(3rd dRFP) Exhibit A CDRL A002 Ontime Delivery and Request for Relief.pdf

PDF 696 KB Posted

Attached to
Logistics Integration Support Federal contract opportunity
Solicitation number
M67004-20-R-0007
Issued by
United States Marine Corps

About this file

This synopsis and related CDRL announce a forthcoming solicitation for logistics integration support services. The Marine Corps Logistics Command intends to issue an indefinite delivery/indefinite quantity contract for remanufacturing, overhaul, and repair of approximately 2,000 secondary repairable national stock numbered items. The contractor will develop and manage a vendor network to perform repairs to original equipment manufacturer specifications. The single award contract would have a 5-year period of performance. Responses to this pre-solicitation notice must be submitted within 15 days and demonstrate capability to perform the work under NAICS code 541614 with a $15 million size standard. The CDRL requires monthly reporting on delivery performance with requests for relief from key turnaround time requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Logistics Integration Support, newest first.
File Type Posted
(3rd dRFP) Exhibit A CDRL A003 ONA TAT AND RFR.pdf PDF
(3rd dRFP) Exhibit A CDRL A006 Frustrated Assets.pdf PDF
DI-ADMN-80447A (1).pdf PDF
(3rd dRFP) Exhibit A CDRL A004 CDRL Estimated Delivery Date.pdf PDF
INSERT OFFEROR NAME Attachment 2 LIS Pricing Workbook (Rev 1) - LIS SECREP RFP M67004-20-R-0007.xlsx XLSX spreadsheet
3rd dRFP M67004-20-R-0007.docx DOCX document
(dRFP3) Attachment 1 PWS - LIS SECREP RFP (10Sep20) (2).docx DOCX document
(3rd dRFP) Exhibit A CDRL A007 Continuous Process Improvement.pdf PDF
(3rd dRFP) Exhibit A CDRL A001 NSN Change Request.pdf PDF
Second M67004-20-R-0007 dRFP Industry Comments (10Sep20).docx DOCX document
(dRFP) Attachment 6 DD254 (10Sep20) - LIS SECREP RFP M67004-20-R-0007.pdf PDF
Attachment 10 - Proposal Adequacy Checklist.docx DOCX document
(3rd dRFP) Exhibit A CDRL A008 Safety Plan.pdf PDF
(3rd dRFP) Exhibit A CDRL A005 FA n RCA.pdf PDF
(3rd dRFP) Exhibit A CDRL A009 Continutiy of Essential Service Plan.pdf PDF
(2nd dRFP) Attachment 1 PWS - LIS SECREP RFP.doc DOC document
(2nd dRFP) Attachment 7 LIS Pricing Workbook - LIS SECREP RFP M67004-20-R-0007.xlsx XLSX spreadsheet
(2nd dRFP) Exhibit A CDRL A004 EDD (14Jul20) - LIS SECREP RFP M67004-20-R-0007.pdf PDF
(2nd dRFP) Exhibit A CDRL A003 OAN and RFR(14Jul20) - LIS SECREP RFP M67004-20-R-0007.pdf PDF
(2nd dRFP) Exhibit A CDRL A005 F and RCA(17Jul20).pdf PDF
(2nd dRFP) Exhibit A CDRL A007 CPI(14Jul20) - LIS SECREP RFP M67004-20-R-0007.pdf PDF
2nd dRFP Sections A-M.docx DOCX document
(2nd dRFP) Attachment 6 DD254.pdf PDF
(2nd dRFP) Attachment 12 Section M.docx DOCX document
(2nd dRFP) Exhibit A CDRL A006 FAR(14Jul20) - LIS SECREP RFP M67004-20-R-0007.pdf PDF
M67004-20-R-0007 Responses to 1st dRFP Industry Questions-Comments.docx DOCX document
(2nd dRFP) Attachment 2 LIS NSN-GFP List.xlsx XLSX spreadsheet
(2nd dRFP) Exhibit A CDRL A001 NSN Chg(14Jul20) - LIS SECREP RFP M67004-20-R-0007.pdf PDF
(2nd dRFP) Attachment 5 PRS_QASP SECREP.doc DOC document
(2nd dRFP) Attachment 11 Section L.docx DOCX document
(2nd dRFP) Exhibit A CDRL A002 TAT OA OTD RFR(14Jul20) - LIS SECREP RFP M67004-20-R-0007.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: A002
title: On Time Delivery (KTAT)
sub: Contract Summary Report
auth: DI-ADMN-80447A
ref: PWS Para 4.4
req_ofc: LIS SCMC
dd250: within 30 days
appcode: N/A
dist: N/A
freq: Monthly
asof: Block 16
firstsub: July 2021
subsub: Monthly
addressee1: LIS PMO
draft1:
reg1: 1
repro1:
addressee2: LOGCOM Contracts
draft2:
reg2: 1
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5: see block 16 for
draft5:
reg5:
repro5:
addressee6: email addresses
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 2
total_repro: 0
remarks: On Time Delivery (OTD) Requests for Relief (RFRs) for deliveries missing the KTAT citing reasons for such request. The OTD RFR will be submitted via email to the contracting officer for resolution. At a minimum, the OTD RFR will contain the work order number, document number, NSN, original KTAT, induction date, return date, actual TAT, number of day past KTAT, and reason for relief.

The contractor will invoice for items that have been reviewed and approved on the OTD /RFR monthly report.

Acceptable Reasons for Relief

- FEDMALL backorder

- ATAC shipping delays

- Acts of nature

- Delays due to the fault of the Government

Note: supplier backorder, vendor capacity, and facility/equipment failure are not acceptable reasons for granting relief.

Block 14: LIS PMO Program Manager tracy.walker@usmc.mil COR abigail.howard@usmc.mil LOGCOM Contracting Officer kimberly.dandridge@usmc.mil Contract Specialist felecity.burns@usmc.mil

group:
total_price:
prep_name: Tracy I. Walker
prep_sign: LIS, Program Manager
prep_date: 28 Aug 30
app_by: Ricky L. Williams
app_sign: Director, RID
app_date: 28 Aug 20
Page:
app: Adobe Professional 7.0
line_item: 0002 & 0005
exhibit: A
xtdp: Off
xtm: Off
othercat:
system: Logistics Integration Support
ctr_no: TBD
contr: TBD
remarksb: BLK 7: Acceptance required by the Government within 30 days of final submission

Contracting Officer Kimberly Dandridge kimberly.dandridge@usmc.mil

Page2:
of_pages:
Reset:

File details come from the government source that posted it. Updated .