The document is a Demolition Plan (M-1) prepared by Florida Engineering Services (FES) for the Academic Village Cooling Tower Replacement project for the Pembroke Pines Charter School. The plan depicts a detailed schematic for the demolition of an existing cooling tower system, with specific focus on maintaining certain existing structural elements such as the enclosure wall and louvered openings. The drawing includes a top-down demolition plan and a side elevation view, showing the precise locations of existing components like concrete structures, condenser water pipes, and mechanical connections that will remain or be removed during the project.
The technical drawing, marked with job number 17024, provides precise engineering specifications for the cooling tower replacement, indicating a comprehensive approach to maintaining site infrastructure while upgrading critical HVAC system components. The plan is professionally sealed and stamped, suggesting compliance with local building codes and engineering standards. The document appears to be part of a broader solicitation for a cooling tower replacement project, with careful consideration given to maintaining existing structural integrity while implementing necessary mechanical upgrades.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION NOTES
EXISTING COOLING TOWER, BAC SERIES 3000 MODEL: 33458-2WS COOLING TOWER TO BE
DISCONNECTED FROM EXISTING PIPING, WIRING AND LEGALLY DISPOSED. EXISTING FAN MOTORS
SHALL BE REMOVED AND RETURNED TO FACILITY MANAGEMENT.
2 EXISTING SUBMERSIBLE / VERTICAL CONDENSER WATER PUMPS TO REMAIN.
3 EXISTING 8''/10'' DIA. CWR PIPING TO REMAIN.
4 EXISTING SHUT OFF VALVE TO REMAIN.
5 EXISTING MOTORIZED VALVE TO REMAIN.
6 EXISTING 8''/10'' DIA. CWS PIPING AND ACCESSORIES TO REMAIN.
7 EXISTING 10'' STRAINER TO REMAIN AND BE SERVICED.
8 EXISTING 6'' DIA. SUMP OVER FLOW PIPING DISCHARGING INTO 8'' HUB DRAIN TO REMAIN.
9 EXISTING 1-1/2'' DOMESTIC WATER MAKE UP TO REMAIN.
10 EXISTING SUMP ACCESS PANELS TO REMAIN.
11 EXISTING CONCRETE SUPPORT WALLS / STRUCTURE TO REMAIN. SEE STRUCTURAL DRAWINGS.
12 EXISTING CONDENSER WATER PUMP DISCONNECT SWITCHES AND STARTERS TO REMAIN.
13 EXISTING COOLING TOWER DISCONNECT SWITCHES TO REMAIN.
X
NOTES:
1- EXISTING COOLING TOWER MOTORS ARE CONTROLLED VIA.
2- EXISTING VARIABLES FREQUENCY DRIVES AND TRANE BMS ALL LOCATED IN ADJACENT
CHILLER PLANT.
ADDITIONAL COMPLIANCE NOTES:
1. THESE ENGINEERING DOCUMENTS AND THE RESULTING INSTALLATION OF THE
DEPICTED HVAC SYSTEMS FOR THIS PROJECT ARE INTENDED TO CONFORM TO THE
FOLLOWING CODES AND STANDARDS:
FLORIDA BUILDING CODE 8TH EDITION (2023)
FLORIDA BUILDING CODE EXISTING BUILDINGS 8TH EDITION (2023)
FLORIDA BUILDING CODE MECHANICAL 8TH EDITION (2023)
FLORIDA ENERGY CONSERVATION CODE 8TH EDITION (2023)
FLORIDA FIRE PREVENTION CODE 8TH EDITION (2023)
ASHRAE 2009 FUNDAMENTALS HANDBOOK
MSS SP-69-2002 PIPE HANGERS AND SUPPORTS - SELECTION AND APPLICATION
NFPA 214 - STANDARD ON COOLING TOWERS
NFPA 101 - LIFE SAFETY CODE
IF WORK AS LAID OUT, INDICATED OR SPECIFIED IS CONTRARY TO OR CONFLICTS
WITH THE LISTED CODES AND STANDARDS, THE CONTRACTOR SHALL REPORT IN
WRITING TO THE ARCHITECT/ENGINEER BEFORE SUBMITTING A BID. THE
ARCHITECT/ENGINEER WILL THEN ISSUE INSTRUCTIONS AS HOW TO PROCEED.
2. ALL EQUIPMENT IS TO BE INSTALLED PER THE MANUFACTURER'S INSTRUCTIONS,
SPECIFICATIONS, AND RECOMMENDATIONS FOR SAFE AND EFFICIENT OPERATIONS.
ALL MANUFACTURER OPERATION AND MAINTENANCE GUIDES SHALL BE ISSUED TO
THE BUILDING OPERATOR AFTER SUCCESSFUL COMPLETION OF MAINTENANCE
AND/OR PREVENTATIVE MAINTENANCE PROCEDURES TRAINING OF THE BUILDING
OPERATORS.
3. DESIGN CRITERIA INCLUDES BUT NOT LIMITED TO:
CLIMATIC DESIGN CONDITIONS - 80ºF EVAPORATION DESIGN PARAMETER FOR
SUMMER (MIAMI, FL)
Demolition Scope Summary:
A. Coordinate timing and logistics with the Facility Management the time frame and schedule available for system shut down.
B. Disconnect all existing electrical wiring serving cooling tower motors.
C. Remove the cooling tower fan motors and return these to the facility manager.
D. Remove existing cooling towers and leave the space open and ready to accept the new equipment. Contractor is responsible for all necessary crane service, rigging, transport of towers to disposal site, and disposal fees.
112 2
EXISTING LOUVERED
OPENING TO REMAIN
EXISTING ENCLOSURE
WALL TO REMAIN
''Ø
C W
R 8'
'Ø C
W R
8''Ø
10''Ø CWR
M-1
LOUVER 53''X53''
(EXISTING)
LOUVER 120''X120''
(EXISTING)
L1 0' - 0"
L2 15' - 0"
EXISTING
ENCLOSURE
WALL TO
REMAIN
EXISTING CONCRETE
STRUCTURE TO REMAIN.
SEE THE STRUCTURAL
DRAWINGS
EXISTING CONDENSER WATER
SUMP TO REMAIN AND BE
SERVICED BY FACILITY
MANAGEMENT
ALBERT SHUB
e-mail: AlbertS@fesinc.biz
IN
C
. D
BA
34 N.W. 168TH STREET
NORTH MIAMI BEACH, FL. 33169
TELEPHONE: (305) 653-0212
(305) 653-0232FAX:
MECHANICAL AND ELECTRICAL
FLORIDA ENGINEERING SERVICES
ENGINEERS
EB0003862
PE# 0043414 M.E.
JOB NUMBER:
DRAWN BY:
CHECKED BY:
PROJECT NUMBER:
ISSUE DATE:05-30-2017
REV DATE DESCRIPTION
DESIGN
DELIVERABLE: SITE PLAN
SHEET TITLE
SHEET TITLE
1702417024
Ac ad em ic
Vi lla ge C oo lin g T ow er R ep lac em en t Le ve l 1
A lte ra tio n p er
F
BC
E xis tin g B uil din gs
C ity o f P em br ok e
Pi ne s Pu bl ic
S er vi ce s D ep
25017
M-1
DEMOLITION
PLAN
Pe m br ok e Pi ne s, F lo rid a
1/4" = 1'-0"1 DEMOLITION PLAN
1/4" = 1'-0"2 Section 1