This performance work statement outlines technical and analytical support services required by the Capabilities Development Directorate of the United States Marine Corps. The contractor shall provide research, analysis, and documentation to support updating the Marine Corps Capabilities List, Marine Corps Gap List, Marine Corps Solutions Development Directive, Marine Corps Capabilities Investment Plan, and the development of the annual Marine Corps Enterprise Integration Plan. The contractor must have facilities to support meetings of 10-50 personnel. Key deliverables include monthly progress reports, quarterly interim progress reviews, and draft updates of various capabilities documents. The period of performance is one base year with four optional one-year periods of performance. The work will be performed at the contractor's facilities. A secret clearance is required for all contractor personnel.

Amendment

View the file

Other files for this federal contract opportunity

Other files attached to CDD Support Services IDIQ - M0026418R0006, newest first.
File Type Posted
Attachment_5_Initial_Task_Order_CDD_IDIQ_Revised_deliverable_table.DOCX DOCX document
CDD_Attachment_7_Pricing_Revised.xlsx XLSX spreadsheet
Amendment_0002_Questions_and_Answers_M0026418R0006.xlsx XLSX spreadsheet
amendment_0003.docx DOCX document
Amendment_0002_Questions_and_Answers_M0026418R0006.xlsx XLSX spreadsheet
CDD_Attachment_7_Pricing_Revised.xlsx XLSX spreadsheet
Attachment_3_Solicitation.docx DOCX document
Draft_DD254.pdf PDF
Attachment_8_Teaming_Partner_Consent_Letter_Template.docx DOCX document
Attachment_4_Questions_matrix.xlsx XLSX spreadsheet
Attachment_9_Past_Performance_Client_Authorization_Letter.docx DOCX document
Attachment_5_Initial_Task_Order_CDD_IDIQ.DOCX DOCX document
M0026418R0006_Attachments.zip ZIP file
Attachment_1_Past_Performance_Questionaire.docx DOCX document
Attachment_3_Solicitation.docx DOCX document
Attachment_6__Past_Performance_Information_Form.docx DOCX document
CDD_Attachment_7_Pricing_Template.xlsx XLSX spreadsheet
Attachment__3_Draft_Solicitation__M0026418R00006.docx DOCX document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M0026418R0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 19-Mar-2018 02:00 PM to 05-Apr-2018 01:00 PM.

The following have been added by full text:

INITIAL TASK ORDER PWS

Performance Work Statement in Support of Capabilities Based Assessment (CBA) Branch, Marine Air-Ground Task Force (MAGTF) Integration Division (MID), Capabilities Development Directorate (CDD) for Technical and Analytical Support Services

C-1.0 SCOPE

The scope of this effort includes provisions for technical and analytical support to the Capabilities Based Assessment (CBA) Branch, Marine Air-Ground Task Force (MAGTF) Integration Division (MID), Capabilities Development Directorate (CDD), Deputy Commandant for Combat Development and Integration (DC CD&I) in the development of annual CBA products for the Marine Corps.

C-1.1 MID-CBA BACKGROUND AND MISSION

The CDD supports DC CD&I by developing and integrating warfighting capabilities solutions and enabling an effective Marine Corps capability to respond to strategic challenges and opportunities. CDD provides resident expertise for capability integration in the areas of: Command and Control, Cyber and Electronic Warfare, Fires and Maneuver, Force Protection, Intelligence, Logistics, MAGTF, Seabasing, Small Wars and Irregular Warfare, and Total Force Structure. In consideration of overarching national strategic and service guidance and concepts development, CDD conducts analysis across the complete spectrum of Doctrine, Organizational, Training, Materiel, Leadership, Personnel, Facilities, and Policy (DOTMLPF-P). The identification of capability gaps, excesses and risk areas impacting development of the Marine Corps Capability List (MCCL), Marine Corps Gap List (MCGL), Universal Needs Statements (UNS), and other capabilities development documents to include the Marine Corps Solution Development Directive (MCSDD) requires vigilant and dedicated coordination supported by a business infrastructure with which to further capability development from concept to acquisition and fielding.

The MID synchronizes capability development activities through the integration divisions and TFSD as well as convenes a Capabilities Development Integration Board (CDIB) on a routine basis consisting of O-6 level representatives to ensure that thorough MAGTF integration is achieved. The culmination of work and products results in the creation of a Marine Corps Enterprise Integration Plan (MCEIP) and in concert with Program Objective Memorandum guidance and other resource informing efforts further provides integrated Marine Corps capabilities approved by the Marine Corps Requirements Oversight Council (MROC). The MROC is the forum for obtaining senior level leadership guidance and approval as it applies to prioritization of desired warfighting capabilities and identification of requirement solutions.

The MID serves as the coordinating authority for integrating all Marine Corps capability development activities, across Headquarters Marine Corps (HQMC), the operating forces (OPFOR), and the supporting establishment as related to capability portfolio management, the Marine Corps Capabilities Based Assessment (MCCBA), doctrine development and maintenance, the Deliberate and Urgent Needs Processes, and management and maintenance of the Marine Corps Task List (MCTL). The MID supports all operational architecture (OA) needs for CDD. Additionally, MID leads all Continuous Process Improvement activities within the CDD, to include management of the Force Development Core Value Stream.

C-2.0 SUPPORT REQUIREMENTS. Annual execution and support requirement of Marine Corps Capabilities Based Assessment (MC CBA) culminates with the production of the MCEIP, which is a consolidated summary of analysis from the MC CBA. MC CBA contents include: an analysis of strategic guidance and results of stakeholder participation in a MC CBA Wargame, identified Marine Corps capability requirements and capability gaps shortfalls and excesses, recommended solution strategies to eliminate or mitigate capability gaps, and an enterprise capability management plan that summarizes resourcing recommendations that are aligned to the Commandant’s strategic goals for the Marine Corps’ 10 year future objectives. Through the identification of the capabilities required by future Marine Corps forces, MC CBA establishes the point of departure for resource decision-making and timely delivery of capabilities to the Marine Corps Enterprise.

Contractor employees shall be identified as contractor personnel by introduction and by displaying visible identification for meetings with Government personnel. In addition contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence including electronic (e.g., email) correspondence.

C-2.1 PLACE OF PERFORMANCE. All work shall be performed off-site at the Contractor’s facilities. If on-site visitation is needed, the contractor shall be responsible for parking in marked contractor spaces with appropriately displayed stickers on vehicles, or using other designated parking areas. As needed, the Government shall provide transport to and from other designated parking areas.

The Contractor shall provide facilities for meetings and Integrated Process Team (IPT) (e.g., 10-50 personnel), as well as a suitable infrastructure to manage program requirements throughout the course of performance to support the scope of activities. Such facilities are not reimbursed as ODCs. Laptops, cellular equipment/services, and other items of convenience are not reimbursable as ODCs.

CONUS travel must be in accordance with the JTR. No travel is anticipated at this time.

C-2.2 SECURITY REQUIREMENTS. ALL CONTRACTOR PERSONNEL REQUIRING ACCESS TO CLASSIFIED INFORMATION AND ASSIGNED TO THIS PROGRAM SHALL POSSESS A SECRET CLEARANCE. The Prime Contractor and all Sub-contractors (through the Prime Contractor) shall certify in writing to the Government that personnel supporting this task order are "Qualified United States (U.S.) Contractors" per DoD Directive 5220.22-M Chapter 2 Section 2. Qualified U.S. Contractors are restricted to U.S. citizens, persons admitted lawfully into the United States for permanent residence, and are located in the United States. All personnel identified on the certification and/or supporting this task order shall be in compliance with DoD, Department of the Navy (DoN), and Marine Corps Information and Personnel Security Policy to include completed background investigations (as required) prior to classified performance. This task order shall include a DoD Contract Security Classification Specification (DD-254 Form) as an attachment. The Contractor shall have a valid Secret Facility Clearance prior to classified performance or classified meetings at the Contractor’s facility. The Government shall assist the Contractor in gaining access to Government agencies and installations related to the systems in question. The Contractor shall ensure that the employees are on the approved Government access list prior to entering any access controlled area. The Contractor shall notify the Government by written notice within twenty-four hours of Contractor personnel that are to be added or removed from the access control list.

The Contractor shall be required to store, access and handle unclassified and classified (up to the SECRET level). Overarching security requirements and Contractor access to classified information shall be specified in the DD-254 form. Security management, inclusive of retention of clearances and document handling/storage, are to be considered as part of the contractor’s indirect base. The Government will not be responsible for getting subcontract companies cleared through any security measures. The Government will sponsor the Contractor’s access to other Government facilities as required. Additional Contractor badging requirements will be delineated on the DD-254. The Government shall also provide the Contractor access to NATO and Secured Internet Protocol Router Network (SIPRNet) at the Government facility located at Raymond G. Davis Building, 3300 Russell Road, Quantico, VA 22134.

C-3.0 SPECIFIC REQUIREMENTS.

C-3.1.1 Technical Support. Contractor shall consolidate and contribute input required for updating the Marine Corps Capabilities List (MCCL) in order to identify Marine Corps capability requirements (tasks, conditions, standards, and performers) based on the concept of operations and a concept of support for the scenario exercised during the MC CBA Wargame.

C-3.1.2 The Contractor shall consolidate and contribute input required for updating the Marine Corps Gap List (MCGL) in order to identify Marine Corps capability gaps based on the inability of the current and programmed Marine Corps forces to perform capability requirements identified in the MCCL.

C-3.2.1 The Contractor shall consolidate and contribute input required for updating the Marine Corps Solutions Development Directive (MCSDD) in order to develop solution strategies to eliminate or mitigate capability gaps through Doctrine, Organization, Training, Materiel, Leadership, and Education, Personnel, Facilities, and Policy (DOTMLPF-P) assessments.

C-3.2.2 The Contractor shall produce and maintain a monitoring and tracking capability for combat development activities and changes in programing decisions, which must result in a quarterly report

C-3.2.3 MC CBA Support. The contractor shall provide research and analysis to draft input regarding Force Protection MC CBA analysis and institutionalization efforts codifying enduring requirements for inclusion in the Marine Corps Capabilities List (MCCL), Marine Corps Gap List (MCGL), and produce associated solutions to address those gaps.

C-3.3.1 The Contractor shall consolidate and contribute input required for producing the Marine Corps Capabilities Investment Plan (MCCIP) that enables Marine Corps programmers to make informed resource allocation decisions that support the Commandant’s future 10 year objectives.

C-3.3.2 The Contractor shall compile all of the above CBA products (MCCL, MCGL, MCSDD and MCCIP) in preparation for timely leadership review via staffing and adjudication for MROC approval of the annual Marine Corps Enterprise Integration Plan (MCEIP)

C-3.3.3 The Contractor shall annually develop draft packages for O-6, 1-Star, and 3-Star for staffing each of the above mentioned CBA products.

C-3.4. Meeting Support. The Contractor shall provide facilities for meetings and Integrated Program Reviews (e.g., 10-50 personnel), as well as a suitable infrastructure to support and manage program requirements and the scope of activities throughout the course of performance. Laptops, cellular equipment/services, and other items of convenience are not reimbursable as ODCs.

C.3.5 PERFORMANCE REQUIREMENTS. The contractor shall adhere to the PWS in the development of its performance solution and annotate any deviations from the material content of that document in accordance with the PWS. Where the contractor seeks to improve upon the standard, this should be clearly annotated in its response.

C-3.6 DELIVERABLES. The Contractor shall provide the following deliverables in relation to the specified PWS paragraphs. The level of effort necessary for each deliverable is annotated by a Due Date and Quantity which signifies when and how often the product is required, i.e. Due: Monthly; Qty: 1 (signifies 1 per month for a total of 12). Those deliverables with due dates beyond the anticipated period of performance are not ‘final’ end-items to be delivered by the Contractor, but the Government requires input for the end-items so that the Government can complete the final products on time. The Government and Contractor together shall ensure proper submission workflow is established at time of award. All deliverables should be provided to either the COR or other designated point of contact at the start of the period of performance.

Unless otherwise agreed to by all parties, the Government will provide written acceptance, comments, and/or change requests, if any, within five (5) business days from receipt of any formal deliverable. If written acceptance, comments, and/or change requests are not provided within five (5) business days, the deliverable shall be deemed acceptable as written by the Contractor. If the Government provides comments and/or change requests, the Contractor shall have five (5) business days from receipt of the Government correspondence to incorporate the comments and/or change requests and resubmit the deliverable. Formal quality control measures are expected to be executed for all formal deliverables under this task order. Upon task order expiration all Government work must be turned over to the Government in electronic format.

Deliverable No.
Deliverable to Government
PWS

Para.

Due Date
Format
Quantity
1
Monthly Progress Report
2.0
Monthly
MS Word
1
2
Interim Progress Reviews (IPRs)
2.0
Quarterly
MS Word/ PowerPoint
1
3
Draft Updated Annual MCCL
2.1.1
Apr 2019
MS Word
1
4
Draft Updated Annual MCGL
2.1.2
Jul 2019
MS Word
1
5
Draft Updated MCSDD
2.1.3
Sep 2019
MS Word
1
6
CBA Quarterly Report
2.1.4
Quarterly
MS Word
1
7
Draft Updated Annual MCCIP
2.1.5
Nov 2019
MS Word
1
8
Draft Annual MCEIP
2.1.6
Dec 2019
MS Word
1
9
Draft CBA Packages (O-6, 1-Star, 3-Star)
2.1.7
Annually
MS Word/ PowerPoint
1 per each Office

C-3.6.1 CONTRACT PERFORMANCE REVIEW. The Contractor, in conjunction with guidance provided by the COR, shall schedule and conduct a quarterly (based upon fiscal year) Program Review within fifteen (15) calendar days of the final day of the month for the period of performance (e.g., October - December – before Jan 16th). The location for this review shall be at the discretion of the Government. The agenda for the review shall be developed between the Contractor’s Program Manager and the COR. The agenda items shall include the task level elements of the Monthly Progress Report, performance metrics, as well as any additional items deemed important by the parties. The Government reserves the right to change the timing (e.g., semi-annually vice quarterly), content and format, as required.

C-3.6.2 MONTHLY PROGRESS REPORT. The Contractor shall submit a Monthly Progress Report to the COR NLT the 10th day of the following month for work accomplished from the first (1st) through the final calendar day of the previous month. This report shall be provided in both hardcopy and electronic media compatible with conventional MS Office applications. The report shall include the following information, at a minimum:

· Comparison of planned and actual task order performance by WBS element;

· Task progress during the past month, plans for the forthcoming month;

· Problems (actual or anticipated) requiring Government action and summary of action required;

· Travel costs, including purpose of trips, duration, and related actions, by task order;

· Total contract staffing by position and assignment;

· Personnel turnover, utilization of subcontractors, and future staffing projections; and

· Deliverables (by task) accepted or rejected, inclusive of the final day of the month, as well as the reason for rejection and timeline for resubmission.

C-3.7 TRAVEL REQUIREMENTS. Daily travel to and from work, and any local travel aboard the installation in the performance of daily duties is not reimbursable by the Government.

CONUS travel must be in accordance with the JTR. No travel is anticipated at this time.

C.3.8 PERIOD OF PERFORMANCE. The period of performance shall be a 12 months based period from the contract award date.

C.3.9 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA). The contractor shall report ALL contract labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USMC/MCCDC/CDI & CDD via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil. Reporting inputs will be for the labor executed during the period of performance during each Government Fiscal Year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at: https://doncmra.nmci.navy.mil.

QASP

Attachment 1

QUALITY ASSURANCE SURVEILLANCE PLAN

1. Objective. This Quality Assurance Surveillance Plan (QASP) serves as the principal basis for assessing overall performance quality associated with the CDD support services task. This document will be used by the Government to assess the effectiveness of the Contractor’s quality with respect to management and technical services provided. This QASP provides the methodology by which the Contractor's performance will be monitored to determine compliance with established performance objectives and to establish performance benchmarks that ensure a quantifiable basis for measuring effectiveness. The plan is designed so that surveillance is limited to that which is necessary to verify the Contractor is performing management and technical services satisfactorily and relates directly to performance objectives of the performance objectives delineated in the PWS.

2. Government Surveillance. The CDD COR will serve as the technical authority for this task, and her/his authority will be limited to administering specific technical aspects of the task order as set forth at in, Inspection and Acceptance. The COR will not provide direction that is outside the scope of responsibilities delineated under this task order and will defer any conditional interpretations to the Contracting Officer. The COR will:

· Maintain a detailed knowledge of the technical requirements of the contract;

· Document Contractor performance in accordance with the QASP and the approved Contractor's Quality Plan (QP);

· Identify and immediately forward notifications of deficient, or non-compliant performance to the Contracting Officer;

· Approve priorities of support, resources, and associated schedules.

3. Surveillance Methods. Surveillance of Contractor performance is the method used by the Government to determine whether the Contractor is effectively and efficiently complying with all terms and conditions of the task order. In addition to statistical analysis, the functional expertise of the COR plays a critical role in adequately evaluating Contractor performance. The below listed methods of surveillance shall be used in the administration of this QASP and the standards are delineated by WBS element in the Performance Requirements Survey (PRS) table at Enclosure 1:

Demonstration - A qualification method that is carried out by operation and relies on observable functional operation. It does not require the use of instrumentation or special test equipment;

Analysis. A qualification method that is carried out by examining and assessing the application of techniques in order to determine if they are appropriate and sufficient. The quality of performance can be determined from Government or Contractor task-based or Management Information System (MIS) reports, Contractor ISO 9000 techniques and procedures, or from Government observation of completed tasks. In some instances, reports may be available in the form of information on a Contractor's performance against contract requirements. Reports generally provide information regarding various characteristics of tasks and can, therefore, be used to determine acceptability of a Contractor's performance.

Inspections: A qualitative inspections can be accomplished through one of the following techniques:

· Random or Stratified Sampling: With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Stratified sampling focuses on selected parts of total Contractor output for sampling. Computer programs may be available to assist in establishing sampling procedures.

· Periodic Inspection, Judgmental Inspection or Planned Sampling: This method, sometimes called "planned sampling,” consists of the evaluation of tasks selected on other than a 100% or random basis.

Performance Characteristic
Required Standard
Measurement

Quality of Work Performed: Provide acceptable or better results through the following:

· Technical accuracy, thoroughness of analysis / findings; and

· Completion and preparation to a professional standard < 5% rejection rate of all formal deliverables submitted under the performance provisions of the contract; and

<10% rejection rate of draft and first time submissions.

- Reconciled weekly by Division Leads;

- Reconciled monthly by COR / Contractor's PM (CPM) and tracked as a 3-mos. moving average.

Responsiveness: Timely response to discrete work requirements emerging at the CDD Division levels, including:

· Timely delivery of deliverables;

· Attendance at required

· meetings Initial Response to any requests provided to COR within 24-hrs., strategy provided to COR <48-hrs. from notification, including:

· Delivery Schedule

· Project Timeline

· Deliverables; and

· Availability of staff.

- Periodic assessment by the COR, CDD Division Task Leads as to the thoroughness of the response;

- Reconciled monthly by COR / CPM and tracked as a 3-mos. moving average.

Management and Administration:

Includes the following measures of performance and compliance:

· Deliverables shall be complete, accurate, and prepared to a professional standard;

· Quality of the Contractor’s overall technical management strategy;

· Ability to identify and preclude problems, or resolve issues; and

· Effectiveness of their use corporate quality practices, resolution of invoice anomalies, WBS compliance, and effectiveness of their overall subcontract management.

Aggregation of subordinated areas assessed using progressively more objective criteria – ratings considered:

Excellent – Exceeded performance expectations and abated, or immediately mitigated known problems;

Acceptable – Met performance expectations and generally responded to problems in a satisfactory manner; and Unacceptable – Areas of inconsistent performance, prolific problems remain unresolved, and two, or more performance areas are noted as substandard.

- Assessment by the COR, CDD Division Task Leads. Performance evaluation at TBD milestones;

- Reconciled monthly by COR / CPM and tracked as a 3-mos. moving average.

WBS stability and forecast use of labor resources to meet quality standards without increasing current performance scope (e.g., change orders <1%)

Consequence of Non-compliance –

- Rejected Invoices/Delayed Payments

- Reduced likelihood of future task order awards under this contract

- Negative CPARs entry

- Contractor Consideration to the Government

4. Performance Requirements. The performance requirements set forth in this section correspond to the material content cited in the PWS and the evaluation factors at the Instructions to Offerors, Addendum to FAR 52.212-1. Corresponding ratings will be generated for each of the weighted performance areas and aggregated monthly. The COR will track and reconcile performance with the Contractor's Program Mgr., RCO Contracts staff, and CDD Division Task Leads. This information will also be included in CPARs reports and offered in response to past performance assistance requests:

Performance Characteristic / Wt.
RFP Relationship
Evaluation Rating[footnoteRef:1] [1: Numerical values for the adjectival ratings are: >.95 – Excellent – Exceeds standard compliance; .85 - .94 standard compliance – Acceptable; and <.85 – unacceptable. ]
Quality of Work Performed: .50
Factor 1 – Technical Understanding and Approach
Excellent / Exceeds: >.95

Acceptable / Meets: .85 - .94 Unacceptable: <.85

Responsiveness / Planning: .20
Factor 2 – Staffing and Management
Excellent / Exceeds: >.95

Acceptable / Meets: .85 - .94 Unacceptable: <.85

Staffing: .15
Factor 1 - Technical Understanding and Approach Factor 2 – Staffing and Management
Excellent / Exceeds: >.95

Acceptable / Meets: .85 - .94 Unacceptable: <.85

Management & Administration: .15
Factor 1 - Technical Understanding and Approach Factor 2 – Staffing and Management
Excellent / Exceeds: >.95

Acceptable / Meets: .85 - .94 Unacceptable: <.85

The criteria that will used to accomplish the evaluation ratings is derived from the RFP and from the elements of performance determined to be most influential to performance. The Contractor’s Quality Plan (QP) should address each of the respective areas. Using the criteria from the Performance Requirements Survey (PRS) task orders can be tailored using all, or some combination of the relevant performance characteristics. This allows for measuring performance at both the individual task order level, as well as aggregating performance in the respective functional areas to assess trends.

PERFORMANCE REQUIREMENTS SURVEY (PRS)

QUESTIONS/ANSWERS

Document
Section
Page
Reference
Questions
Answers

Past Performance

Attachment 8
NA
1
Teaming Partner Consent Letter
The instructions say to submit a consent letter for major subcontractors. Do the letters count as part of the 9 page limitation in the Past Performance Volume?
The consent letters do not count towards the 9 page limitation in the Past Performance volume.
Attachment 3 - Solicitation
52.212-1 Addendum
78
Paragraph 2.6.1
The soliciation requires that a Past Performance Questionnaire (PPQ) be submitted for each paster performance reference submitted. Will the government accept CPARS evaluations in lieu of PPQs?
The Government will review CPARS/PPIRS in addition to the past performance questionaires. If a Past Performance Questionaire is unavailable, a CPARs can be included in Volume 4. The CPARs will not count towards the page limit. Past Performance Questionaires are excluded from the page limit.
Attachment 3 Solicitation
2.6
78
2.6 Vol 4 Past Performance
Given the government allows for up to 6 past performances and the template is 2 pages in length before any data is loaded, can the government provide up to 13 pages in total for the past performance section? If not, there is no way for companies to display their full range of support and make this a competitive evaluation. It is in the best interest of the government to allow industry to describe their full range of support.
The past performance section is updated to allow up to 18 pages in total for this section. The consent letters as stated above do not count towards the page limitation.
RFP
2.6.1
Page 78
Past Performance Instructions
In reference to RFP 2.6.1, of the 6 past performance citations requested, the govt request no more than 3 from significant subcontractors. Given our team’s experience, would the government consider modifying that to 4 from subcontractors?
The limit is set at 3 past performance citations.
RFP
2.6.1
Page 78
Past Performance Instructions
The requirements for the Past Performance Volume listed in RFP 2.6.1 do not comply with the instructions required in Attachment 6, Past Performance Information, nor is there any reference to Attachment 6 in 2.6.1 on page 78. Is the government requirement that the Past Performance Volume contain 6 different versions of Attachment 6?
The government is requesting a past performance information sheet with each past performance reference. This does not count towards the page limit.
Attachment 6, Past Performance Information Form
Question H
RFP
Reference: Attachment 6, the Past Performance Information Form, question “H. For each of the applicable subfactors under the technical/management factor in Section M, illustrate how your experience on this program applies to that subfactor”. Would you please revise this question, as there is no Technical/Management Factor with subfactors in the RFP, nor is there an actual Section M noted in the RFP, although there is an evaluation section. There is only Factor 1 – Technical Capabilities and Factor 2 – Performance Execution and Management Approach. Request Clarification.
For each of the applicable subfactors under Factor 1 or Factor 2 illustrate how your experience on this program applies to the factor.
Attachment 6, Past Performance Information Form
Question I
RFP
Reference: Attachment 6, the Past Performance Information Form, question “I. Specify, by name, any key individuals who participated in this program and are proposed to support this procurement. Also, indicate their contractual roles for both procurements”. As this is an IDIQ, there may be many current personnel who will be proposed on Task Orders. Request Clarification.
List any key individuals that may be proposed on task orders as key personnel.
Attachment 6, Past Performance Information Form
Question J
RFP
Reference: Attachment 6, the Past Performance Information Form, question “J. Describe the nature or portion of the work on the proposed effort to be performed by the business entity being reported here. Also, estimate the percentage of the total proposed effort to be performed by this entity and whether this entity will be performing as the prime, subcontractor/teaming partner, or a corporate division related to the prime (define relationship)”. Is this question referring to the initial task order? Request Clarification.
See above.
Attachment 3 Solicitation
1.3.1
81
Past Performance Recency Assessment. The RFP states: Recent efforts are those which have been performed during any portion of the last three years from date of issuance of this RFP, including those efforts currently being performed. For those efforts currently being performed, the Offer must have been performing for at least six months from the date of issuance of this RFP to qualify as a recent effort.
If the recency assessment is a minimum of 6 months of performance, will the Government consider allowing a Contractor to have until the submission date of the proposal to garner the 6 months of performance? Will the Government consider changing the requirement to state: "For those efforts currently being performed, the Offer must have been performing for at least six months from the RFP proposal submission date to qualify as a recent effort."?
The Government agrees the Contractor can include current performance as follows: For those efforts currently being performed, the Offer must have been performing for at least six months from the RFP proposal submission date to qualify as a recent effort.
RFP
Section L
78
Page 78, Section L, Para 2.6.1
In the Past Performance Section L instructions the Government is asking the Offeror to provide up to six past performance references and to complete Past Performance Questionnaires (PPQ) to be submitted to the Contracting Officer prior to the proposal deadline. Many Government agencies and contracting officers are refusing to respond with PPQs when current or final contract performance ratings are available and recorded in CPARS/PPIRS. Q Will the Government consider a clarifying revision indicating that PPQs are only required when a CPARS/PPIRS is not available for the Past Performance reference submitted? Please also confirm that Past Performance CPARs may be included as an Appendix to Volume 4 and will be excluded from page limit in lieu of a PPQ. Please also confirm that PPQs are excluded from page limit where CPARs are not available.
The Government will review CPARS/PPIRS in addition to the past performance questionaires. If a Past Performance Questionaire is unavailable, a CPARs can be included in Volume 4. The CPARs will not count towards the page limit. Past Performance Questionaires are excluded from the page limit.

Attachment 9 - Past Performance Client Authorization Letter

This letter appears to be required ONLY if a past performance example being submitted was performed for a commercial client, but we were unable to confirm this in the solicitation directions. Will the government please confirm that this letter is not required if all past performance examples were performed for government entities?
This form is not required if all past performance was performed for government entities.
RFP
Section L
78
Page 78, Section L, Para 2.6.1
In the instructions for the PPQ, it indicates that for each Past Performance Reference identified, the Offeror shall “…identify personnel associated with the previous effort and explain their relationship to this proposed contract.” Q Will the Government clarify how this information will be evaluated by the Government?
The information will be used to assist in determining relevancy of the Past Performance Reference. See 52.212-2 Addendum to Evaluation, Section 1.3.2 Past Performance Relevancy Assessment page 82 of the solicitation.

Security Requirements

Attachment 3 - Solicitation
52.212-1 Addendum
76
Paragraph 2.3.5
The solicitation states that the "Offeror will be responsible for ensuring that its subcontractor(s) meet(s) security policies and regulations in accordance with the DD Form 254 and applicable security policies and regulations." If the prime contractor (Offeror) has a Top Secret facility clearance, is it acceptable to include subcontractors on the team at the IDIQ level who do not? Or does each member of the IDIQ team have to have a Top Secret facility clearance?
The prime can include subcontractors that do not possess a Top Secret Facility Clearance.
Attachment 2
DD254
Instructions
In ref to RFP 2.3.5 request for DD254 completion, is the govt asking for the offeror to complete boxes 6a,b,c and 7a,b,c specifically? If so, does a separate DD254 need to be completed for the prime and all subs or will one copy of the DD254 suffice for all?
The requirement to submit a DD-254 has been removed.
Attachment 3 - Solicitation
52.212-1 Addendum
76
Paragraph 2.3.5
The solicitation states that "the Offeror shall provide a completed DD254, Contract Security Classification Specification (Attachment 2) filled out for both Prime Contractor and any proposed Subcontractors." Does the government require that each subcontractor submit a signed copy of the DD254 with the proposal? If not, will the government please clarify the requirement?
The requirement to submit a DD-254 has been removed.

DD254

Which fields need to be filled out and/or signed by the offeror to ensure proposal compliance? Currently, trying to replace the TBDs in some of the fields results in a redlined copy.
The requirement to submit a DD-254 has been removed.
RFP
PWS
13, 14 and DD254
2.7 Security Requirements
The (initial statement in all caps) states: "The contractor is required to possess a TOP SECRET/SENSITIVE COMPARTMENTALIZED INFORMATION in order to perform certain task orders. The DD-254 provided requires a TOP SECRET facility and does not specify any "storage" requirement. At the top of page 14, it states that "...the Contractor shall utilize the Government Sensitive Compartmented Information Facility (SCIF)..." Q Will the Government confirm or clarify by revision amendment for the ID/IQ contract that the offeror is required to have all personnel cleared up to the SECRET level, and have the ability to staff specified personnel at the TS/SCI level that will be specified in specific Task Orders at time of TO award? The contractor must also hold a TOP SECRET facility clearance, and that access to, processing of, and/or storage of classified information (iaw the DD254) shall be given to the contractor only at the government specified facility unless otherwise specified in the DD254 and/or by an awarded task order.
The offeror is required to have all personnel cleared up to the SECRET level, and have the ability to staff specified personnel at the TS/SCI level that will be specified in specific Task Orders at time of TO award. The contractor must hold a TOP Secret facility clearance.
RFP
DD-254
3
DD-254
The DD-254 (Item 13. Security Guidance - cont)

Item 8: All classified work accomplished on this contract will be done so withn US Government - accredited SCI facilities. Only unclassified work will be performed at contractor facilities. These two statements are in conflict with what has been stated in the PWS paragraph 2.7 Security Requirements. Q Will the Government confirm the validity of the DD254; or if classified access, handling and storage is required at the contractor facility, will the government clarify and revise by amendment of the DD254 the highest level of classified access, handling and storage required at the contractor's facility?

The DD-254 is confirmed valid.

PWS
2.7
13
Security Requirements
Second paragraph in this section states "The Contractor is required to have an active Top Secret Facility Clearance with access to Communications Security (COMSEC) and North Atlantic Treaty Organization (NATO) without any special limitations that restrict access to perform certain task orders." Please clarify what is meant by COMSEC and NATO. Are words missing from this sentence? The DD254 does not require COMSEC.
COMSEC access includes having access to encryption and decryption devices like the KG-175, etc. so it, and NATO access, should be included in the DD254 for the IDIQ.
PWS
2.7
13
Security Requirements
The second paragraph requires a Top Secret Facility Clearance. May a subcontractor / team member possess the Top Secret Facility Clearance or must the prime contractor have the Top Secret Facility Clearance?
The contractor must possesses a Top Secret Facility Clearance.
PWS
2.7
13
Security Requirements
Third paragraph in this section states "The Government will provide access to NATO and Secured Internet Protocol Router Network." Is this the same NATO requirement as the paragraph above?
Yes, the same requirement as above.
PWS
2.7
13
Security Requirements
Fourth paragraph in this section states "As required for TS/SCI work, the Contractor is responsible for ensuring all contract personnel possess an in-scope, favorable Single Scope Background Investigation (SSBI) adjudicated for SCI eligibility with no conditions, exceptions or waivers at the time of award and prior to performance under a task order." Does this refer to the time of contract award or at the time of task order award?"
This requirement refers to at the time of task order award. A minimum secret facility is required at the time of award.
Attachment 3 Solicitation
2.3.5
76
DD Form 254
The solicitation states, "The Offeror shall provide a completed DD254, Contract Security Classification Specification (Attachment 2) filled out for both Prime Contractor and any proposed Subcontractors."

The provided DD-254 seems to have all relevant sections already completed. Please specify if vendors should complete a blank DD-254 or which sections of Attachment 2 should be completed.

The requirement to submit a DD-254 has been removed.

PWS/Solicitation
C-2.2
SECURITY REQUIREMENTS states that the Contractor must be able to STORE Classified material at its facility. This appears to be a new requirement. We have a Top Secret Facilities Clearance, but no STORAGE capability, and this requirement would render us non-compliant as written.
May the Prime use the Classified Storage Capabilities of a Subcontractor to meet this requirement?
Storage is not required.
Does the Contractor require ability to STORE Classified materials at their facility?
Storage is not required.
Does the Contractor require an active SCIF in order to be eligible for award?
An active SCIF is not required.
If so, can the Contractor use the storage capabilities of a subcontractor to meet these requirements?
Storage is not required.
Is a SDVOSB require to have a TS/SCI to receive an IDIQ award or, once an IDIQ is award has been received, can the SDVOSB begin the process of obtaining a TS/SCI?
An SDVOSB can begin the process of obtaining a TS/SCI upon award of base IDIQ. The Prime contractor must have a TS/SCI to receive task orders that require a TS/SCI clearance.
Can an SDVOSB use a SUBCONTRACTOR TS/SCI until such time a TS/SCI has been granted to the SDVOSB?
No
Will the Government sponsor the IDIQ awardees
Yes
Attachment 3 Solicitation
PWS 2.7
13
SECURITY REQUIREMENTS. The RFP states: ALTHOUGH THE MAJORITY OF THE WORK WILL REQUIRE ACCESS TO CLASSIFIED INFORMATION AT THE SECRET LEVEL, THE CONTRACTOR IS REQUIRED TO POSSESS A TOP SECRET/SENSITIVE COMPARTMENTALIZED INFORMATION (TS/SCI) IN ORDER TO PERFORM CERTAIN TASK ORDERS. ALL CONTRACTOR PERSONNEL REQUIRING ACCESS TO CLASSIFIED INFORMATION AND ASSIGNED TO THIS PROGRAM SHALL POSSESS A MINIMUM SECRET CLEARANCE. At the task order level, the Contractor may be required to possess a TOP SECRET/SENSITIVE COMPARTMENTALIZED INFORMATION (TS/SCI) clearance.
This paragraph seems to contain conflicting information. Are personnel required to possess a minimum clearance of Secret, or a minimum clearance of TS/SCI in support of this contract?
All task orders will require all personnel to possess a minimum clearance of Secret. All awardees are required to possess a TS/SCI in support of this contract. The Government will sponsor at the time of award if necessary.
Attachment 3 Solicitation
PWS 2.7
13
SECURITY REQUIREMENTS. The RFP states: This contract shall include a DoD Contract Security Classification Specification (DD-254) as an attachment. The Contractor shall ensure they, and any subcontractors, have completed all DD-254 requirements prior to commencing any work under this task order. Specifically, the Contractor shall have completed the information in Block 6 (a/b/c) of the DD-254 form along with Block 13 (Facility Security Officer) contact and provide the form back to the Government for final approval.
For development of the DD-254s for the Prime and Subcontractor, it is understood that the information in block 6 (a/b/c) is specific to the prime contractor, so are we to also complete Block 7 Subcontractor (a/b/c) for all planned subcontractors?
The DD-254 is only required for the Prime and any planned subcontractors on the initial task order.
Attachment 3 Solicitation
PWS 2.7
13
SECURITY REQUIREMENTS. The RFP states: This contract shall include a DoD Contract Security Classification Specification (DD-254) as an attachment. The Contractor shall ensure they, and any subcontractors, have completed all DD-254 requirements prior to commencing any work under this task order. Specifically, the Contractor shall have completed the information in Block 6 (a/b/c) of the DD-254 form along with Block 13 (Facility Security Officer) contact and provide the form back to the Government for final approval.
Are the DD-254s that the contractor is to generate and provide with the proposal for the Prime Contractor and all Subcontractors to contain the identical information in the RFP DD-254 document for Block 13 supplemental guidance?
Contractors are no longer required to submit a DD-254 with their proposal.
Attachment 3 Solicitation
PWS 2.7
13
SECURITY REQUIREMENTS. The RFP states: This contract shall include a DoD Contract Security Classification Specification (DD-254) as an attachment. The Contractor shall ensure they, and any subcontractors, have completed all DD-254 requirements prior to commencing any work under this task order. Specifically, the Contractor shall have completed the information in Block 6 (a/b/c) of the DD-254 form along with Block 13 (Facility Security Officer) contact and provide the form back to the Government for final approval.
Are all the fields in the DD-254 for Block 8, 9, 10, 11 to also be completed using the information that is provided in the RFP DD-254 document?
Contractors are no longer required to submit a DD-254 with their proposal.
Attachment 3 Solicitation
PWS 2.7
13
SECURITY REQUIREMENTS. The RFP states: Overarching security requirements and Contractor access to classified information shall be specified in the task order level DD-254 form. Additional Contractor badging requirements will be delineated on task order DD-254(s).
Will the Prime Contractor be receiving a single DD-254 at the IDIQ level and complete a DD-254 for issuance to each subcontractor at the IDIQ level?

Will a separate DD-254 be generated for each Task Order, or just the main contract for the Prime and all subcontractors?

A DD-254 will be issued at both the base contract and task order level.

Attachment 3 Solicitation
2.3.5
76
DD Form 254. The RFP states: The Offeror shall provide a completed DD254, Contract Security Classification Specification (Attachment 2) filled out for both Prime Contractor and any proposed Subcontractors.
Is the completed DD-254 to contain ALL fields completed using the information from the Draft DD254 document, or only the Block 6 (a/b/c) of the DD-254 form along with Block 13 (Facility Security Officer) contact as stated previously in Section 2.7 (Page 13)?
A completed DD-254 is not required. Please ensure the

PWS Inquiries

Attachment 5
C-3.0
2
Specific Requirements
Does the Government intend to specify minimum educational and experience requirements for any positions in the initial task order or future task orders?
The Government may specify minimum educational and/or experience requirements at the task order level if necessary.
Attachment 5
C-3.2.2
3
Tracking Capability
Will the incumbent's monitoring and tracking system be directed by the Government / provided for use by the new contractor?
No
Attachment 5
C-3.6
3
Deliverables
The due dates for deliverables indicate the year 2016. What are the correct dates for the deliverables?
A revised deliverable table is included in the updated PWS.
RFP
CDD email with Support Statement
3 & 4
C-3.6 Deliverables
The Initial Task Order Deliverables Table requires Data submission in 2016. Q Will the Government correct the Deliverable Due Date based on the anticipated Date of Award of the Initial Task Order? This is needed to provide the level of effort required to meet workflow requirements.
A revised deliverable table is included in the updated PWS.
Attachment 5
C-3.6.2
4
Monthly Progress Report
What are the instructions for preparing and submitting a WBS for the initial task order (WBSs are also referenced in the IDIQ PWS (3.1.3, 3.2.3, 3.3..3, 3.4.3, 3.5.3. 3.6.3, 3.7.3, 3.8.3, 3.9.3, 3.11. 3.13, and PRS)?
A WBS is not required with the initial task order. If a WBS is required it will be specified at the task order level.
Attachment 5
C.3.9
4
Enterprise-Wide Contractor Manpower Reporting Application (ECMRA)
We are unable to access the DONCMRA link provided: https://doncmra.nmci.navy.mil. Does the DONCMRA site require CAC credentials to access? Is it the same website as https://www.ecmra.mil?
The proper link is https://www.ecmra.mil/Default.aspx
Attachment 3 Solicitation
3.1.1
14
3.0 Specific Requirement
3.1.1 Task 1 (and all other Integration Division Task 1s) states "Establish and maintain a high-confidence data integrity model with exportable content and open-systems structure."

Please clarify what this model is, and its purpose.

MCCBA support includes compiling and managing an Excel-based dataset resident on CBA SIPR SharePoint site. No model is required for this aspect of MCCBA.

Attachment 3 Solicitation
3.1.3
15
3.0 Specific Requirement
3.1.3 Task 3 (and all other Integration Division Task 3s) states "development and maintenance of an environment (e.g., modeling & simulation) capable of supporting sustained analytical efforts using verified and validated architecture data."

Please define what government’s expectations for this “environment” are, and its purpose.

Environment is more of a model or simulation tool.

Attachment 3 Solicitation
3.1.1
14
3.0 Specific Requirement
Introduction states "Note this effort does not include the development of Operational Architectures, which will be provided by the Operational Architecture Branch, Marine Air Ground Task Force (MAGTF) Integration Division (MID)."

3.1.1 Task 1 (and all other Integration Division Task 1's) indicate "Assessment of tools and methodologies that improve the DoD Architecture Framework (DoDAF) modeling process."

Please clarify if it’s the government’s intent that the contractor will evaluate the tools and methodologies by which DoDAF architectures are created.

This should be removed.

PWS
2.2.1
12
Meeting Support
Do the four sub-bullets in 2.2.1 (teleconference, 100 seat capacity, multiple displays, breakout rooms) need to be provided in a single facility or may they be provided among all the teammates?
This will be specified at the task order level. These need to be available in a single facility for the initial task order.
PWS
2.2.1
12
Meeting Support
Do the four sub-bullets in 2.2.1 (teleconference, 100 seat capacity, multiple displays, breakout rooms) need to be provided in the Prime Contactor's facility?
No, it doesn't have to be the prime's facility.
RFP
PWS
Varied
3.1.2, 3.2.2, 3.3.2, 3.4.2, 3.5.2, 3.6.2, 3.7.2, 3.8.2 and 3.9.2

3.1.3, 3.2.3, 3.3.3, 3.4.3, 3.5.3, 3.6.3, 3.7.3, 3.8.3 and 3.9.3 All of the sub-paragraphs under paragraphs 3.1, 3.2, 3.3, 3.4, 3.5, 3.6, 3.7, 3.8, and 3.9 are the same. It appears that all of the Division requirements were summed together with no distinction of the different requirements unique to each division. Some examples, Para 3.1.2, 3.2.2, 3.3.2, 3.4.2, 3.5.2, 3.6.2, 3.7.2, 3.8.2 and 3.9.2 contains the following text:

...review documents and conduct research or communicate with external partners at the SCI-level across the spectrum of topics and functional areas of intelligence, cyberspace operations and MAGTF EW This may be appropriate under 3.1.2 but is not appropriate under the rest of the paragraphs.

…provide survivability engineering expertise to support Live Fire Integrated Product Team (IPT) and Test and Evaluation Master Plan (TEMP) combat developer inputs as well as inputs to Live Fire scoring assessments.

This may be appropriate for 3.2 Fires and Maneuvers Integration (FMI) and 3.5 Logistics Integration (LI) but not the other Divisions covered under this PWS.

Para 3.1.3, 3.2.3, 3.3.3, 3.4.3, 3.5.3, 3.6.3, 3.7.3, 3.8.3 and 3.9.3 contains the following text:

…development and maintenance of an environment (e.g., modeling & simulation) capable of supporting sustained analytical efforts using…