Exhibit_A_CDRLs_A001-A069.docx

DOCX document 2 MB Posted

Attached to
AAV Survivability Upgrade Federal contract opportunity
Solicitation number
M67854-14-R-0001
Issued by
United States Marine Corps

About this file

Exhibit A CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to AAV Survivability Upgrade, newest first.
File Type Posted
AAV_SU_Post-award_Synopsis.docx DOCX document
Att_20_-_QA_Matrix_Final_20131205.xlsx XLSX spreadsheet
Exhibit_A_CDRL_A001-A069_2013_12_5.docx DOCX document
Att_13_-_AAV_CDRL_Instructions_2013_11_26.docx DOCX document
Att_04_-_IMP.pdf PDF
Att_12_-_QASP.docx DOCX document
Att_14_-_Test_Schedules_(EMD_and_LRIP)_Training_Courses_and_Transportation_(EMD_and_LRIP)_dated_26_Nov_2013.docx DOCX document
M67854-14-R-000102.pdf PDF
Att_19_-_AAV_Upgrade_SOW__System_Spec_Cross-Ref_Matrix_dtd_2013_10_31.xlsx XLSX spreadsheet
Att_03_-_Government_Furnished_Information.docx DOCX document
Att_16_-_SOW.docx DOCX document
M67854-14-R-000101.pdf PDF
Att_17_-_RFP_Question_Matrix.xlsx XLSX spreadsheet
Att_13_-_AAV_CDRL_Instructions.docx DOCX document
Att_1_DD254_FINAL.pdf PDF
Att_02_-_Concept_of_Operations_MCWP3_13.pdf PDF
Att_04_Integrated_Master_Plan.pdf PDF
Att_12_-__QASP.docx DOCX document
Att_05_-_WBS_Dictionary.xlsx XLSX spreadsheet
Att_15_-_APUC_Info.pdf PDF
Att_11_GFP.pdf PDF
M67854-14-R-0001.doc DOC document
Att_14_-_Test_Schedules.docx DOCX document
Att_06_-_Notional_CSDR_Plan.xls XLS spreadsheet
Att_16_SOW.docx DOCX document
Att_03_-_Government_Furnished_Information.docx DOCX document
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A001
OPERATIONS SECURITY (OPSEC) PLAN
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-80934C
SOW PARA 3.1.3
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
AS REQ
SEE BLOCK 16

a. ADDRESSEE

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

N/A
SEE BLOCK 16
Reg
Repro

16. REMARKS

BLOCK 4: CONTRACTOR FORMAT IS ACCEPTABLE

BLOCK 8: THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS TO THE CONTRACTOR. FINAL SUBMISSION IS DUE NLT 30 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS. IF NO GOVERNMENT COMMENTS ARE RECEIVED WITHIN 30 CALENDAR DAYS OF DRAFT SUBMISSION, PLAN IS APPROVED AS FINAL.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCK 12: DRAFT SUBMISSION IS DUE NO LATER THAN (NLT) 60 CALENDAR DAYS AFTER CONTRACT AWARD.

BLOCK 13: OPSEC PLAN MUST BE UPDATED AS SECURITY REQUIREMENTS CHANGE. ALL CHANGES MUST BE APPROVED BY THE AAV PM.

BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE ADDRESSEES IN BLOCK 14.

DCMA
0
1
0
PCO
0
1
0
PM AAA SECURITY
1
1
0
AAV PM
1
1
0
15. TOTAL
2
4
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

ANGELO SCARLATO

KEVIN HOLT

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
_X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A002
PROGRAM MANAGEMENT PLAN (PMP)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81797
SOW PARA 3.2
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
SEE BLOCK 16
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

N/A
SEE BLOCK 16
Reg
Repro
16. REMARKS
AAV PM
1
1
0

BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE, TAILORING REQUIRES PRIOR PM AAA APPROVAL. THE PMP SHALL ADDRESS THE DATA REQUIREMENTS OF DI-MGMT-81797, TO INCLUDE IDENTIFICATION OF PM AND ALL TEAM MEMBERS, A DETAILED PROGRAM SCHEDULE IN MICROSOFT (MS) PROJECT SHOWING ACTIVITIES REQUIRED FOR THE FIRST THREE (3) LEVELS OF WORK BREAKDOWN STRUCTURE (WBS) IN ACCORDANCE WITH MIL-STD 881C, MAJOR PROGRAM TASKS AND EVENTS, IDENTIFICATION OF PROGRAM RISKS, MITIGATION, AND POTENTIAL IMPACTS TO COST/SCHEDULE/PERFORMANCE. A PMP WILL BE REQUIRED FOR THE PROTOTYPE BUILD CLIN AND THE LOW RATE INITIAL PRODUCTION (LRIP) CLINS (OPTIONS, IF EXERCISED).

BLOCK 8: THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS TO THE CONTRACTOR ON THE DRAFT PMP. THE CONTRACTOR SHALL INCORPORATE THE GOVERNMENT COMMENTS AND RE-SUBMIT THE FINAL PMP WITHIN 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT COMMENTS.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCKS 10 AND 13: INITIAL SUBMISSIONS, SUBSEQUENT SUBMISSIONS, & FREQUENCY

OPTION CONTRACT SUBMISSION EVENTS

THE PMP FOR THE OPTION CONTACTS WILL BE DUE ON A QUARTERLY BASIS 90 CALENDAR DAYS AFTER THE FIRST SUBMISSION.

