This file comprises structured cabling application drawings and technology plans for multiple school construction projects within the Lake Orion Community Schools district in Michigan, prepared by Plante Moran and GMB architectural firms. The projects include additions and renovations at Carpenter Elementary, Webber Elementary, Early Childhood Center, Orion Oaks Elementary, Paint Creek Elementary, and Stadium Drive Elementary. The drawings detail comprehensive technology infrastructure including network cabling systems, communications pathways, fire alarm systems, audio-visual cabling, distributed clock systems, access control systems, video surveillance systems, and intercom/paging systems across multiple building units. Project numbers reference specific initiatives (5-4744 for Carpenter, 5-4740 for Webber, 5-4742 for Early Childhood Center, 5-4743 for Orion Oaks, 5-5063 for Paint Creek, and 5-5064 for Stadium Drive). The drawings span multiple phases of construction documented through various bulletins and addenda issued between December 2019 and November 2020, with design development and bid documentation stages noted throughout.
The structured cabling plans specify extensive conduit routing, cable tray systems, penetration devices with fire ratings, floor boxes, and connectivity infrastructure distributed across classroom units, administrative spaces, and mechanical areas. Multiple panelboards, transformers, and distribution points are identified for electrical and communications systems. The drawings emphasize coordination between the electrical contractor (Division 26), communications contractors (Division 27), and safety/security contractors (Division 28) operating under separate bid packages. Installation requirements include underground conduits, surface raceway systems, automatic door operators, and specialized provisions for kitchen hood fire protection systems where applicable. Drawings include keynotes addressing firestopping requirements, smoke damper installations, fixture relocation procedures, and accessibility standards in accordance with NEC and local code requirements. The technology infrastructure supports interactive flat panels, wireless access points, digital clocks, PA systems, and audio-visual systems throughout each facility.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Legend:
Interactive Flat Panel
General Data (1 drop per triangle unless noted)
PA – PA Buttons
Wireless AP
AV Cabling (IFP or Audio Ehancement Box)
Clock
PA Speaker
Digital Clock (see note below)
Dual-sided Digital Clock (see note below)
Audio Enhancement/PA (4 equally spaced speakers)
Teacher location
S
D
D2
T
Lake Orion Community Schools Carpenter Elementary - Technology
Prepared by Plante Moran
D
P
W
A
C
B F
B F
B F
B F
B F
BF BF
BFBF
B F
B F
B F
B F
B F
AV
A V
A V
A V
A V
F F
A V
A V
AV
AV
A
AV
A
A V
FAA
FACP IDS
A C
S
FB1
R
C R
CR
D
M
S S
D
D
D D
CRD IC
SC
SC
S
S
S
S S S
ID
ID A
V
TS FS
S
C R
CR
1/10
1/6
C R
A V
A V
AV
AV
ID
N
R
D
AV
D
F
RELOC. PANEL 'AD'
EX. PANEL 'MSP'
EX. METER C/T
CABINET EX. UTILITY ELEC.
METER
EX. 208V UTILITY
XFMR
EX. PANEL 'A4'
EX. PANEL 'B4'
PANEL 'C'
WG/PC
WG/PC
PCPC
44"
44"
44"
44"
GFCI
44"
GFCI
44"
44"
44" 44" 44"
44"
M
M
WB1
48"
LIMITED-AREA FIRE
PROTECTION, THIS
ROOM ONLY
RTU-20.1
ON ROOF
EX. PANEL
'DP2'
WB1
64"
80"
AUTO DOOR OPER
CLASSROOM
B102
ELECTRICAL
B133
STORAGE
B132
CLOSET
A119
GIRLS
A120
BOYS
A121
STORAGE
A123
STORAGE
A122
CLASSROOM
A124
TOILET
A110
CORRIDOR
A125
CLASSROOM
A118
CORRIDOR
A117
PRINCIPAL
A104
CONFERENCE
A106
OFFICE
A107
VEST
A101
RECORDS
A112
WAITING
A102
HEALTH
A109
STOR. (TOILET ALT. G-1)
A111
CLOSET
A114
OFFICE
A115
OFFICE
A116
GYM
A133
JAN
A132
OFFICE
A134
STORAGE
A135
WOMEN
A131
MEN
A130
STORAGE
A129
CORRIDOR
A128
CORRIDOR
A113
RECEPTION
A103
HALLWAY
A105
WORK
A108
GREEN
B131
CORRIDOR
A136
RAMP
A126
STAIR
A127
M
PLUMB. FIXTURE PSU
ABOVE CLG.
PLUMB. FIXTURE PSU
ABOVE CLG.
EF-20.2
ON ROOF
EF-20.1
ON ROOF
E7.01
TYP.
E7.01 8 E7.01 8
IM
E7.01 8
P03
P02
P08
P08
P08
E7.01
8 SIM
E7.01
8 SIM
AC-23
A4-18
C-27 C-28
C-29
EX. PANEL
'DP2'
P11
P05
P03
C-26
C-24
C-25
AD-15
AD-18
AD-17
C-23
AD-25
AD-23
AD-20
AD-19
AD-24
AD-22 AD-21
P12
C02 C02
P16
P10
AD-35
C02
A4-19
ENABLES/DISABLES
"EVENT" SEQUENCE
1. REFER TO ELECTRICAL GENERAL NOTES ON SHEET E0.01.
2. REFER TO CODE COMPLIANCE PLAN FOR LOCATIONS AND RATINGS OF
VERTICAL AND HORIZONTAL BUILDING ASSEMBLIES. PROVIDE APPROPRIATE
FIRESTOPPING SYSTEMS PER SPECIFICATIONS TO MEET ALL APPLICABLE
CODES.
3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF SMOKE DAMPERS AND
COMBINATION FIRE/SMOKE DAMPERS. E.C. SHALL PROVIDE 120VAC POWER
FROM DEDICATED 20A/1P BRANCH CIRCUIT (WITH BREAKER LOCKING
MECHANISM) IN LOCAL PANELBOARD FOR DAMPER(S) IN EACH AREA (DAMPERS
MAY BE GROUPED ON EACH CIRCUIT), TERMINATED W/ BOX-COVER FUSIBLE
SWITCH AT EACH DAMPER. ALSO PROVIDE FIRE ALARM DUCT SMOKE
DETECTOR WITHIN 5 FEET OF EACH DAMPER (UNLESS COVERED BY ANOTHER
DUCT DETECTOR WITHIN 5 FEET) AND A FIRE ALARM ADDRESSABLE RELAY FOR
INTERLOCKING DAMPER W/ CORRESPONDING HVAC UNIT PER CODE
REQUIREMENTS.
4. PROVIDE BOX-COVER FUSIBLE DISCONNECT SWITCH (ON BUILDING INTERIOR IN
ACCESSIBLE LOCATION) FOR EACH SMALL (< 1/2 HP) MECHANICAL AND/OR
PLUMBING EQUIPMENT MOTOR LOAD WHERE MORE THAN ONE UNIT IS
CONNECTED TO A COMMON BRANCH CIRCUIT. TYPICAL EQUIPMENT TYPES
INCLUDE BUT ARE NOT LIMITED TO CABINET HEATERS, DAMPERS, EXHAUST
FANS, FAN COIL UNITS, PUMPS, UNIT HEATERS, VAV BOXES, ETC.
5. COORDINATE THE INSTALLATION AND ROUGH-IN REQUIREMENTS (BOXES,
CONDUIT, ETC. IN WALLS AND CEILINGS) FOR THE FOLLOWING SYSTEMS WITH
COMMUNICATIONS AND ELECTRONIC SAFETY/SECURITY CONTRACTORS
ENGAGED VIA SEPARATE BID PACKAGE(S) (NOT IN THIS CONTRACT), INCLUDING
BUT NOT LIMITED TO:
A. NETWORK CABLING SYSTEMS
B. NETWORK ELECTRONICS (SWITCHES, ACCESS POINTS, ETC.)
C. TELEPHONE SYSTEMS
D. INSTRUCTIONAL TECHNOLOGY EQUIPMENT
E. AUDIO-VIDEO SYSTEMS AND EQUIPMENT
F. INTERIOR DIGITAL SIGNAGE SYSTEM AND DISPLAYS
G. INTERCOM/PAGING SYSTEM
H. DISTRIBUTED CLOCK SYSTEM
I. ACCESS CONTROL SYSTEM
J. VIDEO SURVEILLANCE SYSTEM
6. REVIEW ALL OTHER DISCIPLINE PLANS FOR AREAS WHERE REMOVAL AND
REINSTALLATION OF EXISTING CEILINGS WILL BE REQUIRED TO ACCOMMODATE
THE DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AND STRUCTURE.
A. PROVIDE TEMPORARY SUPPORT, RELOCATION, OR REMOVAL OF ALL
EXISTING ELECTRICAL AND ELECTRONIC SAFETY/SECURITY ITEMS
MOUNTED ON OR IN CEILINGS. REINSTALL THE SAME ITEMS TO MATCH
EXISTING CONDITIONS WHEN CEILING IS REINSTALLED.
B. COORDINATE WITH OTHER TRADES TO MODIFY ANY ITEMS ABOVE CEILINGS
AS REQUIRED TO ACCOMMODATE INSTALLATIONS, INCLUDING BUT NOT
LIMITED TO CONDUIT, JUNCTION BOXES, CABLE PATHWAYS, ETC.
C. FIELD-VERIFY EXTENT OF WORK REQUIRED; NOT ALL ITEMS ARE SHOWN
ON DRAWINGS.
D. COORDINATE WITH CONSTRUCTION MANAGER'S DIRECTIVES.
POWER GENERAL NOTES
MECH. PLATFORM
A201
UNIT A
UNIT C
UNIT B
PROJECT NO.
DRAWN
REVIEWED
No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission of
GMB Copyright 2019 All Rights Reserved c
N O
R T
H
KEYPLAN
ISSUANCES
616.796.0200 www.gmb.com
B
IM
/5 -4
L
A K
E O
R
IO
N C
A R
P E
N T
E R
E L
E M
E N
T A
R Y
A D
D
IT
IO
N
S A
N D
R E
N O
V A
T
IO
N S
/5 -4
E
.r v t
/2
/2
:5
:5
A M
E2.1A
5-4744
UNIT 'A' POWER PLAN
MCK
JB / AAB / BJH
C A
R P
E N
T E
R S
IT
E
B
U
IL
D
IN
G I
M P
R O
V E
M E
N T
S
L A
K E
O R
IO
N
C O
M M
U N
IT
Y
S C
H O
O L
S
L A
K E
O R
IO
N
M
IC
H
IG
N
O
R
1/8" = 1'-0"
UNIT 'A' POWER PLAN
ELECTRICAL KEYNOTES
C02 (1) 4" CONDUIT SLEEVE FOR DIV. 27 COMMUNICATIONS
CABLING WITH FIRESTOPPING FITTINGS
P02 BARRIER-FREE AUTOMATIC DOOR OPERATOR, FURNISHED
AND INSTALLED BY ARCH. TRADES, WIRED BY DIV. 26 PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS. INTERFACE
AS REQUIRED WITH ACCESS CONTROL SYSTEM PER SECTION
28 13 00.
P03 INSTALL ALL DEVICES UNDER MILLWORK DESK ON
DUAL-CHANNEL (POWER & COMMUNICATIONS) SURFACE
RACEWAY SYSTEM PER SECTION 26 05 35. COORDINATE
CUTOUTS IN VERTICAL WORKSURFACE SUPPORTS WITH
MILLWORK CONTRACTOR TO PERMIT INSTALLATION AND
REMOVAL OF RACEWAY COVER SECTIONS. FEED RACEWAY
FROM FIXED WALL WITH AT LEAST (2) 1-1/4" OR (3) 1" COMM.
CONDUITS CONCEALED IN WALL AND COUPLED TO RACEWAY
WITH WALL BOX TRANSITION FITTING. ROUTE CONDUITS UP
ADJACENT WALL AND STUB OUT ABOVE ACCESSIBLE CEILING.
