Attachment_01_1_-_MASTER_SOW_-_150316.docx

DOCX document 506 KB Posted

Attached to
Amphibious Combat Vehicle (ACV) 1. 1 Federal contract opportunity
Solicitation number
M67854-15-R-0001
Issued by
United States Marine Corps

About this file

Attachment 01 1 - MASTER SOW - 150316

View the file

Other files for this federal contract opportunity

Other files attached to Amphibious Combat Vehicle (ACV) 1. 1, newest first.
File Type Posted
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data_-_150130.pdf PDF
Attachment_02_-_COVER_150227.docx DOCX document
Attachment_16_-_Cover.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Attachment_20_-_CM_Plan_ACV-PLN-02001_v1.0_Signed.pdf PDF
Attachment_15__-_ACV_Fielding_Table_(150129).docx DOCX document
Attachment_05_-_COVER.docx DOCX document
Attachment_10.1.xlsx XLSX spreadsheet
Attachment_03_-_Meeting_List_150316.docx DOCX document
Attachment_16.3-TABLE_A-IV.__Combined_Maint_and_Maint_w_Parts_Rqmts.docx DOCX document
Attachment_24_-_Reserved_for_Contract_Data_Assertion_List.docx DOCX document
Attachment_22_-_2015_01_30_ACV_1_1_Integrated_Program_Plan.pptx PPTX presentation
Section_L_Attachment_3_-_Proposal_Requirements_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Second_Draft_Attachment_09_-_Failure_Definition_Scoring_Criteria_(FDSC).docx DOCX document
Second_Draft_Attachment_10.1_-GFP-GFI_-__12-9-14_V2.docx DOCX document
Second_Draft_Attachment_06.1_-_ACV_CSDR_PLAN_EMD_Contract_Plan_N-14-G-C1.pdf PDF
Second_Draft_Attachment_10_-_COVER_-_GFP_GFI_List.docx DOCX document
Second_Draft_Attachment_05.1_-_ACV_1._1_Integrated_Master_Plan.pdf PDF
Second_Draft_Attachment_04_-_CDRL_Submission_Instructions.docx DOCX document
ACV_CDRLs_Combined_01082015.pdf PDF
Second_Draft_Attachment_17_-_Technical_Data_Package.docx DOCX document
Second_Draft_Cover_Letter.pdf PDF
Second_Draft_Attachment_05_-_COVER.docx DOCX document
Second_Draft_Attachment_01.1_-_MASTER_SOW_-_150108.docx DOCX document
Second_Draft_Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data.docx DOCX document
Second_Draft_Attachment_23_-_COVER.docx DOCX document
Second_Draft_Attachment_16_-_Technical_Manual_Contract_Requirement_(TMCR).docx DOCX document
Second_Draft_Attachment_22.1_-_2014_12_10_ACV_1_1_Integrated_Program_Plan.pptx PPTX presentation
SECTION_M_dated_6_Nov_2014_M.7_updated_-_Final.docx DOCX document
Attachment_23_-_COVER.docx DOCX document
Attachment_22_-_COVER.docx DOCX document
Attachment_06.2_ACV_CSDR_Contract_Plan_RDTEN_-_EMD_Phase.pdf PDF
Attachment_01_141105_-_MASTER_SOW_-_For_RFP_First_Draft_Release.docx DOCX document
Attachment_13_-_Cataloging_Schema_for_Logistics_and_Technical_Data.docx DOCX document
Attachment_18_-_COVER_-_Ships_Loading_Characteristics_Pamphlet_(SLCP).docx DOCX document
Attachment_24_-_COVER_-_RWS_ICD.docx DOCX document
Attachment_15__-_ACV_Fielding_Table.docx DOCX document
Attachment_04.1_-_CDRL_Submission_Instructions_(CDRL_List).xlsx XLSX spreadsheet
Attachment_04_-_CDRL_Submission_Instructions_.docx DOCX document
Attachment_20_-_Configuration_Management_Plan_(CMP).docx DOCX document
Attachment_22_-_ACV__Integrated_Program_Plan.pptx PPTX presentation
Attachment_06.1_ACV_CSDR_Program_Plan.pdf PDF
Attachment_16_-_Technical_Manual_Contract_Requirement_(TMCR).docx DOCX document
Attachment_14_-_Implementation_Plan_for_Item_Unique_Identification_(IUID)_of_Tangible_Items.docx DOCX document
Attachment_05_-_ACV_1._1_Integrated_Master_Plan.pdf PDF
Attachment_05_-_COVER_-_ACV_1.1_Integrated_Master_Plan.docx DOCX document
Attachment_12_-_COVER_-_Concept_of_Employment_(COE).docx DOCX document
SECTION_M_dated_5_Nov_2014_-_Final.docx DOCX document
Attachment_11_-_Test_Schedules_and_Test_Locations.docx DOCX document
Attachment_21_-_ACV_1.1_Attribute_Selection_Sheet.pdf PDF
Show all 50

Amphibious Combat Vehicle (ACV) 1. 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M67854-15-R-0001 Section J, Attachment (1) Statement of Work

UNCLASSIFIED

Statement of Work (SOW) For the Amphibious Combat Vehicle (ACV)

M67854-15-R-0001 Section J, Attachment 01

ACV-SOW-03001

Version 0.4 16 March 2015

DISTRIBUTION A: Approved for public release: distribution unlimited.

Revision
Date
Summary of Changes

ACV-SOW-03001

This page blank

1SCOPE1
1.1BACKGROUND1
1.2INTRODUCTION OF THE STATEMENT OF WORK2
2APPLICABLE DOCUMENTS2
2.1GOVERNMENT DOCUMENTS2
2.1.1SPECIFICATIONS, STANDARDS, AND HANDBOOKS2
2.2OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS4
2.2.1REGULATIONS, FEDERAL ACQUISITION REGULATIONS, DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENTS, MANUALS, DIRECTIVES, INSTRUCTIONS, AND FORMS4
2.3NON-GOVERNMENT DOCUMENTS7
2.3.1STANDARDS AND GUIDEBOOKS7
2.4AVAILABILITY OF DEPARTMENT OF DEFENSE DOCUMENTS9
3REQUIREMENTS9
3.1GENERAL REQUIREMENTS OVERVIEW13
3.1.1RESOURCE REQUIREMENTS13
3.1.2SECURITY13
3.1.3OPERATIONS SECURITY PLAN13
3.1.4PROGRAM PROTECTION IMPLEMENTATION PLAN14
3.2PROGRAM MANAGEMENT17
3.2.1ASSIGNMENT OF RESPONSIBILITY AND AUTHORITY17
3.2.2CONFERENCES, REVIEWS, AGENDAS, AND REPORTS17
3.2.3MONTHLY PROGRESS STATUS REPORTS19
3.2.4INTEGRATED MASTER PLANNING/INTEGRATED MASTER SCHEDULING/SCHEDULE RISK ASSESSMENT19
3.2.5CONTRACTOR WORK BREAKDOWN STRUCTURE20
3.2.6RESERVED21
3.2.7RESERVED21
3.2.8COST ESTIMATING AND ANALYSIS21
3.2.9RESERVED22
3.2.10CONTRACTOR CONTROLLED LIFE CYCLE COST ESTIMATE22
3.2.11MATERIAL PRICING REPORT23
3.2.12TIME SERIES LOT SIZE PRICING DATA23
3.2.13FINANCIAL MANAGEMENT24
3.3SYSTEMS ENGINEERING24
3.3.1TECHNICAL REVIEWS24
3.3.2SYSTEMS ENGINEERING MANAGEMENT25
3.3.3QUALITY26
3.3.4REQUIREMENTS MANAGEMENT26
3.3.5INTERFACE CONTROL DIAGRAMS27
3.3.6DRAWINGS/MODELS27
3.3.7OPEN SYSTEMS28
3.3.8CONFIGURATION MANAGEMENT28
3.3.9VEHICLE CONFIGURATION DATA29
3.3.10CONFIGURATION AUDITS30
3.3.11CONFIGURATION CONTROL31
3.3.12CONTRACTOR VERIFICATION REPORT32
3.3.13TECHNOLOGY32
3.3.14ENVIRONMENTAL, SAFETY, AND OCCUPATIONAL HEALTH32
3.3.15SOFTWARE36
3.3.16CALIBRATION UPDATES38
3.3.17DATA38
3.3.18DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES39
3.3.19TECHNICAL PERFORMANCE MEASURES39
3.3.20BALLISTIC PROTECTION/SEAT TEST AND ANALYSIS40
3.3.21FORCE PROTECTION AND VULNERABILITY REDUCTION40
3.3.22GOVERNMENT MOBILITY MODELING AND SIMULATION41
3.3.23SEAWORTHINESS ANALYSIS44
3.3.24CORROSION PREVENTION AND CONTROL PLAN44
3.3.25THERMAL ANALYSIS REQUIREMENTS44
3.3.26LAUNCHING FROM AND EMBARKING TO AMPHIBIOUS SHIPS ANALYSIS45
3.3.27WATERTIGHT INTEGRITY ANALYSIS46
3.3.28HUMAN SYSTEMS INTEGRATION47
3.3.29WEIGHT CONTROL AND REPORTING47
3.3.30LOAD PLAN49
3.3.31RELIABILITY AND MAINTAINABILITY PROGRAM MANAGEMENT50
3.3.32FAILURE REPORTING, ANALYSIS, AND CORRECTIVE ACTION SYSTEM51
3.3.33FAILURE PREVENTION REVIEW BOARD53
3.3.34TECHNICAL DATA PACKAGE53
3.4MANUFACTURING OF THE EMD/LRIP/FRP VEHICLES54
3.4.1MANUFACTURING PLAN54
3.4.2MANUFACTURING READINESS ASSESSMENT FOR EMD/LRIP/FRP54
3.4.3CRITICAL PROCESS54
3.4.4PROCESS FAILURE MODES AND EFFECTS ANALYSIS55
3.4.5VEHICLE ASSEMBLY AND GOVERNMENT-FURNISHED PROPERTY INTEGRATION55
3.4.6BREAK-IN OPERATIONS55
3.4.7CONTRACTOR ACCEPTANCE TEST55
3.4.8RESET LRIP INITIAL OPERATIONAL TEST AND EVALUATION VEHICLES57
3.4.9FIRST ARTICLE TESTING57
3.4.10PASS THROUGH OF COMMERCIAL WARRANTIES58
3.5TEST AND EVALUATION58
3.5.1MANAGEMENT AND SUPPORT59
3.5.2GOVERNMENT TEST AND EVALUATION ON EMD VEHICLES67
3.5.3GOVERNMENT TEST AND EVALUATION ON LRIP VEHICLES71
3.5.4TRANSPORTATION73
3.6LOGISTICS74
3.6.1LOGISTICS PROGRAM MANAGEMENT MEETINGS74
3.6.2LOGISTICS MANAGEMENT INFORMATION74
3.6.3SUPPORTABILITY ANALYSIS75
3.6.4SUPPLY SUPPORT77
3.6.5PACKAGING, HANDLING, STORAGE, AND TRANSPORTATION78
3.6.6TRAINING PRODUCTS AND SERVICES79
3.6.7TECHNICAL MANUALS85
3.6.8DEPOT LEVEL OVERHAUL/REBUILD PRODUCTS87
3.6.9PRODUCTION LINE SHUTDOWN88
3.6.10FIELD SERVICE REPRESENTATIVES89
3.7GOVERNMENT-FURNISHED INFORMATION/PROPERTY90
3.7.1GOVERNMENT-FURNISHED INFORMATION90
3.7.2GOVERNMENT-FURNISHED PROPERTY90
3.7.3GOVERNMENT PROPERTY MANAGEMENT90
3.7.4SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY90
3.7.5GOVERNMENT PROPERTY BASELINE INVENTORY REPORT90
3.7.6GOVERNMENT PROPERTY STATUS REPORT91
3.7.7REPAIR AND FAILURE REPORT91
3.7.8CONTRACTOR ACQUIRED PROPERTY91
3.7.9MAINTENANCE OF GOVERNMENT-FURNISHED PROPERTY91
3.7.10GOVERNMENT-FURNISHED PROPERTY WITH WARRANTY91
3.7.11FINAL DISPOSITION OF GOVERNMENT-FURNISHED PROPERTY91
3.8DISPOSITION OF VEHICLES92
3.8.1DISPOSITION OF EMD LIVE FIRE VEHICLES92
3.8.2DISPOSITION OF NON-LRIP OPTION SELECTED CONTRACTOR EMD VEHICLES92
3.8.3DISPOSITION OF FUSL VEHICLES92
3.9CROSSWALK MATRIX93

TABLE OF CONTENTS

ACV-SOW-03001 Unclassified

SCOPE

This Statement of Work (SOW) describes the work scope associated with the Amphibious Combat Vehicle (ACV) Phase 1, Increment 1, Program hereafter referred to as the ACV Program. It includes all efforts associated with the Engineering and Manufacturing Development (EMD) vehicle production and testing, Low Rate Initial Production (LRIP) (Option, if exercised) Build, and Full Rate Production (FRP) (Option, if exercised) Build. It includes the associated Program Management, Systems Engineering (SE), Test and Evaluation (T&E), and Integrated Product Support planning requirements.

BACKGROUND

The ACV Program will continue to build upon the preparatory work of the Marine Personnel Carrier (MPC) Program efforts conducted from 2006 to 2013. In 2006, the Office of the Secretary of Defense (OSD) provided strategic planning guidance to the United States Marine Corps (USMC) to maintain a two (2) Marine Expeditionary Brigade (MEB) forcible entry capability and propose a mix of vehicles suitable for Irregular Warfare (IW) to provide a mobility portfolio that better balanced our maneuver/mobility capability for Major Contingency Operations and IW. In response, the USMC proposed a combination of a light vehicle and a medium vehicle designed for the threats seen in IW. Both maintain a capability to maneuver with formations while conducting Major Contingency Operations. A medium personnel carrier was assessed as necessary to provide the full protection required in a high Improvised Explosive Devices (IED) environment, and the multi-axle wheeled configuration was assessed as the most suitable platform for high cross country speed, combined with the ability to transit urban infrastructure in a non-threatening and non-destructive manner. The Marine Requirements Oversight Council (MROC) convened on 4 February 2008 for a decision brief on the MPC material solution and operational fielding placement, based on the MPC Analysis of Alternatives (AoA) dated December 2007. The Ground Combat Tactical Vehicle Strategy was finalized in August 2008, setting the fundamental MPC capacities (Acquisition Objectives), strategic lift envelope, protection, payload, and performance required of the MPC as a system.

After the Expeditionary Fighting Vehicle (EFV) Program cancellation in January 2011, a Systems Engineering Operational Planning Team (SE-OPT) convened to conduct engineering and cost analysis of EFV requirements to identify those parameters driving complexity in design, identify trade-space, and develop requirement generation options for an EFV replacement, called the ACV. The SE-OPT analyzed 11 system concepts against capabilities delivered, cost, and schedule of delivery. The SE-OPT fully developed four (4) of the system concepts with various capabilities and costs that represented a range of capability from Assault Amphibious Vehicle (AAV)-based system concepts to new developmental ACV-based system concepts. All four (4) system concepts were low water speed capable. The SE-OPT determined and recommended that the most affordable solution was to develop a modern low water speed capable AAV replacement.

Concurrently with the efforts of the SE-OPT, the Government awarded four (4) MPC Demonstrations and & Studies (D&S) Contracts on 6 August 2012 to better understand the capabilities of Non-Developmental Items (NDIs) to meet water performance, survivability, and human factors/stowage capacity requirements. The promising results of testing these demonstrator vehicles led to a re-invigorated ACV Program in late 2013 using the type of NDI vehicles tested during the D&S Contracts as a baseline. In January 2014, the MPC initiative was reprioritized and repurposed to be the material approach for the Phase 1 Program of the ACV. The MPC Program was then re-designated as the ACV Phase 1 Increment 1 (i.e., ACV 1.1) and an acquisition strategy was selected with a NDI Armored Personnel Carrier (APC).

In April 2014, the MROC approved the ACV Capability Development Document (CDD) which will be followed by a Joint Requirements Oversight Council (JROC) approval once the AoA is finalized, setting the stage for development of programmatic and contractual documentation. The Materiel Development Decision (MDD) was received on 4 June 2014 to formally initiate the ACV Program. The current requirement for the USMC is 12 infantry battalion lift equivalents via APCs. The ACV capability along with the AAV Survivability Upgrade will provide the USMC ten (10) infantry battalion lift equivalents through 2035. After which time, the future phase(s) of the ACV Program will provide for the entirety of the USMC armored lift capacity requirement.

INTRODUCTION OF THE STATEMENT OF WORK

The purpose of this contract is to procure NDI ACV Personnel (P) Vehicles from EMD to FRP (Option, if exercised). This EMD contract will include scope associated with the following: Design/Development; Program Management Support; Tooling Development; Manufacturing ACVs; Logistics Management Information (LMI) Data development; Training Materials development; Technical Manual (TM) development; Pre-Milestone (MS) C Test Support; Corrective Action Mods.

This SOW will also include Options (if exercised) to manufacture LRIP and FRP Vehicles, after the down-select decision is completed by the Government. Tasking for these contracts will include: Post MS C Test Support; Design/Development; Program Management Support; Training Materials development; TM development; Support Equipment development; Manufacturing ACVs; LMI Data; Test Support; Test and Initial Spares; Refurbishment of Test Vehicles, Field Service Representative (FSR) and Training Support for fielding.

APPLICABLE DOCUMENTS

The following documents form a part of this SOW to the extent specified herein. Unless otherwise noted, in the event of a conflict between the SOW and the references cited herein (except for related specification sheets) the text of this SOW takes precedence. All second tier and below references cited shall be considered as guidance only. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.

GOVERNMENT DOCUMENTS

SPECIFICATIONS, STANDARDS, AND HANDBOOKS

SPECIFICATIONS

DEPARTMENT OF DEFENSE

Military Performance Specification (MIL-PRF)-32216A
Evaluation of Commercial-Off-The-Shelf (COTS) Manuals and Preparation of Supplemental Data1
12 Aug 2011

Military Handbook (MIL-HDBK)-29612A

Instructional Systems Development/Systems Approach to Training and Education
31 Aug 2001

DEPARTMENT OF NAVY

ACV-SPE-02003
Amphibious Combat Vehicle Phase I, Increment 1 System Performance Specification
Draft
MIL-PREF-29612B
Training Data Products
Aug 2001

STANDARDS

DEPARTMENT OF DEFENSE

Military Standard (MIL-STD)-129R
Military Marking for Shipment and Storage
18 Feb 2014

MIL-STD-130-N,

Change 1

Identification Marking of United States (U.S.) Military Property
16 Nov 2012
MIL-STD-464C
Electromagnetic Environmental Effects Requirements for Systems
1 Dec 2010
MIL-STD-882E
System Safety
11 May 2012
MIL-STD-2073-1E, Change 1
Standard Practice for Military Packaging
7 Jan 2011
MIL-STD-3018, Change 1
Parts Management
27 Oct 2011
MIL-STD-31000A
Technical Data Packages
26 Feb 2013
MIL-STD-881C
Work Breakdown Structures for Defense Materiel Items
03 Oct 2011
Federal Standard (FED-STD)-313E
Material Safety Data, Transportation Data, and Disposal Data for Hazardous Materials Furnished to Government Activities
1 Jul 2014

GUIDEBOOKS

DEPARTMENT OF DEFENSE

Department of Defense (DoD) Guide
Corrosion Prevention and Control Planning Guidebook (CPCPG), Spiral No. 4
4 Feb 2014
DoD Guide
DoD Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide

21 Oct 2005

DoD Guide
Interim Risk Management Guide for DoD Acquisition, Seventh Edition (Interim Release)
Dec 2014
DoD Guidance
Technology Readiness Assessment (TRA) Guidance
April 2011
DoD MRL Deskbook
Manufacturing Readiness Level (MRL) Deskbook, Version 2.2.1
Oct 2012

DEPARTMENT OF ARMY

U.S. Army Corps of Engineers Waterways Experiment Station
North Atlantic Treaty Organization (NATO) Reference Mobility Model, Edition II, (NRMMII) Version 2.8.2b
Dec 1992
Department of the Army Pamphlet (DA PAM) 73-1
Test and Evaluation in Support of Systems Acquisition
30 May 2003
Navy Marine Corps (NAVMC) 1553.1
Systems Approach To Training User's Guide, Short Title: SAT User Guide
27 Oct 2010
MIL-DTL-53072E
Chemical Agent Resistant Coating (CARC) System Application Procedures and Quality Control Inspection
9 May 2013

HANDBOOKS

DEPARTMENT OF DEFENSE

MIL-HDBK-61A
Configuration Management Guidance
7 Feb 2001

OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS

REGULATIONS, FEDERAL ACQUISITION REGULATIONS, DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENTS, MANUALS, DIRECTIVES, INSTRUCTIONS, AND FORMS

REGULATIONS

DEPARTMENT OF ARMY

AR 73-1
Army Regulation Test and Evaluation Policy
1 Aug 2006

FEDERAL ACQUISITION REGULATIONS

Federal Acquisition Regulations (FAR) 2.101(b)
Definitions
13 Nov 2014
FAR 52.245-1
Government Property
June 2007

DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENTS

Defense Federal Acquisition Regulation Supplements (DFARS) 252.211-7003
Item Unique Identification
Dec 2013
DFARS 252.227-7013
Rights in Technical Data—Noncommercial Items
Feb 2014
DFARS 252.227-7014
Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation
Feb 2014
DFARS 252.227-7017
Identification and Assertion of Use, Release, or Disclosure Restrictions
Jan 2011
DFARS 252.234-7003
Notice of Cost and Software Data Reporting System
Nov 2010

MANUALS

DEPARTMENT OF DEFENSE

DoD 4000.25-2-M
Military Standard Transaction Reporting and Accounting Procedures
13 June 2012

DoD 5000.04-M-1

Cost and Software Data Reporting Manual

4 Nov 2011

DoD 5220.22-M
National Industrial Security Program Operating Manual

28 Mar 2013

Naval Sea Systems Command (NAVSEA) S9310-AQ-SAF-010
U.S. Navy Lithium Battery Safety Program TM: Responsibilities and Procedures
15 Jul 2010

DEFENSE LOGISTICS AGENCY

Defense Logistics Management (DLM) 4000.25-2-M
Military Standard Requisitioning and Issue Procedures

13 Jun 2012

DIRECTIVES

Department of Defense Directive (DoDD) 8570.01
Information Assurance Training, Certification, and Workforce Management
15 Aug 2004

INSTRUCTIONS

Department of Defense Instruction (DoDI) 5000.02 (Final)
Operation of the Defense Acquisition System
7 Jan 2015
DoDI 5200.39, Change 1
Critical Program Information Protection within DoD
28 Dec 2010
DoDI 8320.04
Item Unique Identification (IUID) Standards for Tangible Personal Property
June 2008
DoDI 8510.01
Risk Management Framework for DoD Information Technology
12 Mar 2014
DoDI 8520.2
Public Key Infrastructure and Public Key Enabling
24 May 2011
DoDI 8582.01
Security of Unclassified DoD Information on Non-DoD Information Systems
6 Jun 2012

COMNAVSURFLANT/

COMNAVSURFPAC INSTRUCTION 3340.3D

Marine Corps Order (MCO) 1553.2B

Wet Well Operations Manual

Management Of Marine Corps Formal Schools and Training Detachments 9 Oct 2012

1 Apr 2011

MCO 3070.2A

The Marine Corps Operational Security (OPSEC) Program 2 Jul 2013

MCO 4790.25
Ground Equipment Management Program
12 Jan 2014
Office of the Chief of Naval Operations Instruction (OPNAVINST) 3000.12A
Operational Availability of Equipment’s and Weapon Systems
2 Sep 2003
OPNAVINST 3432.1A
Operations Security
4 Aug 2011

FORMS

DD Form 250
Material Inspection and Receiving Report
Aug 2000
DD Form 254
Contract Security Classification Specification, Department of Defense
Dec 1999
DD Form 1423
Contract Data Requirements List (CDRL)
Aug 1996
DD Form 1586
Contract Funds Status Report
Aug 1996
DD Form 2734/1
Contract Performance Report, Format 1, Work Breakdown Structure
Apr 2005
DD Form 2734/2
Contract Performance Report, Format 2, Organizational Categories
Apr 2005
DD Form 2734/3
Contract Performance Report, Format 3, Baseline
Apr 2005
DD Form 2734/4
Contract Performance Report, Format 4, Staffing
Apr 2005
DD Form 2734/5
Contract Performance Report, Format 5, Explanations and Problem Analyses
Apr 2005
DD Form 2794
Cost and Software Data Reporting Plan
May 2011

GSA Optional Form

Optional Form (OF) 346
U.S. Government Motor Vehicle Operators Identification Card

Nov 1985

NON-GOVERNMENT DOCUMENTS

STANDARDS AND GUIDEBOOKS

STANDARDS

SAE Government Electronics and Information Technology Association Standard (GEIA-STD)-0007, Rev B
Logistics Product Data
01 May 2013
American Society of Mechanical Engineers (ASME) Y14.24
Types and Application of Engineering Drawings
1 Jan 2012
ASME Y14.34
Associated Lists
1 Jan 2013
ASME Y14.35M
Revision of Engineering Drawings and Associated Documents
8 Dec 1997
ASME Y14.41
Digital Product Definition Data Practices
14 May 2012
ASME Y14.5-2009
Geometric Dimensioning and Tolerancing
9 Feb 2009
ASME Y14.100
Engineering Drawing Practices
30 Jul 2013
American Society Testing Materials (ASTM)-D-3951
Standard Practice For Commercial Packaging
2004
Institute of Electrical and Electronic Engineers (IEEE) 12207.2
Software Life Cycle Processes
1997
International Organization for Standardization (ISO) 9001:2008
Quality Management Systems- Requirements
2008
National Aerospace Standard (NAS) 411-1:2013
National Aerospace Standard: Hazardous Materials Target List
30 Sep 2013
NAS 411, Rev 3
National Aerospace Standard:

Hazardous Materials Management Program 30 Sep 2013

National Institute of Standards and Technology Interagency Report (NISTIR) 7622
National Institute of Standards and Technology Interagency Report 7622, “Notional Supply Chain Risk Management Practices for Federal Information Systems: Piloting Supply Chain Risk Management for Federal Information Systems”

Oct 2012

National Institute of Standards and Technology (NIST) Special Publication 800-53A
Guide for Assessing the Security Controls in Federal Information Systems and Organizations
June 2010
SAE JA1011
Evaluation Criteria for Reliability-Centered Maintenance Processes
Aug 1999

GUIDEBOOKS

International Society of Weight Engineers, Inc. Recommended Practice Number 5

Mass Properties Control System for Wheeled and Tracked Vehicles, Revision A
26 May 2007
National Defense Industrial Association Guidebook
Engineering for System Assurance, Version 1.0
2008

REPORTS

NISTIR 7622

Piloting Supply Chain Risk Management (SCRM) for Federal Information Systems,
16 Oct 2012

MANUALS

Automotive Industry Action Group (AIAG) Failure Mode and Effects Analyses (FMEA) Manual
4th Edition of Industry Standards
2008

AVAILABILITY OF DEPARTMENT OF DEFENSE DOCUMENTS

DoD Directives, Manuals, Instructions, and Publications are available online at http://www.dtic.mil/whs/directives/ or from the National Technical Information Services (NTIS), 5301 Shawnee Rd, Alexandria, VA 22312.

DoD FAR and DFARS are available online at http://farsite.hill.af.mil/.

DoD Forms are available online at http://www.dtic.mil/whs/directives/infomgt/forms/.

Department of Navy (DON) Issuances (e.g., Office of the Chief of Naval Operations (OPNAV) Instructions) are available online at http://doni.daps.dla.mil/allinstructions.aspx.

General Services Administration (GSA) OF are available by ordering from http://www.gsa.gov/portal/forms/download/116942

Military Specifications, Military Standards, Military Handbooks, and Data Item Descriptions (DIDs) are available online at http://quicksearch.dla.mil/ or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.

If a DoD document cannot be acquired, they may be provided by the Government upon the Contractor’s request.

REQUIREMENTS

This SOW encompasses the EMD and the Production and Deployment (PD) Phases of the ACV Acquisition Program. The ACV performance requirements are fully described in Section J, Attachment 02, ACV System Performance Specification ACV-SPE-02003. Vehicle quantities are detailed in Section B - Supplies or Services and Prices of the Request for Proposal (RFP).

Contract Line Item Number (CLIN) 0001 – For EMD Design and Development, the Contractor shall provide the following efforts:

· Vehicle Design/Development

· Vehicle Tooling

· Program Management

· Armor and Seat Coupons

· Development of Software

CLIN 0002 – The Contractor shall manufacture and deliver 13 ACV-P EMD Vehicles.

CLIN 0003 –Delivery incentive for EMD vehicles, see Section H; H.4 Delivery Incentive.

CLIN 0004 – The Contractor shall prepare and deliver EMD, LRIP and FRP Contract Data Requirements List (CDRLs) in accordance with Exhibit A, DD-1423s.

CLIN 0005 (Option) – The Contractor shall manufacture and deliver 3 ACV-P EMD Vehicles.

CLIN 1001 (Option) – The Contractor shall continue to Design and Develop EMD vehicles, and provide the following efforts:

· Program Management

· Producibility

· Engineering Planning

CLIN 1002 (Option) – The Contractor shall provide EMD Test Support that shall include the following efforts:

· Pre-MS C and Post MS C Test Support

· Test Spares

· Vehicle Transportation

· Conduct of training for testing

CLIN 1003 (Option) – The Contractor shall provide corrective action modifications to the EMD vehicles in support of system Reliability Growth Testing (RGT). These corrective action modifications are in response to safety and reliability failures discovered during system developmental testing. The corrective action modifications will be implemented during the planned Corrective Action Periods.

CLIN 1004 (Option) – The Contractor shall provide the following efforts for Logistics Management:

· Develop and deliver LMI data

· Develop and deliver Technical Manuals

· Develop and deliver Training Material

CLIN 1005 (Option) – The Contractor shall provide Studies for Advanced Capability Improvements. This will include design and installation of key objective-level performance improvements to EMD vehicles. A Contract modification will be awarded prior to any efforts being executed by the Contractor.

CLIN 1006 (Option) – The non-selectee Contractor shall follow the instructions identified in SOW paragraph 3.8.2 for disposition of the Contractor EMD vehicles.

CLIN 1007 (Option) – The Contractor shall provide Post down-select efforts for EMD Design and Development.

CLIN 1008 (Option) – The Contractor shall provide post down-select efforts for EMD Test Support to include the following efforts:

· Conduct and Support of Test

· Vehicle Transportation

· Test Spares

For the PD phase the following CLINs shall apply:

CLIN 2001 (Option) will include two (2) sub-CLINs for the LRIP (Lot 1) Vehicles. They are:

CLIN 2001AA (Option) – The Contractor shall manufacture and deliver four (4) ACV-P Full-Up System-Level (FUSL) vehicles.

CLIN 2001AB (Option) – The Contractor shall manufacture and deliver 26 ACV-P Production vehicles.

CLIN 2002 (Option) will include two (2) sub-CLINs for other production related Costs for LRIP (Lot 1). They are:

CLIN 2002AA (Option) – The Contractor shall provide the following development funded efforts:

· Test Support

· Test Spares

· Transportation

· Logistics Demonstration

· First Article Testing

· Corrective Action Modifications

· Conduct of Training for Testing

CLIN 2002AB (Option) – The Contractor shall provide the following procurement funded efforts:

· Program Management

· Tooling

· Acceptance Testing

· Field Service Representative(s)

CLIN 2003 (Option) will include two (2) sub-CLINs for Fielding and Support Costs for LRIP (Lot 1). They are:

CLIN 2003AA (Option) – The Contractor shall provide the following development funded efforts:

· Develop logistics products (LMI data, training materials, TMs)

CLIN 2003AB (Option) – The Contractor shall provide the following procurement funded efforts:

· Procure data products (LMI data, training materials, TMs)

· Procure support equipment

· Procure initial spares

· Fielding support

CLIN 2004 (Option) – The Contractor shall reset LRIP operational test and evaluation vehicles identified in SOW paragraph 3.4.8.

CLIN 3001 (Option) – The Contractor shall manufacture and deliver 30 ACV-P vehicles for LRIP (Lot 2).

CLIN 3002 (Option) – The Contractor shall provide the following production related efforts for LRIP (Lot 2):

· Program Management

· Tooling

· Acceptance Testing

· Transportation

· Field Service Representative(s)

CLIN 3003 (Option) – The Contractor shall provide the following fielding and support efforts for LRIP (Lot 2):

· Procure data products (LMI data, training materials, TMs)

· Procure support equipment

· Procure initial spares

· Fielding support

CLIN 4001 (Option) – The Contractor shall manufacture and deliver 30 ACV-P vehicles for FRP (Lot 1).

CLIN 4002 (Option) – The Contractor shall provide the following production related efforts for FRP (Lot 1):

· Program Management

· Tooling

· Acceptance Testing

· Transportation

· Field Service Representative(s)

CLIN 4003 (Option) – The Contractor shall provide the following fielding and support efforts for FRP (Lot 1):

· Procure data products (LMI data, training materials, TMs)

· Procure support equipment

· Procure initial spares

· Fielding support

CLIN 4004 (Option) – The Contractor shall develop and deliver depot data and support products necessary for depot stand-up.

CLIN 5001 (Option) – The Contractor shall manufacture and deliver 30 ACV-P vehicles for FRP (Lot 2).

CLIN 5002 (Option) – The Contractor shall provide the following production related efforts for FRP (Lot 2):

· Program Management

· Tooling

· Acceptance Testing

· Transportation

· Field Service Representative(s)

CLIN 5003 (Option) – The Contractor shall provide the following fielding and support efforts for FRP (Lot 2):

· Procure data products (LMI data, training materials, TMs)

· Procure support equipment

· Procure initial spares

· Fielding support

CLIN 6001 (Option) – The Contractor shall manufacture and deliver 30 ACV-P vehicles for FRP (Lot 3).

CLIN 6002 (Option) – The Contractor shall provide the following production related efforts for FRP (Lot 3):

· Program Management

· Tooling

· Acceptance Testing

· Transportation

· Field Service Representative(s)

CLIN 6003 (Option) – The Contractor shall provide the following fielding and support efforts for FRP (Lot 3):

· Procure data products (LMI data, training materials, TMs)

· Procure support equipment

· Procure initial spares

· Fielding support

CLIN 6004 (Option) – The Contractor shall provide production line shut-down efforts.

GENERAL REQUIREMENTS OVERVIEW

RESOURCE REQUIREMENTS

The Contractor shall provide all necessary personnel, resources and facilities to execute the requirements, and provide deliverables within the identified schedules. The Contractor shall ensure that video teleconference and telephone bridges are available at the Contractor’s facility for the entire contract period of performance. All personnel attending demonstration events at the test sites shall speak fluent English, and submit visit requests to applicable test agencies.

SECURITY

The Contractor shall safeguard controlled unclassified information and administrative data and classified program information and material at all levels of classification through all stages of the contract associated with the ACV from unauthorized access or disclosure in accordance with DoDI 8582.01, "Security of Unclassified DoD Information on Non-DoD Information Systems."

The Contractor shall comply with the security requirements imparted by the Contract Security Classification (DD Form 254), per Section J, Attachment 23, and the National Industrial Security Program Operating Manual (NISPOM), DoD 5220.22-M (current version). Additional information can be found in the National Industrial Security Program Library on the Defense Security Service web site: http://www.dss.mil/isp/fac_clear/download_nispom.html.

OPERATIONS SECURITY PLAN

The Contractor shall develop an OPSEC plan. The OPSEC plan shall:

1) Describe the OPSEC environment to include identification of critical information, the OPSEC threat, and vulnerabilities an adversary might exploit to acquire critical information,

2) Document the OPSEC risk analysis,

3) Identify proposed and actual OPSEC measures,

4) Define and assign specific OPSEC responsibilities and tie the OPSEC Plan to the contractor's corporate OPSEC Program, and

5) Serve as a repository of the OPSEC history of the contract. Additional guidance can be found in the OPNAVINST 3432.1A, "Operations Security" and MCO 3070.2A "The Marine Corps OPSEC Program".

The Contractor shall prepare and deliver the Contractor's OPSEC Plan in accordance with CDRL A001.

PROGRAM PROTECTION IMPLEMENTATION PLAN

The Contractor shall provide a Program Protection Implementation Plan (PPIP) that includes a criticality analysis, vulnerability assessment, risk assessment, and countermeasure selection and implementation, with assumptions, rationale, and results. For each Level I and Level II component with the following Protection Failure Criticality Levels, Table (1), the Contractor shall identify the associated logic-bearing hardware, software, and firmware that implements critical functions or introduces vulnerability to the associated components (designated as critical components).

Level
Description
Level I: Total Mission Failure
Function/component failure is a failure that results in total compromise of mission capability

Level II: Significant/Unacceptable Degradation Function/component failure is a failure that results in unacceptable compromise of mission capability or significant mission degradation

Level III: Partial/Acceptable
Function/component failure is a failure that results in partial compromise of mission capability or partial mission degradation
Level IV: Negligible
Function/component failure is a failure that results in little or no compromise of mission capability

Table (1) Protection Failure Criticality Levels

The Contractor shall demonstrate visibility into its supply chain for critical components, understanding of the risks to that supply chain, and shall implement or provide plans for implementation of risk mitigation efforts to counter those risks.

The Contractor shall plan for and implement countermeasures which mitigate foreign intelligence, technology exploitation, supply chain and battlefield threats, and system vulnerabilities that result in the catastrophic (Level I) and critical (Level II) protection failures, including:

1) Application of supply chain risk management key practices, applied as appropriate to the development of the system. Supply chain risk management key practices are found in the National Institute of Standards and Technology Interagency Report 7622, Piloting SCRM for Federal Information Systems, and the National Defense Industrial Association Guidebook, Engineering for System Assurance, both publicly available.

2) Identification and recording of the relevant cost, schedule, and performance information used to choose between alternates as a part of the selection of critical components. The Contractor shall define associated program protection risks with the selected critical component(s) and work with the Government to develop mutually-agreeable risk management plans.

3) Implementation of processes to control access by foreign nationals to program information, including system design information, DoD-unique technology, and software or hardware used to integrate commercial technology.

4) Establishment and maintenance of a Counterfeit Electronic Part Detection and Avoidance System. The processes and practices employed to ensure that genuine hardware, software and logic elements will be employed in the solution. The Contractor shall ensure flow down requirements necessary for the Contractor’s Counterfeit Electronic Part Detection and Avoidance System are levied upon subcontractors.

5) Implementation of processes for safeguarding unclassified controlled technical information in the development environment.

The Contractor shall develop a set of secure design and coding practices to be followed for implementation of Level I and II critical components. Top 10 Secure Coding Practices (https://www.securecoding.cert.org/confluence/display/seccode/Top+10+Secure+Coding+Practices) and the Common Weakness Enumeration (CWE)/SysAdmin, Audit, Network, Security (SANS) top 25 most dangerous software errors (http://cwe.mitre.org/top25/index.html) may be used as guidance.

The Contractor’s PPIP shall address the following areas:

· Section 2: Identifying what to protect

· Section 4: Vulnerabilities

· Section 5: Countermeasures

· Section 7: Program Protection Risks

· Section 8: Managing and Implementing Program Protection Plan (PPP)

· Section 9: Process for Management and Implementation of PPP

· Section 10: Process for Monitoring and Reporting Compromises

· Appendix C: Criticality Analysis

The Contractor shall prepare and deliver the Contractor’s PPIP in accordance with CDRL A002. The Government will provide a Contracting Office letter to the Contractor validating that the Critical Program Information/Critical Technology (CPI/CT) is properly identified for the program.

Program Protection Review Meetings

The Contractor shall host three (3) Program Protection Review Meetings in accordance with the Section J, Attachment 03, Meeting List. Each of the three (3) meetings shall include:

· The Contractor’s CPI Assessment identifying CPI or CT (defined by DoDI 5200.39, July 16, 2008 Incl Change 1 Dec 28, 2010, CPI Protection within the DoD)

· A classified session for the Contractor’s Anti-Tamper Plan and status of the Anti-Tamper Solution’s implementation

For planning purposes, each meeting will be a one (1) day event.

CyberSecurity

The Contractor shall designate an Information Systems Security Manager (ISSM) who shall meet the training and certification requirements as defined in DoDD 8570.01, “Information Assurance Training, Certification, and Workforce Management,” dated 15 Aug 2004.

The Contractor shall ensure that Contractor Information Assurance Workforce (IAW) personnel comply with Contractor IAW certification standards and security background investigation requirements, as defined in the DoDD 8570.01.

The Contractor shall ensure that Contractor IAW personnel comply with the identification, tracking and assignment reporting requirements, as defined in the DoDD 8570.01. Contractor IAW personnel shall meet the same standards for IAW certification, system access, management, training and reporting requirements as Government IAW personnel, as defined in DoDD 8570.01.

The Contractor shall comply with and provide Cybersecurity/Information Assurance (IA) supporting activities and functions for the requirements, processes, reporting activities, reviews, certification and accreditation, security design, and assessment activities as defined in the DoDI 8510.01, “Risk Management Framework (RMF) for DoD Information Technology (IT),” dated 12 Mar 2014.

The Contractor shall ensure that ACV IA designated contract deliverables and activities are in compliance with DoDI 8510.01.

The Contractor shall ensure that deliverables comply with applicable U.S. Government and DoD Cybersecurity/IA, Directives, Regulations, and Standards that are applicable to the ACV Program’s Security Classification Level (SCL).

The Contractor shall provide a Cybersecurity/IA status at each of the identified Program Management Reviews (PMRs) per Section J, Attachment 03, Meeting List. The Government may require the Contractor to provide quarterly Cybersecurity/IA program status reports at the PMR to ensure Cybersecurity/IA is fully integrated and compliant with:

1) Federal Information Security Management Act of 2002, Title III-Information Security

2) NIST Special Publication 800-53A Guide for Assessing the Security Controls in Federal Information Systems and Organizations

3) DoDI 8510.01- Risk Management Framework for DOD IT, dated 12 Mar 2014

4) Interim DoDI 5000.02 – Operation of the Defense Acquisition System, dated 25 November 2013

5) The ACV Program’s designated SCL implementation requirements as defined by DoDI 8510.01

6) The Government’s Integrated Master Schedule (IMS)

The Contractor ISSM shall ensure the ACV design is reviewed for Cybersecurity/IA and Anti-Tamper Compliance at the Preliminary Design Review (PDR)/Critical Design Review (CDR), Vehicle Acceptance Review (VAR), and the Production Readiness Review/System Verification Review (PRR/SVR).

The Contractor shall provide support to the Government to successfully achieve an Authority to Operate (ATO) as defined in DoDI 8510.01.

The Contractor shall deliver the Cybersecurity/IA Assessment in accordance with CDRL A003.

Anti-Tamper Plan

The Contractor’s Anti-Tamper Plan shall provide countermeasures to protect CPI and Critical Technologies in accordance with DoDI-5200.39, “Critical Program Information with DoD, Change 1,” dated 28 Dec 2010 to address the following:

1) Deter countermeasure development that would decrease U.S. warfighting capabilities

2) Prevent the unauthorized or out of baseline augmentation or change of capabilities in Direct Commercial Sales (DCS), Foreign Military Sales (FMS), and International Cooperative Development Programs

3) Prevent unauthorized technology changes on CPI or any released capability

4) Protect U.S. critical design knowledge and manufacturing processes from unauthorized transfer

5) Protect U.S. investment in weapon system capabilities, and avoid additional unplanned investment to regain the U.S. advantage

The Contractor’s Anti-Tamper countermeasures shall be verified by Contractor testing to include any prototypes. The Contractor shall deliver the detailed Anti-Tamper solution as an Anti-Tamper Plan submission in accordance with CDRL A004 and the ACV Security Classification Guide, Section J, Attachment 25, and shall incorporate the solutions into the ACV design.

PROGRAM MANAGEMENT

The Contractor shall provide a qualified Program Manager (PM) that shall be responsible for the accomplishment of all tasks in this SOW. The Contractor’s PM shall plan, organize, manage, schedule, implement, control, analyze, and report on all elements of the SOW. The Contractor’s PM shall have resources and authority to efficiently and effectively execute tasks necessary to complete the requirements. The Contractor’s PM shall be prepared to present and discuss the status of contract activities, requirements, and issues with the Program Manager Advanced Amphibious Assault (PM AAA) ACV Product Manager (PdM), the Contracting Officer, and the Contracting Officer Representative (COR).

The Contractor shall execute the program with established, defined, and repeatable organizational processes, procedures, and policies unless otherwise directed within this SOW or other Government regulations, policies, and/or direction.

The Contractor shall deliver all Unclassified/Classified CDRLs in accordance with each DD Form 1423 and the CDRL Submission Instructions, per Section J, Attachment 04.

ASSIGNMENT OF RESPONSIBILITY AND AUTHORITY

The Contractor shall identify clear lines of authority, within their organization, of the personnel who shall be responsible for conducting all activities delineated in this SOW. Those individuals shall be responsible for determining and controlling the resources necessary to satisfy each element of this SOW.

CONFERENCES, REVIEWS, AGENDAS, AND REPORTS

The Contractor shall plan, host, attend, coordinate, provide administrative support and conduct meetings, formal reviews and events, conferences, and audits (hereinafter called "reviews") in conjunction with the Government. The reviews shall be conducted at the Contractor’s or Government’s facilities, as indicated in Section J, Attachment 03, Meeting List. The reviews shall be included in the IMS, and multiple reviews may be held concurrently with the Government’s approval. In addition, the Contractor shall be available to participate in Government – Contractor internet conferencing (Web Meetings) using Government approved systems such as Defense Connect Online (DCO) conferencing tool.

Prior to each review, the Contractor shall prepare agendas for Government approval, unless waived by the Government, in accordance with CDRL A006. The Contractor shall deliver Conference Reports following each review, in accordance with CDRL A008. Action item documentation, assignment of responsibility for completion and due dates will be determined by the Government Chairperson prior to adjournment of all reviews. A summary of all action items, responsible parties, and completion dates shall be included with the meeting minutes.

Post-Award and Contract Option Post-Award Conferences

Post-Award Conference

The Post-Award Conference (PAC) is the first meeting of key Contractor and Government personnel. This PAC is to achieve a clear and mutual understanding of all contract requirements between the Government and the Contractor, and identify and resolve potential problems to ensure successful contract performance. The PAC shall be conducted within 20 calendar days after contract award, per Section J, Attachment 03, Meeting List. The PAC shall include Contractor representatives, the cognizant Contract Administration Office and the Contracting Officer. The Contracting Officer, or designated representative, initiating the conference, will designate or act as the chairperson. The Contractor shall participate with the Government to draft an agenda for the PAC, prior to the meeting.

Contract Option Post-Award Conference

A contract Option PAC shall be held within 20 calendar days after exercise of the LRIP and FRP CLINs (Options, if exercised) per Section J, Attachment 03, Meeting List. The attendees shall include the Contractor, contracting representative, Government Contracting Officer, management, and technical personnel from both the Government and the Contractor. The Contractor shall participate with the Government to arrange a schedule and agenda for the PAC prior to the meeting.

RESERVED

Program Management Reviews

The Contractor shall participate in PMRs during EMD, LRIP (Option, if exercised) and FRP (Option, if exercised) to assess program cost, schedule, performance, process implementation, risk, and status related to the execution of the ACV Program per Section J, Attachment 03, Meeting List. The PMRs may be held in conjunction with other reviews and conferences for efficiency. The Contractor shall summarize the following items and any others that the Government identifies within 30 days of each of the PMRs:

1) Work completed (inclusive of meeting action items)

2) Work planned for upcoming quarter

3) Contract tasks not completed

4) Significant accomplishments

5) Problems or delays

6) Corrective actions

7) Schedule updates and Critical Path Analysis

8) Other program or personnel changes

9) Risk Management Status (Cybersecurity and Safety included)

10) Configuration Management

11) IMS review with critical path and supporting metrics

12) Schedule Risk Assessment (SRA) review with supporting metrics

13) Contractor Cost Data Reporting (CCDR) with most recent cost estimates

14) Status Report for each Integrated Product Team (IPT) or Team

15) Project Metric Status (including Average Unit Manufacturing Cost (AUMC))

16) Technical Performance Measures (TPMs)

MONTHLY PROGRESS STATUS REPORTS

The Contractor shall deliver a Monthly Progress Status Report for the EMD CLINs, and the LRIP (Option, if exercised) and FRP (Option, if exercised) CLINs in accordance with CDRL A009.

INTEGRATED MASTER PLANNING/INTEGRATED MASTER SCHEDULING/SCHEDULE RISK ASSESSMENT

Contract Integrated Master Plan

The Contractor shall develop and deliver a Contract Integrated Master Plan (IMP) in accordance with the Integrated Program Management Report (IPMR), CDRL A010. The Contract IMP shall be traceable to the Government Program IMP, provided in Section J, Attachment 05, Program IMP, and shall include all accomplishments and criteria necessary to achieve each identified Program IMP event. The Contractor shall maintain the IMP throughout the period of performance and if changes occur, obtain written Government approval. The Contract IMP shall be statused by the Contractor to the third level of the Government Work Breakdown Structure (WBS). The IMP shall comply with the “DoD Integrated Master Plan and Integrated Master Schedule Preparation and Use Guide.” If the Contract IMP requires additional IMP accomplishment criteria to be added to the Program IMP, the Contractor can request a change to the Program IMP. The Government will use an established internal process to evaluate the proposed change prior to approval. The Contractor shall liaison with the COR to facilitate the integration of all Contract IMP events, accomplishments, and criteria into the ACV Program IMP.

Contract Integrated Master Schedule

The Contractor shall decompose the Contract IMP into a time-based IMS showing the detailed tasks required to accomplish the work effort contained in the Contract IMP. The Contractor shall develop and deliver the Contract IMS in accordance with IPMR, CDRL A010. The Contractor shall liaison with the COR to facilitate the integration of key Contract IMS milestones and tasks into the Program IMS. The Contractor shall develop task definitions that include task durations and dependencies with other Contract IMS Tasks. The Contractor shall maintain the Contract IMS and the Government will ensure key Contract IMS milestones and tasks are fully integrated into the Program IMS. The Contractor shall deliver an IMS Narrative Report and Analysis to reflect changes in the Contract IMS, in accordance with IPMR, CDRL A010. In addition, the Contractor shall perform system critical path and near-critical path analyses to the closest major acquisition MS (e.g., MS C) and to each key system-level technical review (e.g., PDR/CDR, VAR). The Contractor shall deliver the results of the analyses and Corrective Action Plans in the IMS Narrative Report and Analysis to resolve those efforts negatively impacting the critical path, in accordance with the IMPR, CDRL A010.

The Contract IMS shall meet the below listed requirements:

1. Define all tasks required to execute the Government-approved Contract IMP. Define all internal and external schedule dependencies necessary to execute the Contract IMS.

1. Incorporate material order, material delivery, fabrication, assembly, and test for vehicle production and delivery into the IMS (e.g., EMD CLINs, LRIP (Option, if exercised) CLINs, and FRP (Option, if exercised) CLINs).

1. Include Contractor tasks required to accomplish each IMP event and relevant subcontractor scheduled milestones necessary for the achievement of each Contract IMS event.

1. Include all CDRL deliveries and events as defined by the IMP.

1. Be vertically traceable to the Contract IMP, the Contract Work Breakdown Structure (CWBS), and the Contract SOW and horizontally traceable to all dependent project tasks, identifying the relationships and constraints between project tasks.

Schedule Risk Assessment

A probabilistic SRA shall be developed and delivered in accordance with IPMR CDRL A010. The SRA will provide the Government with an understanding of the potential schedule impacts associated with existing or emerging program risks. These analyses shall compute the probability of completing key milestones, events, and tasks/activities by specific dates. The Contractor shall report optimistic, pessimistic, and most likely remaining durations and rationale for the values in accordance with the Contract IMS for each task/activity on the following paths: critical path to contract completion, critical path to the next Major MS (e.g. MS C), and the next three (3) near-critical paths to the next Major MS. Global weighting values and rationale shall also be provided by the Contractor. In addition, the Contractor technical team members shall be asked to provide pessimistic, most likely, and optimistic durations for moderate to high risk activities identified in the Program Risk Database (generally identified through a risk cube) that are associated with IMS tasks.

CONTRACTOR WORK BREAKDOWN STRUCTURE

The Contractor shall refine the WBS Index and Dictionary developed by the Government at an appropriate level to make the resulting structure program specific, and to facilitate effective Program Management; in accordance with MIL-STD-881C, Work Breakdown Structures for Defense Materiel Items. The Contractor shall establish the CWBS definition at a level necessary to identify work progress and enable effective management, regardless of the CWBS level reported per Section J, Attachment 06, Cost and Software Data Reporting (CSDR) Plan, for program oversight. The Contractor shall be responsible for periodic updates and maintenance of the CWBS at the level below the required reporting level established per Section J, Attachment 06, CSDR Plan, according to the provisions set forth in the CWBS. Changes to the reporting level CWBS, as specified per Section J, Attachment 06, CSDR Plan, require a contractual modification before incorporation; however, the Contractor has complete flexibility to extend the CWBS below the reporting level to reflect how work is accomplished. The CWBS shall not be influenced by the Contractor’s organizational structure. For reporting purposes, the CWBS is required to be the same for CCDR and IPMR, though reporting levels may be different for each report. The Contractor shall prepare and deliver the CWBS Index and Dictionary in accordance with CDRL A011. Section J, Attachment 28 provides the Program WBS Index and Dictionary as a reference to assist the Contractor in the development of the CWBS Index and Dictionary, should the Contractor choose to use it.

RESERVED

Reserved

Reserved

Reserved

Reserved

Reserved

Reserved

RESERVED

COST ESTIMATING AND ANALYSIS

Contractor Cost and Software Data Reporting

The Contractor shall systematically collect and report actual…

This is the start of the file's text. The full file is on GovTribe.