CLRF_IC_FINAL_RFP_M67854-14-R-6001_15_JUL_2014.doc
DOC document 1 MB Posted
- Attached to
- COMMON LASER RANGE FINDER INTEGRATED CAPABILITY
- Solicitation number
- M67854-14-R-6001
- Issued by
-
United States Marine Corps
About this file
CLRF IC FINAL RFP M67854-14-R-6001 15 JUL 2014
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FAT UNITS, TESTING & TRAINING
FFP
First Article Units, Testing & Training shall be IAW SOW paragraphs 3.2.1-3.2.8, 3.3.1, 3.3.4-3.3.9, 3.4.6.1-3.4.6.5, and 3.4.8-3.4.9 and P-Spec Sections 3 and 4, and includes CDRLs A003-A005, B001, B003-B013, and C004-C010.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AA
| 14 |
| Each |
FAT UNITS
FAT Units shall be IAW the SOW and P-Spec paragraphs defined in CLIN 0001 above and as defined in Section B.1.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AB
| 1 |
| Lot |
FAT TESTING
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AC
| 1 |
| Lot |
FUE TECHNICAL SUPPORT & TRAINING
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AD
| 1 |
| Lot |
OPERATOR TRAINING
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AE
| 1 |
| Lot |
FAT & TRAINING DATA CDRLS
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
PRODUCTION DATA
Production Data shall be IAW SOW paragraphs 3.1.1, 3.3.2.2-3.3.3.2, 3.3.9.3, and 3.4.2, and includes CDRLs A001, A002, B00A, B00B, B002, B014, and C001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C008 TECHNICAL MANUAL
Technical Manual shall be IAW SOW paragraph 3.4.9 and CDRL C008.
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C010 QUICK REFERENCE CARD
Quick Reference Card shall be IAW SOW paragraph 3.4.9.1 and CDRL C010.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SYSTEM IUID DATA PLATE
System IUID Data Plate shall be IAW SOW paragraph 3.4.7.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
LASER RANGE FINDER, STRAPS/LENS COVER(S)
Laser Range Finder with Carrying Strap, Neck Strap, and Objective Lens Cover(s) shall be IAW P-Spec paragraphs 3.2, 3.9.5, and 3.9.6.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
DETACHABLE GLINT PROTECTION
Detachable Glint Protection shall be IAW P-Spec paragraph 3.7.8.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL
Picatinny Rail shall be IAW P-Spec paragraph 3.9.2.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL GRABBER
Picatinny Rail Grabber shall be IAW P-Spec paragraph 3.9.4.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
OBJECTIVE LENS COVER(S)
Objective Lens Cover(s) shall be IAW P-Spec paragraph 3.9.5.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CELESTIAL LENS COVER(S)
Celestial Lens Cover(s) shall be IAW P-Spec paragraph 3.9.5.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
EYEPIECE LENS COVER
Eyepiece Lens Cover shall be IAW P-Spec paragraphs 3.9.5 and 3.22.2.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
NECKSTRAP
Neckstrap shall be IAW P-Spec paragraph 3.9.6.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRANSIT CASE
Transit Case shall be IAW P-Spec paragraphs 3.9.7 and 3.27.2.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 490 |
| Each |
TLDHS INTERFACE CABLE
TLDHS Interface Cable shall be IAW P-Spec paragraph 3.11.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
REMOTE FIRE CABLE
Remote Fire Cable shall be IAW P-Spec paragraph 3.9.8.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SAASM CRYPTO LOAD CABLE
SAASM Crypto Load Cable shall be IAW P-Spec paragraphs 3.6 and 3.11.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 20 |
| Each |
WMM UPDATE CABLE
World Magnetic Model (WMM) Update Cable shall be IAW P-Spec paragraphs 3.6 and 3.11.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 170 |
| Each |
JTAC LTD INTERFACE CABLE
JTAC LTD Interface Cable shall be IAW P-Spec paragraphs 3.10 and 3.11.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
BA-5590/BB-2590 INTERFACE CABLE
BA-5590/BB-2590 Interface Cable shall be IAW P-Spec paragraphs 3.11 and 3.15.3.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 490 |
| Each |
TLSI INTERFACE CABLE
TLSI Interface Cable shall be IAW P-Spec paragraphs 3.10 and 3.11.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
FIELD CARRY POUCH
Field Carry Pouch shall be IAW P-Spec paragraph 3.12.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD SOFT CARRY POUCH
Tripod Soft Carry Pouch shall be IAW P-Spec paragraph 3.13.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
CR123 BATTERY CARTRIDGE
CR123 Battery Cartridge shall be IAW P-Spec paragraph 3.15.1.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
AA BATTERY CARTRIDGE
AA Battery Cartridge shall be IAW P-Spec paragraph 3.15.1.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
INTERCHANGEABLE BATTERY CARTRIDGE
INTERCHANGEABLE Battery Cartridge shall be IAW P-Spec paragraph 3.15.1.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
RECHARGEABLE BATTERY PACK
RECHARGEABLE Battery Pack shall be IAW P-Spec paragraph 3.15.2.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD
Tripod shall be IAW P-Spec paragraph 3.17.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
PRODUCTION DATA
PProduction Data shall be IAW SOW paragraphs 3.1.1, 3.3.2.2-3.3.3.2, 3.3.9.3, and 3.4.2, and includes CDRLs A001, A002, B00A, B00B, B002, B014, and C001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CONTRACTOR LOGISTICS SUPPORT (CLS)
T&M
CLS shall be IAW SOW paragraphs 3.4.5 and 3.4.5.1.