BLOCK 12: THE PMP IS DUE 60 CALENDAR DAYS AFTER EXERCISE OF EMD PROTOTYPE BUILD AND LRIP CLINS (OPTIONS, IF EXERCISED).

BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE ADDRESSEES IN BLOCK 14.

PCO
0
1
0
APM-PM
1
1
0
15. TOTAL
2
3
0

G. PREPARED BY

ANGELO SCARLATO

H. DATE

I. APPROVED BY

KEVIN HOLT

J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A003
CONFERENCE AGENDAS
MEETINGS/REVIEWS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-ADMN-81249A
SEE BLOCK 16
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
AS REQ
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

N/A

N/A
SEE BLOCK 16
Reg
Repro
16. REMARKS
AAV PM
0
1
0

BLOCK 4: THE CONTRACTOR SHALL PROVIDE THE CONFERENCE AGENDAS IN ACCORDANCE WITH THE REFERENCED DID. CONTRACTOR FORMAT IS ACCEPTABLE.

BLOCK 5: THE SUBMISSION OF CONFERENCE AGENDAS SHALL APPLY TO ALL STATEMENT OF WORK (SOW) PARAGRAPHS THAT REQUIRE MEETINGS/REVIEWS.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCKS 12 AND 13: THE CONTRACTOR SHALL PROVIDE CONFERENCE AGENDAS SEVEN (7) CALENDAR DAYS PRIOR TO ANY FORMAL MEETING.

BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE ADDRESSEES IN BLOCK 14.

PCO
0
1
0
15. TOTAL
0
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

ANGELO SCARLATO

KEVIN HOLT

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A004
CONFERENCE MINUTES
MEETING/REVIEWS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-ADMN-81250A
SEE BLOCK 16
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
AS REQ
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

N/A
SEE BLOCK 16
Reg
Repro
16. REMARKS
AAV PM
0
1
0

BLOCK 4: MEETING MINUTES SHALL BE A MICROSOFT (MS) WORD DOCUMENT IN THE CONTRACTOR’S FORMAT, AND AT A MINIMUM CONTAIN THE FOLLOWING INFORMATION:

· TITLE PAGE

· PURPOSE AND OBJECTIVE OF THE EVENT

· LOCATION, DATE AND DURATION OF THE EVENT

· LIST OF ATTENDEES

· SUMMARY OF THE DISCUSSIONS, DECISIONS, AGREEMENTS REACHED, AND DIRECTIONS OF THE CONFERENCE OR INDIVIDUALS THEREOF

· COPY OF PRESENTATIONAL MATERIAL

· ACTION ITEMS RESULTING FROM THE EVENT, INCLUDING THE ACTION TO BE TAKEN BY RESPONSIBLE INDIVIDUAL OR GROUP, AND DUE DATE OF EACH ACTION ITEM COMPLETION

BLOCK 5: THE SUBMISSION OF CONFERENCE MINUTES SHALL APPLY TO ALL STATEMENT OF WORK (SOW) PARAGRAPHS THAT REQUIRE MEETINGS/REVIEWS.

BLOCK 8: THE GOVERNMENT WILL HAVE SEVEN (7) CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS. THE CONTRACTOR SHALL HAVE THREE (3) CALENDAR DAYS TO MAKE CORRECTIONS AND RESUBMIT FOR APPROVAL.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCKS 12 AND 13: THE CONTRACTOR SHALL SUBMIT THE MEETING MINUTES WITHIN SEVEN (7) CALENDAR DAYS AFTER EACH MEETING/REVIEW.

BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE ADDRESSEES IN BLOCK 14.

PCO
0
1
0
15. TOTAL
0
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

ANGELO SCARLATO

KEVIN HOLT

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____ __X____
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A005
STATUS REPORT
PROJECT STATUS REPORT
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-80368A
SOW PARA 3.2.4, 3.2.5.2
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
MONTHLY
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

N/A

N/A
MONTHLY
Reg
Repro
16. REMARKS
AAV PM
0
2
0

BLOCK 4: DI-MGMT-80368A IS TAILORED AS FOLLOWS: EXCEPT CONTENT DESCRIBED IN 3.2.3 ITEMIZED MAN-HOURS AND COSTS.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCK 12: INITIAL SUBMISSION OF THE PROJECT STATUS REPORT SHALL OCCUR NO LATER THAN 30 CALENDAR DAYS AFTER THE EXERCISE OF THE EMD PROTOTYPE BUILD AND LRIP CLINS (OPTIONS, IF EXERCISED).

15. TOTAL
0
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

ANGELO SCARLATO

KEVIN HOLT

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
___X___
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A006
INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR)
CPR/IMS/SRA
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81861
SOW PARA 3.2.5.1, 3.2.5.2, 3.2.5.3, 3.7.6
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
SEE BLOCK 16
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
APM-PM
1
1
1

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

THE CONTRACTOR SHALL PROVIDE A MONTHLY IPMR PER DID DI-MGMT-81861 EXCEPT AS MODIFIED PER THE FOLLOWING:

BLOCKS 10, 12, 13: INITIAL SUBMISSIONS, SUBSEQUENT SUBMISSIONS, & FREQUENCY

BASE CONTRACT SUBMISSION EVENTS

INTEGRATED MASTER SCHEDULE (IMS) SUBMISSIONS

BLOCK 12:

· CONTRACTORS DRAFT IMS SUBMISSION IS DUE 60 CALENDAR DAYS AFTER AWARD OF CONTRACT

· CONTRACTORS FINAL IMS SUBMISSION IS DUE 90 CALENDAR DAYS AFTER AWARD OF CONTRACT

BLOCKS 10 AND 13:

· IMS SUBSEQUENT SUBMISSIONS SHALL BE PROVIDED MONTHLY AFTER ACCEPTANCE OF THE FINAL IMS. FINAL IMS AND CRITICAL PATH ANALYSIS NARRATIVE SHALL BE COMPLETED FOR GOVERNMENT REVIEW AND COMMENT 21 CALENDAR DAYS AFTER THE CLOSE OF BUSINESS OF THE CONTRACTOR ACCOUNTING PERIOD.

