The document is a mechanical floor plan (M-2) prepared by Florida Engineering Services (FES) for the Academic Village Cooling Tower Replacement project per FBC 2023 Existing Buildings. The technical drawing provides detailed schematic designs for two cooling towers (CT-1 and CT-2), including isometric views, floor plans, and a comprehensive cooling tower schedule. The plan shows specific technical details such as pipe connections (8'' and 10'' diameter), water return and supply lines, and precise mechanical layout configurations.
The mechanical floor plan reveals a technical replacement strategy for aging cooling tower infrastructure, with carefully designed specifications for integration into the existing HVAC system. The job is numbered 17024 and appears to be part of a broader campus infrastructure upgrade, focusing on replacing existing cooling towers with modern units to improve system efficiency and reliability. The document includes professional engineering stamps and detailed technical annotations, suggesting a comprehensive approach to the cooling tower replacement that prioritizes technical precision and system performance.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING NOTES
1 NEW CT-1, CT-2 MOUNTED ON EXISTING CONCRETE WALL STRUCTURE. SEE CT SCHEDULE ON M-2.
SEE STRUCTURAL DRAWINGS FOR TIE-DOWN INFORMATION. FINAL POSITION OF COOLING TOWER
MUST ALIGN WITH EXISTING CWS/R PIPING TERMINATION.
2 EXISTING SHUT-OFF VALVE.
3 EXISTING AUTO-FLOW CONTROL VALVE.
XCOOLING TOWER SCHEDULE
TOWER NUMBER CT-1 & CT-2
CAPACITY (MBH) TOTAL 12,245.10
FLOW RATE (gpm) TOTAL 1,750.00
EWT/LWT (°F) 99/85
DESIGN WB TEMP (°F) 80
FAN MOTOR HP 2 @ 25 EA
FAN MOTOR SPEED (rpm) 1800
TOWER FAN SPEED (rpm) --
MOTOR VOLTAGE 460-3-60
MANUFACTURER BAC
MODEL S3E-1222-06N-2S
DRIVE TYPE BELT
OPERATING WEIGHT (lbs) 23,799
LOCATION GROUND
1. INDUCED DRAFT CROSSFLOW COOLING TOWER WITH CTI CERTIFIED
STD-201 PERFORMANCE AND FULLY WIND-LOADED CONSTRUCTION TO
WITHSTAND (138 PSF HORIZONTAL/109 PSF VERTICAL) HURRICANE
FORCE WINDS. SIGNED AND SEALED ENGINEERED CALCULATIONS FROM
THE MANUFACTURER REQUIRED. COOLING TOWER AND INSTALLATION
TO COMPLY WITH FBC-2020 MECHANICAL SECTION 908.1 AND 908.4
2. COOLING TOWERS TO BE OF 304L STAINLESS STEEL CONSTRUCTION
AND HARDWARE INCLUDING DISTRIBUTION AND COLLECTION BASINS.
3. INTERIOR PLENUM WALKWAY
4. PREMIUM EFFICIENCY, DRIVE DUTY MOTORS WITH SHAFT GROUNDING
RINGS.
5. 1 YEAR PARTS AND LABOR BASE WARRANTY PLUS AN EXTENDED
4-YEAR FACTORY PARTS AND CONTRACTOR LABOR WARRANTY IS
REQUIRED.
6. VIBRATION DETECTION SWITCH FOR EACH TOWER METRIX
5550.
7. 80 dba MAX SOUND RATING AT 5ft FROM AIR INLET FACE.
8. FACTORY ASSISTED START-UP.
9. FM CERTIFICATION TO ALLOW OPERATION WITHOUT DEDICATED FIRE
PROTECTION SYSTEM.
10. 5ft. LADDER EXTENSIONS.
New installation scope summary:
1- Install new cooling towers as specified. Set cooling tower on existing structure such that all piping connections line up with existing piping. Rearranging existing piping is not part of the scope of work.
2- Tie down cooling towers as specified in structural drawings.
3- Connect new cooling tower motors to existing disconnect switches. The variable frequency drives that control the motors are existing and located within the chiller water plan. Contractor to replace as necessary the sump water temperature sensor and wiring for proper system operation. All operating set point to remain as they are.
4- Start up new cooling towers. Verify proper operation.
NEW CT-1
FLOW DIAGRAM
N.T.S.
8" ∅8"
10"∅ CWR
NEW CT-2
P-CW1 P-CW2
EXISTING PIPING
10"∅ CWS8"∅
8"
EXISTING PIPING
CT-1 CT-2
P-CW1 P-CW2
8''Ø CWR
NPW
M-2
EXISTING 10''Ø
CWS/R PIPING TO
CHILLER PLANT
N
PW
10''Ø CWS
''Ø
C W
S
8''Ø
Level 1 0' - 0"
L1 0' - 0"
L2 15' - 0"
3 2
1/4" = 1'-0"1 MECHANICAL FLOOR PLAN
ALBERT SHUB
e-mail: AlbertS@fesinc.biz
IN
C
. D
BA
34 N.W. 168TH STREET
NORTH MIAMI BEACH, FL. 33169
TELEPHONE: (305) 653-0212
(305) 653-0232FAX:
MECHANICAL AND ELECTRICAL
FLORIDA ENGINEERING SERVICES
ENGINEERS
EB0003862
PE# 0043414 M.E.
JOB NUMBER:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
ISSUE DATE:05-30-2017
REV DATE DESCRIPTION
DESIGN
DELIVERABLE: SITE PLAN
SHEET TITLE
SHEET TITLE
1702417024
Ac ad em ic
Vi lla ge C oo lin g T ow er R ep lac em en t Le ve l 1
A lte ra tio n p er
F
BC
E xis tin g B uil din gs
C ity o f P em br ok e
Pi ne s Pu bl ic
S er vi ce s D ep
25017
M-2
MECHANICAL
FLOOR PLAN
Pe m br ok e Pi ne s, F lo rid a
MECHANICAL FLOOR PLAN-ISOMETRIC
VIEW
1/4" = 1'-0"3 Section 2
| 2025-07-08T15:42:48-0400 | |
| Albert S. Shub PE 43414 |
File details come from the government source that posted it. Updated .