technical_Manual_Contract_Requirement_(TMCR).docx DOCX document
Attachment_14_-_Implementation_Plan_for_Item_Unique_Identification_(IUID)_of_Tangible_Items.docx DOCX document
Attachment_05_-_ACV_1._1_Integrated_Master_Plan.pdf PDF
Attachment_05_-_COVER_-_ACV_1.1_Integrated_Master_Plan.docx DOCX document
Attachment_12_-_COVER_-_Concept_of_Employment_(COE).docx DOCX document
SECTION_M_dated_5_Nov_2014_-_Final.docx DOCX document
Attachment_11_-_Test_Schedules_and_Test_Locations.docx DOCX document
Attachment_25_-_Cover_-_ACV_Security_Classification_Guide.docx DOCX document
SECTION_L_dated_5_Nov_2014_-_Final.docx DOCX document
Show all 50

Amphibious Combat Vehicle (ACV) 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M67854-15-R-0001 Section J

Attachment 03 Meeting List Document Identification Number ACV-SPE-02003 16 Mar 2015

M67854-15-R-0001
Section J

Attachment 03 – Meeting List

Type of Activity
Paragraph Number
Location
Meeting Duration
Deliverable
Meeting Date
Program Protection Review Meetings
3.1.4.1
Contractor Facility
1 day
Agenda (CDRL A006) &

Minutes (CDRL A008) #1: 285 calendar days after contract award.

#2: 520 calendar days after contract award #3: 780 calendar days after contract award

Program Management Reviews (Government Led)
3.1.4.2, 3.2.2.3
Government Facility
1 day
Minutes (CDRL A008); Deliverables per SOW
For EMD, within 67-72 calendar days after execution of the EMD Vehicle Build CLINS and quarterly thereafter. For LRIP/FRP, 60 days after execution of the LRIP/FRP Build CLINS (Options, if Exercised) and quarterly thereafter, until the delivery of the last LRIP vehicle
Post Award Conference (PAC) for the EMD Vehicle Build CLINS (Government Led)
3.2.2.1.1
Government

Facility

No more than 1 day
Agenda (CDRL A006) &

Minutes (CDRL A008) Within 20 calendar days after contract award

Contract Option Post Award Conference for LRIP/FRP Build CLINs. (Government Led)

3.2.2.1.2
Government

Facility

No more than 1 day
Agenda (CDRL A006) &

Minutes (CDRL A008) Within 20 calendar days after option exercise

Cost and Software Data Reporting Post Award Conference
3.2.8.1
Government Facility
1 day
Agenda (CDRL A006) &

Minutes (CDRL A008) Within 20 days after contract award in conjunction with the Post Award Conference

System Requirements Review-II
3.3.1.1
Government Facility
1 day
Agenda (CDRL A006) &

Minutes (CDRL A008) One (1) calendar day following the Post Award Conference

Preliminary Design Review (PDR)/Critical Design Review (CDR)

3.3.1.2, 3.4.2.1

Government Facility
2 days
CDRL A007: Conference Presentation Materials, and SOW
No sooner than 100 days after contract award, but no later than 114 days after contract award
Vehicle Acceptance Review
3.3.1.3
Government Facility
1 day
CDRLs defined by the SOW
No later than 30 days prior to the start of Government Developmental Testing

System Verification Review (SVR)

3.3.1.4
Government Facility
1 day
CDRL A109: System Verification Review, and SOW
70-80 days after completion of the last system verification test
Production Readiness Review
3.3.1.5
Contractor Facility
2 days
CDRL A110 – PRR Presentation
10 Months Prior to

MS C

Physical Configuration Audit (PCA) Planning Meeting
3.3.10.3
Contractor Facility
2 days
Agenda (CDRL A006) &

Minutes (CDRL A008) No later than 210 days after LRIP Option 1 Contract Modification

PCA Kick-Off Meeting
3.3.10.3
Contractor Facility
1 day
Agenda (CDRL A006) &

Minutes (CDRL A008) No later than 15 days after PCA vehicle completes Acceptance Test

PCA Close-Out Meeting
3.3.10.3
Contractor Facility
1 day
Agenda (CDRL A006) &

Minutes (CDRL A008) No later than 30 days after completion of the vehicle physical audit

Government Safety Reviews and Audits
3.3.14.2
Government Facility
1 day
Per MIL-STD-882E. Task 104: 104.1-104.2.2
Two (2) Weapon System Explosive Safety Review Board (WSESRB) Conferences

One (1) Laser Safety Review Board (if required during EMD Phase)

Vulnerability Model Reviews
3.3.21.2
Government Facility
No more than 1 day
Minutes (CDRL A008)
Within 60 days after Contract award,

Within 60-180 days after Contract award, & Within 45 Days after last system verification, identified in the Government IMS

Failure Prevention Review Board Meeting
3.3.33
Government Facility
No more than 1 day
N/A
No later than 30 days after completion of PCA and monthly thereafter
MRA MS C Capstone Meeting
3.4.2.2
CONUS Location
2 Days
Assessment according to CDRL: Manufacturing Readiness Self-Assessment
Six (6) months prior to MS C approval
MRA FRP Capstone Meeting
3.4.2.3
CONUS Location
2 Days
Assessment according to CDRL: Manufacturing Readiness Self-Assessment
FRP: Eight (8) months prior to FRP (Option, if Exercised)

Acceptance Test Readiness Review

(ATRR)

3.4.7.6
Contractor Facility
2 Days
Agenda (CDRL A006) &

Minutes (CDRL A008) 30 days prior to initiation of the AT for the first vehicle that completes EMD production

Government Developmental Test (GDT) Readiness Review (DTRR) #2
3.5.1.8.1
Contractor Facility
1 day
Agenda (CDRL A006),

Minutes (CDRL A008), Test Readiness Review (CDRL A090), and SOW 60 days prior to first GDT event

DTRR #3
3.5.1.8.1
Government

Facility

1 day
Agenda (CDRL A006),

Minutes (CDRL A008), Test Readiness Review (CDRL A090), and SOW 30 days prior to first GDT event

LFT&E IPT Meeting
3.5.1.8.2
Government Facility
1 day
N/A
120 DAC and then monthly until completion of FUSL
Government Live Fire Test Readiness Review
3.5.1.8.3
Government Facility
1 day
Documentation per SOW
60 and 30 calendar days prior to the start of each Live Fire Event
Pre-Logistics Demonstration Planning Meeting
3.5.3.1.3
Government Facility
1 day
Logistics Demonstration Support Plan (CDRL A103)
150 days prior to the Logistics Demonstration
Logistics Program Management Meetings
3.6.1
Government Facility
1 Day
Agenda (CDRL A006) &

Minutes (CDRL A008) One (1) Day After PAC, and One (1) Day after LRIP and FRP (Options if exercised)

Provisioning Guidance Conference (PGC)
3.6.4.2
Contractor Facility
1 day
Contractor’s Provisioning Requirements Statement (CDRL A093), Agenda (CDRL A006) &

Minutes (CDRL A008) Two (2) Times:

60 Days after LRIP and 60 Days after FRP (Options, if exercised),

Provisioning Technical Conference (PTCs)
3.6.4.2
Government Facility
3 Days Each
Agenda (CDRL A006) &

Minutes and Action Items (CDRL A008) Three (3) Times:

12 and 24 months after LRIP (Option, if exercised)

12 months after FRP (Option, if exercised)

In-Process Review
3.6.6.3
Contractor’s Facility
No more than 2 days Each
Agenda (CDRL A006) &

Minutes (CDRL A008) Eight (8) Times:

7, 14, 21, and 28 months after Contract award

12 and 24 months after LRIP and FRP (Options, if exercised)

Technical Manual Guidance Conference
3.6.7.2
Contractor’s Facility
1 Day Each
Agenda (CDRL A006) &

Minutes (CDRL A008) Three (3) Times:

60 Days after Contract Award

60 Days after LRIP and FRP (Options, if exercised)

Technical Manual In-Process Reviews (IPRs)

3.6.7.2
Contractor’s Facility
1 Day Each
Agenda (CDRL A006) &

Minutes (CDRL A008) Nine (9) Times:

8, 16, and 24 months after Contract Award

8, 16, and 24 months after LRIP and FRP (Options, if exercised)

FOR PLANNING PURPOSES ONLY. To be finalized at Technical manual Guidance Conferences

TDP Guidance Conference
Attachment 17
Contractor’s Facility
No more than 2 days
Agenda (CDRL A006) &

Minutes (CDRL A008) One Time: 90 DAC of FRP Option 3 Execution

TDP In-Process Review
Attachment 17
Contractor’s Facility
No more than 5 days each – TBD at TDP Guidance Conference
Agenda (CDRL A006) &

Minutes (CDRL A008) As Required to Complete TDP Review

ACV-SPE-02003 v0.X Page A-2