QA_11-05-2020.pdf
PDF 101 KB Posted
- Attached to
- ID DOT T 33(1), IDAHO TETON CENTENNIAL TRAIL & WY DOT 22(1) WYOMING TETON PASS CENTENNIAL TRAIL
- Solicitation number
- 69056720B000017
About this file
This document contains questions and answers related to solicitation number 69056720B000017 for the Idaho Teton Centennial Trail and Wyoming Teton Pass Centennial Trail project being carried out by the Department of Transportation Federal Highway Administration. The project involves construction work along existing sections of the Old Jackson road and existing trail sections. Questions address issues such as how to obtain bid documents, who to direct technical and general questions to, whether excavation may encounter rock, clarification regarding culvert extensions versus new construction, diverting water flow around an existing structure during bridge work at Moose Creek, whether in-water work is allowed, availability of flow records for Moose Creek, use of existing asphalt in embankment fill, and how to obtain the registered vendors list. Responses provide guidance on contract requirements and indicate that forthcoming amendments would address requests for CAD files and design/existing surfaces data.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum.pdf | ||
| Sign in sheet.pdf | ||
| QA_11-16-2020.pdf | ||
| Amendment A002.pdf | ||
| QA_11-12-2020.pdf | ||
| Amendment A001.pdf | ||
| Proposed_Terrain 1 through 16.zip | ZIP file | |
| Physical Data files.zip | ZIP file | |
| QA_11-03-2020.pdf | ||
| QA_10-30-2020.pdf | ||
| Compiled TCT WY SWPPP for physical folder.pdf | ||
| Existing Moose Creek Bridge Plans - 1929.pdf | ||
| Line_F_XS.pdf | ||
| Line_H_XS.pdf | ||
| Alignment Data.pdf | ||
| Brand Name Equal Natina-Permeon.pdf | ||
| ID DOT T 33(1)_PlanSet.pdf | ||
| Line_B_XS.pdf | ||
| Line_C_XS.pdf | ||
| IFB Idaho Teton.pdf | ||
| Line_I_XS.pdf | ||
| Brand Name Equal Nyoplast.pdf | ||
| Line_E_XS.pdf | ||
| Line_D_XS.pdf | ||
| Line_A_XS.pdf | ||
| Report Geotech.pdf | ||
| Compiled TCT ID SWPPP for physical folder.pdf | ||
| Line_G_XS.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID DOT T 33(1) & WY DOT 22(1)
Idaho Teton Centennial Trail & Wyoming Teton Pass Centennial Trail
# General Technical Question Answer Date
1 X
Been watching this job and saw drawing earlier this month but now I can't fine them anymore.
The Link doesn't work or something. I also see that you moved the bid date up to this next month. Can you tell me how to get the bid documents?
The preliminary documents for this project were posted at:
https://beta.sam.gov/opp/9db3d5f8b9ef44 a39ebb150f5fd41ab3/view.
Submit bids according to the solicitation and bid documents at the following link (that differs):
https://beta.sam.gov/opp/51c12aa4201b4e 47827da611b8d000d3/view.
10/26/2020
2 X I have questions regarding this project and would like to know who I need to address questions to.
You can send technical questions to wfl.plans‐spec@dot.gov and general questions to wfl.contracts@dot.gov
10/30/2020
3 X Is there an anticipation of excavation encountering Rock? If so what is the intended step forward?
See Physical Data file Report Geotech.pdf.
We do not provide intent. Determine methods of operations from the solicitation documents and bid accordingly.
11/3/2020
4 X
Please clarify that the following culverts under existing hwy 33/22 are extensions and not complete new construction:
a.) 250+58 (drawing D.23) – Plans say install 24” pipe culvert and Riprap outlet protection. This looks to be outside of the construction limits of the HWY 33 cut; and b.) 252+63 (drawing D.23) – Plans say install 24” pipe culvert and Riprap outlet protection. This looks to be outside of the construction limits of the HWY 33 cut.
We have received your question and will be providing an appropriate response.
11/3/2020
Check General or Technical
5 X
Moose Creek, can the water be diverted around the existing structure? If so, likely piping would need to be placed outside of the current clearing limits, would this be acceptable?
We have received your question and will be providing an appropriate response.
11/3/2020
6 X Is in water work allowed while working on the Moose Creek bridge?
See Section H and comply with Subsection 107.01.
11/3/2020
7 X Are there flow records for Moose Creek?
We have received your question and will be providing an appropriate response.
11/3/2020
8 X
Due to small amount of existing asphalt on current sections of Old Jackson road, as well as on existing trail sections, can this be used in the embankment fill?
No. Comply with the requirements of Subsection 203.05.
11/3/2020
9 X I am curious if there is a plan holders list for the project?
Obtain the registered vendors list (aka planholders list) for this project as follows.
Register in beta.sam and link your entity to your registration. After doing this, log into beta.sam to find the interested vendors list under this announcement. Contact the Federal Service Help Desk if you experience further issues.
11/3/2020
10 X Knifer River would like to request the CAD files, Specifically the existing and Design surfaces for the follow project.
This will be addressed under a forthcoming amendment.
11/5/2020