This is Addendum 3 to a Structured Cabling Request for Proposal issued by Lake Orion Community Schools, with project management by Plante Moran. The addendum announces modifications to the public bid opening process and provides clarifications to vendor questions regarding the scope of work. The project involves comprehensive recabling of multiple school buildings, including Lake Orion High School (LOHS), Paint Creek Elementary, Carpenter Elementary, and Webber Elementary, with work encompassing network closet renovation, fiber backbone installation, data cabling drops for classroom technology (interactive flat panels and PA/audio control systems), and installation of clocks and audio enhancement systems throughout the facilities. The public bid opening was scheduled for December 18, 2020 at 10:00 AM ET and was to be conducted via Zoom video conference due to COVID-19 social distancing protocols, with in-person attendance prohibited.

The addendum addresses ten specific vendor questions covering technical specifications and installation requirements, including clarifications on AV data placement and mounting, existing pathway utilization, network closet locations, fiber termination bulkhead sizing, cable management configurations, grounding requirements and responsibility for ground lugs, and provision of existing closet condition photographs. Key clarifications include confirmation that all buildings are being fully recabled, that bulkheads should accommodate all backbone fiber terminations with larger sizes permitted if necessary, that existing network closet bus bars will be utilized with vendor responsibility for grounding components, and that the District will obtain ground lugs if not provided with existing network switches. Photographic documentation of existing conditions at multiple IDFs and MDFs across the project sites was provided to support vendor bidding efforts.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum # 3

To: Interested Vendors

From: Shae Sultes – Plante Moran

Date: December 11, 2020

Re: Lake Orion Community Schools – Structured Cabling

Due to social distancing guidelines and COVID‐19 protocols, the public bid opening will be conducted over a Zoom video conference. In‐person attendance will not be permitted. Vendors are welcome to access the Zoom conference using the information provided below:

Lake Orion Community Schools – Structured Cabling RFP – Public Bid Opening

December 18, 2020 @ 10AM ET

Phone one‐tap: US: +13126266799,,91509515606# or +16468769923,,91509515606#

Meeting URL: https://plantemoran.zoom.us/j/91509515606?pwd=QVJwTjBwcW9DT0Y2ZTk0OEZ6cXgrQT09

Meeting ID: 915 0951 5606

Passcode: 392470

Below is list of vendor questions and answers received to date:

QUESTION ANSWER

1. Please clarify the “typical” data placements on your High School drawings where 1 Data are shown in blue to represent AV cabling at the IFP panel location and a second single data representing AV data is shown on the same wall.

Is the second blue data on the wall by itself reserved for a particular AV technology? If so, please clarify mounting details for this drop. It is assumed that field coordination will be required at some point to connect the other AV technologies in each room. You call out clocks, WAPs, and general data.

AV data drops will be coiled above ceiling at the prescribed locations on the print with a 10ft service loop. A typical classroom consists of two:

1. Interactive Flat Panel – Data Connection

2. PA/Audio System Control Unit – Data

Connection

These two connections are network connected devices that will connect just as other network drops.

Field coordination will occur with the awarded vendor and the District’s AV/PA vendor to determine any installation considerations.

2. Is there an existing pathway or floor core to get fiber from the first floor to the lower level or do I need to create one?

At LOHS, existing pathways are available where existing fiber is run throughout the building. If replacing this fiber, it is assumed that the existing cores can be utilized once existing is removed.

3. Are the Office Area and rooms 200‐210 and rooms 250‐271 fed from IDFs E and H on the lower level?

Correct.

4. Does the Pool have its own IDF? IDF C1 looks like it would be out of distance.

While not shown on the drawings, there is an IDF located on the upper level in the corridor between the gymnasium and pool areas. In addition, an IDF is located on the first floor on the far side of the gymnasium.

5. Appendix A shows 9 network closets renovated and 8 backbone fiber runs at the HS.

Drawings A0.01 and A0.02 show only 8 network closets. Where is the 9th closet?

See Answer #4.

6. Section 2.4 What do you mean by the "Other data cabling needs include... Shared Spaces, Offices" can you elaborate what do you mean?

The entirety of the building is being re‐cabled as part of this effort. This includes spaces such as office areas and the like.

7. On the prints you have the following below, do they all take Data Drops? how about Audio enhancement with the 4 equally spaced speakers?

o PA‐ PA Buttons o PA Speakers o Clock o Digital Clock o Dual‐sided Digital Clock o PA‐ PA Buttons – Will require a single data drop in the office.

o PA Speakers – No drops required.

o Clock – Drops are marked on provided maps.

o Digital Clock – Same as above. All clocks will be digital. Drops are marked on provided maps.

o Dual‐sided Digital Clock ‐ Same as above. All clocks will be digital.

‐ End of Addendum 3 ‐ o Audio enhancement/PA (4 equally spaced speakers)

Drops are marked on provided maps.

o Audio enhancement/PA (4 equally spaced speakers) – Only a single drop is required for the control unit. This is typically the second “AV” data drop in each classroom.

8. Section 2.5.2 you are asking to have 12 strands terminated at each panel, then you are asking to have bulkhead inserts that accommodate six fiber termination. can you elaborate please.

Bulkheads should be sized appropriately to terminate all backbone fiber connections in full (e.g., if there are seven IDFs, the MDF will have all 84 strands terminated into a bulkhead). Larger size bulkheads will be permitted if necessary to complete all terminations.

9. Section 2.6.1 you are asking for Cable management below the patch panel and assuming switch will be installed below the CM.

However, in section 2.4.3 you are asking for 1 foot patch cords for the closet side. can you elaborate please.

Horizonal cable managers between the patch panel may not be necessary given the desire to use 1‐ft patch cables.

10. Section 2.6.2 are we providing a Rack or cabinet Bus Bar to tie in to closet Main Grounding Bus Bar

All network closets have existing bus bars. The Vendor must assume responsibility for grounding network closet components to these bus bars.

11. Section 2.6.2 you are asking to ground all equipment. Some existing switches come with their own ground lugs. if those lugs are not available, who is proving the lugs for all different type of equipment.

If lugs for network switches are not provided, the District will assume responsibility to obtain those lugs.

12. Do you have any pictures of existing conditions of Closets that need to be removed?

Pictures from most of the network closets at the buildings in‐scope are provided below.

Not all pictured closets will be removed.

Not pictured is the MDF and IDF at Webber Elementary.

Alex.Dietrich Text Box Carpenter - IDF

LOHS - IDF B

LOHS - IDF B

LOHS - IDF C1

LOHS - IDF C2

LOHS - IDF E

LOHS - IDF H

LOHS - IDF H

LOHS - IDF K

LOHS - IDF L

LOHS - IDF L

LOHS - MDF

LOHS - MDF

Paint Creek - IDF 1

Paint Creek - IDF 1

Paint Creek - IDF 2

Paint Creek - IDF 2

Paint Creek - MDF

Paint Creek MDF