About this file

This document contains questions and answers related to the federal contract solicitation number 69056720B000017 for construction of the Idaho Teton Centennial Trail and Wyoming Teton Pass Centennial Trail. The solicitation involves construction work including asphalt, culverts, embankments, excavation and a bridge over Moose Creek. Questions addressed project details such as the availability of design files and survey data, the use of existing materials, in-water work restrictions, and whether registration in Idaho and Wyoming is required to bid. The agency responded that prequalification is not necessary and that excavation methods and restrictions on material use will be determined by the solicitation documents. Bids are due in November 2020 and the agency will provide responses to support bidding.

View the file

Other files

File Type Posted
BidSum.pdf PDF
Sign in sheet.pdf PDF
QA_11-16-2020.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
Proposed_Terrain 1 through 16.zip ZIP file
Physical Data files.zip ZIP file
QA_11-05-2020.pdf PDF
QA_11-03-2020.pdf PDF
QA_10-30-2020.pdf PDF
Compiled TCT WY SWPPP for physical folder.pdf PDF
Existing Moose Creek Bridge Plans - 1929.pdf PDF
Line_F_XS.pdf PDF
Line_H_XS.pdf PDF
Alignment Data.pdf PDF
Brand Name Equal Natina-Permeon.pdf PDF
ID DOT T 33(1)_PlanSet.pdf PDF
Line_B_XS.pdf PDF
Line_C_XS.pdf PDF
IFB Idaho Teton.pdf PDF
Line_I_XS.pdf PDF
Brand Name Equal Nyoplast.pdf PDF
Line_E_XS.pdf PDF
Line_D_XS.pdf PDF
Line_A_XS.pdf PDF
Report Geotech.pdf PDF
Compiled TCT ID SWPPP for physical folder.pdf PDF
Line_G_XS.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ID DOT T 33(1) & WY DOT 22(1)

Idaho Teton Centennial Trail & Wyoming Teton Pass Centennial Trail

# General Technical Question Answer Date

1 X

Been watching this job and saw drawing earlier this month but now I can't fine them anymore.

The Link doesn't work or something. I also see that you moved the bid date up to this next month. Can you tell me how to get the bid documents?

The preliminary documents for this project were posted at:

https://beta.sam.gov/opp/9db3d5f8b9ef44 a39ebb150f5fd41ab3/view.

Submit bids according to the solicitation and bid documents at the following link (that differs):

https://beta.sam.gov/opp/51c12aa4201b4e 47827da611b8d000d3/view.

10/26/2020

2 X I have questions regarding this project and would like to know who I need to address questions to.

You can send technical questions to wfl.plans‐spec@dot.gov and general questions to wfl.contracts@dot.gov

10/30/2020

3 X Is there an anticipation of excavation encountering Rock? If so what is the intended step forward?

See Physical Data file Report Geotech.pdf.

We do not provide intent. Determine methods of operations from the solicitation documents and bid accordingly.

11/3/2020

4 X

Please clarify that the following culverts under existing hwy 33/22 are extensions and not complete new construction:

a.) 250+58 (drawing D.23) – Plans say install 24” pipe culvert and Riprap outlet protection. This looks to be outside of the construction limits of the HWY 33 cut; and b.) 252+63 (drawing D.23) – Plans say install 24” pipe culvert and Riprap outlet protection. This looks to be outside of the construction limits of the HWY 33 cut.

We have received your question and will be providing an appropriate response.

11/3/2020

Check General or Technical

5 X

Moose Creek, can the water be diverted around the existing structure? If so, likely piping would need to be placed outside of the current clearing limits, would this be acceptable?

We have received your question and will be providing an appropriate response.

11/3/2020

6 X Is in water work allowed while working on the Moose Creek bridge?

See Section H and comply with Subsection 107.01.

11/3/2020

7 X Are there flow records for Moose Creek?

We have received your question and will be providing an appropriate response.

11/3/2020

8 X

Due to small amount of existing asphalt on current sections of Old Jackson road, as well as on existing trail sections, can this be used in the embankment fill?

No. Comply with the requirements of Subsection 203.05.

11/3/2020

9 X I am curious if there is a plan holders list for the project?

Obtain the registered vendors list (aka planholders list) for this project as follows.

Register in beta.sam and link your entity to your registration. After doing this, log into beta.sam to find the interested vendors list under this announcement. Contact the Federal Service Help Desk if you experience further issues.

11/3/2020

10 X Knifer River would like to request the CAD files, Specifically the existing and Design surfaces for the follow project.

This will be addressed under a forthcoming amendment.

11/5/2020

11 X

Would you be able to tell me if our company needs to be registered & pre‐qualed in Idaho & Wyoming to be able to submit a bid for the above referenced project? We are a certified Small Business in the state of Pennsylvania.

This is not a requirement. 11/12/2020