TOT ESTIMATED PRICE
CEILING PRICE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AA
| 1,500 |
| Labor Hours |
CLS LABOR
CLS Labor Hours shall not exceed 1,500 hours.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AB
Each
CLS MATERIALS
CLS Materials shall be non-fee bearing and shall not exceed a total of $150,000.00.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1003AC
| 1 |
| Lot |
CDRLS C002 & C003 CLS DATA
CLS Data – CDRLs C002 and C003 shall be IAW the CDRLs themselves.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
GOVT DIRECTED ENGINEERING STUDIES (GDES)
GDES shall be IAW SOW paragraph 3.3.2.1.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AA
| 2,000 |
| Labor Hours |
GDES LABOR
GDES Labor Hours shall not exceed 2,000 hours.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1004AB
Each
GDES MATERIALS
GDES Materials shall be non-fee bearing and shall not exceed a total of $300,000.00.
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C008 TECHNICAL MANUAL
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C010 QUICK REFERENCE CARD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SYSTEM IUID DATA PLATE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
LASER RANGE FINDER, STRAPS/LENS COVER(S)
Laser Range Finder with Carrying Strap, Neck Strap, and Objective Lens Cover(s) shall be IAW P-Spec paragraphs 3.2, 3.9.5, and 3.9.6.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
DETACHABLE GLINT PROTECTION
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL GRABBER
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
OBJECTIVE LENS COVER(S)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CELESTIAL LENS COVER(S)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
EYEPIECE LENS COVER
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
NECKSTRAP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRANSIT CASE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 490 |
| Each |
TLDHS INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
REMOTE FIRE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SAASM CRYPTO LOAD CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 20 |
| Each |
WMM UPDATE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 170 |
| Each |
JTAC LTD INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
BA-5590/BB-2590 INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 490 |
| Each |
TLSI INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
FIELD CARRY POUCH
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD SOFT CARRY POUCH
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
CR123 BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
AA BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
INTERCHANGEABLE BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
RECHARGEABLE BATTERY PACK
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 11 |
| Set |
TRAINING SHELL PARTS
Training Shell Parts shall be IAW SOW paragraph 3.4.6.6.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
PRODUCTION DATA
Production Data shall be IAW SOW paragraphs 3.1.1, 3.3.2.2-3.3.3.2, 3.3.9.3, and 3.4.2, and includes CDRLs A001, A002, B00A, B00B, B002, B014, and C001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CONTRACTOR LOGISTICS SUPPORT (CLS)
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AA
| 15,000 |
| Labor Hours |
CLS LABOR
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AB
Each
CLS MATERIALS
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2003AC
| 1 |
| Lot |
CDRLS C002 & C003 CLS DATA
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
GOVT DIRECTED ENGINEERING STUDIES (GDES)
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AA
| 2,000 |
| Labor Hours |
GDES LABOR
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2004AB
Each
GDES MATERIALS
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C008 TECHNICAL MANUAL
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C010 QUICK REFERENCE CARD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SYSTEM IUID DATA PLATE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
LASER RANGE FINDER, STRAPS/LENS COVER(S)
Laser Range Finder with Carrying Strap, Neck Strap, and Objective Lens Cover(s) shall be IAW P-Spec paragraphs 3.2, 3.9.5, and 3.9.6.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
DETACHABLE GLINT PROTECTION
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL GRABBER
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
OBJECTIVE LENS COVER(S)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CELESTIAL LENS COVER(S)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
EYEPIECE LENS COVER
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
NECKSTRAP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRANSIT CASE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 50 |
| Each |
TLDHS INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
REMOTE FIRE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SAASM CRYPTO LOAD CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 20 |
| Each |
WMM UPDATE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 30 |
| Each |
JTAC LTD INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
BA-5590/BB-2590 INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 50 |
| Each |
TLSI INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
FIELD CARRY POUCH
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD SOFT CARRY POUCH
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
CR123 BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
AA BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
INTERCHANGEABLE BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
RECHARGEABLE BATTERY PACK
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 11 |
| Set |
TRAINING SHELL PARTS
Training Shell Parts shall be IAW SOW paragraph 3.4.6.6.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
PRODUCTION DATA
Production Data shall be IAW SOW paragraphs 3.1.1, 3.3.2.2-3.3.3.2, 3.3.9.3, and 3.4.2, and includes CDRLs A001, A002, B00A, B00B, B002, B014, and C001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
CONTRACTOR LOGISTICS SUPPORT (CLS)
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3003AA
| 1,500 |
| Labor Hours |
CLS LABOR
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3003AB
Each
CLS MATERIALS
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3003AC
| 1 |
| Lot |
CDRLS C002 & C003 CLS DATA
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
GOVT DIRECTED ENGINEERING STUDIES (GDES)
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3004AA
| 2,000 |
| Labor Hours |
GDES LABOR
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3004AB
Each
GDES MATERIALS
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C008 TECHNICAL MANUAL
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C010 QUICK REFERENCE CARD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SYSTEM IUID DATA PLATE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
LASER RANGE FINDER, STRAPS/LENS COVER(S)
Laser Range Finder with Carrying Strap, Neck Strap, and Objective Lens Cover(s) shall be IAW P-Spec paragraphs 3.2, 3.9.5, and 3.9.6.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
DETACHABLE GLINT PROTECTION
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL GRABBER
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
OBJECTIVE LENS COVER(S)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CELESTIAL LENS COVER(S)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
EYEPIECE LENS COVER
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
NECKSTRAP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRANSIT CASE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 50 |
| Each |
TLDHS INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
REMOTE FIRE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SASSM CRYPTO LOAD CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 20 |
| Each |
WMM UPDATE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 30 |
| Each |
JTAC LTD INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
BA-5590/BB-2590 INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 50 |
| Each |
TLSI INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
FIELD CARRY POUCH
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD SOFT CARRY POUCH
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
CR123 BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
AA BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
INTERCHANGEABLE BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
RECHARGEABLE BATTERY PACK
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
PRODUCTION DATA
Production Data shall be IAW SOW paragraphs 3.1.1, 3.3.2.2-3.3.3.2, 3.3.9.3, and 3.4.2, and includes CDRLs A001, A002, B00A, B00B, B002, B014, and C001.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
RESERVED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C008 TECHNICAL MANUAL
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CDRL C010 QUICK REFERENCE CARD
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SYSTEM IUID DATA PLATE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
LASER RANGE FINDER, STRAPS/LENS COVER(S)
Laser Range Finder with Carrying Strap, Neck Strap, and Objective Lens Cover(s) shall be IAW P-Spec paragraphs 3.2, 3.9.5, and 3.9.6.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
DETACHABLE GLINT PROTECTION
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
PICATINNY RAIL GRABBER
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
OBJECTIVE LENS COVER(S)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
CELESTIAL LENS COVER(S)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
EYEPIECE LENS COVER
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
NECKSTRAP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRANSIT CASE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 50 |
| Each |
TLDHS INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
REMOTE FIRE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
SASSM CRYPTO LOAD CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 20 |
| Each |
WMM UPDATE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 30 |
| Each |
JTAC LTD INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
BA-5590/BB-2590 INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 50 |
| Each |
TLSI INTERFACE CABLE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
FIELD CARRY POUCH
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD SOFT CARRY POUCH
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
CR123 BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
AA BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
INTERCHANGEABLE BATTERY CARTRIDGE
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1,800 |
| Each |
RECHARGEABLE BATTERY PACK
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 600 |
| Each |
TRIPOD
MAX
SECTION B INSTRUCTIONS
B-1 FIRST ARTICLE TEST (FAT) UNITS
The Government intends to procure fourteen (14) First Article Test (FAT) Units, which will consist of one (1) each of Contract Line Item Numbers (CLINs) 0005-0025 and 0030, and three (3) each of CLINs 0026-0029.
B-2 INITIAL DELIVERY ORDER (DO)
The Government intends to issue the first Delivery Order (DO) for a quantity of fourteen (14) FAT Units and up to eighty-six (86) Low Rate Initial Production (LRIP) Units based on the specific CLIN quantities listed in B-1 above.
B-3 CONTRACT MINIMUM AND MAXIMUM QUANTITIES
Per the table below, the Contract Minimum for the entire life of the contract is fifty (50) of CLIN 0008 only. There is no Contract Minimum quantity for any other CLIN throughout this contract.
The Contract Maximum Quantities for the entire life of the contract are:
· 1,500 for CLINs X005 through X025 and X030 (e.g. CLIN 0005 + CLIN 1005 + CLIN 2005 + CLIN 3005 + CLIN 4005 will not exceed 1,500 in total)
· 4,500 for CLINs X026 through X029 (e.g. CLIN 0026 + CLIN 1026 + CLIN 2026 + CLIN 3026 + CLIN 4026 will not exceed 4,500 in total)
· eleven (11) for CLIN 1031
· eleven (11) for CLIN 2031
| CLIN |
| MINIMUM |
| MAXIMUM |
| X001 |
| N/A |
| N/A |
| X002 |
| N/A |
| N/A |
| X003 |
| N/A |
| N/A |
| X004 |
| N/A |
| N/A |
| X005 |
| N/A |
| 1,500 |
| X006 |
| N/A |
| 1,500 |
| X007 |
| N/A |
| 1,500 |
| 0008 |
| 50 |
| N/A |
| X008 |
| N/A |
| 1,500 |
| X009 |
| N/A |
| 1,500 |
| X010 |
| N/A |
| 1,500 |
| X011 |
| N/A |
| 1,500 |
| X012 |
| N/A |
| 1,500 |
| X013 |
| N/A |
| 1,500 |
| X014 |
| N/A |
| 1,500 |
| X015 |
| N/A |
| 1,500 |
| X016 |
| N/A |
| 1,500 |
| X017 |
| N/A |
| 1,500 |
| X018 |
| N/A |
| 1,500 |
| X019 |
| N/A |
| 1,500 |
| X020 |
| N/A |
| 1,500 |
| X021 |
| N/A |
| 1,500 |
| X022 |
| N/A |
| 1,500 |
| X023 |
| N/A |
| 1,500 |
| X024 |
| N/A |
| 1,500 |
| X025 |
| N/A |
| 1,500 |
| X026 |
| N/A |
| 4,500 |
| X027 |
| N/A |
| 4,500 |
| X028 |
| N/A |
| 4,500 |
| X029 |
| N/A |
| 4,500 |
| X030 |
| N/A |
| 1,500 |
| 1031 |
| N/A |
| 11 |
| 2031 |
| N/A |
| 11 |
Section C - Descriptions and Specifications
STATEMENT OF WORK
1. Scope. This Statement of Work (SOW) specifies the tasks the Contractor shall perform under this contract in support of the production of the Common Laser Range Finder Integrated Capability (CLRF IC) System. The Contractor is responsible for providing all material, services, and necessary support documentation needed to complete the tasks identified in this SOW.
1.1. System Description. The CLRF IC is a handheld, lightweight, man portable, GPS target location device. The principal function of the CLRF IC System is to assist the operator in determining the location of a target or other object of interest by measuring the distance, direction, and vertical angle from the operator to the object. The CLRF IC System shall also provide the capability to export these measurements (in a suitable digital format) through a serial communications port to external digital devices for further processing. The CLRF IC System shall also assist the operator with day and night target detection, recognition, and identification. The CLRF IC System shall be capable of operating in the full range of environments and operational situations where Marines deploy. Objective requirements that assist the user in target location, detection, recognition, and identification, include the CLRF IC System internal capabilities of laser spot imaging of multiple laser wavelengths.
2. Applicable Documents. The following documents will be a part of this SOW as specified. The most recent revision of the referenced document will be used unless otherwise specified. In the event of conflict between the applicable documents and this SOW, this document shall take precedence. This document will not supersede applicable laws and regulations unless a specific exemption has been granted.
2.1. Specifications, Standards and Handbooks.
MIL-STD-130N
Identification Marking of U.S. Military Property
MIL-STD-882E
Standard Practice for System Safety
MIL-STD-3018
Parts Management
MIL-STD-38784A
Standard Practice for Manuals, Technical:
General Style and Format Requirements
MIL-PRF-29612B
Training Data Products
MIL-HDBK-61A
Configuration Management Guidance
MIL-HDBK-470A
Designing and Developing Maintainable Products
NOT 2
and Systems Volume 1
MIL-HDBK-502A
Product Support Analysis
(Copies of these documents are available online at http://quicksearch.dla.mil/)
GEIA-STD-0007
Logistics Product Data
GEIA-HB-0007
Logistics Product Data Handbook
SG-1A
Marine Corps Style Guide for Technical Publications
(Copies of these documents are available by written request from Marine Corps Systems Command, Procuring Contracting Officer.)
Other Government Documents, Drawings, and Publications.
DoDI 8320.04 Item Unique Identification (IUID) Standards for Tangible Personal Property
DoD Materials of Evolving Interest List (MERIT) Action and Watch Lists
GPU-09-105
Security Approval Review Process Requirements Document
(PRD) for the Global Positioning System Selective Availability Anti-Spoofing Modules (SAASM) Host Application Equipment
(HAE)
MARADMIN 159/13
Levels of Maintenance
MCO 5104.1C
Navy Laser Hazards Control Program
NAVSEAINST 9310.1B
Naval Lithium Battery Safety Program
NAVSEA S9310-AQ-
Technical Manual for Batteries, Navy Lithium Safety
SAF-010, 2nd Revision Program Responsibilities and Procedures
NAVSEA ltr 5090
NAVSEA Prohibited and Controlled Chemicals List
Ser 04R/138 dtd 26 Nov 2008
(Copies of this manual are available by written request from Marine Corps Systems Command, Procuring Contracting Officer.)
PRF-PMM141/
Performance Specification for the CLRF IC
CLRF IC
(The Performance Specification can be located as an attachment in Section J.)
3. General Requirements. The Contractor shall perform all tasks required and delineated in this SOW to deliver and prepare associated documentation, provide logistics support, technical support, test support, integration and design support, and training, develop technical manuals, and deliver the CLRF IC in the quantity specified in the contract. The Contractor shall provide all materials, equipment, personnel, and facilities necessary to produce and deliver the types and quantities of deliverables specified by the contract.
3.1. Program and Data Management.
3.1.1. Program Management. The Contractor shall prepare and submit a monthly Progress, Status and Management Report to the Government. The Contractor shall maintain an accurate MS Project compatible integrated master schedule of program events and recommended program schedules, including reviews and evaluations, which provide for the earliest delivery of the CLRF IC. The MS Project Schedule shall include all significant events, major tasks, and deliverables from start to the completion of the contract. The MS Project Schedule and subsequent updates shall be submitted with the Integrated Program Management Report. The Contractor shall notify the Government, in writing, of any anticipated or projected work stoppages or delays that will impact schedules.
