PDF 104 KB Posted
- Attached to
- LAP - Regional Traffic Management Center Facility Construction Federal Funded Project FPID: D324-034B
- Solicitation number
- PD 24-25.086
- Issued by
- Escambia County, Florida
About this file
The document is a LAP (Local Agency Program) Certification of Current Capacity form from the Florida Department of Transportation (FDOT), designed for pre-qualified contractors bidding on transportation projects. The form requires contractors to certify their current contract capacity by detailing their ongoing and awarded contracts, ensuring they have sufficient remaining capacity to undertake additional work. The form consists of two pages: a certification page and a detailed "Status of Contracts on Hand" worksheet, which requires contractors to list project details including owner, location, contract amounts, subcontracted work, and uncompleted contract amounts.
The specific form is part of the procurement process for the Regional Traffic Management Center Facility Construction project in Escambia County, Florida, with a Federal Funding Identification Number (FAIN) of D324-034B. The project involves constructing a 19,940 square foot transportation management center on a 4.23-acre site adjacent to the Escambia County Emergency Operations Center. The certification form ensures that bidding contractors have the financial and operational capacity to successfully complete the project, which includes site development, building construction, utility installations, and advanced Intelligent Transportation System (ITS) technology integration. The form is confidential under Florida Statute 337.14(1) and must be completed precisely according to the specified guidelines for contract letting dates and reporting periods.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
LAP CERTIFICATION OF CURRENT CAPACITY
525-010-46
PROGRAM MANAGEMENT
09/20
CONFIDENTIAL per Ch 337.14(1) F.S.
For bids to be received on (Letting Date)
Fill in your FDOT Vendor Number
VF
(Only applicable to FDOT pre-qualified contractors)
CERTIFICATE
I hereby certify that the amount of any proposal submitted by this bidder for the above letting does not exceed the amount of the Firm’s CURRENT CAPACITY (maximum capacity rating less total uncompleted work).
The total uncompleted work as shown on the “Status of Contracts on Hand” report (page 2) $
I further certify that the “Status of Contracts on Hand” report (page 2) was prepared as follows:
1. If the letting is before the 25th day of the month, the certificate and report reflect the uncompleted work as of the 15th day of the month, last preceding the month of the letting.
2. If the letting is after the 25th day of the month, the certificate and report reflects the uncompleted work in progress as of the 15th day of the month of the letting.
3. All new contracts (and subcontracts) awarded earlier than five days before the letting date are included in the report and charged against our total rating.
I certify that the information above is correct. NAME OF FIRM
Sworn to and subscribed this day By:
of , 20 Title
STATUS OF CONTRACTS ON HAND
525-010-46
PROGRAM MANAGEMENT
09/20
(Furnish complete information about all your contracts, whether prime or subcontracts;
whether in progress or awarded, but not yet begun; and regardless of whom contracted with.)
1 2 3 4 5 6
PROJECTS
OWNER, LOCATION AND DESCRIPTION
CONTRACT (OR
SUBCONTRACT)
AMOUNT
AMOUNT
SUBLET
TO OTHERS
BALANCE OF
CONTRACT
AMOUNT
UNCOMPLETED AMOUNT TO BE DONE
BY YOU
AS PRIME
CONTRACTOR
AS
SUBCONTRACTOR
NOTE: Columns 2 and 3 to show total contract (or subcontract) amounts. Column 4 to be difference between columns 2 and 3. Amount in columns 5 or 6 to be uncompleted portion of amount in column 4. All amounts to be shown to nearest $100. The Contractor may consolidate and list as a single item all contracts which, individually, do not exceed 3% of total, and which, in the aggregate, amount to less than 20% of the total.
TOTALS $0.00 $0.00
TOTAL UNCOMPLETED WORK ON
HAND TO BE DONE BY YOU
(TOTAL COLUMNS 5 AND 6)
$0.00