CONFIRM EXACT DEVICE LOCATIONS WITH OWNER PRIOR TO
INSTALLATION ONCE FURNITURE PLANS HAVE BEEN
DEVELOPED.
P05 UNDERGROUND CONDUITS FOR FLOOR BOX(ES), ROUTED
OVER TO AND UP NEW WALL TO ABOVE ACCESSIBLE
SUSPENDED CEILING SPACE. COORDINATE CONCRETE
FLOOR CUTTING AND PATCHING W/ ARCH. TRADES.
P08 RECONNECT NEW RECEPTACLE TO EXISTING BRANCH
CIRCUIT AS EXTENDED FROM FORMER TELEVISION OR VIDEO
PROJECTOR LOCATION (REFER TO DEMOLITION PLAN).
MODIFY CONDUIT/RACEWAYS AND CONDUCTORS AS REQ'D.
P10 CONNECT RECEPTACLE TO NEAREST EXISTING 20A
RECEPTACLE BRANCH CIRCUIT WITH AVAILABLE CAPACITY.
IDENTIFY CIRCUIT ON AS-BUILT DOCUMENTS.
P11 INSTALL RECEPTACLE INSIDE BACK OF NEW WALL-MOUNTED
EQUIPMENT RACK FOR GYMNASIUM AUDIO SYSTEM;
COORDINATE EXACT LOCATION WITH AUDIO-VIDEO SYSTEMS
CONTRACTOR (SEPARATE BID PACKAGE).
P12 COORDINATE COMMUNICATIONS CONNECTIONS REQUIRED
FOR MONITORING AND NETWORK ADMINISTRATION OF
ELECTRONIC SAFETY/SECURITY EQUIPMENT WITH OWNER,
OWNER'S MONITORING SERVICE PROVIDER(S), AND OWNER'S
COMMUNICATIONS CONTRACTOR. ALL CONNECTIONS SHALL
BE PROTECTED FROM TAMPERING AND ACCIDENTAL
DISCONNECTION.
P16 ALTERNATE G-1 (TOILET) LAYOUT IS SHOWN FOR THIS ROOM.
FOR BASE BID, DELETE FIRE ALARM NOTIFICATION APPLIANCE
AND PLUMBING FIXTURE PSU CONNECTION, PLACE STANDARD
DUPLEX RECEPTACLE ADJACENT TO STRIKE SIDE OF DOOR.
N O
R
MECH. PLATFORM POWER PLAN
12.12.2019BIDS &
CONSTRUCTION
04.14.2020BULLETIN 002
07.01.2020BULLETIN 008
07.24.2020BULLETIN 010
IDF
General Data (1 drop per triangle unless noted)
PA – PA Buttons
Wireless AP
AV Cabling (IFP or Audio Ehancement Box)
Clock
PA Speaker
Digital Clock (see note below)
Dual-sided Digital Clock (see note below)
Audio Enhancement/PA (4 equally spaced speakers)
Teacher location
S
D
D2
T
Lake Orion Community Schools Carpenter Elementary - Technology
Prepared by Plante Moran
D
P
W
A
C
A V
A V
A V
F
AV
A V
AVAV
A V
AV
A V
A
VA
V
A V
V V
A V
A V
AV AV
FACP IDS
D D
CRD IC
SC
FS
15 15
1/2
M
KP
D
A
E
1/12
C R
1/2
D
EX. 480V UTILITY
XFMR
EX. PANEL 'DP2'
EX. METER C/T
CABINET
EX. UTILITY ELEC.
METER
EX. PANEL 'BH'
EX. PANEL 'BF'
EX. PANEL 'AE'
PANEL 'A1'
B-20.1B-20.2 P-20.2 P-20.1
EX. CHWP
EX. PANEL
'DP2'
BH-11
RTU-20.2 SUPPLY
ON ROOF
CLOSET
B103
CLASSROOM
B102
GIRLS
B104
BOYS
B105
TOILET
B106
CLOSET
B109
GIRLS
B110
BOYS
B111
TOILET
B112
CLASSROOM
B108
CLASSROOM
B107
CLASSROOM
B113
TOILET
B123
TOILET
B124
STORAGE
B126
JAN
B125
FOOD SERVICE
B127
ELECTRICAL
B133
STORAGE
B132
STORAGE
B120
CONFERENCE
B122
MECH
B121
CLOSET
B114
TOILETS
B116
CLASSROOM
B115
CLOSET
B119
TOILETS
B118
CLASSROOM
B117
CORRIDOR
B101
PLATFORM
B130
GREEN
B131
STORAGE
B129
CAFETERIA
B128
RTU-20.2 EXHAUST
ON ROOF
RELOC. EX. HWRP
44"
TO SOUTH/EAST SITE LIGHTING
POLES; REFER TO SHEET ES2.01
BH-15
BH-4BH-2
E7.01
E7.01
E7.01 8
P08
P08
P08
P08 P08
P08 C-27 C-28
C-29
DOM. HW HEATER
BH-8
BH-6
GFT-20.1
BH-3
EX. PANEL
'DP2'
P12
L05
P10
L03
RTU LTS &
RECEPTS
EX. KITCHEN EXH. HOOD
FIRE PROTECTION
INSTALL ON EX. MAU
DUCTS BELOW ROOF
P10
1. REFER TO ELECTRICAL GENERAL NOTES ON SHEET E0.01.
2. REFER TO CODE COMPLIANCE PLAN FOR LOCATIONS AND RATINGS OF
VERTICAL AND HORIZONTAL BUILDING ASSEMBLIES. PROVIDE APPROPRIATE
FIRESTOPPING SYSTEMS PER SPECIFICATIONS TO MEET ALL APPLICABLE
CODES.
3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF SMOKE DAMPERS AND
COMBINATION FIRE/SMOKE DAMPERS. E.C. SHALL PROVIDE 120VAC POWER
FROM DEDICATED 20A/1P BRANCH CIRCUIT (WITH BREAKER LOCKING
MECHANISM) IN LOCAL PANELBOARD FOR DAMPER(S) IN EACH AREA (DAMPERS
MAY BE GROUPED ON EACH CIRCUIT), TERMINATED W/ BOX-COVER FUSIBLE
SWITCH AT EACH DAMPER. ALSO PROVIDE FIRE ALARM DUCT SMOKE
DETECTOR WITHIN 5 FEET OF EACH DAMPER (UNLESS COVERED BY ANOTHER
DUCT DETECTOR WITHIN 5 FEET) AND A FIRE ALARM ADDRESSABLE RELAY FOR
INTERLOCKING DAMPER W/ CORRESPONDING HVAC UNIT PER CODE
REQUIREMENTS.
4. PROVIDE BOX-COVER FUSIBLE DISCONNECT SWITCH (ON BUILDING INTERIOR IN
ACCESSIBLE LOCATION) FOR EACH SMALL (< 1/2 HP) MECHANICAL AND/OR
PLUMBING EQUIPMENT MOTOR LOAD WHERE MORE THAN ONE UNIT IS
CONNECTED TO A COMMON BRANCH CIRCUIT. TYPICAL EQUIPMENT TYPES
INCLUDE BUT ARE NOT LIMITED TO CABINET HEATERS, DAMPERS, EXHAUST
FANS, FAN COIL UNITS, PUMPS, UNIT HEATERS, VAV BOXES, ETC.
5. COORDINATE THE INSTALLATION AND ROUGH-IN REQUIREMENTS (BOXES,
CONDUIT, ETC. IN WALLS AND CEILINGS) FOR THE FOLLOWING SYSTEMS WITH
COMMUNICATIONS AND ELECTRONIC SAFETY/SECURITY CONTRACTORS
ENGAGED VIA SEPARATE BID PACKAGE(S) (NOT IN THIS CONTRACT), INCLUDING
BUT NOT LIMITED TO:
A. NETWORK CABLING SYSTEMS
B. NETWORK ELECTRONICS (SWITCHES, ACCESS POINTS, ETC.)
C. TELEPHONE SYSTEMS
D. INSTRUCTIONAL TECHNOLOGY EQUIPMENT
E. AUDIO-VIDEO SYSTEMS AND EQUIPMENT
F. INTERIOR DIGITAL SIGNAGE SYSTEM AND DISPLAYS
G. INTERCOM/PAGING SYSTEM
H. DISTRIBUTED CLOCK SYSTEM
I. ACCESS CONTROL SYSTEM
J. VIDEO SURVEILLANCE SYSTEM
6. REVIEW ALL OTHER DISCIPLINE PLANS FOR AREAS WHERE REMOVAL AND
REINSTALLATION OF EXISTING CEILINGS WILL BE REQUIRED TO ACCOMMODATE
THE DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AND STRUCTURE.
A. PROVIDE TEMPORARY SUPPORT, RELOCATION, OR REMOVAL OF ALL
EXISTING ELECTRICAL AND ELECTRONIC SAFETY/SECURITY ITEMS
MOUNTED ON OR IN CEILINGS. REINSTALL THE SAME ITEMS TO MATCH
EXISTING CONDITIONS WHEN CEILING IS REINSTALLED.
B. COORDINATE WITH OTHER TRADES TO MODIFY ANY ITEMS ABOVE CEILINGS
AS REQUIRED TO ACCOMMODATE INSTALLATIONS, INCLUDING BUT NOT
LIMITED TO CONDUIT, JUNCTION BOXES, CABLE PATHWAYS, ETC.
C. FIELD-VERIFY EXTENT OF WORK REQUIRED; NOT ALL ITEMS ARE SHOWN
ON DRAWINGS.
D. COORDINATE WITH CONSTRUCTION MANAGER'S DIRECTIVES.
POWER GENERAL NOTES
UNIT A
UNIT C
UNIT B
PROJECT NO.
DRAWN
REVIEWED
No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission of
GMB Copyright 2019 All Rights Reserved c
N O
R
616.796.0200 www.gmb.com
C
L o ca l
P ro je ct s\
-4
E
C E
N T
R A
L m at tk al
.r v t
/1
/2
:0
:2
A M
E2.1B
5-4744
UNIT 'B' POWER PLAN
MCK
JB / AAB / BJH
C A
R P
E N
T E
R S
IT
E
B
U
IL
D
IN
G I
M P
R O
V E
M E
N T
S
L A
K E
O R
IO
N
C O
M M
U N
IT
Y
S C
H O
O L
S
L A
K E
O R
IO
N
M
IC
H
IG
R
UNIT 'B' POWER PLAN
ELECTRICAL KEYNOTES
L03 NEW BMS/ATC CONTROL RELAYS FURNISHED AND INSTALLED
BY SEPARATE BID PACKAGE FOR PILOT CONTROL OF NEW
EXTERIOR LIGHTING CONTROL CONTACTOR(S) BY SECTION 26
09 19. BMS/ATC CONTRACTOR SHALL PROVIDE CONTROL
WIRING, INTEGRATION INTO SYSTEM, AND APPLY AN
ASTRONOMIC TIME SCHEDULE IN PROGRAMMING FOR
EXTERIOR LIGHTING ZONES PER ENERGY CODE
REQUIREMENTS.
L05 RELOCATE EXISTING LIGHT FIXTURES IN ROOM AS
NECESSARY TO ACCOMMODATE MECHANICAL EQUIPMENT,
DUCTWORK, AND PIPING MODIFICATIONS. ARRANGE LIGHT
FIXTURES FOR OPTIMAL ILLUMINATION OF ALL WORKING
AREAS.
P08 RECONNECT NEW RECEPTACLE TO EXISTING BRANCH
CIRCUIT AS EXTENDED FROM FORMER TELEVISION OR VIDEO
PROJECTOR LOCATION (REFER TO DEMOLITION PLAN).
MODIFY CONDUIT/RACEWAYS AND CONDUCTORS AS REQ'D.
P10 CONNECT RECEPTACLE TO NEAREST EXISTING 20A
RECEPTACLE BRANCH CIRCUIT WITH AVAILABLE CAPACITY.
IDENTIFY CIRCUIT ON AS-BUILT DOCUMENTS.
P12 COORDINATE COMMUNICATIONS CONNECTIONS REQUIRED
FOR MONITORING AND NETWORK ADMINISTRATION OF
ELECTRONIC SAFETY/SECURITY EQUIPMENT WITH OWNER,
OWNER'S MONITORING SERVICE PROVIDER(S), AND OWNER'S
COMMUNICATIONS CONTRACTOR. ALL CONNECTIONS SHALL
BE PROTECTED FROM TAMPERING AND ACCIDENTAL
DISCONNECTION.
12.12.2019BIDS &
CONSTRUCTION
07.01.2020BULLETIN 008
General Data (1 drop per triangle unless noted)
PA – PA Buttons
Wireless AP
AV Cabling (IFP or Audio Ehancement Box)
Clock
PA Speaker
Digital Clock (see note below)
Dual-sided Digital Clock (see note below)
Audio Enhancement/PA (4 equally spaced speakers)
Teacher location
S
D
D2
T
Lake Orion Community Schools Carpenter Elementary - Technology
Prepared by Plante Moran
D
P
W
A
C
B F
BF BF
BF BF
B F
B F
B F B
F
BF
BFBF
BF
BF
BF BF
BF
BF
BF
B F
AV
A V
A V
A V
A V
A V
A V
AV
A V
A V
AV
AV
A V
AV
AV
AV
AV
AV
AV
A V
A V
AV
A V
A V
AV
A
V
AV
AV
A V
A
AV
M
S S
S S
1/8
1/8
1/6
C C
S S S
V
CR
1/12
S
N
PANEL 'D'
EX. PANEL 'AA'
EX. PANEL 'AB'
EX. PANEL 'AC'
PANEL 'A2'
PANEL 'B2'
PANEL 'A3'
20"
20"
20"
20" 20"
44" 44"
CUH-20.2
CUH-20.1
EF-20.3
ON ROOF
RTU-20.3
ON ROOF
VUV-20.3
VUV-20.1 VUV-20.2
GFCI
44"
GFCI
44" 44"
GFCI
44"
CORD REEL
CLG
CLG
CLG CLG
CLG
CLG
CORD REEL
CORD REEL
CORD REEL
CORD REEL
CORD REEL
WB1
48"
WL
GFCI
WL
GFCI
WL
GFCI
GFCI
44"
WB1
48"
44"
WB1
48"
WB1
48"
EX. PANEL
'DP2'
CLOSET
C164
CLASSROOM
C163
STORAGE
C167
GIRLS
C165
BOYS
C166
STORAGE
C168
CLASSROOM
C169
CLOSET
C157
CLASSROOM
C162
STORAGE
C161
STORAGE
C160
GIRLS
C158
BOYS
C159
CLOSET
C171
CLASSROOM
C170
STORAGE
C174
GIRLS
C172
BOYS
C173
STORAGE
C175
CLOSET
C150
CLASSROOM
C155
STORAGE
C154
STORAGE
C153
GIRLS
C151
BOYS
C152
CLASSROOM
C176
CLASSROOM
C149
CLASSROOM
C147
CLASSROOM
C140
JAN
C146
STORAGE
C141 CLOSET
C142
STORAGE
C143
GIRLS
C144
BOYS
C145
KILN
C125
CLASSROOM
C124
CLASSROOM
C127
CLOSET
C129
LOUNGE
C128
CLOSET
C130
MUSIC
C131
OFFICE
C121
OFFICE
C122
STORAGE
C123
WOMEN
C132
MEN
C133
GIRLS
C134
JAN
C135
BOYS
C136
CLOSET
C138
LRC
C137
MEDIA CENTER
C120
OFFICE
C107
STOR
C115
OFFICE
C104
OFFICE
C106
OFFICE
C117
VEST
C108
OFFICE
C103
OFFICE
C105
ELEC
C113
CORRIDOR
C109
OFFICE
C102
STOR
C111
CLASSROOM
C116
CLASSROOM
C114
CLASSROOM
C110
JAN
C112
CORRIDOR
C101
CORRIDOR
C119
CORRIDOR
C148
CLASSROOM
C156
MEDIA PROD
C126A
TELECOMM
C122A
CORRIDOR
C139
FLOOR
EX. DWH
WB1
48"
20"
D-1
D-8
D-9
D-12
D-3 D-7
D-22
D-5 D-10
D-20
D-21
D-25
D-23
D-19 D-2
D-17
D-18
D-16 D-15
D-6
D-13
D-4
D-11
D-14
E7.01 8
E7.01
8 SIM
E7.01
TYP.
P05
P06
P07
44"
EX. UVEX. UV
GFCI
40"
A3-20
A3-19
A3-31
A3-16
A3-30
A3-28
REPLACE RECEPT.
IN EX. FLOOR BOX
AB-24
AB-22
P08
P08
P08
P08 P08
P08
P08
P08
P08
P08
P08
P08 P08
P08
EX. BMS/ATC PANEL(S)
A3-39,41
A3-37
PP-1
A3-18
P14
P13
P13
P15
C04
C08
C01
C01
D-31
CUA-20.1
ON ROOF
ACU-20.1
AB-34,36
WL GFCI
ON ROOF
1. REFER TO ELECTRICAL GENERAL NOTES ON SHEET E0.01.
2. REFER TO CODE COMPLIANCE PLAN FOR LOCATIONS AND RATINGS OF
VERTICAL AND HORIZONTAL BUILDING ASSEMBLIES. PROVIDE APPROPRIATE
FIRESTOPPING SYSTEMS PER SPECIFICATIONS TO MEET ALL APPLICABLE
CODES.
3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF SMOKE DAMPERS AND
COMBINATION FIRE/SMOKE DAMPERS. E.C. SHALL PROVIDE 120VAC POWER
FROM DEDICATED 20A/1P BRANCH CIRCUIT (WITH BREAKER LOCKING
MECHANISM) IN LOCAL PANELBOARD FOR DAMPER(S) IN EACH AREA (DAMPERS
MAY BE GROUPED ON EACH CIRCUIT), TERMINATED W/ BOX-COVER FUSIBLE
SWITCH AT EACH DAMPER. ALSO PROVIDE FIRE ALARM DUCT SMOKE
DETECTOR WITHIN 5 FEET OF EACH DAMPER (UNLESS COVERED BY ANOTHER
DUCT DETECTOR WITHIN 5 FEET) AND A FIRE ALARM ADDRESSABLE RELAY FOR
INTERLOCKING DAMPER W/ CORRESPONDING HVAC UNIT PER CODE
REQUIREMENTS.
4. PROVIDE BOX-COVER FUSIBLE DISCONNECT SWITCH (ON BUILDING INTERIOR IN
ACCESSIBLE LOCATION) FOR EACH SMALL (< 1/2 HP) MECHANICAL AND/OR
PLUMBING EQUIPMENT MOTOR LOAD WHERE MORE THAN ONE UNIT IS
CONNECTED TO A COMMON BRANCH CIRCUIT. TYPICAL EQUIPMENT TYPES
INCLUDE BUT ARE NOT LIMITED TO CABINET HEATERS, DAMPERS, EXHAUST
FANS, FAN COIL UNITS, PUMPS, UNIT HEATERS, VAV BOXES, ETC.
5. COORDINATE THE INSTALLATION AND ROUGH-IN REQUIREMENTS (BOXES,
CONDUIT, ETC. IN WALLS AND CEILINGS) FOR THE FOLLOWING SYSTEMS WITH
COMMUNICATIONS AND ELECTRONIC SAFETY/SECURITY CONTRACTORS
ENGAGED VIA SEPARATE BID PACKAGE(S) (NOT IN THIS CONTRACT), INCLUDING
BUT NOT LIMITED TO:
A. NETWORK CABLING SYSTEMS
B. NETWORK ELECTRONICS (SWITCHES, ACCESS POINTS, ETC.)
C. TELEPHONE SYSTEMS
D. INSTRUCTIONAL TECHNOLOGY EQUIPMENT
E. AUDIO-VIDEO SYSTEMS AND EQUIPMENT
F. INTERIOR DIGITAL SIGNAGE SYSTEM AND DISPLAYS
G. INTERCOM/PAGING SYSTEM
H. DISTRIBUTED CLOCK SYSTEM
I. ACCESS CONTROL SYSTEM
J. VIDEO SURVEILLANCE SYSTEM
6. REVIEW ALL OTHER DISCIPLINE PLANS FOR AREAS WHERE REMOVAL AND
REINSTALLATION OF EXISTING CEILINGS WILL BE REQUIRED TO ACCOMMODATE
THE DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AND STRUCTURE.
A. PROVIDE TEMPORARY SUPPORT, RELOCATION, OR REMOVAL OF ALL
EXISTING ELECTRICAL AND ELECTRONIC SAFETY/SECURITY ITEMS
MOUNTED ON OR IN CEILINGS. REINSTALL THE SAME ITEMS TO MATCH
EXISTING CONDITIONS WHEN CEILING IS REINSTALLED.
B. COORDINATE WITH OTHER TRADES TO MODIFY ANY ITEMS ABOVE CEILINGS
AS REQUIRED TO ACCOMMODATE INSTALLATIONS, INCLUDING BUT NOT
LIMITED TO CONDUIT, JUNCTION BOXES, CABLE PATHWAYS, ETC.
C. FIELD-VERIFY EXTENT OF WORK REQUIRED; NOT ALL ITEMS ARE SHOWN
ON DRAWINGS.
D. COORDINATE WITH CONSTRUCTION MANAGER'S DIRECTIVES.
POWER GENERAL NOTES
UNIT A
UNIT C
UNIT B
PROJECT NO.
DRAWN
REVIEWED
No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission of
GMB Copyright 2019 All Rights Reserved c
N O
R
616.796.0200 www.gmb.com
B
IM
/5 -4
L
A K
E O
R
IO
N C
A R
P E
N T
E R
E L
E M
E N
T A
R Y
A D
D
IT
IO
N
S A
N D
R E
N O
V A
T
IO
N S
/5 -4
E
.r v t
/1
/2
:0
:2
P
E2.1C
5-4744
UNIT 'C' POWER PLAN
MCK
JB / AAB / BJH
C A
R P
E N
T E
R S
IT
E
B
U
IL
D
IN
G I
M P
R O
V E
M E
N T
S
L A
K E
O R
IO
N
C O
M M
U N
IT
Y
S C
H O
O L
S
L A
K E
O R
IO
N
M
IC
H
IG
R
UNIT 'C' POWER PLAN
ELECTRICAL KEYNOTES
C01 (1) 4" CONDUIT SLEEVE FOR DIV. 27 COMMUNICATIONS
CABLING
C04 (2) 4" CONDUIT SLEEVES FOR DIV. 27 COMMUNICATIONS
CABLING WITH FIRESTOPPING FITTINGS
C08 PROTECT EX. COMMUNICATIONS EQUIPMENT, RACKS, AND
ASSOCIATED CABLING FROM THE INGRESS OF DUST AND
DEBRIS DURING CONSTRUCTION PERIOD. COORDINATE ANY
REQUIRED TEMPORARY DISCONNECTION OF POWER OR
COMMUNICATIONS CABLING WITH THE OWNER AND
CONSTRUCTION MANAGER.
P05 UNDERGROUND CONDUITS FOR FLOOR BOX(ES), ROUTED
OVER TO AND UP NEW WALL TO ABOVE ACCESSIBLE
SUSPENDED CEILING SPACE. COORDINATE CONCRETE
FLOOR CUTTING AND PATCHING W/ ARCH. TRADES.
P06 ESTABLISH NEW CONCRETE-ENCASED GROUNDING
ELECTRODE IN FOOTING OF NEW ADDITION, INTERCONNECT
WITH GROUNDING ELECTRODE SYSTEM AT SERVICE
ENTRANCE OR NEAREST SEPARATELY-DERIVED SYSTEM PER
NEC AND SPECIFICATION REQUIREMENTS.
P07 BOND METAL STRUCTURE OF ADDITION TO METAL
STRUCTURE OF EXISTING BUILDING PER NEC REQUIREMENTS.
P08 RECONNECT NEW RECEPTACLE TO EXISTING BRANCH
CIRCUIT AS EXTENDED FROM FORMER TELEVISION OR VIDEO
PROJECTOR LOCATION (REFER TO DEMOLITION PLAN).
MODIFY CONDUIT/RACEWAYS AND CONDUCTORS AS REQ'D.
P13 COORDINATE CUTOUTS IN ANY NEW FIXED CASEWORK OR
FURNITURE ALONG WALLS OR COLUMNS WITH
ARCHITECTURAL TRADES TO ENSURE THAT EXISTING
RECEPTACLES AND JUNCTION BOXES REMAIN ACCESSIBLE
PER NEC REQUIREMENTS; FIELD-VERIFY EXACT LOCATIONS
AND QUANTITIES.
P14 REINSTALL EX. RECESSED PAGING SPEAKER, BACKBOX
ENCLOSURE, AND GRILLE SALVAGED FROM BUILDING
EXTERIOR; STUB CONDUIT FROM ENCLOSURE TO INTERIOR
OF BUILDING ABOVE SUSPENDED CEILING, COORDINATE
SPLICING, EXTENSION, AND RECONNECTION OF PAGING
SYSTEM CABLING TO SPEAKER WITH COMMUNICATIONS
CONTRACTOR (SEPARATE BID PACKAGE).
P15 MOUNT CORD REELS TO STRUCTURE ABOVE SUSPENDED
CEILING SUCH THAT REELS ARE ACCESSIBLE AND CORDS
DROP DOWN THROUGH AND ARE CENTERED IN THE GAP
BETWEEN CEILING ELEMENTS. ADJUST CORD STOP SUCH
THAT RETRACTED HEIGHT OF BOX IS 8'-0" AFF.
12.12.2019BIDS &
CONSTRUCTION
07.01.2020BULLETIN 008
07.13.2020BULLETIN 009
MDF
Lake Orion Community Schools Webber Elementary - Technology
Prepared by Plante Moran Legend:
Interactive Flat Panel
General Data (1 drop per triangle unless noted)
PA – PA Buttons
Wireless AP
AV Cabling (IFP or Audio Ehancement Box)
Clock
PA Speaker
Digital Clock (see note below)
Dual-sided Digital Clock (see note below)
Audio Enhancement/PA (4 equally spaced speakers)
Teacher location
S
D
D2
T
D
P
W
A
C
BF
BF
BF
BF
BF
ID
S
A C
S
T
T
FAA
X
X
IC
KP
C R
CR CR
CR
CR CR
C R
D D D
M
M
M
S S
TS
TS
V
AV
AV
AV
AVAV
F B
A V
A V
A V
A V
A
S S
AV
AV
AV
AV
AV
F F
A V
AV
A V
A V
A V
AV
VF
VF
A
AV
C
ID
1/8
1/8
CRCR
AV
1/20
FS
C S C
ID
1/10
D
D
1/15
AV
D
D
1/8
1/20
1/2
TS
FS
A V
AV
AV
S
CR
1. REFER TO ELECTRICAL GENERAL NOTES ON SHEET E0.01.
2. REFER TO CODE COMPLIANCE PLAN FOR LOCATIONS AND RATINGS OF
VERTICAL AND HORIZONTAL BUILDING ASSEMBLIES. PROVIDE APPROPRIATE
FIRESTOPPING SYSTEMS PER SPECIFICATIONS TO MEET ALL APPLICABLE
CODES.
3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF SMOKE DAMPERS AND
COMBINATION FIRE/SMOKE DAMPERS. E.C. SHALL PROVIDE 120VAC POWER
FROM DEDICATED 20A/1P BRANCH CIRCUIT (WITH BREAKER LOCKING
MECHANISM) IN LOCAL PANELBOARD FOR DAMPER(S) IN EACH AREA (DAMPERS
MAY BE GROUPED ON EACH CIRCUIT), TERMINATED W/ BOX-COVER FUSIBLE
SWITCH AT EACH DAMPER. ALSO PROVIDE FIRE ALARM DUCT SMOKE
DETECTOR WITHIN 5 FEET OF EACH DAMPER (UNLESS COVERED BY ANOTHER
DUCT DETECTOR WITHIN 5 FEET) AND A FIRE ALARM ADDRESSABLE RELAY FOR
INTERLOCKING DAMPER W/ CORRESPONDING HVAC UNIT PER CODE
REQUIREMENTS.
4. PROVIDE BOX-COVER FUSIBLE DISCONNECT SWITCH (ON BUILDING INTERIOR IN
ACCESSIBLE LOCATION) FOR EACH SMALL (< 1/2 HP) MECHANICAL AND/OR
PLUMBING EQUIPMENT MOTOR LOAD WHERE MORE THAN ONE UNIT IS
CONNECTED TO A COMMON BRANCH CIRCUIT. TYPICAL EQUIPMENT TYPES
INCLUDE BUT ARE NOT LIMITED TO CABINET HEATERS, DAMPERS, EXHAUST
FANS, FAN COIL UNITS, PUMPS, UNIT HEATERS, VAV BOXES, ETC.
5. COORDINATE THE INSTALLATION AND ROUGH-IN REQUIREMENTS (BOXES,
CONDUIT, ETC. IN WALLS AND CEILINGS) FOR THE FOLLOWING SYSTEMS WITH
COMMUNICATIONS AND ELECTRONIC SAFETY/SECURITY CONTRACTORS
ENGAGED VIA SEPARATE BID PACKAGE(S) (NOT IN THIS CONTRACT), INCLUDING
BUT NOT LIMITED TO:
A. NETWORK CABLING SYSTEMS
B. NETWORK ELECTRONICS (SWITCHES, ACCESS POINTS, ETC.)
C. TELEPHONE SYSTEMS
D. INSTRUCTIONAL TECHNOLOGY EQUIPMENT
E. AUDIO-VIDEO SYSTEMS AND EQUIPMENT
F. INTERIOR DIGITAL SIGNAGE SYSTEM AND DISPLAYS
G. INTERCOM/PAGING SYSTEM
H. DISTRIBUTED CLOCK SYSTEM
I. ACCESS CONTROL SYSTEM
J. VIDEO SURVEILLANCE SYSTEM
6. REVIEW ALL OTHER DISCIPLINE PLANS FOR AREAS WHERE REMOVAL AND
REINSTALLATION OF EXISTING CEILINGS WILL BE REQUIRED TO ACCOMMODATE
THE DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AND STRUCTURE.
A. PROVIDE TEMPORARY SUPPORT, RELOCATION, OR REMOVAL OF ALL
EXISTING ELECTRICAL AND ELECTRONIC SAFETY/SECURITY ITEMS
MOUNTED ON OR IN CEILINGS. REINSTALL THE SAME ITEMS TO MATCH
EXISTING CONDITIONS WHEN CEILING IS REINSTALLED.
B. COORDINATE WITH OTHER TRADES TO MODIFY ANY ITEMS ABOVE CEILINGS
AS REQUIRED TO ACCOMMODATE INSTALLATIONS, INCLUDING BUT NOT
LIMITED TO CONDUIT, JUNCTION BOXES, CABLE PATHWAYS, ETC.
C. FIELD-VERIFY EXTENT OF WORK REQUIRED; NOT ALL ITEMS ARE SHOWN
ON DRAWINGS.
D. COORDINATE WITH CONSTRUCTION MANAGER'S DIRECTIVES.
POWER GENERAL NOTES
EX. PANEL 'AC'
PANEL 'BD'
EX. PANEL 'L1A'
PANEL 'BC'
SWBD. 'MSB'
XFMR 'T-C1'
PANEL 'DPC'
PANEL 'BE'
PANEL 'DPB'
EX. PANEL 'AD'
XFMR 'T-B1'
RTU-20.2
EXHAUST
ON ROOF
RTU-20.1
ON ROOF
MECHANICAL
B132
WOMENS TOILET
A130
MENS TOILET
A131
MECHANICAL
A138
OFFICE
A133
STORAGE
A141
JAN.
A134
STORAGE
A135
STORAGE
A136
CLASSROOM
A116
CLASSROOM
A115
OFFICE
B133
OFFICE
A129
OFFICE
A128
OFFICE
A105
MECHANICAL
A144
LRC
A126
OFFICE
A122
OFFICE
A123
OFFICE
A110
OFFICE
A111
OFFICE
B139
VESTIBULE
A118
MEDIA PRODUCTIONS
C102
ELECTRICAL
C127
OFFICE
A143
CORRIDOR
A127
CONFERENCE
A109
OFFICE
A108
TOILET
A106
KITCHEN
A140
CAFETERIA
A137
STORAGE
A142
CORRIDOR
A112
LRC
A125
CORRIDOR
A117
MECHANICAL
A119
WORK AREA
A107
CLASSROOM
A120
VESTIBULE
A101
RECEPTION
A103
CLINIC
A104
VESTIBULE
A113
OFFICE
B138
OFFICE
A132
CORRIDOR
A114
CORRIDOR
A121
CLASSROOM
A124
WAITING
A102
VUV-20.02 VUV-20.01
VUV-20.04
VUV-20.03
EHD EHD
EHD EHD
WB1
48"
WB1
48"
WB1
48"
WB1
64"
E7.01
E7.01 8
E7.01
8 SIM
WL
CUH-20.2
CUH-20.1
UH-20.2
GFCI
U.G. COMM. CONDUITS TO ORION ART
CENTER (MOOSE TREE) BLDG. AND
POWER / COMM. CONDUITS TO FUTURE
SITE SIGN, ROUTED UP IN CHASE AND
STUBBED OUT ABOVE SUSPENDED
CEILING; REFER TO SITE ELECTRICAL
PLAN, SHEET E2.01 FOR CONTINUATION
WL
GFCI
WL
GFCI
WL
GFCI
44"
44" 44"
44"
8"x2" CABLE TRAY
B-20.1
AC-14
P08
P08
P08
P08
C07
44"
44"
44" 44"
44"
44"
44"
44"
44"
P05
P02 P02
P03 P03
EX. EXH. HOOD
FIRE PROTECTION
E7.01
TYP.
C09
PANEL 'DP2'
EX. PANEL
'DP1'
AHU-20.1 EXHAUSTAHU-20.1 SUPPLY
EF-20.1
ON ROOF
PANEL 'DP2'
E7.01
8 SIM
CUH-20.3
UH-20.1
BCU-20.1
44"
44" 44"
CLG
CLG
CLG
CLG
CLG
CLG
GFCI
44"
BE-29
BMS/ATC PANEL(S)
E7.01
44"
BE-35 BE-37
BE-39 BE-41
L1A-4
L1A-3
L1A-1
L1A-19
L1A-2
L1A-9
L1A-7
L1A-6 L1A-12
L1A-14L1A-11
L1A-23
L1A-13
L1A-17
L1A-16
L1A-20
L1A-22
L1A-15
BE-28
BF-12
C05
C05
GFCI
GFCI
BC-26 BC-20
BC-22
BC-24
BC-32
BC-12 BC-19
BC-23 BC-21 BC-31
BC-34
BC-36
BC-37
BC-35
AC-20
PANEL 'DP2'
AHU LTS &
RECEPTS
L1A-21
CA-14
CA-13
PBB
C08
AC-13
AC-7
AC-8
AC-9
AC-12
AC-11
AC-10
AC-18
AC-5
AC-6
AC-2
EX. EF
L1A-18
C02
C02 C03
C05
C03
RTU-20.2
SUPPLY
ON ROOF
PANEL 'DP2'
RTU LTS &
RECEPTS
PANEL 'BE'
E7.01
L1A-5
P06
P07
P11 P11
P13
PLUMB. FIXTURE PSU
ABOVE CLG.
PLUMB. FIXTURE PSU
ABOVE CLG.
WB1
48"
LRC
A126B
C03
BC-39
P04
ENABLES/DISABLES
"EVENT" SEQUENCE
M M
M M
M
UNIT A
UNIT C
UNIT B
UNIT D
ADDITIONEXISTING
NORTH KEYPLAN
PROJECT NO.
DRAWN
REVIEWED
No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission of
GMB Copyright 2019 All Rights Reserved c
ISSUANCES
616.796.0200 www.gmb.com
B
IM
/5 -4
L
A K
E O
R
IO
N W
E B
B E
R E
L E
M E
N T
A R
Y A
D D
IT
IO
N S
A N
D R
E N
O V
A T
IO
N
S /5
-4
E
.r v t
/2
/2
:5
:0
P M
E2.1A
5-4740
UNIT 'A' POWER PLAN
MCK
RDG
W E
B B
E R
E L
E M
E N
T A
R Y
S
IT
E A
N D
B U
IL
D
IN
G
I M
P R
O V
E M
E N
T S
L A
K E
O R
IO
N
C O
M M
U N
IT
Y
S C
H O
O L
S
L A
K E
O R
IO
N
M
IC
H
IG
ELECTRICAL KEYNOTES
C02 (2) 12.6 SQ. IN. CABLE PATHWAY PENETRATION DEVICE (FIRE)
PER SECTION 27 05 28
C03 (2) 4" CONDUIT SLEEVES FOR DIV. 27 COMMUNICATIONS
CABLING
C05 (2) 6 SQ. IN. CABLE PATHWAY PENETRATION DEVICE (FIRE)
PER SECTION 27 05 28
C07 (3) 2" CONDUIT SLEEVES FOR DIV. 27 COMMUNICATIONS
CABLING
C08 (2) 6.7 SQ. IN. CABLE PATHWAY PENETRATION DEVICE
(SMOKE) PER SECTION 27 05 28
C09 PROTECT EX. COMMUNICATIONS EQUIPMENT, RACKS, AND
ASSOCIATED CABLING FROM THE INGRESS OF DUST AND
DEBRIS DURING CONSTRUCTION PERIOD. COORDINATE ANY
REQUIRED TEMPORARY DISCONNECTION OF POWER OR
COMMUNICATIONS CABLING WITH THE OWNER AND
CONSTRUCTION MANAGER.
P02 BARRIER-FREE AUTOMATIC DOOR OPERATOR, FURNISHED
AND INSTALLED BY ARCH. TRADES, WIRED BY DIV. 26 PER
MANUFACTURER'S INSTALLATION INSTRUCTIONS. INTERFACE
AS REQUIRED WITH ACCESS CONTROL SYSTEM PER SECTION
28 13 00.
P03 INSTALL ALL DEVICES UNDER MILLWORK DESK ON
DUAL-CHANNEL (POWER & COMMUNICATIONS) SURFACE
RACEWAY SYSTEM PER SECTION 26 05 35. COORDINATE
CUTOUTS IN VERTICAL WORKSURFACE SUPPORTS WITH
MILLWORK CONTRACTOR TO PERMIT INSTALLATION AND
CONTINUED REMOVAL OF RACEWAY COVER SECTIONS.
CONFIRM EXACT DEVICE LOCATIONS WITH OWNER PRIOR TO
INSTALLATION ONCE FURNITURE PLANS HAVE BEEN
DEVELOPED.
P04 DUAL-CHANNEL (POWER & COMMUNICATIONS) SURFACE
RACEWAY SYSTEM AS SPECIFIED, CONTINUOUS RUN WITH
SINGLE VERTICAL DROP FROM ACCESSIBLE CEILING SPACE
AND ACTIVATIONS/FITTINGS AS INDICATED.
P05 UNDERGROUND CONDUITS FOR FLOOR BOX(ES), ROUTED
OVER TO AND UP NEW WALL TO ABOVE ACCESSIBLE
SUSPENDED CEILING SPACE. COORDINATE CONCRETE
FLOOR CUTTING AND PATCHING W/ ARCH. TRADES.
P06 ESTABLISH NEW CONCRETE-ENCASED GROUNDING
ELECTRODE IN FOOTING OF NEW ADDITION, INTERCONNECT
WITH GROUNDING ELECTRODE SYSTEM AT SERVICE
ENTRANCE OR NEAREST SEPARATELY-DERIVED SYSTEM PER
NEC AND SPECIFICATION REQUIREMENTS.
P07 BOND METAL STRUCTURE OF ADDITION TO METAL
STRUCTURE OF EXISTING BUILDING PER NEC REQUIREMENTS.
P08 RECONNECT NEW RECEPTACLE TO EXISTING BRANCH
CIRCUIT AS EXTENDED FROM FORMER TELEVISION OR VIDEO
PROJECTOR LOCATION (REFER TO DEMOLITION PLAN).
MODIFY CONDUIT/RACEWAYS AND CONDUCTORS AS REQ'D.
P11 RECESS BOXES FOR DEVICES SHOWN IN EX. MASONRY WALL,
DRILL THROUGH WALL TO CONNECT REQ'D CONDUIT
PATHWAYS, AND ROUTE SURFACE-MOUNTED
CONDUIT/RACEWAY WITHIN ADJACENT STORAGE ROOM TO
ABOVE SUSPENDED CEILING
P13 FEED SURFACE RACEWAY UNDER MILLWORK RECEPTION
DESK FROM ACCESSIBLE CEILING WITH VERTICAL
DUAL-CHANNEL (POWER & COMMUNICATIONS) SURFACE
RACEWAY SYSTEM PER SECTION 26 05 35 ON WALL. MAKE
CONNECTIONS BEHIND DESK AND ABOVE WALL-MOUNTED
FIN-TUBE RADIANT HEAT UNIT WHERE NOT VISIBLE YET
ACCESSIBLE. MAKE POWER CONNECTIONS WITH 3/4" OR
LARGER FMC CONDUIT. PROVIDE GROMMETED OPENINGS ON
BOTH RACEWAYS TO FACILITATE ROUTING OF
COMMUNICATIONS/SECURITY CABLES ACROSS THE GAP
THROUGH A HOLE IN BACK OF DESK; FREE AREA SHALL BE AT
LEAST (2) 1-1/4" TRADE DIA. OR EQUIVALENT.
NORTH 1/8" = 1'-0"
UNIT 'A' POWER PLAN
01.22.2020BIDS &
CONSTRUCTION
02.06.2020ADDENDUM 001
03.10.2020BULLETIN 001
04.21.2020BULLETIN 003
07.24.2020BULLETIN 011
T
T
T
T
DD
D2
D
D
D D
D
D2
D
D
D
D
D D
NOTES
Clock installation requirements:
* Height of box needed for the clocks: 7.5 ft from the ground to bottom of the box, or 4” from the ceiling to top of the box, whichever is lower.
* Size of the box needed at classroom and office: 2-gang box
* Size of the box needed at hallways: 2-gang box
NOTES
Clock installation requirements:
* Height of box needed for the clocks: 7.5 ft from the ground to bottom of the box, or 4” from the ceiling to top of the box, whichever is lower.
* Size of the box needed at classroom and office: 2-gang box
* Size of the box needed at hallways: 2-gang box
W W
D
2A
D
2A
2A D
W
W
2D 2D
D
W
2A
D
D
D
W
W
2D2D
2D
DW
2D
D
D
W
D
D
D
D
D
D D
D
A
D2
D
S S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
Strobe
WW
W
D
D
W
W
D
Prepared by Plante Moran Legend:
Interactive Flat Panel
General Data (1 drop per triangle unless noted)
PA – PA Buttons
Wireless AP
AV Cabling (IFP or Audio Ehancement Box)
Clock
PA Speaker
Digital Clock (see note below)
Dual-sided Digital Clock (see note below)
Audio Enhancement/PA (4 equally spaced speakers)
Teacher location
S
D
D2
T
D
P
W
A
C
DN
B F
BF
BF
BF
BF
BF
BF
BF B
F
B F
B F
B F
T
ID
S
A C
S
T
AV
A V
A V
A
A
V
A V
S
V
A V
AV
AV
V
F
AV
F A
V
AV
AV
AV
A V
AV
AV
A V
ID
1/15
1/6
1/10
D
1/20
A V
S S
S
S
A V
D
D
D
D
D
D D
D
AV
AV
F
7.5
3 1515
1. REFER TO ELECTRICAL GENERAL NOTES ON SHEET E0.01.
2. REFER TO CODE COMPLIANCE PLAN FOR LOCATIONS AND RATINGS OF
VERTICAL AND HORIZONTAL BUILDING ASSEMBLIES. PROVIDE APPROPRIATE
FIRESTOPPING SYSTEMS PER SPECIFICATIONS TO MEET ALL APPLICABLE
CODES.
3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF SMOKE DAMPERS AND
COMBINATION FIRE/SMOKE DAMPERS. E.C. SHALL PROVIDE 120VAC POWER
FROM DEDICATED 20A/1P BRANCH CIRCUIT (WITH BREAKER LOCKING
MECHANISM) IN LOCAL PANELBOARD FOR DAMPER(S) IN EACH AREA (DAMPERS
MAY BE GROUPED ON EACH CIRCUIT), TERMINATED W/ BOX-COVER FUSIBLE
SWITCH AT EACH DAMPER. ALSO PROVIDE FIRE ALARM DUCT SMOKE
DETECTOR WITHIN 5 FEET OF EACH DAMPER (UNLESS COVERED BY ANOTHER
DUCT DETECTOR WITHIN 5 FEET) AND A FIRE ALARM ADDRESSABLE RELAY FOR
INTERLOCKING DAMPER W/ CORRESPONDING HVAC UNIT PER CODE
REQUIREMENTS.
4. PROVIDE BOX-COVER FUSIBLE DISCONNECT SWITCH (ON BUILDING INTERIOR IN
ACCESSIBLE LOCATION) FOR EACH SMALL (< 1/2 HP) MECHANICAL AND/OR
PLUMBING EQUIPMENT MOTOR LOAD WHERE MORE THAN ONE UNIT IS
CONNECTED TO A COMMON BRANCH CIRCUIT. TYPICAL EQUIPMENT TYPES
INCLUDE BUT ARE NOT LIMITED TO CABINET HEATERS, DAMPERS, EXHAUST
FANS, FAN COIL UNITS, PUMPS, UNIT HEATERS, VAV BOXES, ETC.
5. COORDINATE THE INSTALLATION AND ROUGH-IN REQUIREMENTS (BOXES,
CONDUIT, ETC. IN WALLS AND CEILINGS) FOR THE FOLLOWING SYSTEMS WITH
COMMUNICATIONS AND ELECTRONIC SAFETY/SECURITY CONTRACTORS
ENGAGED VIA SEPARATE BID PACKAGE(S) (NOT IN THIS CONTRACT), INCLUDING
BUT NOT LIMITED TO:
A. NETWORK CABLING SYSTEMS
B. NETWORK ELECTRONICS (SWITCHES, ACCESS POINTS, ETC.)
C. TELEPHONE SYSTEMS
D. INSTRUCTIONAL TECHNOLOGY EQUIPMENT
E. AUDIO-VIDEO SYSTEMS AND EQUIPMENT
F. INTERIOR DIGITAL SIGNAGE SYSTEM AND DISPLAYS
G. INTERCOM/PAGING SYSTEM
H. DISTRIBUTED CLOCK SYSTEM
I. ACCESS CONTROL SYSTEM
J. VIDEO SURVEILLANCE SYSTEM
6. REVIEW ALL OTHER DISCIPLINE PLANS FOR AREAS WHERE REMOVAL AND
REINSTALLATION OF EXISTING CEILINGS WILL BE REQUIRED TO ACCOMMODATE
THE DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AND STRUCTURE.
A. PROVIDE TEMPORARY SUPPORT, RELOCATION, OR REMOVAL OF ALL
EXISTING ELECTRICAL AND ELECTRONIC SAFETY/SECURITY ITEMS
MOUNTED ON OR IN CEILINGS. REINSTALL THE SAME ITEMS TO MATCH
EXISTING CONDITIONS WHEN CEILING IS REINSTALLED.
B. COORDINATE WITH OTHER TRADES TO MODIFY ANY ITEMS ABOVE CEILINGS
AS REQUIRED TO ACCOMMODATE INSTALLATIONS, INCLUDING BUT NOT
LIMITED TO CONDUIT, JUNCTION BOXES, CABLE PATHWAYS, ETC.
C. FIELD-VERIFY EXTENT OF WORK REQUIRED; NOT ALL ITEMS ARE SHOWN
ON DRAWINGS.
D. COORDINATE WITH CONSTRUCTION MANAGER'S DIRECTIVES.
POWER GENERAL NOTES
PANEL 'BF'
PANEL 'BE'
PANEL 'DPB'
EX. PANEL 'AE'
EX. PANEL 'RP1' EX. PANEL 'LP1'
EX. XFMR 'T-RP1'
EX. PANEL 'DP1'
EX. PANEL 'AD'
XFMR 'T-B1'
P-20.1
P-20.2
RTU-20.2
EXHAUST
ON ROOF
ACH-20.1
CLASSROOM
B129
MECHANICAL
B132
COPY ROOM
B130
KILN
B115
WOMENS TOILET
B114
MENS TOILET
B113
JAN.
B118
OFFICE
B126
STORAGE
B119
OFFICE
B133
STAFF TOILET
B131
VESTIBULE
B105
OFFICE
A128
CLOSET
B116
OFFICE
B139
CLASSROOM
B137
MECH. ENCLOSURE
B120
STORAGE
B117
CLASSROOM
B128
CORRIDOR
B106
CORRIDOR
B101
GYMNASIUM
B121
RAMP
B122
PLATFORM
B123
STAIR
B124
OFFICE
B108
OFFICE
B107
TOILET
B109
TEACHER LOUNGE/WORK AREA
B110
CORRIDOR
B112
VESTIBULE
B127
MUSIC
B125
WOMENS TOILET
B135
MENS TOILET
B136
OFFICE
B138
OFFICE
A132
CORRIDOR
B134
CLASSROOM
B102
CLASSROOM
B104
CLASSROOM
B103
STORAGE
B140
VUV-20.08
VUV-20.09
VUV-20.07
VUV-20.06
VUV-20.05
WG/PC
WG/PC
PC
WL WL
EHD EHD
EHD EHD
WB1
48"
WB1
48"
WB1
48"
CORD REEL CORD REEL
CORD REEL CORD REEL
CLG CLG
CLG CLG
GFCI
44"
GFCI
44"
GFCI
44"
GFCI
44"
E7.01
8 SIM
E7.01
8 SIM
E7.01
8 SIM
E7.01
8 SIM
E7.01
8 SIM
EF-20.3
ON ROOF
44"
GFCI
44"
GFCI
44"
44"
44"
E7.01 8
44" 44"
44"
44"
44"
44" 44"
44"
GFCI
B-20.1
B-20.2
NEMA 4
JUNCTION BOX
P08
P08
P08
P08
P08
44"
44"
C09
E7.01
8 SIM
P08
DWH DWH
RP-1
GFT-20.1
WFP-20.1
PANEL 'DP2'
SWBD. 'MSB'
EF-20.2
ON ROOF
PANEL 'DP2'
UH-20.1
GFT-20.2
BE-18
BE-20
BE-24
BE-27
PANEL 'DP2'
PANEL 'DP2'
PANEL 'DP2'
BE-29
BE-31
BE-33
BMS/ATC PANEL(S)
E7.01
44"
AE-16 AE-18
AE-20 AE-22
GFCI
44"
AE-14
AE-12
AE-11
AE-7
AE-10
AE-9
AE-8
AE-5
AE-6
AE-3
AE-4 AE-1
BE-28
BF-28
BF-30
GFCI
GFCI
BF-33
BF-36
BF-12
BF-11
BF-6
BF-9
BF-7
BF-8
BF-4
BF-10
BF-2
BF-26
INSTALL FEEDER SPLICE IN 30"W X 48"L X 36"D
UNDERGROUND JUNCTION BOX PER SECTION
26 05 34 (COVER LOGO "ELECTRIC"), JOIN
CONDUCTORS WITH WATERPROOF LUG-TYPE
CONNECTORS. VERIFY EXACT J.B. SIZE WITH
NEC RULES AND FIELD-VERIFIED CONDITIONS.
SAWCUT EX. CONCRETE PAD AND SLAB AS
REQ'D FOR CONDUIT INSTALLATION, BACKFILL
AND COMPACT SOILS, PATCH PAD/SLAB IN
MECH. ENCLOSURE TO INFILL ANY REMAINING
OPENINGS, THICKNESS TO MATCH EXISTING
NEW U.G. FEEDER CONDUITS FROM SWBD. 'MSB'
DRILLED THROUGH ENCLOSURE WALL FOUNDATION;
REFER TO SHEET ES2.01 FOR PLAN CONTINUATION
AND SHEET E4.02 FOR SIZE/QUANTITY
ELEVATE CHILLER FEEDER CONDUIT ABOVE
CONCRETE SLAB/PAD INSIDE MECH. ENCLOSURE
W/ SUITABLE HARDWARE PER SECTION 26 05 29
EX. U.G. CONDUITS TO PANEL 'DP1',
RE-PURPOSED FROM SERVICE
CONDUCTORS TO FEEDER
CONDUCTORS; REFER TO SHEET
E4.02 FOR SIZE/QUANTITY
BE-22
RP1-38
P15
28" 28"
AE-13
SBB
C02
C02 C03
P04
P04
P04
P04
PLUMB. FIXTURE PSU
ABOVE CLG.
PLUMB. FIXTURE PSU
ABOVE CLG.
PLUMB. FIXTURE PSU
ABOVE CLG.
PLUMB. FIXTURE PSU
ABOVE CLG.
GFCI P01
C11
C11
CLOSET
B132A
MECH. MEZZANINE
B201
EX. AHU-201
EX. AHU-203
EX. AHU-204
EX. AHU-202 P-20.4P-20.3
EX. PANEL
'DP1'
EX. PANEL
'DP1'
WFP-20.2
EX. PANEL
'DP1'
UNIT A
UNIT C
UNIT B
UNIT D
ADDITIONEXISTING
NORTH KEYPLAN
PROJECT NO.
DRAWN
REVIEWED
No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission of
GMB Copyright 2019 All Rights Reserved c
ISSUANCES
616.796.0200 www.gmb.com
C
L o ca l
P ro je ct s\
-4
E
C E
N T
R A
L
M at tk .r v t
/6
/2
:2
:3
E2.1B
5-4740
UNIT 'B' POWER PLAN
MCK
RDG
W E
B B
E R
E L
E M
E N
T A
R Y
S
IT
E A
N D
B U
IL
D
IN
G
I M
P R
O V
E M
E N
T S
L A
K E
O R
IO
N
C O
M M
U N
IT
Y
S C
H O
O L
S
L A
K E
O R
IO
N
M
IC
H
IG
C02 (2) 12.6 SQ. IN. CABLE PATHWAY PENETRATION DEVICE (FIRE)
PER SECTION 27 05 28
C03 (2) 4" CONDUIT SLEEVES FOR DIV. 27 COMMUNICATIONS
CABLING
C09 PROTECT EX. COMMUNICATIONS EQUIPMENT, RACKS, AND
ASSOCIATED CABLING FROM THE INGRESS OF DUST AND
DEBRIS DURING CONSTRUCTION PERIOD. COORDINATE ANY
REQUIRED TEMPORARY DISCONNECTION OF POWER OR
COMMUNICATIONS CABLING WITH THE OWNER AND
CONSTRUCTION MANAGER.
C11 PROVIDE RETROFIT/SPLIT CABLE PATHWAY PENETRATION
DEVICES (FIRE-RATED) PER SECTION 27 05 28 AS NECESSARY
TO SLEEVE ALL EXISTING AND NEW CABLING THROUGH NEW
FIRE BARRIER WALL, PLUS LEAVE 25% FREE AREA FOR
FUTURE CABLING. DEVICES SHALL BE MINIMUM OF (2) 6 SQ.
IN. / 2" DIA. FREE AREA SIZE. FIELD-VERIFY EX. CONDITIONS
AND ADJUST LOCATIONS/QUANTITY AS NECESSARY.
P01 RECONNECT NEW RECEPTACLE TO EXISTING BRANCH
CIRCUIT AS PRESENT AT EX. OUTLET BOX.
P04 DUAL-CHANNEL (POWER & COMMUNICATIONS) SURFACE
RACEWAY SYSTEM AS SPECIFIED, CONTINUOUS RUN WITH
SINGLE VERTICAL DROP FROM ACCESSIBLE CEILING SPACE
AND ACTIVATIONS/FITTINGS AS INDICATED.
P08 RECONNECT NEW RECEPTACLE TO EXISTING BRANCH
CIRCUIT AS EXTENDED FROM FORMER TELEVISION OR VIDEO
PROJECTOR LOCATION (REFER TO DEMOLITION PLAN).
MODIFY CONDUIT/RACEWAYS AND CONDUCTORS AS REQ'D.
P15 MOUNT CORD REELS TO STRUCTURE ABOVE SUSPENDED
CEILING SUCH THAT REELS ARE ACCESSIBLE AND CORDS
DROP DOWN THROUGH AND ARE CENTERED IN THE GAP
BETWEEN CEILING ELEMENTS. ADJUST CORD STOP SUCH
THAT RETRACTED HEIGHT OF BOX IS 8'-0" AFF.
NORTH 1/8" = 1'-0"
UNIT 'B' POWER PLAN
NORTH 1/8" = 1'-0"
GYM MECH. MEZZ. POWER PLAN
01.22.2020BIDS &
CONSTRUCTION
02.06.2020ADDENDUM 001
04.21.2020BULLETIN 003
05.07.2020BULLETIN 004
T
T
T
T
T
T
D
D
D D
S
D
D
D
D
D2
D
D2
D
D D
D
D
D
D
2A D
W
2D
D
D
W
W
D
2A
2A D
W
2D
W2D
D
W2D 2D
W
2A D
A
D D
D
D
W
W
W W
D
2A
D
D
A
2A
2A
MDF
D
Strobe
S
S
S
S
S S
S
SSS
S
S
S
S
S
W W
W
W
W
W
W
W
Strobe
Prepared by Plante Moran Legend:
Interactive Flat Panel
General Data (1 drop per triangle unless noted)
PA – PA Buttons
Wireless AP
AV Cabling (IFP or Audio Ehancement Box)
Clock
PA Speaker
Digital Clock (see note below)
Dual-sided Digital Clock (see note below)
Audio Enhancement/PA (4 equally spaced speakers)
Teacher location
S
D
D2
T
D
P
W
A
C
BF
BF
BF
BF
BF
B F
B F
BF
B F
B F
B F
BF
BF
BF
B F
B F
B F
B F
BF
BF
F A
C P
F F
M
M
M
M
S S
S
TS
TS
AV
A V
AV
AV
AV
AV AV
AV
AV
A V
AV
FB
AV
F
FB1
FB1
FB1
FB1
A V
AV
1/8
1/6
1/10
1/6
1/20
1/15
1/15
TS
FS
1. REFER TO ELECTRICAL GENERAL NOTES ON SHEET E0.01.
2. REFER TO CODE COMPLIANCE PLAN FOR LOCATIONS AND RATINGS OF
VERTICAL AND HORIZONTAL BUILDING ASSEMBLIES. PROVIDE APPROPRIATE
FIRESTOPPING SYSTEMS PER SPECIFICATIONS TO MEET ALL APPLICABLE
CODES.
3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF SMOKE DAMPERS AND
COMBINATION FIRE/SMOKE DAMPERS. E.C. SHALL PROVIDE 120VAC POWER
FROM DEDICATED 20A/1P BRANCH CIRCUIT (WITH BREAKER LOCKING
MECHANISM) IN LOCAL PANELBOARD FOR DAMPER(S) IN EACH AREA (DAMPERS
MAY BE GROUPED ON EACH CIRCUIT), TERMINATED W/ BOX-COVER FUSIBLE
SWITCH AT EACH DAMPER. ALSO PROVIDE FIRE ALARM DUCT SMOKE
DETECTOR WITHIN 5 FEET OF EACH DAMPER (UNLESS COVERED BY ANOTHER
DUCT DETECTOR WITHIN 5 FEET) AND A FIRE ALARM ADDRESSABLE RELAY FOR
INTERLOCKING DAMPER W/ CORRESPONDING HVAC UNIT PER CODE
REQUIREMENTS.
4. PROVIDE BOX-COVER FUSIBLE DISCONNECT SWITCH (ON BUILDING INTERIOR IN
ACCESSIBLE LOCATION) FOR EACH SMALL (< 1/2 HP) MECHANICAL AND/OR
PLUMBING EQUIPMENT MOTOR LOAD WHERE MORE THAN ONE UNIT IS
CONNECTED TO A COMMON BRANCH CIRCUIT. TYPICAL EQUIPMENT TYPES
INCLUDE BUT ARE NOT LIMITED TO CABINET HEATERS, DAMPERS, EXHAUST
FANS, FAN COIL UNITS, PUMPS, UNIT HEATERS, VAV BOXES, ETC.
5. COORDINATE THE INSTALLATION AND ROUGH-IN REQUIREMENTS (BOXES,
CONDUIT, ETC. IN WALLS AND CEILINGS) FOR THE FOLLOWING SYSTEMS WITH
COMMUNICATIONS AND ELECTRONIC SAFETY/SECURITY CONTRACTORS
ENGAGED VIA SEPARATE BID PACKAGE(S) (NOT IN THIS CONTRACT), INCLUDING
BUT NOT LIMITED TO:
A. NETWORK CABLING SYSTEMS
B. NETWORK ELECTRONICS (SWITCHES, ACCESS POINTS, ETC.)
C. TELEPHONE SYSTEMS
D. INSTRUCTIONAL TECHNOLOGY EQUIPMENT
E. AUDIO-VIDEO SYSTEMS AND EQUIPMENT
F. INTERIOR DIGITAL SIGNAGE SYSTEM AND DISPLAYS
G. INTERCOM/PAGING SYSTEM
H. DISTRIBUTED CLOCK SYSTEM
I. ACCESS CONTROL SYSTEM
J. VIDEO SURVEILLANCE SYSTEM
6. REVIEW ALL OTHER DISCIPLINE PLANS FOR AREAS WHERE REMOVAL AND
REINSTALLATION OF EXISTING CEILINGS WILL BE REQUIRED TO ACCOMMODATE
THE DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AND STRUCTURE.
A. PROVIDE TEMPORARY SUPPORT, RELOCATION, OR REMOVAL OF ALL
EXISTING ELECTRICAL AND ELECTRONIC SAFETY/SECURITY ITEMS
MOUNTED ON OR IN CEILINGS. REINSTALL THE SAME ITEMS TO MATCH
EXISTING CONDITIONS WHEN CEILING IS REINSTALLED.
B. COORDINATE WITH OTHER TRADES TO MODIFY ANY ITEMS ABOVE CEILINGS
AS REQUIRED TO ACCOMMODATE INSTALLATIONS, INCLUDING BUT NOT
LIMITED TO CONDUIT, JUNCTION BOXES, CABLE PATHWAYS, ETC.
C. FIELD-VERIFY EXTENT OF WORK REQUIRED; NOT ALL ITEMS ARE SHOWN
ON DRAWINGS.
D. COORDINATE WITH CONSTRUCTION MANAGER'S DIRECTIVES.
POWER GENERAL NOTES
PANEL 'CA'
SWBD. 'MSB'
XFMR 'T-C1'
PANEL 'DPC'
NEW 480V UTILITY
XFMR
OFFICE
A122
OFFICE
A123
CLASSROOM
C125
CLASSROOM
C121
STORAGE
C122
TOILET
C116
VESTIBULE
A118
MEDIA PRODUCTIONS
C102
TOILET
C123
STORAGE
C115
CLASSROOM
D119
JAN.
C118
VESTIBULE
C126
ELECTRICAL
C127
BREAKOUT
C106
STORAGE
C105
TOILET
C124 WOMENS TOILET
C119
MENS TOILET
C117
STORAGE
C120
HALL
D101
CLASSROOM
D102
STORAGE
C108
TOILET
C109
STAFF TOILET
C110
TELECOMM
C114
STORAGE
C113
BREAKOUT
C112
MEDIA CENTER
C103
OFFICE
C104
MECHANICAL
A119
CLASSROOM
A120
HALL
C101
CORRIDOR
A121
CLASSROOM
A124
EXTENDED LEARNING AREA
C111
CLASSROOM
C107
HALL
C128
VUV-20.10 VUV-20.11
VUV-20.12
VUV-20.04
VUV-20.03
EHD
EHD EHD
EHD
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
GFCI
44"
GFCI
GFCI
GFCI
44"
EWC
GFCI
GFCI
GFCI
GFCI
WL
GFCI
E7.01
E7.01
8 SIM
WL
CUH-20.4
EF-20.4
ON ROOF
EF-20.5
ON ROOF
EF-20.6
ON ROOF
UH-20.2
GFCI
WL
GFCI
WL
GFCI
WL
GFCI
WL
GFCI
12"x4" CABLE TRAY
"x
C A
B L
E T
R A
Y
"x
4" C
A B
L E
T R
Y
12"x4" CABLE TRAY
12"x4" CABLE TRAY
"x
C
A B
L E
T R
8"x2" CABLE TRAY
8"x2" CABLE TRAY
P08
P08
COMM. EQUIP.
RACK(S), N.I.C.
P05
P05
P05
P05
P05
P05
P05
P05
E7.01
TYP.
E7.01
TYP.
E7.01
TYP.
EF-20.9
ON ROOF
EF-20.11
ON ROOF
C05
C05
BC-22
BC-24
BC-34
BC-36
BC-37
CA-39
CA-37
CA-14
CA-13
CA-18
CA-20
CA-26
CA-21
CA-19
CA-16
CA-17
CA-15
CA-38
CA-36
CA-35
CA-32
CA-30
CA-34
CA-1 CA-2
CA-31
CA-28
CA-29 CB-36
CB-37
CB-38
CB-35
CB-33
CB-32
CB-34
CB-1
CB-19
CB-16
CB-17
CB-25
CB-14
CB-15
CB-13
CA-27
CA-25
CA-24
CA-23
CA-22
CA-33
CA-12
CA-3
CB-2
CB-18
SBB
PBB
C06
C03 C10
C10
C10
C10
C03
C10
C08
E7.01
P06
P07
P12
PLUMB. FIXTURE PSU
ABOVE CLG.
PLUMB. FIXTURE PSU
ABOVE CLG.
PLUMB. FIXTURE PSU
ABOVE CLG.
PLUMB. FIXTURE PSU
ABOVE CLG.
C06
UNIT A
UNIT C
UNIT B
UNIT D
ADDITIONEXISTING
NORTH KEYPLAN
PROJECT NO.
DRAWN
REVIEWED
No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission of
GMB Copyright 2019 All Rights Reserved c
ISSUANCES
616.796.0200 www.gmb.com
C
L o ca l
P ro je ct s\
-4
E
C E
N T
R A
L
M at tk .r v t
/2
/2
:1
:0
UNIT 'C' POWER PLAN
MCK
RDG
W E
B B
E R
E L
E M
E N
T A
R Y
S
IT
E A
N D
B U
IL
D
IN
G
I M
P R
O V
E M
E N
T S
L A
K E
O R
IO
N
C O
M M
U N
IT
Y
S C
H O
O L
S
L A
K E
O R
IO
N
M
IC
H
IG
C03 (2) 4" CONDUIT SLEEVES FOR DIV. 27 COMMUNICATIONS
CABLING
C05 (2) 6 SQ. IN. CABLE PATHWAY PENETRATION DEVICE (FIRE)
PER SECTION 27 05 28
C06 (3) 13 SQ. IN. CABLE PATHWAY PENETRATION DEVICE (SMOKE)
PER SECTION 27 05 28
C08 (2) 6.7 SQ. IN. CABLE PATHWAY PENETRATION DEVICE
(SMOKE) PER SECTION 27 05 28
C10 (3) 4" CONDUIT SLEEVES FOR DIV. 27 COMMUNICATIONS
CABLING
P05 UNDERGROUND CONDUITS FOR FLOOR BOX(ES), ROUTED
OVER TO AND UP NEW WALL TO ABOVE ACCESSIBLE
SUSPENDED CEILING SPACE. COORDINATE CONCRETE
FLOOR CUTTING AND PATCHING W/ ARCH. TRADES.
P06 ESTABLISH NEW CONCRETE-ENCASED GROUNDING
ELECTRODE IN FOOTING OF NEW ADDITION, INTERCONNECT
WITH GROUNDING ELECTRODE SYSTEM AT SERVICE
ENTRANCE OR NEAREST SEPARATELY-DERIVED SYSTEM PER
NEC AND SPECIFICATION REQUIREMENTS.
P07 BOND METAL STRUCTURE OF ADDITION TO METAL
STRUCTURE OF EXISTING BUILDING PER NEC REQUIREMENTS.
P08 RECONNECT NEW RECEPTACLE TO EXISTING BRANCH
CIRCUIT AS EXTENDED FROM FORMER TELEVISION OR VIDEO
PROJECTOR LOCATION (REFER TO DEMOLITION PLAN).
MODIFY CONDUIT/RACEWAYS AND CONDUCTORS AS REQ'D.
P12 COORDINATE COMMUNICATIONS CONNECTIONS REQUIRED
FOR MONITORING AND NETWORK ADMINISTRATION OF
ELECTRONIC SAFETY/SECURITY EQUIPMENT WITH OWNER,
OWNER'S MONITORING SERVICE PROVIDER(S), AND OWNER'S
COMMUNICATIONS CONTRACTOR. ALL CONNECTIONS SHALL
BE PROTECTED FROM TAMPERING AND ACCIDENTAL
DISCONNECTION.
NORTH 1/8" = 1'-0"
UNIT 'C' POWER PLAN
01.22.2020BIDS &
CONSTRUCTION
02.06.2020ADDENDUM 001
04.21.2020BULLETIN 003
T T
T
D2
D D
D
D
D
D
D
D
D
D D
2D D
2D
D
D
D
D
D
W
W
W
W
W
W
D
D
W
W
S
S
S
S
55" LCD
Prepared by Plante Moran Legend:
Interactive Flat Panel
General Data (1 drop per triangle unless noted)
PA – PA Buttons
Wireless AP
AV Cabling (IFP or Audio Ehancement Box)
Clock
PA Speaker
Digital Clock (see note below)
Dual-sided Digital Clock (see note below)
Audio Enhancement/PA (4 equally spaced speakers)
Teacher location
S
D
D2
T
D
P
W
A
C
BFBF
B F
B F
BF
B F
B F
BF
B F
BF
C
C R
AV
AV
A V
A V
A V
A V
A V
AV
AV
AV
A V
A V
FB
A V
A V
AV
AV
FB1
FB1
FB1
FB1
A V
1/8
1/15
1/15
1/15
AV
AV
F
F
D
D
1/2 1/20
1. REFER TO ELECTRICAL GENERAL NOTES ON SHEET E0.01.
2. REFER TO CODE COMPLIANCE PLAN FOR LOCATIONS AND RATINGS OF
VERTICAL AND HORIZONTAL BUILDING ASSEMBLIES. PROVIDE APPROPRIATE
FIRESTOPPING SYSTEMS PER SPECIFICATIONS TO MEET ALL APPLICABLE
CODES.
3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF SMOKE DAMPERS AND
COMBINATION FIRE/SMOKE DAMPERS. E.C. SHALL PROVIDE 120VAC POWER
FROM DEDICATED 20A/1P BRANCH CIRCUIT (WITH BREAKER LOCKING
MECHANISM) IN LOCAL PANELBOARD FOR DAMPER(S) IN EACH AREA (DAMPERS
MAY BE GROUPED ON EACH CIRCUIT), TERMINATED W/ BOX-COVER FUSIBLE
SWITCH AT EACH DAMPER. ALSO PROVIDE FIRE ALARM DUCT SMOKE
DETECTOR WITHIN 5 FEET OF EACH DAMPER (UNLESS COVERED BY ANOTHER
DUCT DETECTOR WITHIN 5 FEET) AND A FIRE ALARM ADDRESSABLE RELAY FOR
INTERLOCKING DAMPER W/ CORRESPONDING HVAC UNIT PER CODE
REQUIREMENTS.
4. PROVIDE BOX-COVER FUSIBLE DISCONNECT SWITCH (ON BUILDING INTERIOR IN
ACCESSIBLE LOCATION) FOR EACH SMALL (< 1/2 HP) MECHANICAL AND/OR
PLUMBING EQUIPMENT MOTOR LOAD WHERE MORE THAN ONE UNIT IS
CONNECTED TO A COMMON BRANCH CIRCUIT. TYPICAL EQUIPMENT TYPES
INCLUDE BUT ARE NOT LIMITED TO CABINET HEATERS, DAMPERS, EXHAUST
FANS, FAN COIL UNITS, PUMPS, UNIT HEATERS, VAV BOXES, ETC.
5. COORDINATE THE INSTALLATION AND ROUGH-IN REQUIREMENTS (BOXES,
CONDUIT, ETC. IN WALLS AND CEILINGS) FOR THE FOLLOWING SYSTEMS WITH
COMMUNICATIONS AND ELECTRONIC SAFETY/SECURITY CONTRACTORS
ENGAGED VIA SEPARATE BID PACKAGE(S) (NOT IN THIS CONTRACT), INCLUDING
BUT NOT LIMITED TO:
A. NETWORK CABLING SYSTEMS
B. NETWORK ELECTRONICS (SWITCHES, ACCESS POINTS, ETC.)
C. TELEPHONE SYSTEMS
D. INSTRUCTIONAL TECHNOLOGY EQUIPMENT
E. AUDIO-VIDEO SYSTEMS AND EQUIPMENT
F. INTERIOR DIGITAL SIGNAGE SYSTEM AND DISPLAYS
G. INTERCOM/PAGING SYSTEM
H. DISTRIBUTED CLOCK SYSTEM
I. ACCESS CONTROL SYSTEM
J. VIDEO SURVEILLANCE SYSTEM
6. REVIEW ALL OTHER DISCIPLINE PLANS FOR AREAS WHERE REMOVAL AND
REINSTALLATION OF EXISTING CEILINGS WILL BE REQUIRED TO ACCOMMODATE
THE DEMOLITION AND INSTALLATION OF DUCTWORK, PIPING, AND STRUCTURE.
A. PROVIDE TEMPORARY SUPPORT, RELOCATION, OR REMOVAL OF ALL
EXISTING ELECTRICAL AND ELECTRONIC SAFETY/SECURITY ITEMS
MOUNTED ON OR IN CEILINGS. REINSTALL THE SAME ITEMS TO MATCH
EXISTING CONDITIONS WHEN CEILING IS REINSTALLED.
B. COORDINATE WITH OTHER TRADES TO MODIFY ANY ITEMS ABOVE CEILINGS
AS REQUIRED TO ACCOMMODATE INSTALLATIONS, INCLUDING BUT NOT
LIMITED TO CONDUIT, JUNCTION BOXES, CABLE PATHWAYS, ETC.
C. FIELD-VERIFY EXTENT OF WORK REQUIRED; NOT ALL ITEMS ARE SHOWN
ON DRAWINGS.
D. COORDINATE WITH CONSTRUCTION MANAGER'S DIRECTIVES.
POWER GENERAL NOTES
PANEL 'CB'
PANEL 'CC'
XFMR 'T-C2'
CLASSROOM
D117
TOILET
C116
CLASSROOM
D113
CLASSROOM
D106
CLASSROOM
D107
STORAGE
D115
BREAKOUT
D118
COPY
D111
ELECTRICAL
D112
HALL
D109
VESTIBULE
D108
STORAGE
C115
CLASSROOM
D119
JAN.
C118
MENS TOILET
C117
STORAGE
C120
JAN.
D116
HALL
D101
CLASSROOM
D102
CLASSROOM
D103
CLASSROOM
D104
CLASSROOM
D105
TELECOMM
C114
STORAGE
C113
BREAKOUT
C112
EXTENDED LEARNING AREA
D114
CLASSROOM
D110
EXTENDED LEARNING AREA
C111
VUV-20.13
VUV-20.14
VUV-20.15
VUV-20.16
VUV-20.22
VUV-20.20
VUV-20.19
VUV-20.18
VUV-20.17
EHD
EHD
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
WB1
48"
GFCI
44"
GFCI
GFCI
44"
VUV-20.21
GFCI
44"
EWC
EWC
GFCI
GFCI
WL
GFCI
WL
GFCI
WL
GFCI
WL
GFCI
44"
44"
44"
44"
CUH-20.5
EF-20.7
ON ROOF
EF-20.8
ON ROOF
WL
GFCI
"x
4" C
A B
L E
T R
8"x4" C
ABLE TRAY
12"x4" C A
B L
E T
R
12"x4" C
B L
E T
R
B L
E T
R
B L
E T
R
12"x4" CABLE TRAY
12"x4" CABLE TRAY
COMM. EQUIP.
RACK(S), N.I.C.
44"
44"
P05
P05
P05
P05
P05
E7.01
TYP.
E7.01
TYP.
E7.01
TYP.
EF-20.11
ON ROOF
CB-36
CB-37
CB-38
CB-35
CB-33
CB-32
CB-34
CB-1
CB-19
CB-16
CB-17
CB-25
CB-14
CB-15
CB-13
CB-21
CB-22
CB-20
CB-3
CB-4 CB-23
CB-24
CB-42
CB-43
CB-5
CC-3
CC-13
CC-12
CC-14
CC-15
CC-17
CC-16
CC-4
CC-5
CC-19
CC-20
CC-18
CC-21
CC-22
CC-2
CC-24
CC-23
CC-26
CC-27
CC-28
CC-25
CC-31
CC-1
CC-30
CC-29
CC-32
CC-33
CB-27
CB-28
CB-25
CB-26
CB-29
CB-31
CB-2
CB-30
CB-44
CB-18
SBB
C10
C10
C10
C03
C03
C10
C10
C10
PLUMB. FIXTURE PSU
ABOVE CLG.
BASEMENT
D001
WL
GFCI
AHU-20.2 SUPPLY
AHU-20.2 EXHAUST
EF-20.10
UH-20.3
AHU LTS &
RECEPTS
SWBD. 'MSB'
CB-41
CB-39
CB-40
UNIT A
UNIT C
UNIT B
UNIT D
ADDITIONEXISTING
NORTH KEYPLAN
PROJECT NO.
DRAWN
REVIEWED
No part of this drawing may be used or reproduced in any form or by any means, or stored in a database or retrieval system, without prior written permission of
GMB Copyright 2019 All Rights Reserved c
ISSUANCES
616.796.0200 www.gmb.com
C
L o ca l
P ro je ct s\
-4
E
C E
N T
R A
L
M at tk .r v t
/2
/2
:1
:2
E2.1D
UNIT 'D' POWER PLAN
MCK
RDG
W E
B B
E R
E L
E M
E N
T A
R Y
S
IT
E A
N D
B U
IL
D
IN
G
I M
P R
O V
E M
E N
T S
L A
K E
O R
IO
N
C O
M M
U N
IT
Y
S C
H O
O L
S
L A
K E
O R
IO
N
M
IC
H
IG
C03 (2) 4" CONDUIT SLEEVES FOR DIV. 27 COMMUNICATIONS
CABLING
C10 (3) 4" CONDUIT SLEEVES FOR DIV. 27 COMMUNICATIONS
CABLING
P05 UNDERGROUND CONDUITS FOR FLOOR BOX(ES), ROUTED
OVER TO AND UP NEW WALL TO ABOVE ACCESSIBLE
SUSPENDED CEILING SPACE. COORDINATE CONCRETE
FLOOR CUTTING AND PATCHING W/ ARCH. TRADES.
NORTH 1/8" = 1'-0"
UNIT 'D' POWER PLAN
NORTH 1/8" = 1'-0"
BASEMENT POWER PLAN
01.22.2020BIDS &
CONSTRUCTION
02.06.2020ADDENDUM 001
04.21.2020BULLETIN 003
S
W
W
S
S
Early Childhood Center - Technology
Prepared by Plante Moran
Legend:
Interactive Flat Panel
General Data
PA – PA Buttons
Wireless AP
AV Cabling (IFP or Audio Enhancement Box)
Clock
PA Speaker
Digital Clock
Dual-sided Digital Clock
Audio Enhancement/PA
Teacher location
S
D
D2
T
D
P
W
A
C
BF
B F
B F
B F
B F
B F
B F
B F
BF
ATS
F
C P
T
ATS
X
X
24X 42 24X 36
24X 48
X
X
24X 42
X
24X 48
D
TS TS
7.5 7.5
F
S S
S
F
AV
AV
A
AV
A V
AV
A V
A V
A V
A V
A V
AV
A V
AV
A V
A V
AV
AV
AV
A V
A V
AV
AV
A V
A V
A
F
AV
S
S
S S
S
S
S
C
S
S
S
S
S
S
S
S
CR
C R
CR CR
D D D
S
ID
S
1/4
1/8
1/2
1/10
1/4
1/8
1/20
IC
K P
E
1.5
TSTS
FS
CR
C R
C R
1/12
FS FS
1.5
1/20
A V -S1
A V -S1
A V -S1
A V -S1
A V -S1
A V -S1
A V -S1
A V -S1
A V -D
A V -C1
A V -W
AV-W2
A V -C
C R
CR
D
D
D
D
D
D
R
R
R
AV
A V
A V
AVAV
S
S
CR
S
BF
X
X
24X42 24X36
24X48
X
X
24X42
X
24X48
K
C1
C
C1
IC
1. REFER TO ELECTRICAL GENERAL NOTES ON SHEET E0.01.
2. REFER TO CODE COMPLIANCE PLAN FOR LOCATIONS AND RATINGS OF
VERTICAL AND HORIZONTAL BUILDING ASSEMBLIES. PROVIDE APPROPRIATE
FIRESTOPPING SYSTEMS PER SPECIFICATIONS TO MEET ALL APPLICABLE
CODES.
3. REFER TO MECHANICAL DRAWINGS FOR LOCATIONS OF SMOKE DAMPERS AND
COMBINATION FIRE/SMOKE DAMPERS. E.C. SHALL PROVIDE 120VAC POWER
FROM DEDICATED 20A/1P BRANCH CIRCUIT (WITH BREAKER LOCKING
MECHANISM) IN LOCAL PANELBOARD FOR DAMPER(S) IN EACH AREA (DAMPERS
MAY BE GROUPED ON EACH CIRCUIT), TERMINATED W/ BOX-COVER FUSIBLE
SWITCH AT EACH DAMPER. ALSO PROVIDE FIRE ALARM DUCT SMOKE
DETECTOR WITHIN 5 FEET OF EACH DAMPER (UNLESS COVERED BY ANOTHER
DUCT DETECTOR WITHIN 5 FEET) AND A FIRE ALARM ADDRESSABLE RELAY FOR
INTERLOCKING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .