Attachment J-6 LIS QASP.pdf
PDF 200 KB Posted
- Attached to
- Logistics Integration Support (LIS) Program
- Solicitation number
- M6700425R0009
- Issued by
-
United States Marine Corps
About this file
This document is a Quality Assurance Surveillance Program (QASP) for a Supply Chain Management Center (SCMC) Logistics Integration Support (LIS) contract. The QASP outlines comprehensive performance standards and evaluation methods for monitoring the contractor's performance across multiple key areas, including: maintaining SECREP inventory, managing turnaround times, identifying and processing O&A work requests, maintaining accountability for government material, providing flexible quotes, and submitting contract deliverables. The surveillance program uses monthly, quarterly, and annual inspections by the Contracting Officer's Representative (COR) to assess performance against specific metrics, with an Acceptable Quality Level (AQL) of 95-98% for most requirements. Performance will be evaluated using methods such as random inspections, data analysis, customer surveys, and Product Quality Deficiency Reports, with potential consequences including CPARS evaluation, financial penalties (such as a 1% reduction in cost for missed turnaround times), and possible negative performance ratings.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 12, 2024
Attachment J-6
Quality Assurance Surveillance Program (QASP) and Performance Matrix
1. Purpose. This Quality Assurance Surveillance Plan (QASP) is a Government-developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the Contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract and that the Government only pays for the acceptable level of services received. This QASP has been developed to provide the standard of surveillance for monitoring the Supply Chain Management Center (SCMC) Logistics Integration Support (LIS) contract. The
Contracting Officer (KO) has appointed the COR and COTRs to serve as the Quality Assurance
Evaluators (QAEs) and will use this QASP to ensure the standards of the contract are being met.
The COR/COTR/QAEs will be referred to as CORs throughout this QASP.
2. Authority: The authority for issuance of this QASP is provided under FAR 52-212-4(a), Inspection/Acceptance, which provides for inspections and acceptance of the articles, services, and documentation called for in the contract to be accomplished by the Contracting Officer or their duly authorized representative.
3. Scope: The Contractor, and not the Government, is responsible for management and quality control actions necessary to meet quality standards set forth by the contract. The QASP is put in place to provide Government surveillance oversight of the Contractor's quality control efforts to assure that they are timely, effective and are delivering the results specified in the contract. The
QASP is not a part of the contract, nor is it intended to duplicate the Contractor's Management
Plan. The Government may provide the Contractor an information copy of the QASP as an
Attachment to the solicitation to support the Contractor's efforts in developing its plan for maintaining the levels of quality anticipated to be delivered under the terms of the contract.
4. Responsibilities: The Government resources shall have responsibilities for the implementation of this QASP as follows:
• Contracting Officer - The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the
Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor's performance.
• Contracting Officer's Representative (COR) Contracting Officer’s Technical
Representative (COTR) - An individual designated in writing by the Contracting
Officer to act as his authorized representative to assist in administering a contract. The source and authority for the COR is the Contracting Officer. COR limitations are contained in the written letter of appointment.
5. Performance Standards. The QASP provides a systematic method to evaluate the level of services the Contractor is required to furnish pursuant to the contract. The COR will assess the
Contractor’s performance to ensure the Contractor is performing up to the specified standards identified in the contract. The performance standards for the Performance Work Statement
(PWS) are stated in the Performance Requirements Summary (PRS), appendix 1, included in this
QASP. Additional surveillance will be applied to topics listed in the request for proposal (RFP) and affirmed in the subsequent proposal. The standards for this contract are objective since specific metric-driven standards are provided.
6. Management and Oversight. This QASP is based on the premise that the Contractor and not the Government, is responsible for the management and any quality control action required to meet the terms of the contract. The performance requirements allow for sufficient unforeseen and uncontrollable issues. Good management and use of an adequate Quality Control Plan
(QCP) will allow the Contractor to operate within specific performance requirements.
7. Acceptable Quality Levels (AQLs). AQLs have been established in the attached PRS table
(appendix 1) and provide performance standards that the Contractor will meet in performing the contract. In the event the Contractor does not meet the established AQLs, the KO has the right to exercise the negative incentives stated in this QASP.
8. Primary Method of Surveillance/Evaluation. The COR will perform evaluation based on using one of the methods outlined below and included in the attached table of this QASP. The
COR will have at their disposal Government site employees at each site to assist in these evaluations. If more in depth assistance, equipment specialists can be sent to each site as needed to further evaluate discrepancies/complaints or perform samplings.
• Random inspection: Simple random sampling method in which each unit of the population has an equal chance of being selected. If additional effort is required, local
Government employees or equipment specialists can be sent to increase the detail of the sampling. Details of random inspection are included in QASP table on pages 6.
• Defense Contracting Management Agency (DCMA): DCMA may be used to conduct inspection on selective NSNs.
• Customer Surveys and Feedback: Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the Contractor.
The Contractor shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file
• Data analysis: Using the Integrators IS, COR records, GCSS-MC, Finance, O&A and
Warranty records.
• Product Quality Deficiency Report (PQDR): Review of PQDRs submitted for items repaired on this contract for quality and performance.
9. Negative Incentives. If any of the performance requirements do not meet the AQL set in the
PRS table, the COR shall document the discrepancy(s) and shall notify the KO promptly for appropriate action. When the performance is below the AQL standard, the Government may implement a negative incentive that includes increased surveillance and/or Contractor reporting, as well as documentation on the Contractor’s Performance Assessment Reporting System
(CPARS). For a missed TAT with no excused acceptable justification, at the time of reconciliation for invoicing, the COR will reduce the cost of repair by a one-time penalty of 1% for each item that missed the contractual TAT. The invoiced amount will be agreed to at that time and reflected in the invoice report.
10. Notification. The COR will notify the KO, in writing, of unacceptable quality levels. The
KO will promptly provide written notification of discrepancies on a monthly basis to the
Contractor, or immediately if the situation significantly affects the well-being of the project. The
Contractor will be given the opportunity to respond, in writing, to each discrepancy.
11. Response. Upon notification of failure to meet contractually specified quality levels, the
Contractor shall provide a written response to the cause and the corrective action to prevent recurrence within 5 working days after receipt of KO’s notification. The Contractor should cite specific quality assurance program procedures or new procedures instituted to prevent recurrence.
12. Records. The COR will maintain contract surveillance files as directed by the KO.
Surveillance files will include, in part, the following documentation for this Firm Fixed Price contract:
a. COR designation and appointment letters
b. A copy of the contract and all contract modifications
c. QASP and any other tools, checklists, etc.
d. All correspondence including KO notifications and the Contractor’s responses
e. Contractor monthly status reports
f. Evidence of cost monitoring: invoices certified and tracked against any contract and/or order ceilings
g. Evidence that all materials/equipment obtained under any task order is accounted for and remains in Government possession.
h. Surveillance reports and a summary of the Surveillance Logs will be prepared by the
COR and submitted to the Contracting Officer annually.
i. Out-of-cycle reports may be submitted in support of unacceptable performance identified during the performance period by the COR, or when there is a significant change in performance that alters the assessment in one or more evaluation areas.
j. Annual in-progress reviews will be conducted and entered into CPARS.
13. Ratings. The following criteria will be used for performance evaluations: Exceptional, Very Good, Satisfactory, Marginal, and Unacceptable. Upward arrow may be used to indicate exceeding AQL and downward arrows may be used to indicate performance below AQL. If performance meets acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
a. Exceptional: Performance meets contractual requirements and exceeds many to the
Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. Exceeding AQL, depending upon how much, may be considered very good or exceptional.
b. Very Good: Performance meets contractual requirements and exceeds some to the
Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective. Exceeding AQL, depending upon how much, may be considered very good or exceptional.
c. Satisfactory: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. Meeting the AQL is satisfactory as it is the “acceptable” level.
d. Marginal: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
e. Unsatisfactory: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
14. Documentation. Documentation used and referenced to perform surveillance will consist of monthly reports, monthly program review, Contractor plans and procedures, schedules, customer feedback and contract deliverables.
a. Recording Observations. Use Surveillance Logs to record information on scheduled observations and deficiencies noted. Each observation is recorded on the log. The documents then become a formal record for reference. The Contractor is to be told each time that a deficiency is found during scheduled observations. The COR makes a notation on the Surveillance Log of the date and time the deficiency was discovered, and subsequently requests that the Contractor initial the notation, documenting notification of the deficiency only. (Program Monthly Review serves as a form of surveillance documentation)
b. Potential Unacceptable Performance. The COR must identify the specific service that is unacceptable and the possible causes, and ask a number of questions which if answered, will probably pinpoint the source of the problem.
c. Documenting Unacceptable Performance. The COR must attempt to resolve the problem with the Contractor. The original log and the attempted solution (along with an evaluation of results) are forwarded to the Contracting Officer through the COR.
Based on the severity of the discrepancy and the success of the solution, the COR will notify the
KO. The Contractor shall complete a response to the unacceptable evaluation if requested by the
KO or by its own choice.
15. Taking Action.
a. The COR may evaluate the Contractor’s performance and document any non-compliance, but only the KO may take action against the Contractor for an unacceptable rating.
b. When the Contractor’s performance is unacceptable and a formal action is indicated, the COR will report such to the KO and the program officer make a recommendation to them on appropriate action to take.
16. Documentation. The COR retains a copy of all inspection schedules and surveillance activity logs during the course of the contract and forwards them for inclusion in the contract file at the end of the surveillance period. However, when a specific service becomes unsatisfactory during a surveillance period, the inspection documentation supporting the contract discrepancy report is promptly forwarded to the KO.
17. PERFORMANCE REQUIREMENTS SUMMARY (PRS). The performance standards are included as an attachment in the PWS.
Stakeholder
Desired
Outcome
Performance Requirement
Summary
Inspection/Surveillance
Objective
(Outcomes) Standard AQL
Who is
Responsible
Frequency Data Source Calculation
Method of
Inspection
Incentive/
Disincentive
RIP: Maintain
SECREP
Inventory/
Depot: Stay on schedule
Manage and facilitate the
LIS SECREP
integrated
ROR process to ensure exchange
OEM Spec
SECREP at
Government
Location within contractual turnaround time
OEM spec: 100%
Operation to Spec w/in specified warranty period per contract year
98%
Operation to
Spec w/in specified warranty period (per contract year)
Inspection by COR monthly w/ quarterly and yearly roll-up
IS/Warranty
Resolution
Reports
(valid warranty claims/total items currently under warranty) warranty resolution reports checked against IS data
PQDRs
Contract
Performance and
Assessment
Reporting System
(CPARS) entry.
Specified Time: 100% w/in specified days after turn-in including negotiated O&A extensions per contract year
95% of deliveries are on time
(contract year)
Inspection by COR monthly w/ quarterly and yearly roll-up
IS (# of late deliveries/total # deliveries)
Turn in date and return dates check against
COR Records and IS
-CPARS
Evaluation
-Onetime 1% reduction in cost for a verified missed TAT per day, up to ten
(10) days per each induction.
100% of the time, the need for O&A work identified within 37 calendar days of joint induction inspection date for CONUS customers and 49 calendar days for
OCONUS customers including negotiated O&A extensions. The contractor shall submit to the COR an
O&A work request. Per contract year.
95% of O&A notifications are submitted to COR on time (contract year) by COR monthly w/ quarterly and yearly roll-up
IS/O&As/COR
Records
=DAYS360
(Checklist inspection date, O&A notification date)
All O&As submitted within a month. The number of days between checklist inspection date and
O&A notification date.
CPARS
Evaluation
Account for
Government
Materiel
Maintain control and accountability for
Government materiel while operating and facilitating the LIS
SECRP
integrated
ROR process and report
GFP
possessed by contractor
100% visibility of GFP in contractor possession per contract year
Data no older than
1 working day (from custody exchange)
Inspection by COR monthly w/ quarterly and yearly roll-up
IS/COR
Records
Extrapolation of sample error random sample of DD1348 delivery and return dates checked against
IS transaction input dates
95% system availability
(per contract year)
Inspection by COR monthly w/ quarterly and yearly roll-up
IS/COR
Records
Extrapolation of sample availability
Random system availability checks
100% accuracy of required data elements per contract year
98% accuracy
(contract year)
Inspection by COR monthly w/ quarterly and yearly roll-up
IS/COR
Records
Extrapolation of sample error random sample of DD1348 delivery and return dates checked against
IS data elements
100% Transfer of GFP using the GFP module on the Procurement Integrated
Enterprise Environment
(PIEE) w/in two (2) business days of the transfer date from the
Government per contract year
98% w/in 2 business days of transfer from the
Government.
(contract year) monthly w/ quarterly and yearly roll-up
IS/COR
Records
# of late transfers/ total # of transfers
PIEE GFP module IS
COR Calculation
Flexibility Prepare
Quotes for
ROR $, TAT
and warranty terms for new
SECREPS
Provide fixed ROR $, TAT and warranty within 30 day per contract year.
95% of new adds are answered
(contract year) 0%
New adds exceed
(3) Next Bids
Inspection by COR monthly w/ quarterly and yearly roll-up
COR Records
# of late quotes/all quote
COR calculations CPARS
Contract
Deliverables
(CDR)
Contract deliverables furnished as prescribed in the PWS
100% of CDRLs submitted on time and without error per contract year
95% of deliverables submitted timely and without rework
Inspection by COR monthly w/ quarterly and yearly roll-up
100% inspection of all contract deliverable s
CDRLs # of CDRLs due/date/
Evaluate each the date received by the date due and for accuracy. Total
Due/ CDLR on time and accurate
Overall Contract
Performance
Overall contract performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the
COR's annual report on Contractor
Performance per contract year
Satisfactory Rating
(or higher)
Inspection by COR annual All performance elements rated satisfactory
(or higher)
AQL, PMR,
Overall assessment of
Contractor performance
PRS, PMR, COR
records, PQDRs, and
Customer Survey
Continuous
Process
Improvements
(CPI)
Report/Present
Process
Improvement
Opportunities as identified and
Provide Advice on
Recommended
Improvements
100% of Quarterly CPI
Reports submitted on time per contract year
100% Compliance if a process improvement substantiated by the Government.
Quarterly
CDRL Report
Submitted 1st week of the months quarterly
Report submitted on time
File details come from the government source that posted it. Updated .