M-2-MECHANICAL_FLOOR_PLAN.pdf

PDF 2 MB Posted

Attached to
Academic Village Cooling Tower
Solicitation number
PSPW-25-10
Issued by
Broward County, Florida

About this file

The document is a mechanical floor plan (M-2) prepared by Florida Engineering Services (FES) for the Academic Village Cooling Tower Replacement project per FBC 2023 Existing Buildings. The technical drawing provides detailed schematic designs for two cooling towers (CT-1 and CT-2), including isometric views, floor plans, and a comprehensive cooling tower schedule. The plan shows specific technical details such as pipe connections (8'' and 10'' diameter), water return and supply lines, and precise mechanical layout configurations.

The mechanical floor plan reveals a technical replacement strategy for aging cooling tower infrastructure, with carefully designed specifications for integration into the existing HVAC system. The job is numbered 17024 and appears to be part of a broader campus infrastructure upgrade, focusing on replacing existing cooling towers with modern units to improve system efficiency and reliability. The document includes professional engineering stamps and detailed technical annotations, suggesting a comprehensive approach to the cooling tower replacement that prioritizes technical precision and system performance.

View the file

Other files

File Type Posted
Academic_Village_Cooling_Tower_(Addendum_#6_Revision).pdf PDF
Sikagard_7600_VG.pdf PDF
1000_Ton_Cooling_Tower_RSCT1000F2_Spec_Sheet_Draft(Reymsa).pdf PDF
Pictures.pdf PDF
Academic_Village_Cooling_Tower.pdf PDF
Sample_Insurance_Certificate.pdf PDF
Standard_Release_of_Lien.pdf PDF
Sample_Insurance_Certificate.pdf PDF
Specimen_Contract_-_Construction_Agreement.pdf PDF
Standard_Release_of_Lien.pdf PDF
Specimen_Contract_-_Construction_Agreement.pdf PDF
Attachment_A_-_Cooling_Tower_Specifications_&_Instructions.pdf PDF
Attachment_B_-_Plans.pdf PDF
Attachment_A_-_Cooling_Tower_Specifications_&_Instructions.pdf PDF
Attachment_B_-_Plans.pdf PDF
S-1.0.pdf PDF
S-1.0.pdf PDF
S-0.0.pdf PDF
S-0.0.pdf PDF
M-1-DEMOLITION_PLAN.pdf PDF
M-1-DEMOLITION_PLAN.pdf PDF
M-2-MECHANICAL_FLOOR_PLAN.pdf PDF
Cooling_Tower_Instructions.pdf PDF
Cooling_Tower_Instructions.pdf PDF
Submittal_Package_Merged_Quote090609_-_Revision_002_Line_100_-S3E_-_S3E-1222-06N-2_2025-03-04_13-22_EN.pdf PDF
Submittal_Package_Merged_Quote090609_-_Revision_002_Line_100_-S3E_-_S3E-1222-06N-2_2025-03-04_13-22_EN.pdf PDF
HUD's_Davis-Bacon_and_Labor_Standards_Contractor_Guide_Addendum.pdf PDF
Specimen_Contract_-_Professional_Services_(CCNA_Non-Continuing_Services).pdf PDF
Specimen_Contract_-_Contractual_Services_Agreement.pdf PDF
Specimen_Contract_-_Professional_Services_(CCNA_Non-Continuing_Services).pdf PDF
HUD's_Davis-Bacon_and_Labor_Standards_Contractor_Guide_Addendum.pdf PDF
Specimen_Contract_-_Contractual_Services_Agreement.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING NOTES

1 NEW CT-1, CT-2 MOUNTED ON EXISTING CONCRETE WALL STRUCTURE. SEE CT SCHEDULE ON M-2.

SEE STRUCTURAL DRAWINGS FOR TIE-DOWN INFORMATION. FINAL POSITION OF COOLING TOWER

MUST ALIGN WITH EXISTING CWS/R PIPING TERMINATION.

2 EXISTING SHUT-OFF VALVE.

3 EXISTING AUTO-FLOW CONTROL VALVE.

XCOOLING TOWER SCHEDULE

TOWER NUMBER CT-1 & CT-2

CAPACITY (MBH) TOTAL 12,245.10

FLOW RATE (gpm) TOTAL 1,750.00

EWT/LWT (°F) 99/85

DESIGN WB TEMP (°F) 80

FAN MOTOR HP 2 @ 25 EA

FAN MOTOR SPEED (rpm) 1800

TOWER FAN SPEED (rpm) --

MOTOR VOLTAGE 460-3-60

MANUFACTURER BAC

MODEL S3E-1222-06N-2S

DRIVE TYPE BELT

OPERATING WEIGHT (lbs) 23,799

LOCATION GROUND

1. INDUCED DRAFT CROSSFLOW COOLING TOWER WITH CTI CERTIFIED

STD-201 PERFORMANCE AND FULLY WIND-LOADED CONSTRUCTION TO

WITHSTAND (138 PSF HORIZONTAL/109 PSF VERTICAL) HURRICANE

FORCE WINDS. SIGNED AND SEALED ENGINEERED CALCULATIONS FROM

THE MANUFACTURER REQUIRED. COOLING TOWER AND INSTALLATION

TO COMPLY WITH FBC-2020 MECHANICAL SECTION 908.1 AND 908.4

2. COOLING TOWERS TO BE OF 304L STAINLESS STEEL CONSTRUCTION

AND HARDWARE INCLUDING DISTRIBUTION AND COLLECTION BASINS.

3. INTERIOR PLENUM WALKWAY

4. PREMIUM EFFICIENCY, DRIVE DUTY MOTORS WITH SHAFT GROUNDING

RINGS.

5. 1 YEAR PARTS AND LABOR BASE WARRANTY PLUS AN EXTENDED

4-YEAR FACTORY PARTS AND CONTRACTOR LABOR WARRANTY IS

REQUIRED.

6. VIBRATION DETECTION SWITCH FOR EACH TOWER METRIX

5550.

7. 80 dba MAX SOUND RATING AT 5ft FROM AIR INLET FACE.

8. FACTORY ASSISTED START-UP.

9. FM CERTIFICATION TO ALLOW OPERATION WITHOUT DEDICATED FIRE

PROTECTION SYSTEM.

10. 5ft. LADDER EXTENSIONS.

New installation scope summary:

1- Install new cooling towers as specified. Set cooling tower on existing structure such that all piping connections line up with existing piping. Rearranging existing piping is not part of the scope of work.

2- Tie down cooling towers as specified in structural drawings.

3- Connect new cooling tower motors to existing disconnect switches. The variable frequency drives that control the motors are existing and located within the chiller water plan. Contractor to replace as necessary the sump water temperature sensor and wiring for proper system operation. All operating set point to remain as they are.

4- Start up new cooling towers. Verify proper operation.

NEW CT-1

FLOW DIAGRAM

N.T.S.

8" ∅8"

10"∅ CWR

NEW CT-2

P-CW1 P-CW2

EXISTING PIPING

10"∅ CWS8"∅

8"

EXISTING PIPING

CT-1 CT-2

P-CW1 P-CW2

8''Ø CWR

NPW

M-2

EXISTING 10''Ø

CWS/R PIPING TO

CHILLER PLANT

N

PW

10''Ø CWS

''Ø

C W

S

8''Ø

Level 1 0' - 0"

L1 0' - 0"

L2 15' - 0"

3 2

1/4" = 1'-0"1 MECHANICAL FLOOR PLAN

ALBERT SHUB

e-mail: AlbertS@fesinc.biz

IN

C

. D

BA

34 N.W. 168TH STREET

NORTH MIAMI BEACH, FL. 33169

TELEPHONE: (305) 653-0212

(305) 653-0232FAX:

MECHANICAL AND ELECTRICAL

FLORIDA ENGINEERING SERVICES

ENGINEERS

EB0003862

PE# 0043414 M.E.

JOB NUMBER:

DRAWN BY:

CHECKED BY:

PROJECT NUMBER:

ISSUE DATE:05-30-2017

REV DATE DESCRIPTION

DESIGN

DELIVERABLE: SITE PLAN

SHEET TITLE

SHEET TITLE

1702417024

Ac ad em ic

Vi lla ge C oo lin g T ow er R ep lac em en t Le ve l 1

A lte ra tio n p er

F

BC

E xis tin g B uil din gs

C ity o f P em br ok e

Pi ne s Pu bl ic

S er vi ce s D ep

25017

M-2

MECHANICAL

FLOOR PLAN

Pe m br ok e Pi ne s, F lo rid a

MECHANICAL FLOOR PLAN-ISOMETRIC

VIEW

1/4" = 1'-0"3 Section 2

2025-07-08T15:42:48-0400
Albert S. Shub PE 43414

File details come from the government source that posted it. Updated .