OPTION CONTRACT SUBMISSION EVENTS

IMS SUBMISSIONS

BLOCK 12:

· CONTRACTORS DRAFT IMS SUBMISSION IS DUE 60 CALENDAR DAYS AFTER AWARD OF OPTION

· CONTRACTORS FINAL IMS SUBMISSION IS DUE 90 CALENDAR DAYS AFTER AWARD OF OPTION

BLOCKS 10 AND 13:

· IMS SUBSEQUENT SUBMISSIONS SHALL BE PROVIDED MONTHLY AFTER ACCEPTANCE OF THE FINAL IMS

SCHEDULE RISK ASSESSMENT (SRA) SUBMISSIONS

BLOCK 12:

· THE FIRST SRA SUBMISSION IS DUE 90 CALENDAR DAYS AFTER CONTRACT OPTION AWARD

BLOCKS 10 AND 13:

· SRA SUBSEQUENT SUBMISSIONS SHALL BE PROVIDED QUARTERLY AFTER THE INITIAL SRA. THE SRA SHALL BE COMPLETED AND AVAILABLE FOR GOVERNMENT REVIEW AND COMMENT 51 CALENDAR DAYS AFTER THE CLOSE OF BUSINESS OF THE CONTRACTOR’S 3RD ACCOUNTING PERIOD (QUARTERLY).

FORMAT SIX (6) INSTRUCTIONS:

THE CONTRACTOR INTEGRATED MASTER PLAN (IMP)

· SHALL BE DEVELOPED IN ACCORDANCE WITH DOD INTEGRATED MASTER PLAN (IMP) AND SCHEDULE GUIDE (V0.9 DATES 21 OCT 05).

· ALL CONTRACTORS RECOMMENDED UPDATES TO THE PROGRAM IMP SHALL BE SUBMITTED AS REQUIRED FOR REVIEW AND APPROVAL BY THE GOVERNMENT.

· THE IMP SHALL BE DELIVERED USING A NETWORKED ELECTRONIC INTERFACE. THE COTS SOFTWARE, MIRCOSOFT OFFICE EXCEL 2010 OR LATER VERSION SHALL BE UTILIZED TO DELIVER AND MAINTAIN THE IMP.

THE CONTRACTOR IMS:

· THE IMS SHALL INCLUDE ALL DISCRETE WORK. SUBCONTRACTORS WITH FLOWDOWN SHALL BE INCORPORATED WITH SUFFICIENT DETAIL TO DEVELOP A REALISTIC CRITICAL PATH.

· THE IMS SHALL BE DEVELOPED IN ACCORDANCE WITH DOD INTEGRATED MASTER PLAN (IMP) AND SCHEDULE GUIDE (V0.9 DATED 21 OCT 05) AS WELL AS DI-MGMT-81861 (SUPERSEDES DI-MGMT-81650).

· THE CONTRACTOR SHALL UPDATE THE IMS AT A MINIMUM ON A MONTHLY BASIS WITH A STATUS DATE OF THE LAST DAY OF THE ACCOUNTING MONTH. THE CONTRACTOR SHALL CONDUCT MONTHLY STATUS REVIEWS AND CRITICAL PATH ANALYSIS.

· THE IMS SHALL BE DELIVERED USING A NETWORKED ELECTRONIC INTERFACE. THE COTS SOFTWARE, MICROSOFT OFFICE PROJECT 2010 OR LATER VERSION (SUPPORTED VERSION) SHALL BE UTILIZED TO DELIVER AND MAINTAIN THE IMS. THE ELECTRONIC INTERFACE SHALL ENABLE AUTOMATED SCHEDULE RESOURCE UTILIZATION UPDATES.

THE SRA:

THE SRA SHALL BE DEVELOPED IN ACCORDANCE WITH DOD IMP AND SCHEDULE GUIDE (V0.9 DATED 21 OCT 05) AS WELL AS DI-MGMT-81861 (SUPERSEDES DI-MGMT-81650).

· FOR THE OPTION PORTION OF THE CONTRACT, THE CONTRACTOR SHALL UPDATE THE SRA ON A QUARTERLY BASIS.

· THE SRA SHALL BE DELIVERED USING A NETWORKED ELECTRONIC INTERFACE. THE COTS SOFTWARE, MICROSOFT OFFICE PROJECT 2010 VERSION OR LATER (SUPPORTED VERSION) SHALL BE UTILIZED TO DELIVER AND MAINTAIN THE SRA. THE ELECTRONIC INTERFACE SHALL ENABLE AUTOMATED SCHEDULE RESOURCE UTILIZATION UPDATES.

PCO
1
0
1
15. TOTAL
2
1
2
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

MARYLAND HARRELL

DUSTIN ATKINSON

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A007
CONTRACT WORK BREAKDOWN STRUCTURE (CWBS)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MGMT-81334D
SOW PARA 3.2.5.4, 3.3.3
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT(PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
SEE BLOCK 16
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
APM-PM (COST)
1
1
0

BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCKS 10, 11, 12 AND 13: SEE THE THE OFFICE OF THE SECRETARY OF DEFENSE (OSD) DEPUTY DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED COST AND SOFTWARE DATA REPORTING (CSDR) PLAN FOR SUBMISSION DATES.

BLOCK 8: THE GOVERNMENT HAS 15 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON ALL CSDR SUBMISSIONS (TO INCLUDE THE CWBS DICTIONARY AND STRUCTURE). THE CONTRACTOR SHALL REVIEW AND INCORPORATE GOVERNMENT COMMENTS WITHIN 7 CALENDAR DAYS AND RESUBMIT TO THE GOVERNMENT.

BLOCK 14: ELECTRONIC SUBMISSION IS REQUIRED. THE CONTRACTOR SHALL PROVIDE AN ELECTRONIC COPY TO THE ADDRESSEES IN BLOCK 14.

PCO
0
1
0
15. TOTAL
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DAMIEN WOODLEY

JIM MYERS

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A008
COST DATA SUMMARY REPORT(CDSR) (DD FORM 1921)
CONTRACTOR COST DATA REPORTING (CCDR) CDSR (1921)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-FNCL-81565C
SOW PARA 3.3.1
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
SEE BLOCK 16
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
APM-PM (COST)
1
1
0

BLOCK 8: THE GOVERNMENT HAS 15 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON ALL CSDR SUBMISSIONS. THE CONTRACTOR SHALL REVIEW AND INCORPORATE GOVERNMENT COMMENTS WITHIN 7 CALENDAR DAYS AND RESUBMIT TO THE GOVERNMENT.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCKS 10, 11, 12, AND 13: PREPARE IN ACCORDANCE WITH THE OFFICE OF THE SECRETARY OF DEFENSE (OSD) DEPUTY DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED COST AND SOFTWARE DATA REPORTING (CSDR) PLAN PROVISIONS, THE WORK BREAKDOWN STRUCTURE (WBS) DATA DICTIONARY, AND THE CSDR MANUAL (DODM 5000.04-M-1). THE CSDR PLAN IS INCLUDED AS CONTRACT ATTACHMENT 06. THE CSDR MANUAL IS AVAILABLE FROM THE DEFENSE COST AND RESOURCE CENTER (DCARC) WEB SITE AT HTTP://DCARC.PAE.OSD.MIL.

CONTRACTORS SHALL BE REQUIRED TO SUBMIT REPORTS AT FREQUENCIES SPECIFIED IN THE OSD DDCA-APPROVED CSDR PLAN AND IN THE CONTRACT. THE REQUIRED FILE FORMAT FOR EACH REPORT IS SPECIFIED IN ITS DATA ITEM DESCRIPTION (DID). THE ASSOCIATED CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) INDEX AND DICTIONARY MUST BE SUBMITTED IN MICROSOFT WORD-COMPATIBLE FILES.

SUBCONTRACTOR REPORTING: THE PRIME CONTRACTOR SHALL BE REQUIRED TO FLOW-DOWN CSDR REQUIREMENTS TO ALL SUBCONTRACTORS AT ALL TIERS THAT MEET REPORTING THRESHOLDS. DEPENDING UPON THE SPECIFIC CONTRACTUAL RELATIONSHIP, PRIME CONTRACTS AND SUBCONTRACTS MAY HAVE SIMILAR REQUIREMENTS REGARDING REPORT TYPE, FREQUENCY, AND METHOD OF TRANSMISSION.

ALL SUBMISSIONS MUST BE REVIEWED AND ACCEPTED BY PM AAA APM-PM(COST) ORGANIZATION.

IN THE EVENT OF A SUBMISSION REJECTION BY PM AAA, THE GOVERNMENT WILL PROVIDE NOTIFICATION IDENTIFYING ISSUES WITH THE SUBMISSION. THE CONTRACTOR SHALL ADDRESS ALL COMMENTS AND RESUBMIT FOR VALIDATION. PM AAA APM-PM(COST) ORGANIZATION WILL UPLOAD ALL SUBMISSIONS TO DCARC ONCE ACCEPTED.

PCO
0
1
0
15. TOTAL
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DAMIEN WOODLEY

JIM MYERS

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A009
FUNCTIONAL COST-HOUR REPORT (FCHR)

(DD FORM 1921-1)

CONTRACTOR COST DATA REPORTING (CCDR) FCHR (1921-1)

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-FNCL-81566C
SOW PARA 3.3.1
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
SEE BLOCK 16
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
APM-PM (COST)
1
1
0

BLOCK 8: THE GOVERNMENT HAS 15 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON ALL CSDR SUBMISSIONS. THE CONTRACTOR SHALL REVIEW AND INCORPORATE GOVERNMENT COMMENTS WITHIN 7 CALENDAR DAYS AND RESUBMIT TO THE GOVERNMENT.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCKS 10, 11, 12, AND 13: PREPARE IN ACCORDANCE WITH THE OFFICE OF THE SECRETARY OF DEFENSE (OSD) DEPUTY DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED COST AND SOFTWARE DATA REPORTING (CSDR) PLAN PROVISIONS, THE WORK BREAKOWN STRUCTURE (WBS) DATA DICTIONARY, AND THE CSDR MANUAL (DODM 5000.04-M-1). THE CSDR PLAN IS INCLUDED AS CONTRACT ATTACHMENT 06. THE CSDR MANUAL IS AVAILABLE FROM THE DEFENSE COST AND RESOURCE CENTER (DCARC) WEB SITE AT HTTP://DCARC.PAE.OSD.MIL.

CONTRACTORS SHALL BE REQUIRED TO SUBMIT REPORTS AT FREQUENCIES SPECIFIED IN THE OSD DDCA-APPROVED CSDR PLAN AND IN THE CONTRACT. THE REQUIRED FILE FORMAT FOR EACH REPORT IS SPECIFIED IN ITS DATA ITEM DESCRIPTION (DID). THE ASSOCIATED CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) INDEX AND DICTIONARY MUST BE SUBMITTED IN MICROSOFT WORD-COMPATIBLE FILES.

SUBCONTRACTOR REPORTING: THE PRIME CONTRACTOR SHALL BE REQUIRED TO FLOW-DOWN CSDR REQUIREMENTS TO ALL SUBCONTRACTORS AT ALL TIERS THAT MEET REPORTING THRESHOLDS. DEPENDING UPON THE SPECIFIC CONTRACTUAL RELATIONSHIP, PRIME CONTRACTS AND SUBCONTRACTS MAY HAVE SIMILAR REQUIREMENTS REGARDING REPORT TYPE, FREQUENCY, AND METHOD OF TRANSMISSION.

ALL SUBMISSIONS MUST BE REVIEWED AND ACCEPTED BY PM AAA APM-PM(COST) ORGANIZATION.

IN THE EVENT OF A SUBMISSION REJECTION BY PM AAA, THE GOVERNMENT WILL PROVIDE NOTIFICATION IDENTIFYING ISSUES WITH THE SUBMISSION. THE CONTRACTOR SHALL ADDRESS ALL COMMENTS AND RESUBMIT FOR VALIDATION. PM AAA APM-PM(COST) ORGANIZATION WILL UPLOAD ALL SUBMISSIONS TO DCARC ONCE ACCEPTED.

IN THE REMARKS SECTION THE CONTRACTOR MUST INCLUDE THE BASIS OF ESTIMATE FOR COST ESTIMATED AT COMPLETION (EAC) FOR ALL FUNCTIONAL CATEGORIES SEPARATED BY RECURRING AND NONRECURRING AS WELL AS A TIME PHASING BREAKOUT OF THE COST. ALL ASSUMPTIONS USED IN THE DEVELOPMENT OF THE EAC VALUES SHALL BE DISCLOSED ON EACH 1921-1.

PCO
0
1
0
15. TOTAL
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DAMIEN WOODLEY

JIM MYERS

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A010
PROGRESS CURVE REPORT (PCR) (DD FORM 1921-2)
CONTRACTOR COST DATA REPORT (CCDR) PCR (1921-2)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-FNCL-81567C
SOW PARA 3.3.1
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
SEE BLOCK 16
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro
16. REMARKS
APM-PM (COST)
1
1
0

BLOCK 8: THE GOVERNMENT HAS 15 CALENDAR DAYS TO REVIEW AND PROVIDE COMMENTS ON ALL SUBMISSIONS. THE CONTRACTOR SHALL REVIEW AND INCORPORATE GOVERNMENT COMMENTS WITHIN 7 CALENDAR DAYS AND RESUBMIT TO THE GOVERNMENT.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCKS 10, 11, 12, AND 13: PREPARE IN ACCORDANCE WITH THE OFFICE OF THE SECRETARY OF DEFENSE (OSD) DEPUTY DIRECTOR, COST ASSESSMENT (DDCA)-APPROVED COST AND SOFTWARE DATA REPORTING (CSDR) PLAN PROVISIONS, THE WORK BREAKDOWN STRUCTURE (WBS) DATA DICTIONARY, AND THE CSDR MANUAL (DODM 5000.04-M-1). THE CSDR PLAN IS INCLUDED AS CONTRACT ATTACHMENT 06. THE CSDR MANUAL IS AVAILABLE FROM THE DEFENSE COST AND RESOURCE CENTER (DCARC) WEB SITE AT HTTP://DCARC.PAE.OSD.MIL .

CONTRACTORS SHALL BE REQUIRED TO SUBMIT CCDR AT FREQUENCIES SPECIFIED IN THE OSD DDCA-APPROVED CSDR PLAN AND IN THE CONTRACT. THE REQUIRED FILE FORMAT FOR EACH CCDR IS SPECIFIED IN ITS DATA ITEM DESCRIPTION (DID). THE CONTRACT WORK BREAKDOWN STRUCTURE (CWBS) INDEX AND DICTIONARY MUST BE SUBMITTED IN MICROSOFT WORD-COMPATIBLE FILES.

SUBCONTRACTOR REPORTING: THE PRIME CONTRACTOR SHALL BE REQUIRED TO FLOW-DOWN CSDR REQUIREMENTS TO ALL SUBCONTRACTORS AT ALL TIERS THAT MEET REPORTING THRESHOLDS. DEPENDING UPON THE SPECIFIC CONTRACTUAL RELATIONSHIP, PRIME CONTRACTS AND SUBCONTRACTS MAY HAVE SIMILAR REQUIREMENTS REGARDING REPORT TYPE, FREQUENCY, AND METHOD OF TRANSMISSION.

ALL SUBMISSIONS MUST BE REVIEWED AND ACCEPTED BY PM AAA APM-PM(COST) ORGANIZATION.

IN THE EVENT OF A SUBMISSION REJECTION BY PM AAA, THE GOVERNMENT WILL PROVIDE NOTIFICATION IDENTIFYING ISSUES WITH THE SUBMISSION. THE CONTRACTOR SHALL ADDRESS ALL COMMENTS AND RESUBMIT FOR VALIDATION. PM AAA APM-PM(COST) ORGANIZATION WILL UPLOAD ALL SUBMISSIONS TO DCARC ONCE ACCEPTED.

PCO
0
1
0
15. TOTAL
1
2
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DAMIEN WOODLEY

JIM MYERS

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A011
CONTRACTOR BUSINESS DATA REPORT (CBDR)

(DD FORM 1921-3)

CONTRACTOR COST DATA REPORTING (CCDR) CBDR (1921-3)

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-FNCL-81765B
SOW PARA 3.3.1
OFFICE OF THE SECRETARY OF DEFENSE (OSD) CAPE
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
NO
SEE BLOCK 16
ANNUALLY
SEE BLOCK 16
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

N/A

SEE BLOCK 16
SEE BLOCK 16
Reg
Repro

16. REMARKS

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

DCARC (SEE BLOCK 16)
0
1
0

BLOCKS 11, 12 & 13: CONTRACTORS SHALL BE REQUIRED TO SUBMIT WITHIN 60 CALENDAR DAYS SUBSEQUENT TO THE END OF THE CONTRACTOR'S FISCAL YEAR, AND THEN ANNUALLY FOR THE LIFE OF THE CONTRACT. ONLY ONE (1) REPORT IS REQUIRED TO BE COMPLETED AND SUBMITTED BY EACH FORWARD PRICING RATE (FPR) UNIT (E.G., PLANT, SITE, BUSINESS UNIT) PER YEAR, INDEPENDENT OF THE NUMBER OF CONTRACTS WITHIN THE FPR UNIT WHICH CONTAIN THIS CDRL ITEM. IN THE ABSENCE OF A FPR REQUIREMENT, THE TERM “FPR UNIT” SHOULD BE INTERPRETED FOR REPORTING PURPOSES AS “BUSINESS UNIT” AS DEFINED IN THE FEDERAL ACQUISITION REGULATION (FAR). THE DEFENSE COST AND RESOURCE CENTER (DCARC) IS RESPONSIBLE FOR ADMINISTRATION OF THIS REQUIREMENT. THE DCARC WEBSITE IS LOCATED AT HTTP://DCARC.PAE.OSD.MIL.

BLOCK 16: ALL 1921-3 REPORTS SHALL BE SUBMITTED ELECTRONICALLY USING THE COST AND SOFTWARE DATA REPORTING (CSDR) SUBMIT-REVIEW SYSTEM. THE REQUIRED FILE FORMAT FOR EACH 1921-3 REPORT IS SPECIFIED IN ITS DATA ITEM DESCRIPTION (DID). DATA SUBMITTERS MUST REGISTER THROUGH THE DCARC WEBSITE AND POSSESS A DOD-ISSUED COMMON ACCESS CARD (CAC) OR DEPARTMENT OF DEFENSE (DOD)-APPROVED EXTERNAL CERTIFICATE AUTHORIZATION (ECA) DIGITAL CERTIFICATE TO OBTAIN A DCARC PORTAL ACCOUNT AND BE AUTHORIZED TO UPLOAD CSDR CONTENT. USERS CAN OBTAIN ACCESS BY SUBMITTING USER INFORMATION ABOUT THEMSELVES AND THEIR ORGANIZATIONS TO THE DCARC PORTAL AND REQUESTING A CSDR SUBMITTER USER ROLE. AFTER THE REGISTRATION INFORMATION HAS BEEN VERIFIED, THE DCARC SHALL AUTHORIZE THE USER ACCOUNT AND REQUESTED ROLES. DCARC PORTAL USERS WITH A DOD-ISSUED CAC SHALL BE ABLE TO REGISTER THEIR CAC WITH THEIR DCARC PORTAL ACCOUNT, ENABLING CAC LOGIN. ALL DCARC PORTAL ACCOUNTS NEED TO BE RENEWED AT LEAST ANNUALLY.

THE CBDR IS TO BE PREPARED BY AND FOR THE BUSINESS ENTITY (E.G., PLANT, SITE, OR BUSINESS UNIT) RESPONSIBLE FOR SUBMITTING THE FORWARD PRICING RATE PROPOSAL (FPRP) REPRESENTING THE BASIS FOR FORWARD PRICING RATE AGREEMENT (FPRA) NEGOTIATIONS WITH THE GOVERNMENT. THIS BUSINESS ENTITY IS REFERRED TO AS THE “FPR UNIT” IN THE CBDR AND IN THE REMAINDER OF THIS DID. IN THE ABSENCE OF A FPR REQUIREMENT, THE TERM “FPR UNIT” SHOULD BE INTERPRETED FOR REPORTING PURPOSES AS “BUSINESS UNIT” AS DEFINED IN THE FAR. REPORTS ARE TO BE SUBMITTED ANNUALLY, WITHIN 60 CALENDAR DAYS SUBSEQUENT TO THE END OF THE CONTRACTOR'S FISCAL YEAR. THE DATA REQUESTED IN SECTIONS A AND B MUST BE PROVIDED FOR THE PRIOR YEAR, FOR THE CURRENT YEAR, AND FOR FUTURE YEARS. “CURRENT YEAR” REFERS TO THE COMPANY’S MOST RECENTLY COMPLETED FISCAL YEAR. “PRIOR YEAR” IS THE YEAR PRECEDING THE CURRENT YEAR, AND “FUTURE YEAR” IS ANY YEAR SUBSEQUENT TO THE CURRENT YEAR. FOR PURPOSES OF THIS REPORT, SUBMIT ACTUAL COSTS FOR THE CURRENT YEAR AND THE PRIOR YEAR. SUBMIT ESTIMATED COSTS FOR ALL FUTURE YEARS.

THE NUMBER OF FUTURE YEARS MUST REFLECT THE NUMBER OF YEARS CONTAINED IN THE MOST CURRENT FPRP OR FPRA DOCUMENT. IN THE ABSENCE OF THESE DOCUMENTS OR IF THE FPRP OR FPRA CONTAINS LESS THAN THREE (3) FUTURE YEARS, ESTIMATES MUST BE PROVIDED FOR THREE (3) FUTURE YEARS. COMPLETE A SEPARATE COPY OF THE FIRST PAGE (I.E., SECTIONS A AND B, WITH ACCOMPANYING METADATA) FOR EACH FISCAL YEAR. NOTE: PAGE 2 (SECTIONS C THROUGH F, AND REMARKS) OF THE DD FORM 1921-3 NEED BE PROVIDED ONLY ONCE FOR THE ENTIRE SUBMISSION.

15. TOTAL
0
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DAMIEN WOODLEY

JIM MYERS

17. PRICE GROUP

18. ESTIMATED TOTAL PRICE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A012
SCIENTIFIC AND TECHNICAL REPORTS
CONTRACTOR CONTROLLED RESEARCH, DEVELOPMENT, TEST AND EVALUATION (CCRDT&E), PROCUREMENT COST (CCPC), AND OPERATING AND SUPPORT (CCO&S)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80711A
SOW PARA 3.3.2
PROGRAM MANAGER ADVANCED AMPHIBIOUS ASSAULT (PM AAA)
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
SEE BLOCK 16
QUARTERLY
30 DAYS AFTER PDR
a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSIONS

Draft
Final

A

N/A
SEE BLOCK 16
Reg
Repro
16. REMARKS
APM-PM (COST)
1
1
0

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE/OPERATIONAL USE, 9 APRIL 2012. OTHER REQUESTS SHALL BE REFERRED TO PROGRAM EXECUTIVE OFFICER - LAND SYSTEMS (PM AAA), 2200 LESTER STREET, QUANTICO, VA.

BLOCK 3: SUBTITLES FOR COST ESTIMATES:

CCRDT&E

CCRDT&E WILL BE ASSESSED FOR EFFORTS REQUIRED TO BE PERFORMED FROM CONTRACT AWARD THROUGH THE END OF THE CONTRACTUAL PERIOD OF PERFORMANCE. THE CCRDT&E ESTIMATE WORK BREAKDOWN STRUCTURE (WBS) SHALL BE ORGANIZED IN ACCORDANCE WITH THE OFFICE OF THE SECRETARY OF DEFENSE (OSD) DEPUTY DIRECTOR, COST ASSESSMENT (DDCA) – APPROVED COST AND SOFTWARE DATA REPORTING (CSDR) PLAN CONTRACT WORK BREAKDOWN STRUCTURE (CWBS). AFTER THE INITIAL CCRDT&E REPORT IS DEVELOPED, ALL SUBSEQUENT REPORTS SHALL BE UPDATES TO THE INITIAL REPORT.

CCPC

THE CONTRACTOR SHALL DEVELOP, MAINTAIN, AND UPDATE CONTRACTOR CONTROLLED PROCUREMENT COST (CCPC) ESTIMATES. CCPC INCLUDES THE FOLLOWING ELEMENTS:

· MANUFACTURING COST – MANUFACTURING COST INCLUDES ONLY THOSE RECURRING COSTS NECESSARY TO BUILD COMPLETE PRODUCTION VEHICLES. THIS INCLUDES THE COSTS OF ALL MATERIALS, LABOR, OTHER DIRECT COSTS INCURRED IN THE FABRICATION, CHECKOUT, AND PROCESSING OF PARTS, SUBASSEMBLIES, MAJOR ASSEMBLIES, AND SUBSYSTEMS NEEDED FOR THE FINAL SYSTEM, AND ASSOCIATED BURDEN (OVERHEAD, GENERAL AND ADMINISTRATIVE, COST OF MONEY, AND PROFIT/FEE). MANUFACTURING COST ALSO INCLUDES THE COSTS OF SUBCONTRACTORS AND PURCHASED PARTS/EQUIPMENT, COSTS OF EFFORTS TO INTEGRATE AND ASSEMBLE VARIOUS SUBASSEMBLIES INTO A WORKING SYSTEM, COSTS TO INSTALL GENERAL AND SPECIFIC EQUIPMENT, AND COSTS TO PAINT AND PACKAGE THE SYSTEM FOR SHIPMENT TO ITS ACCEPTANCE DESTINATION.

· INITIAL SPARES AND REPAIR PARTS

· SUPPORT EQUIPMENT

· ANCILLARY EQUIPMENT

· CONTRACTOR PROCUREMENT NRE

· INTERIM LOGISTICS SUPPORT

· TRAINING & TECHNICAL DATA COSTS

· OTHER PROCUREMENT FUNDED CONTRACTOR CONTROLLED EFFORTS

THE CCPC ESTIMATE WBS STRUCTURE SHALL BE ORGANIZED IN ACCORDANCE WITH THE OSD DDCA-APPROVED CSDR PLAN CWBS.

CCO&S

CCO&S COSTS ARE ASSESSED BEGINNING WITH THE ESTIMATED IN SERVICE DEPOT SUPPORT AND ORGANIC SUPPORT CAPABILITY DATE (BASED UPON THE PROGRAM SCHEDULE) THROUGH THE PHASE OUT OF ALL VEHICLES, EXCLUDING INTERIM CONTRACTOR SUPPORT COSTS. THE SERVICE LIFE FOR EACH VEHICLE WILL BE DETERMINED BY THE PROGRAM OFFICE. CCO&S ESTIMATE SHALL USE THE OSD CAPE CONTRACTOR SUSTAINMENT REPORT (DD FORM 1921-4) DI-FNCL-81831 SUSTAINMENT COST ELEMENTS STRUCTURE. THE CONTRACTOR IS ONLY RESPONSIBLE TO REPORT THOSE COSTS WHICH ARE CONTRACTOR CONTROLLED. GOVERNMENT CONTROLLED COSTS ARE NOT TO BE INCLUDED IN THE CCO&S ESTIMATE.

BLOCK 4: CONTRACTOR FORMAT IS ACCEPTABLE

THE FOLLOWING INFORMATION MUST BE INCLUDED IN THE INITIAL REPORT:

· EXECUTIVE SUMMARY OF THE RDT&E, PROCUREMENT, AND O&S COST INCLUDING THE ESTIMATED CONTRACTOR CONTROLLED RDT&E, AVERAGE PROCUREMENT UNIT COST (CCAPUC), AVERAGE UNIT MANUFACTURING COST (AUMC), AND O&S.

· DETAILED COSTS BY CWBS IN BASE YEAR 2014 DOLLARS AND THEN YEAR DOLLARS TIME PHASED SEPARATED BY RECURRING AND NONRECURRING

· DETAILED BUILD-UP OF COST BY WBS INCLUDING ASSUMPTIONS, SOURCES AND FORMULAS

· NARRATIVE INCLUDING RISK APPLICATION RATIONALE (ASSUMPTIONS AND BASIS OF ESTIMATES) BY WBS

SUBSEQUENT SUBMISSION SHALL REPRESENT UPDATES TO THE INITIAL REPORT CAPTURING:

· DELTAS (DOLLARS AND PERCENTAGES) COMPARING CURRENT AND PRIOR SUBMISSIONS IN A SUMMARY VIEW

· NARRATIVE DETAILING REASONS FOR DELTAS/CHANGES TO INCLUDE SOURCE UPDATES; METHODOLOGY CHANGES; ALL DESIGNS AND CHANGES IMPLEMENTED BY THE CONTRACTOR, SUBCONTRACTORS, AND SUPPLIERS UNDER THE CONTRACT; DESIGN CHANGES IMPLEMENTED BY THE GOVERNMENT; BUSINESS BASE CHANGES AT THE CONTRACTOR’S MAJOR SUBCONTRACTORS AND SUPPLIERS; PROGRAM ACQUISITION STRATEGY CHANGES; CONTRACTOR MANUFACTURING CHANGES; ETC.

· ACTUALS INCLUDED AND IDENTIFIED AS SUCH IN TIME PHASING REPORT WHEN APPLICABLE

· SUMMARY REPORTS FOR CCAPUC AND AUMC

REPORT DATA MUST BE PROVIDED IN A MICROSOFT EXCEL 2007 OR LATER VERSION WITH FORMULAS THAT WILL MAINTAIN VISIBILITY INTO HISTORICAL DATA

EACH WBS ELEMENT MUST CONTAIN SUFFICIENT DATA, SOURCE OF DATA, DESCRIPTION OF SPECIFIC ASSUMPTIONS, FORMULAS AND A METHODOLOGY DESCRIPTION SUFFICIENT TO ENABLE A GOVERNMENT COST ANALYST TO DEVELOP DETAILED COST ESTIMATES BLOCK 8: THE GOVERNMENT WILL HAVE 14 CALENDAR DAYS AFTER DELIVERY OF EACH REPORT TO REVIEW AND DETERMINE IF IT IS ACCEPTABLE. THE CONTRACTOR SHALL REVISE THE DOCUMENTATION IN ACCORDANCE WITH GOVERNMENT COMMENTS WITHIN 7 CALENDAR DAYS OF RECEIPT.

BLOCK 14: ELECTRONIC SUBMISSION REQUIRED. ELECTRONIC SUBMISSIONS SHALL INCLUDE A MICROSOFT EXCEL FILE 2007 OR LATER VERSION WITH FORMULAS

15. TOTAL
1
1
0
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DAMIEN WOODLEY

JIM MYERS

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
0001, 0002, 0100, 0105, 0200, 0201, 0202
A
TDP
________
TM
______
OTHER
____X______
D. SYSTEM / ITEM
E. CONTRACT / PR NO.
F. CONTRACTOR
ASSAULT AMPHIBIOUS VEHICLE (AAV)
M67854-14-R-0001
TBD
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
A013
SCIENTIFIC AND TECHNICAL REPORTS
BILL OF MATERIAL (BOM) PRICING REPORT
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
DI-MISC-80711A

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .