About this file

This document includes cross-section plans and specifications for a federal highway construction project. The solicitation is for the Idaho Department of Transportation Project T 33(1) Idaho Teton Centennial Trail and Wyoming Department of Transportation Project 22(1) Wyoming Teton Pass Centennial Trail. The Federal Highway Administration Western Federal Lands Highway Division is the contracting agency. The cross-section plans provide elevation details and slope ratios for segments of the trail between stations 500+00.00 and 500+49.85. Specifications include the project numbers, sheet identification, and file information.

View the file

Other files

File Type Posted
BidSum.pdf PDF
Sign in sheet.pdf PDF
QA_11-16-2020.pdf PDF
Amendment A002.pdf PDF
QA_11-12-2020.pdf PDF
Amendment A001.pdf PDF
Proposed_Terrain 1 through 16.zip ZIP file
Physical Data files.zip ZIP file
QA_11-05-2020.pdf PDF
QA_11-03-2020.pdf PDF
QA_10-30-2020.pdf PDF
Compiled TCT WY SWPPP for physical folder.pdf PDF
Existing Moose Creek Bridge Plans - 1929.pdf PDF
Line_F_XS.pdf PDF
Alignment Data.pdf PDF
Brand Name Equal Natina-Permeon.pdf PDF
ID DOT T 33(1)_PlanSet.pdf PDF
Line_B_XS.pdf PDF
Line_C_XS.pdf PDF
IFB Idaho Teton.pdf PDF
Line_I_XS.pdf PDF
Brand Name Equal Nyoplast.pdf PDF
Line_E_XS.pdf PDF
Line_D_XS.pdf PDF
Line_A_XS.pdf PDF
Report Geotech.pdf PDF
Compiled TCT ID SWPPP for physical folder.pdf PDF
Line_G_XS.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE H CROSS-SECTIONS

500+00.00 to 500+49.85 for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

ID DOT T 33(1), Idaho Teton Centennial Trail and

WY DOT 22(1), Wyoming Teton Pass Centennial Trail

500+00.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

6,480 6,480

6,490 6,490

6488.34EL

'43.90OFF

6489.76EL

'34.63OFF

6488.85EL

'-38.71OFF

6487.71EL

'-46.01OFF

6490.02EL

'-28.84OFF

6490.71EL

'27.45OFF

1:6.4

1:6.1

6 -1.8% +0.1%+0.1% 1:7.59

1:6.48

500+25.00

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

6,480 6,480

6,490 6,490

6491.12EL

'12.48OFF

6489.56EL

'9.38OFF

6488.82EL

'-21.35OFF

6488.86EL

'-21.57OFF

6488.06EL

'-42.13OFF

6488.14EL

'-42.87OFF

6490.11EL

'-14.32OFF

6490.52EL

'6.50OFF

1:4.

5 1:

21:3

500+49.85

-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70

6,480 6,480

6,490 6,490

6,500 6,500

6492.28EL

'11.41OFF

6491.28EL

'9.40OFF

6491.07EL

'-9.60OFF

6491.59EL

'-10.65OFF

6492.11EL

'-5.50OFF 6492.24EL

'6.50OFF

See Alignment B

1:3

1:3 1:

)500+00.00 [SHEET]X-SECTIONS (

FHWA, Office of Federal Lands Highway

:0

A

M

O c to b e r

.0

S h e e t] c p w w o r k \d

\L in e H

X S

.d g n

DOT T 33(1) / DOT 22(1) 500+00.00

STATE PROJECT

NUMBER

SHEET

ID/WY

Line H XS

File details come from the government source that posted it. Updated .