DRAFT CLRF_IC_Production_CDRLs

View the file

Other files

File Type Posted
M67854-14-R-6001_0003.doc DOC document
Attachment_(7)_-_Section_B_-_Description_of_Supplies_Services_18_Aug_14.xlsx XLSX spreadsheet
M67854-14-R-6001_0002.doc DOC document
Attachment_(1)_-_CLRF_IC_Performance_Specification_3_Jul_2014.docx DOCX document
Exhibits_(A)-(C)_-_CLRF_IC_Production_CDRLs_1_Aug_2014.pdf PDF
Attachment_(9)_-_CLRF_IC_Final_RFP_Questions_ _Answers_-_8_Aug_2014.xlsx XLSX spreadsheet
M67854-14-R-6001_0001.doc DOC document
Attachment_(7)_-_Section_B_-_Description_of_Supplies_Services_-_7_Aug_14.xlsx XLSX spreadsheet
Attachment_(2)_-_CLRF_IC_CPSCM__MSC_-_1_Aug_2014.xlsx XLSX spreadsheet
Attachment_(2)_-_CLRF_IC_CPSCM__MSC_15_Jul_2014.xlsx XLSX spreadsheet
Attachment_(8)_-_Past_Performance_Questionnaire_16_Jun_2014.docx DOCX document
Attachment_(3)_-_CLRF_IC_CRM_Template_16_Jun_2014.xlsx XLSX spreadsheet
Exhibits_(A)-(C)_-_CLRF_IC_Production_CDRLs_9_Jul_2014.pdf PDF
Attachment_(5)_-_DD254_M67854-14-R-6001_27_Jan_2014.pdf PDF
CLRF_IC_FINAL_RFP_M67854-14-R-6001_15_JUL_2014.doc DOC document
Attachment_(6)_-_CLRF_IC_GFP_16_Jun_2014.pdf PDF
Attachment_(4)_-_CLRF_IC_FDA_Compliance_Checklist_1_Jul_2014.pdf PDF
Attachment_(1)_-_CLRF_IC_Performance_Specification_3_Jul_2014.pdf PDF
Attachment_(7)_-_Section_B_-_Description_of_Supplies_Services_15_Jul_14.xlsx XLSX spreadsheet
CLRF_IC_Draft__RFP_Questions_Answers_-_1_Jul_14.pdf PDF
DRAFT_CLRF_IC_Sections_L_ _M_12_Jun_14.docx DOCX document
DRAFT_CLRF_IC_Section_F_Delivery_Requirements_5_Jun_2014.docx DOCX document
DRAFT_CLRF_IC_Section_H_Clause_-_Government_Purpose_Rights_12_Jun_14.docx DOCX document
DRAFT_CLRF_IC_Section_B_-_Description_of_Supplies_Services_5_Jun_14.xlsx XLSX spreadsheet
DRAFT_CLRF_IC_Performance_Specification_20140609.docx DOCX document
DRAFT_CLRF_IC_Production_SOW.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Contractor’s Progress, Status and Management Report

3. SUBTITLE18. ESTIMATED TOTAL PRICE

17. PRICE GROUP

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80555A

5. CONTRACT REFERENCE

SOW para 3.1.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 12 - Submit 1st report 45 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

Block 14 - Delivery media shall be in Microsoft Word (for Windows) via email or AMRDEC SAFE site.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Robert Gonzalez

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

9 June 2014

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Integrated Program Management Report

3. SUBTITLE18. ESTIMATED TOTAL PRICE

Program Management Report

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81861

5. CONTRACT REFERENCE

SOW para 3.1.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

Monthly

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - Modify DID as follows:

The contractor shall submit data for Formats 5 and 6 only. Formats 1, 2, 3, 4, and 7 are omitted for this CDRL.

Format 5 - Shall be limited to amplify and explain data elements contained in Formats 1 and 6.

Format 6 - Shall include subcontractor’s IMS and data.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 12 - Submit 1st report 45 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

Block 14 - Delivery media shall be via email or AMRDEC SAFE site. The IMS shall be delivered in the format specified in the SOW.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Robert Gonzalez

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Conference Agenda

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81249A

5. CONTRACT REFERENCE

SOW para 3.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - Agendas shall not include general company profiles, advertisements, etc., not directly related to the CLRF IC program.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - Agenda items shall be added, changed, or revised, as required, to provide the Government with accurate and complete data.

Block 12 - Submit 14 calendar days prior to each review/conference.

Block 13 - The Government requires 7 calendar days to review. The contractor shall submit final 7 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Robert Gonzalez

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Conference Minutes

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250A

5. CONTRACT REFERENCE

SOW para 3.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - Minutes shall not include general company profiles, advertisements, etc., not directly related to the CLRF IC program. Minutes shall be unclassified. Global Positioning System (GPS) information shall be marked in accordance with the GPS Security Classification Guide.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - Conference minutes shall be added, changed, or revised, as required, to provide the Government with accurate and complete data.

Block 12 - Submit 7 calendar days after each review/conference.

Block 13 - The Government requires 7 calendar days to review. The contractor shall submit final 7 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Robert Gonzalez

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Presentation Material

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81373

5. CONTRACT REFERENCE

SOW para 3.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - Presentation materials shall not include general company profiles, advertisements, etc., not directly related to the CLRF IC program. Presentation materials shall be unclassified. Global Positioning System (GPS) information shall be marked in accordance with the GPS Security Classification Guide.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - Presentation materials shall be added, changed, or revised, as required, to provide the Government with accurate and complete data.

Block 12 - Submit 14 calendar days prior to each review/conference.

Block 13 - The Government requires 7 calendar days to review. The contractor shall submit final 7 calendar days after receipt of Government comments.

Block 14 - Delivery media shall be in Microsoft PowerPoint (for Windows) via email or AMRDEC SAFE site.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Robert Gonzalez

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B001

2. TITLE OF DATA ITEM

Configuration Management Plan

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80858B

5. CONTRACT REFERENCE

SOW para 3.3.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - The CM Plan shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - Submit 75 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 14 calendar days to review. The contractor shall submit final 7 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B00A

2. TITLE OF DATA ITEM

Engineering Change Proposal

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80639C

5. CONTRACT REFERENCE

SOW para 3.3.2.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

As Req

12. DATE OF FIRST SUBMISSION

As Req

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

As Req

Draft
Final
Reg
Repro

16. REMARKS

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 12 - The contractor shall submit an ECP to the Government 30 calendar days before implementing any Class 2 ECP. Notifications shall be submitted for all changes which affect Government established baselines. The opportunity to submit notifications shall extend through contract finalization. In addition, notifications shall be submitted at the request of the Government.

Block 13 - The Government requires 30 calendar days to review and approve/disapprove the class designation of the ECP. The contractor shall submit final 14 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B00B

2. TITLE OF DATA ITEM

Notice of Revision

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80642C

5. CONTRACT REFERENCE

SOW para 3.3.2.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

As Req

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 12 - The contractor shall submit a NOR to the Government with each ECP.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B002

2. TITLE OF DATA ITEM

Configuration Status Accounting Information

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-81253A

5. CONTRACT REFERENCE

SOW para 3.3.3

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Blocks 10/13 - CSA database shall be revised and submitted as requested by the Government to provide complete and accurate data.

Block 12 - Submit 30 Calendar Days after issuance of Delivery Order.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B003

2. TITLE OF DATA ITEM

Spectrum Certification Spectral Characteristics Data

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-EMCS-81827

5. CONTRACT REFERENCE

SOW para 3.3.4

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - Complete DD Form 1494 for the Global Positioning System (GPS) Selective Availability Anti-Spoofing Module (SAASM) receiver and antenna information only.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - This deliverable shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - Submit 30 Calendar Days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

Block 14 - Delivery media shall be in Microsoft Word (for Windows) or Portable Document Format (PDF) via email or AMRDEC SAFE site.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B004

2. TITLE OF DATA ITEM

Interface Control Document

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-81248A

5. CONTRACT REFERENCE

SOW para 3.3.5

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - Modify DID as follows:

Replace 2.d. and 2.e. with:

d. a description of the mechanical/physical interface relationships with a defined set of external devices:

1. Provisions required for performing maintenance and repair

2. Size, shape, mass, mass distribution, and center of gravity

3. Sealing, pressurization, attachment, and locking provisions

4. Location and alignment requirements with respect to other equipment

5. Load-carrying capability

6. Dimensional relationships between mating equipment

e. a description of the electrical/functional interface capabilities of the device:

1. Function name and symbol

2. Cable characteristics

3. Connector characteristics

4. Power source

5. Power input/output Add 2.f. and 2.g. with:

f. a description of the communications interface capabilities of the device:

1. Interface communication protocol

2. Signal characteristics

3. Data definition

4. Data transmission, format, coding, timing, and updating

5. Message structure and flow

6. Interface configuration settings

g. any mechanical and electrical interface drawings, diagrams, models, and/or pictures for the device

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - The Mechanical Interface Control Drawing and Electrical Interface Control Document shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - Submit 75 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B005

2. TITLE OF DATA ITEM

Commercial Drawings and Associated Lists

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81003E

5. CONTRACT REFERENCE

SOW para 3.3.6.1

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - The Commercial Drawings and Associated Lists shall be revised 20 calendar days after the Provisioning Conference.

Block 12 - Submit 30 calendar days after Provisioning Guidance Conference (PGC).

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

Block 14 - Delivery media shall be in Microsoft Word (for Windows) or Portable Document Format (PDF) via email or AMRDEC SAFE site.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B006

2. TITLE OF DATA ITEM

Cable Drawings

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81000E

5. CONTRACT REFERENCE

SOW para 3.3.6.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - Modify DID as follows:

Change Requirement 3 to: “Format. Product Drawings/Models and Associated Lists shall be in contractor's format for 3-Dimensional Solid Models and shall include 2-D drawings based on the 3-D solid models in PDF format ”.

Delete Requirement 4.p.

Change Requirement 6 to: “CAGE code and document numbers. Product Drawings/Models and Associated Lists shall be identified with the contractor's CAGE code and contractor document numbers”.

Change Requirement 7 to: “Selection of drawings. The types of drawings required will vary according to the complexity of the contract end item. The contractor is responsible for selecting the types of drawings/models and Associated Lists”.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - The Cable Drawings shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - Submit 90 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

Block 14 - Delivery media shall be Portable Document Format (PDF) and Contractor’s 3-Dimensional Solid Model Format(s) via email or AMRDEC SAFE site.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B007

2. TITLE OF DATA ITEM

LSRB Data Package

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

SOW para 3.3.8.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - The LSRB Data Package shall include all data elements of a Laser Data Package in accordance with Marine Corps Order (MCO) 5104.1C, Enclosure (4), Paragraph 2.a.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - The LSRB Data Package shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - Submit 20 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 45 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Tiffany Johnson

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B008

2. TITLE OF DATA ITEM

Lithium Battery Data Package

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

SOW para 3.3.8.2

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - The Lithium Battery Data Package shall include all data elements of a Safety Data Package in accordance with Section 2-3 of NAVSEA S9310-AQ-SAF-010 (2nd Revision), Technical Manual for Navy Lithium Battery Safety Program Responsibilities and Procedures.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - The Lithium Battery Data Package shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - Submit 30 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Tiffany Johnson

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B009

2. TITLE OF DATA ITEM

Hazardous Materials Management Plan

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

SOW para 3.3.8.5

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - The HMMP shall be written in accordance with Task 108 of MIL-STD-882E and shall address data elements of the Task Description as outlined in Section 108.2. The contractor may exclude item (d) of Section 108.2.2. The NAVSEA Prohibited and Controlled Chemicals List (PCCL) and DoD Materials of Evolving Interest List (MERIT) Action and Watch Lists shall be used for HAZMAT Categorization per Section 108.2.2.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - The HMMP shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - Submit 20 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Tiffany Johnson

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B010

2. TITLE OF DATA ITEM

Safety Assessment Report Update

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE

SOW para 3.3.8.7

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 4 - The SAR supporting a Field User Evaluation shall be written in accordance with Task 301 of MIL-STD-882E and shall address all data elements of the Task Description as outlined in Section 301.2.

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - The SAR shall be changed or revised yearly to provide the Government with complete and accurate data.

Block 12 - Submit 45 calendar days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Tiffany Johnson

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B011

2. TITLE OF DATA ITEM

FAT Procedure

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80603A

5. CONTRACT REFERENCE

SOW para 3.3.9.3

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - Test Procedure shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - Submit 120 Calendar Days after issuance of Delivery Order.

Block 13 - The Government requires 30 calendar days to review. The contractor shall submit final 14 calendar days after receipt of Government comments.

MCSC PdM FSS

COR
1
0
1

MCSC CT (PCO)

PCO
Cover Letter
15. TOTAL ---------
1
0
1

G. PREPARED BY:

Bruce Leaman

H. DATE

9 June 2014

I. APPROVED BY:

Jeff Nebel

J. DATE

CONTRACT DATA REQUIREMENTS LIST

Form Approved

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP ___ TM ___ OTHER X .

D. SYSTEM/ITEM

CLRF IC

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

B012

2. TITLE OF DATA ITEM

FAT Report

3. SUBTITLE18. ESTIMATED TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B

5. CONTRACT REFERENCE

SOW para 3.3.9.3

6. REQUIRING OFFICE

MARCORSYSCOM (PdM FSS)

7. DD 250 REQ

LT

9. DIST

STATEMENT

See Block 16

10. FREQUENCY

See Block 16

12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft
Final
Reg
Repro

16. REMARKS

Block 9 - The following information shall be included on the deliverable: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Export Controlled, 30 May 2013. Other requests shall be referred to Commander, Marine Corps Systems Command (Attn: AFSS), 2200 Lester Street, Quantico, VA 22134-6050.

Block 10 - Test Report shall be changed or revised, as required, to provide the Government with complete and accurate data.

Block 12 - The draft copy shall be provided immediately following completion of FAT as a quick look for the Program Office. The official data deliverable shall follow 20 calendar days after completion of FAT.

Block 13 - The Government requires 30…