CDRL A001: Contractor’s Progress, Status and Management Report
CDRL A002: Integrated Program Management Report
3.1.2. Data Management. The Contractor shall establish a single, centralized system for management of data required under this contract. The Government reserves the right to review all data associated with and developed for the CLRF IC. Documentation shall be readily available to Government representative(s) during planned visits.
3.1.3. Security Requirements. All CLRF IC systems will require a Selective Availability Anti-Spoofing Module (SAASM) Global Positioning System (GPS). The Contractor's facilities and personnel shall have the appropriate clearances and approval to store and use GPS data and equipment required to operate the system. The Contractor shall provide evidence that their host application equipment has been approved per GPU-09-105. The Contractor and/or their subcontractors shall possess a valid COMSEC account number.
This contract will require the Contractor to have a Secret Facility Clearance and will require certain Contractors to obtain and maintain classified access eligibility. The Contractor shall have a valid Secret Facility Clearance prior to classified performance. The prime Contractor and all subcontractors (through the prime Contractor) shall adhere to all aspects of DoD Directive 5220.22-M. All personnel identified to perform on this contract shall maintain compliance with Department of Defense, Department of the Navy, and Marine Corps Information and Personnel Security Policy to include completed background investigations (as required) prior to classified performance. Contractor performance shall be in accordance with a DoD Contract Security Classification Specification (DD Form 254) as an attachment. The Contractor shall notify the Government (written notice) within twenty-four hours of any Contractor personnel added or removed from the contract that have been granted classified access.
Classified involvement entails unescorted access into secure spaces and access to Secret materials and/or systems (SIPRNET). There will be Secret products used under this contract.
3.1.4. Change in Production Facility Location or Break in Production Line. Should the Contractor change production facility locations after the completion of the Production Readiness Review (PRR) and First Article Test (FAT), the Contractor shall host another PRR in accordance with section 3.2.8 prior to producing any systems at their new facility as well as conduct FAT in accordance with section 3.3.9.1 prior to beginning full rate production at their new facility. The PRR shall be conducted 30 calendar days prior to the production of the first units at their new facility. Should the Contractor have a break in production for greater than 90 calendar days, the Contractor shall conduct another FAT in accordance with section 3.3.9.1.
3.2. Meetings, Formal Reviews, Audits, and Conferences.
3.2.1. Contractor Responsibilities. The Contractor shall plan, host, attend, coordinate, support and conduct meetings, formal reviews, conferences, and audits (hereinafter called "reviews"). The reviews shall be conducted at Government and Contractor facilities. All such reviews shall be included in the program schedule and may be held concurrently with the Government’s approval. The Contractor shall prepare agendas and conference presentation materials and provide minutes following each review. The Government reserves the right to cancel any review. Action item documentation, assignment of responsibility for completion and due dates shall be determined prior to adjournment of all reviews. A summary of all action items, responsible parties, and estimated completion dates shall be included with the minutes.
CDRL A003: Conference Agenda
CDRL A004: Conference Minutes
CDRL A005: Presentation Material
3.2.2. Post Award Conference. The Contractor shall host a Post Award Conference (PAC) at the Contractor's facility within 30 calendar days after issuance of the initial Delivery Order. During the PAC, the parties will review the contract and all stated requirements and testing procedures, clarify any questions, and ensure the parties have a complete understanding of the technical requirements and responsibilities. The Contractor shall present management, key personnel and program implementation processes. The Contractor shall prepare presentation materials providing an overview of all agenda items.
CDRL A003: Conference Agenda-PAC
CDRL A004: Conference Minutes-PAC
CDRL A005: Presentation Material-PAC
3.2.3. In-Process Review (IPR). In-Process Reviews (IPR) will be held twice a year at the Contractor’s facilities. The Government reserves the right to cancel any review. The Contractor’s progress, management, integrated logistics product support, administrative, assurance of compliance with contract requirements, program status, problem identification and resolutions shall be agenda items. Actual versus expected performance of each area shall be addressed. The Contractor shall prepare presentation materials providing an overview of all agenda items. The Contractor shall ensure that appropriate personnel are available for reviews to address and resolve agenda items.
CDRL A003: Conference Agenda-IPR
CDRL A004: Conference Minutes-IPR
CDRL A005: Presentation Material-IPR
3.2.4. Provisioning Guidance Conference (PGC). The Contractor shall host a PGC and furnish provisioning data prior to the provisioning conference. The PGC shall be held in conjunction with the PAC. All key Contractor logistics personnel shall be in attendance and prepared to discuss all provisioning deliverables in detail. During the PGC, the parties will review the requirements for provisioning data including format and medium of delivery and discuss/resolve any unclear provisioning/cataloging related areas. As a result of the PGC, the Government and the Contractor will arrive at a firm understanding of the contractual provisioning requirements. Development of a Provisioning Performance Schedule (PPS) will also be accomplished at this conference.
CDRL A003: Conference Agenda-PGC
CDRL A004: Conference Minutes-PGC
CDRL A005: Presentation Material-PGC
3.2.5. Provisioning Conference (PC). The Contractor shall host a PC at the Contractor's facility in accordance with the PPS developed at the PGC. All key Contractor logistics personnel shall be in attendance. During the PC, the parties will conduct a Hardware Breakdown (Top Down Break Down) analysis of the item to be provisioned. Hardware Breakdown is accomplished by sequencing all parts comprising the end item in a lateral and descending "family tree/generation breakdown." This breakdown shall consist of the end item, including all components, listing every assembly, subassembly, and parts which can be disassembled, reassembled/replaced. As a result of the PC, the Government and the Contractor will finalize the recommended spare components/parts list proposed by the Contractor.
CDRL A003: Conference Agenda-PC
CDRL A004: Conference Minutes-PC
CDRL A005: Presentation Material-PC
3.2.6. Test Readiness Review (TRR). The Contractor shall host a TRR supporting the First Article Test (FAT). The TRR shall be held at least 30 calendar days prior to the test event. The TRR shall address the following items:
· Test program overview, including the test schedule and traceability of discrete test events to each specification
· Test program staffing, including organizational structure and key Government / Contractor interfaces
· Preliminary or informal test results
a. Identify any preliminary testing that has already been conducted
b. Identify any outstanding discrepancies as a result of any preliminary / informal testing previously conducted
· A review of the following:
a. Problem Report System. Show that software and hardware problem report systems are defined and implemented
b. Test Risks. Summary of the test risk items identified that impact successful completion of FAT to include the points in time that risks are being mitigated and how
c. Hardware/Performance Specification Testing:
i. Test Procedures completed and baselined. Confirm required revisions have been completed and are verified by the Government
ii. Test Facilities and Resources. Present availability of all test facilities and resources for testing within the defined schedule
iii. Metrics. Present how Metrics show readiness for testing
iv. Test limitations. Identification of all Hardware/Performance Specification test limitations
d. Software Testing:
i. Software Metrics. Present how Software Metrics show readiness for testing
ii. Requirements changes. Any changes to the Software Requirements Specification or Interface Requirements Specification(s) that have been approved
iii. Design changes. Any changes to the Software Design Description, or Interface Design Descriptions that have been made since PDR and CDR, and which impact SW testing
iv. Test limitations. Identification of all software test limitations
v. Software problems. Summary of software problem status including all known discrepancies of the CSCI and test support software
CDRL A003: Conference Agenda-TRR
CDRL A004: Conference Minutes-TRR
CDRL A005: Presentation Material-TRR
3.2.7. System Verification Review / Physical Configuration Audit (SVR/PCA). The Contractor shall host an SVR/PCA no later than 30 calendar days after the completion of FAT. The SVR/PCA shall assess the system final product, as evidenced in its production configuration, and determine if it meets the documented functional requirements as well as vendor documentation such as drawings, commercial item descriptions, vendor item descriptions, and source control documents. The SVR/PCA shall establish and verify final product performance and confirm that the manufacturing processes, quality control system, measurement and test equipment, and training are adequately planned, followed, and controlled.
CDRL A003: Conference Agenda-SVR/PCA
CDRL A004: Conference Minutes-SVR/PCA
CDRL A005: Presentation Material-SVR/PCA
3.2.8. Production Readiness Review. The Contractor shall host a PRR on a mutually agreed upon date to be determined at the PAC. The PRR shall be held no later than 60 calendar days after completion of the FAT. The PRR shall address each hardware and software configuration item and related maintenance and logistics support. The Contractor shall show and/or demonstrate that evaluations of materials, lead times, tooling, fabrication techniques, assembly methods, test equipment, skills, processes and inspection techniques have been accomplished for each equipment, hardware and software configuration item and related support equipment; show and/or demonstrate that producibility objectives have been achieved; and shall identify all single source, sole source and diminishing source(s). This review will evaluate the progress, technical adequacy and risks of the system and will assess the technical risk associated with the selected assembly processes. During this review the Contractor shall present their plan to meet the production schedule.
CDRL A003: Conference Agenda-PRR
CDRL A004: Conference Minutes-PRR
CDRL A005: Presentation Material-PRR
3.3. Systems Engineering.
3.3.1. Configuration Management (CM). The Contractor shall maintain a CM process for the control of all hardware and software configuration documentation, media and parts representing or comprising the CLRF IC. MIL-HDBK-61A may be used as guidance. The Contractor's CM process shall consist of configuration identification, configuration control, Configuration Status Accounting (CSA) and configuration audits. The Contractor shall notify the Government of any changes which affect the Contractor's established CM process and make configuration data available for review upon request.
CDRL B001: Configuration Management Plan
3.3.2. Engineering Change Proposals (ECP).
3.3.2.1. Government Directed Engineering Studies. The Contractor shall perform Government directed engineering studies on increasing the performance, durability, or the service life for the system. The Contractor shall provide a cost estimate to the Contracting Officer’s Representative (COR) and copy the PCO prior to conducting any studies. The COR/PCO will provide authorization to conduct the studies.
3.3.2.2. Contractor Engineering Change Proposals. Contractor Engineering Change Proposals. The Contractor shall maintain configuration control of CLRF IC product baseline throughout the contract period and notify the Government of any changes impacting form, fit, function, interfaces, interchangeability, interoperability and parts management. The Government will use the Activity Guide Tables in MIL-HDBK-61A as guidance for review of Contractor submitted change proposals and notices of revision. The Contractor shall submit Class I ECPs using DD Form 1692. The Contractor shall submit Class II ECPs using DD Form 1692 or Contractor formatted forms containing all required information sufficient to review the ECP. The Government must approve all Class I ECPs and concur with the classification of all Class II ECPs. A notice of revision will be submitted with each ECP. The Contractor will recommend alternate courses of action for the Government to determine what action is in its best interest. Additionally, notification information shall include enclosures, illustrations and drawings that identify and define the impact on integrated logistic support (ILS) elements, interoperability/ interchangeability, lifecycle costs, maintainability, reliability, and ESOH, (to include identification of any ozone depleting substances) and retrofit information. Sufficient supporting data to evaluate the proposed or requested change, such as engineering drawings, sketches, specifications, manufacturing data sheets, or test results, shall be submitted as supplemental information.
CDRL B00A: Engineering Change Proposal
CDRL B00B: Notice of Revision
3.3.3. Configuration Status Accounting (CSA). The Contractor shall establish and maintain a CSA database which represents the configuration of the CLRF IC. All baselines and changes shall be documented in the Contractor’s CSA database. The Contractor's CSA database shall permit acceptance of commercial product information; however, if requirements to report data outside of the Contractor's CSA database or format exist, the information may be delivered as a supplement to prevent disruption to their existing system. The Contractor's CSA database shall reconcile any differences between the supplier information and Contractor practices to provide the Government with clear accountability of product information. Additionally, the CSA database shall provide a reliable source of configuration information to support CLRF IC activities, including program management, systems engineering, logistics support and modification/maintenance actions.
CDRL B002: Configuration Status Accounting Information
3.3.3.1. Configuration Status Accounting Serialized Tracking. The Government and the Contractor will agree to the list of configuration items. The Contractor shall utilize the CSA database to record the serial numbers for configuration items of the CLRF IC delivered to the Government. The Contractor’s CSA database shall include the following data elements:
· Item Unique Identification (IUID)
· Vendor Part Number/ Commercial and Government Entity (CAGE)
· Vendor Serial Number
· Serialized Part Nomenclature
· Date of Report
CDRL B002: Configuration Status Accounting Information
3.3.3.2. Configuration Status Accounting Modification Tracking. The Contractor shall utilize the CSA database to record completed field modifications or retrofit actions as a result of approved ECPs. The Contractor shall maintain the information that allows visibility of completed actions to the CLRF IC serial numbers. The Contractor’s CSA database shall include the following data elements:
· IUID
· ECP/Modification Item (MI) Number
· Date Installed
· Location
· Ownership
CDRL B002: Configuration Status Accounting Information
3.3.4. Radio Frequency Spectrum Compatibility. The Contractor shall submit the data required to complete DD Form 1494 for obtaining an approved frequency for the CLRF IC.
CDRL B003: Spectrum Certification Spectral Characteristics Data
3.3.5. Interface Control Documents (ICD). The Contractor shall provide electrical (including message interfaces) and mechanical ICDs for the CLRF IC to enable electrical and mechanical interfaces to external systems.
CDRL B004: Interface Control Document
3.3.6. Engineering Drawings.
3.3.6.1. Commercial Drawings. The Contractor shall provide commercial drawings to the Government for commercial item(s) approved for use in the design and not covered by Government or nationally recognized industry association specifications and standards. The Contractor shall provide evidence that the part complies with the requirements of the applicable part documentation. Existing test data (such as supplier originated objective evidence of compliance or Government/Industry Data Exchange Program (GIDEP) reports) shall be used to the maximum extent practicable.
The Contractor shall provide sufficient information to permit field-level maintenance, modification, and engineering analysis of commercial items. Contractor provided drawings shall contain necessary data to indicate the physical characteristics, location, and/or function of the item. The Contractor shall provide information that, at a minimum, must provide:
· Cataloging actions and assignment of a National Stock Number (NSN)
· Item management coding
· Identification/procurement of initial spares
· Sketches or photographs with brief descriptions of dimensional, material, mechanical, electrical, or other descriptive characteristics CDRL B005: Commercial Drawings and Associated Lists
3.3.6.2. Cable Drawings. The Contractor shall provide a product drawing package for all external cables to allow the Government to build the cables.
CDRL B006: Cable Drawings
3.3.7. Quality Management System. The Contractor's quality management system with respect to CLRF IC shall ensure product conformance to the Performance Specification for the CLRF IC and other contractual requirements. The Contractor shall have implemented, documented, and have previously demonstrated the ability to maintain the quality management system to be used on the CLRF IC contract. The Contractor shall make available all quality management documentation related to CLRF IC for the Government to review upon request.
3.3.8. Environment, Safety, and Occupational Health (ESOH).
3.3.8.1. System Safety. The Contractor shall establish a system safety program to identify environmental, safety, and occupational health hazards and assess and mitigate any associated risks encountered in the test, production, use, and disposal of the system in accordance with MIL-STD-882E, Task 101, Hazard Identification and Mitigation Effort Using the System Safety Methodology.
3.3.8.2. Support of Government Safety Boards. The Contractor shall support reviews, certifications, boards, and/or audits performed by or for the Government in accordance with Task 104 of MIL-STD-882E. This includes support of the Laser Safety Review Board (LSRB) and lithium battery certification. LSRB support involves the submission of test assets, safety test data, measurements, laser hazard evaluation results, corrective actions, and/or other system safety data in accordance with MCO 5104.1C as required by the LSRB Chair prior to the Field User Evaluation (FUE) and prior to Full Rate Production (FRP). The Contractor shall verify that proper labeling is in place as required for the laser classification. Support of lithium battery certification involves the submission of lithium battery data that documents the stability of design and validity of the battery selection, in accordance with NAVSEAINST 9310.1B and NAVSEA S9310-AQ-SAF-010 (2nd revision).
CDRL B007: LSRB Data Package
CDRL B008: Lithium Battery Data Package
3.3.8.3. ESOH Working Group (ESOHWG) Support. The Contractor shall provide one participant to support the CLRF IC ESOHWG, in accordance with Task 105 of MIL-STD-882E. Three (3) ESOHWGs will be held throughout the contract period of performance. Participation via teleconference will be available.
3.3.8.4. Hazard Tracking and Risk Resolution. The Contractor shall establish and maintain a closed-loop Hazard Tracking System (HTS) in accordance with Task 106 of MIL-STD-882E and provide Government access to hazard tracking data, as requested.
3.3.8.5. Hazardous Materials Management Plan (HMMP). The Contractor shall develop and submit a written HMMP in accordance with Task 108 of MIL-STD-882E. The HMMP shall consider all life cycle phases of the CLRF IC acquisition, to include development, manufacturing, testing, operation, sustainment, maintenance, and demilitarization/disposal. Any materials solely associated with manufacturing (i.e., not present in the final, delivered product) shall be identified as such.
The Contractor shall establish and follow a Hazardous Material (HAZMAT) Target List, which at a minimum, shall include the following materials: (1) materials identified as prohibited or controlled in the NAVSEA Prohibited and Controlled Chemicals List (26 Nov 2008) and (2) materials identified on the DoD Materials of Evolving Interest List (MERIT) Action and Watch Lists, as of the date of this SOW. The HAZMAT Target List shall be used as the basis for hazardous materials management efforts, including HAZMAT identification, minimization, approval, and tracking. It shall be understood that some materials listed on the prescribed Government HAZMAT target lists may qualify for automatic exemption as defined by the Government. It is incumbent upon the Contractor to seek guidance regarding such exemptions. Examples include the use of copper, in such items as piping and wiring, and stainless steel, which involves the use of hexavalent chromium during the manufacturing process.
The Contractor shall also provide the associated Material Safety Data Sheets (MSDSs) for all identified HAZMAT identified in the system design, as of the date of HMMP submittal.
CDRL B009: Hazardous Materials Management Plan
3.3.8.6. Reserved.
3.3.8.7. Safety Assessment Report (SAR). The Contractor shall update their SAR in accordance with Task 301 of MIL-STD-882E. The SAR shall provide a comprehensive evaluation of the status of all safety hazards and their associated mishap risk prior to FUE and prior to FRP. The SAR shall include a summary statement addressing the readiness of CLRF IC to proceed into FUE and FRP.
CDRL B010: Safety Assessment Report Update
3.3.9. Testing/Verification.
3.3.9.1. First Article Test. The Contractor shall deliver and develop for Government approval FAT procedures to demonstrate the adequacy and suitability of the Contractor's production processes and procedures for achieving all of the requirements in Section 3 of the Performance Specification per the verification methods in Section 4 of the Performance Specification. The Contractor shall conduct FAT in compliance with the Government approved test procedure. The FAT shall be conducted on systems built from their production line using their production processes. The results of the test shall demonstrate that the manufacturing and production techniques employed do not negatively impact established requirements. The Contractor shall deliver the FAT report at the conclusion of the test. The Government reserves the right to witness any portion of FAT.
CDRL B011: FAT Procedure
CDRL B012: FAT Report
3.3.9.2. Field User Evaluation (FUE) Support. The FUE support shall consist of eight (8) hours of operator training based on operator’s manuals and a team of two (2) people to address technical issues at the FUE conducted by the Government. The team shall have the capability to troubleshoot and operate the system. The FUE shall be no more than 40 consecutive hours in length (including training) at a Government provided facility located in CONUS. The Contractor shall provide draft training materials and quick reference cards to support no more than 15 students.
CDRL C007: Training Materials
CDRL C010: Quick Reference Card
3.3.9.3. Acceptance Testing.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .