451524-1-38-01_09_ITS_S&S.pdf

PDF 4 MB Posted

Attached to
LAP - Regional Traffic Management Center Facility Construction Federal Funded Project FPID: D324-034B
Solicitation number
PD 24-25.086
Issued by
Escambia County, Florida

About this file

The provided documents are technical design and engineering drawings for the Florida-Alabama Transportation Planning Organization's (FL-AL TPO) new Regional Traffic Management Center Facility Construction project in Escambia County, Florida. The project involves constructing a 19,940 square foot modern transportation management center on a 4.23-acre site adjacent to the Escambia County Emergency Operations Center, located at 6575 North W Street in Pensacola. The design documents include detailed plans for a comprehensive facility with specialized infrastructure, featuring a complex video wall system with 60 horizontal and 24 vertical 55-inch LED monitors, server rack layouts, cable management systems, and integrated technological components for traffic management operations.

The project is federally funded with a Financial Project Identification Number (FPID) of 451524-1-58-01 and FDOT FAIN of D324-034B. The solicitation is open to general contractors licensed in Florida and registered with the Escambia County Board of Contractor Competency. The facility will include advanced Intelligent Transportation System (ITS) technology, comprehensive site development with selective tree clearing, grading, drainage structures, utilities, parking areas, roadways, and sidewalks. The building systems will encompass HVAC, fire suppression, power backup systems, security systems, and full office components designed to create a turn-key traffic management center. Escambia County encourages participation from small businesses, minority/women-owned businesses, and disadvantaged business enterprises, with bids to be submitted through the county's OpenGov Software platform.

View the file

Other files

File Type Posted
LAP_-_Regional_Traffic_Management_Center_Facility_Construction_Federal_Funded_Project_FPID:_D324-034B.pdf PDF
FDOT_Form_575-060-13_v001_Non_Collusion.pdf PDF
Agreement.ModifiedA_LAPwith_FPID_no_pg_num.pdf PDF
Agreement.ModifiedA_LAPwith_FPID.docx DOCX document
451524-1-38-01_10_TELECOMMUNICATIONS_S&S_.pdf PDF
451524-1-38-01_00_ARCHITECTURE_S&S.pdf PDF
Trench_Safety_Act_(1)_(1).pdf PDF
451524-1-38-01_11_SECURITY_S&S.pdf PDF
2025DavidBaconWages.pdf PDF
U_-_Cert_Debarment_Susupension_Ineligibilty_w37503032_v001_(1)_(1).pdf PDF
LAP_Cert_of_Capacity_w52501046_v001_(1).pdf PDF
451524-1-38-01_04_STUCTURAL_S&S_.pdf PDF
451524-1-38-01_02_CIVIL_S&S_.pdf PDF
451524-1-38-01_03_LANDSCAPE_S&S_.pdf PDF
451524-1-38-01_08___ELECTRICAL_S&S.pdf PDF
Technical_Specifications_April_1_2025.pdf PDF
American_with_Disabilities_Act_Affidavit_(2).pdf PDF
DBE_Bid_Pkg_Info_w27503011_(1).pdf PDF
451524-1-38-01_07_MECHANICAL_S&S_.pdf PDF
Federal_Contract_Provisions_(CFR_200)_With_Sign_11-1-2024_(5)_(1).pdf PDF
Cert_Disclosure_of_Lobbying_Activities_w37503033_(2).pdf PDF
451524-1-38-01_05_FIRE_PROTECTION_S&S_.pdf PDF
451524-1-38-01_06_PLUMBING_S&S_.pdf PDF
451524-1-38-01_01__GEOTECHNICAL_S&S.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

MECHANICAL

149 ELEC

UPS

FIRE

SUPPRESSION

CORRIDOR

BREAK

ROOM

CONTROL

ROOM

OFFICE

SERVER/BENCH

TEST

MEDIA

COVERAGE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

FOOD

STORAGE

1 2 3 4 5

TMC

STORAGE

CORRIDOR

136.1

CORRIDOR

1 CONTROL ROOM VIDEO WALL PLAN

FINANCIAL PROJECT IDCOUNTYROAD NO.

DWG NO.

SHEET NO.

FLORIDA-ALABAMA TPO

TH

E O F F

IC

IA

L R E C

OR

D O F T H

IS

S H E E T

IS

T H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A N D S E

AL

E D U N D E R R U

LE

1G -2 3.

4, F .A .C

HALFF ASSOCIATES, INC.

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FL 32309 NORTH W

STREET 451524-1-38-01

ITS100

CONTROL ROOM VIDEO WALL PLAN

ESCAMBIA

4'0' 8' 16'

BRYAN P. HUBBARD P.E

PE NO. 70962

No. Date Issue / Revision

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FLORIDA 32309

TEL. (850) 224-4400

Bryan Hubbard Florida PE

39'-8"

5"

7' -1 1"

13'-5"

VIDEO WALL MONITOR LAYOUT

55" HORIZONTAL LED MONITORS

QTY: 60

55" VERTICAL LED MONITORS

QTY: 12

55" VERTICAL LED MONITORS

QTY: 12

BASE CABINETS

DONE BY OTHERS

FINANCIAL PROJECT IDCOUNTYROAD NO.

DWG NO.

SHEET NO.

FLORIDA-ALABAMA TPO

TH

E O F F

IC

IA

L R E C

OR

D O F T H

IS

S H E E T

IS

T H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A N D S E

AL

E D U N D E R R U

LE

1G -2 3.

4, F .A .C

HALFF ASSOCIATES, INC.

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FL 32309

BRYAN P. HUBBARD P.E

PE NO. 70962

NORTH W

STREET 451524-1-38-01

ITS101

VIDEO WALL MONITOR LAYOUT

ESCAMBIA

2'0' 4' 8'

No. Date Issue / Revision

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FLORIDA 32309

TEL. (850) 224-4400

SECTION A-A

SECTION A-A

CHIEF PAC525

CHIEF PAC525

CHIEF PAC526

CHIEF PAC526

CABLE CHASE

CABLE CHASE

RAISED FLOOR

CEILING

DROP

CEILING

STUB OUT 2' MIN.

FROM WALL

FINANCIAL PROJECT IDCOUNTYROAD NO.

DWG NO.

SHEET NO.

FLORIDA-ALABAMA TPO

TH

E O F F

IC

IA

L R E C

OR

D O F T H

IS

S H E E T

IS

T H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A N D S E

AL

E D U N D E R R U

LE

1G -2 3.

4, F .A .C

HALFF ASSOCIATES, INC.

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FL 32309

BRYAN P. HUBBARD P.E

PE NO. 70962

NORTH W

STREET 451524-1-38-01

ITS102

VIDEO WALL CONNECTION DIAGRAM

ESCAMBIA

2'0' 4' 8'

No. Date Issue / Revision

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FLORIDA 32309

TEL. (850) 224-4400

KEYBOARD MONITOR

SERVERS

DATA SWITCH

STORAGE ARRAY

RESERVED FOR ISP

NETWORK SWITCH

FIREWALL

NETWORK PATCH PANELS

FUTURE 4U CORNING

PRETERMINATED

144 CT "LC" PATCH PANEL

ESCAMBIA COUNTY TRAFFIC

MANAGEMENT 4U CORNING

PRETERMINATED

144 CT "LC" PATCH PANEL

RACK 4 RACK 5RACK 3RACK 2RACK 1

SECURITY

BY OTHERS

BUSINESS

BY OTHERSVIDEO WALL

RAISED FLOOR

FINANCIAL PROJECT IDCOUNTYROAD NO.

DWG NO.

SHEET NO.

FLORIDA-ALABAMA TPO

TH

E O F F

IC

IA

L R E C

OR

D O F T H

IS

S H E E T

IS

T H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A N D S E

AL

E D U N D E R R U

LE

1G -2 3.

4, F .A .C

HALFF ASSOCIATES, INC.

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FL 32309

BRYAN P. HUBBARD P.E

PE NO. 70962

NORTH W

STREET 451524-1-38-01

ITS103

SERVER RACK LAYOUT

ESCAMBIA

No. Date Issue / Revision

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FLORIDA 32309

TEL. (850) 224-4400

FINANCIAL PROJECT IDCOUNTYROAD NO.

DWG NO.

SHEET NO.

FLORIDA-ALABAMA TPO

TH

E O F F

IC

IA

L R E C

OR

D O F T H

IS

S H E E T

IS

T H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A N D S E

AL

E D U N D E R R U

LE

1G -2 3.

4, F .A .C

HALFF ASSOCIATES, INC.

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FL 32309

BRYAN P. HUBBARD P.E

PE NO. 70962

NORTH W

STREET 451524-1-38-01

ITS104

VIDEO WALL CUTSHEETS

ESCAMBIA

PAC525/526 MI-363

No. Date Issue / Revision

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FLORIDA 32309

TEL. (850) 224-4400

HALFF ASSOCIATES, INC.

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FL 32309

No. Date Issue / Revision DWG NO.

SHEET NO.

ESCAMBIA 451524-1-38-01NORTH W

STREET

BRYAN P. HUBBARD, P.E.

PE NO. 70962 FLORIDA-ALABAMA TPO

TH

E O

F F

IC

IA

L

R E C

OR

D O

F T

H

IS

S H E E T

IS

T

H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A

N D S

E

AL

E D U

N D E R R

U

LE

1G

-2

3.

4, F

.A .C

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FLORIDA 32309

TEL. (850) 224-4400

SPLICING DIAGRAM

ITS105

EXISTING SPLICE BOX

LOCATED AT THE NW CORNER OF

PENSACOLA BLVD AND ESCAMBIA

COUNTY PUBLIC SAFETY COMPLEX

SIGNAL

EXISTING SPLICE

ENCLOSURE

SR 95 (US 29/PENSACOLA BLVD)

AT ESCAMBIA COUNTY PUBLIC

SAFETY COMPLEX SIGNAL

NOTES:

1. REFER TO TELECOMMUNICATIONS SITE PLAN SHEET

TN100.

2. SLACK REQUIREMENTS:

100 FEET OF CABLE ON EACH SIDE OF CABLE

SPLICE IN SPLICE BOXES

50 FEET OF CABLE IN FIBER OPTIC PULL BOXES.

25 FEET OF CABLE IN SERVER RACK ENCLOSURE.

2. ONE WEEK PRIOR TO THE BEGINNING OF THE

INSTALLATION, NOTIFY:

ESCAMBIA COUNTY ENGINEERING DEPARTMENT -

TRANSPORTATION AND TRAFFIC OPERATIONS DIVISION

JIM HAGON

3363 WEST PARK PLACE

PENSACOLA, FLORIDA 32305

PHONE: 850-516-6590

3. ALL MATERIALS, EQUIPMENT AND OTHER CONTRACTOR

SUPPLIED ITEMS SHALL BE INSTALLED AND

MAINTAINED ACCORDING TO THE MANUFACTURER'S

RECOMMENDATIONS, UNLESS SPECIFICALLY DIRECTED

OTHERWISE BY THE ENGINEER.

4. SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW

FOR ALL EQUIPMENT AND MATERIALS FURNISHED AND

INSTALLED. THE CONTRACTOR SHALL FURNISH COPIES

OF ALL DRAWINGS, SCHEDULES AND COMPLETE

DESCRIPTIVE AND TECHNICAL DATA ON ALL ITEMS TO

THE ENGINEER OF RECORD.

N.T.S.

TO EXISTING TRAFFIC

SIGNAL CABINET ON SR 95

(US 29/PENSACOLA BLVD)

AT ESCAMBIA COUNTY

PUBLIC SAFETY COMPLEX

SIGNAL

EXISTING CONDUIT

EXISTING 12

SMFOC DROP

CABLE

BL SM

Bl Or Gr Br Sl Wh Rd Bk Yl Vi Ro Aq

E X

IS

TI

N G

C S

M F

OC

(1 2)

S M

B U F F E R T

U B E S

EXISTING CONDUIT

B

LU

E

OR

AN

GE

GR

E E N

B R

OW

N S

LA

TE

W H

IT

E R E D

B

LA

C K

YE

LL

OW

V

IO

LE

T

R

OS

E

AQ

U A

(1

(2

(3

(4

(5

(6

(7

(8

(9

(1 0)

(1 1)

(1 2)

S P

LI

C E T

R

AY

B

LU

E

OR

AN

GE

GR

E E N

B R

OW

N S

LA

TE

W H

IT

E R E D

B

LA

C K

YE

LL

OW

V

IO

LE

T

R

OS

E

AQ

U A

(1

(2

(3

(4

(5

(6

(7

(8

(9

(1 0)

(1 1)

(1 2)

S M B

LU

E

S M B

LU

E

F R

OM

E

AS

T

C R

W S

T)

S M O

R

AN

GE

-2 4)

S M G

R E E N

-3 6)

S M B

R

OW

N

-4 8)

S M S

LA

TE

-6 0)

S M W

H

IT

E

-7 2)

S M R

E D

-8 4)

S M B

LA

C K

-9 6)

S M Y

E

LL

OW

-1

S M V

IO

LE

T (1

-1

S M R

OS

E

1-

2)

S M A

QU

A

(1

-1

S M B

L

S M O

R

S M G

R

S M B

R

S M S

L

S M W

H

S M R

D

S M B

K

S M Y

L

S M V

I

S M R

O

S M A

Q

144 C SMFOC

(12)- 12 SM

BUFFER TUBES

CONDUIT (SEE TN100)

TERMINATE CORNING

PRETERMINATED

144 CT "LC" PATCH PANEL

(SEE ITS103)

LEGEND DESCRIPTION

EXISTING SPLICE

PROPOSED SPLICE

EXISTING FIBER

PROPOSED FIBER

633-2-31 SPLICE 144 EA

0633-1-124 FIBER 100 LF COILED

0633-1-124 FIBER 150 LF

0633-1-124 FIBER 25 LF

633-2-31 SPLICE 144 EA

RTMC SERVER/BENCH TEST

ROOM 147 RACK 3

O T

OE

OE

OE

OE

OE

OE

OE

O E

O E

O E

O E

O E

O E

O E

O E

O E

O E

O E

O E

O E O E

O E

O E

O E

O E

O E

O E

O E

O E

O E

O E

O E

O E

O E

WATER

SD

SDSD

SD

SAN

SAN

LOST IMAGE

E

E

E

E

E

E

E

E

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

B T B

BT

(B

BT

(B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

BFO

(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

BFO(B)

BFO(B)

BFO(B)

BFO(B)

BFO(B)

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

B F O B

BT

V( B)

BT

V( B)

BT

V( B)

BT

V( B)

BT

V( B)

BT

V( B)

BTV

(B)

BTV

(B)

BTV(B)

BTV(B)

BTV(B)

BTV(B)

BTV(B)

BTV(B)

BTV(B)

BTV(B)

BTV(B)

B T V B

B T V B

B T V B

B T V B

B T V B

B T V B

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B) BE(B)

B E B

)BE(B)BE(B)

B E B

BE

(B

B E B

B E B

B E B

B E B

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

B E B

BE(B)

BE(B) BE(B) BE(B) BE(B) BE(B)

B E B

) BE(B) BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE

(B

BE

(B

BE(B)

BE(B)

BE(B)

BE

(B

BE(B)

BE(B)

BE(B)

UNK(

B)

UNK(

B)

UNK(

B)

UNK(

B)

UNK(

B)

UNK(

B)

UNK(

B)

UNK(

B)

UNK(

B)

UNK(

B)

UNK(B)

UNK(B)

UNK(B)

UNK(B)

U N K B

U N K B

U N K B

U N K B

U N K B

U N K B

U N K B

B E B

BE

(B

B E B

B E B

B E B

B E B

B E B

B E B

BE(B) BE(B)

BE(

B)

BE

(B

BE

(B

BE

(B

BE

(B

BE(B) BE(B)

BE(B)

BE(

B)

BE(B

BE(B

BE(B

BE(B

BE(B

BE(B

BE(B

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B) BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

BE(B)

B E B

B E B

B E B

B E B

B E B

BE(B)

BE(B)

BE(B

BE(B

BE(B

BE(B

BE(B)

BE(B)

BE(B)

BE(B)

B E B

B E B

B E B

B E B

B E B

B E B

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

W(B)

B E B

B E B

BT(B)

BT(B)

BT(B)

BT(B)

SAN

SCALE IN FEET

10 20 40

FINANCIAL PROJECT IDCOUNTYROAD NO.

HALFF ASSOCIATES, INC.

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FL 32309

No. Date Issue / Revision DWG NO.

SHEET NO.

ESCAMBIA 451524-1-38-01NORTH W

STREET

BRYAN P. HUBBARD, P.E.

PE NO. 70962 FLORIDA-ALABAMA TPO

TH

E O

F F

IC

IA

L

R E C

OR

D O

F T

H

IS

S H E E T

IS

T

H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A

N D S

E

AL

E D U

N D E R R

U

LE

1G

-2

3.

4, F

.A .C

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FLORIDA 32309

TEL. (850) 224-4400

WARNING SIGN PLAN

ITS106

PROPOSED CONDUIT, OPEN TRENCH

PROPOSED CONDUIT, DIRECTIONAL BORE

PROPOSED PULL BOX

PROPOSED ENHANCED WARNING SIGN

EXISTING SIGNAL CABINET

EXISTING PULL BOX

LEGEND

1. REFER TO WARNING SIGN DETAILS SHEET ITS107.

2. ONE WEEK PRIOR TO THE BEGINNING OF THE INSTALLATION,

NOTIFY:

ESCAMBIA COUNTY ENGINEERING DEPARTMENT -

TRANSPORTATION AND TRAFFIC OPERATIONS DIVISION

JIM HAGON

3363 WEST PARK PLACE

PENSACOLA, FLORIDA 32305

PHONE: 850-516-6590

3. THE LOCATION OF UTILITIES SHOWN ON THE PLANS ARE

APPROXIMATE ONLY. THE EXACT LOCATIONS SHALL BE

DETERMINED BY THE CONTRACTOR, VIA SUNSHINE STATE ON CALL

OF FLORIDA, INC AT 811 OR 1-800-432-4770, IN COORDINATION

WITH UNDERGROUND AND OVERHEAD UTILITY OWNERS. A MINIMUM

OF 2 FULL BUSINESS DAYS PRIOR TO DIGGING IS REQUIRED.

4. HAND DIG THE FIRST 48 INCHES OF THE HOLE WHERE NEW PULL

BOXES OR CONDUIT RUNS ARE IN CLOSE PROXIMITY TO UTILITIES.

5. ALL MATERIALS, EQUIPMENT AND OTHER CONTRACTOR SUPPLIED

ITEMS SHALL BE INSTALLED AND MAINTAINED ACCORDING TO THE

MANUFACTURER'S RECOMMENDATIONS, UNLESS SPECIFICALLY

DIRECTED OTHERWISE BY THE ENGINEER.

6. SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW FOR ALL

EQUIPMENT AND MATERIALS FURNISHED AND INSTALLED. THE

CONTRACTOR SHALL FURNISH COPIES OF ALL DRAWINGS,

SCHEDULES AND COMPLETE DESCRIPTIVE AND TECHNICAL DATA

ON ALL ITEMS TO THE ENGINEER OF RECORD.

7. RETURN ALL DISTURBED AREAS TO PRE-CONSTRUCTION

CONDITIONS WITHIN 72 HOURS OF THE CONSTRUCTION ACTIVITY,

INCLUDING BUT NOT LIMITED TO: RESTORATION OF GRADE,

REMOVAL OF CONSTRUCTION TRASH, RESTORATION OF IRRIGATION,

ETC. THE CONTRACTOR SHALL VERIFY THE LOCATION AND

FUNCTION OF EXISTING IRRIGATION LINES PRIOR TO INITIALIZING

CONSTRUCTION.

8. ALL HDPE CONDUIT CONNECTION SHALL BE JOINED WITH A

FUSION COUPLER.

9. ADJUST THE CONDUIT RUNS, PULL BOXES AND BORES TO AVOID

ANY UTILITY CONFLICT IDENTIFIED BY THE LOCATES. ANY

SIGNIFICANT CHANGE SHALL BE APPROVED BY THE ENGINEER.

10. THE CONDUIT ARE TO BE PLACED SO AS TO TOTALLY AVOID ANY

CONFLICTS WITH EXISTING UTILITIES ALONG THE ROUTE. IT IS

THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN THE NECESSARY

INFORMATION REQUIRED TO PLAN THE WORK AHEAD FOR THE

INSTALLATION OF THE REQUIRED CONDUITS WITHIN DESIGN OR

SPECIFIED PARAMETERS, AND HIS TIME FRAME. ADJUST CONDUIT

VERTICALLY OR HORIZONTALLY TO AVOID CONFLICT WITH

UNDERGROUND UTILITIES.

NOTES

ENHANCED WARNING SIGN ASSEMBLY

ENHANCED WARNING SIGN ASSEMBLY

TIE IN CONDUIT TO

EXISTING SIGNAL

CABINET PULL BOX

WIRE ENHANCED

SIGNS TO FLASHING

RED PREEMPTION

PHASE

PROPOSED

BUILDING

0700141112

0700141112

0635 2 11 13"x24" PULL BOX

0635 2 11 13"x24" PULL BOX

0630 2 12 2" CONDUIT - 46 LF

0630 2 12

0630 2 11

0630 2 115 LF - 2" CONDUIT

0632 7 2

0632 7 2

0632 7 2

0632 7 2

SIGNAL CABLE - 46 LF

2" CONDUIT - 153 LF

SIGNAL CABLE - 153 LF

5 LF - SIGNAL CABLE

5 LF - 2" CONDUIT

5 LF - SIGNAL CABLE

0632 7 2 SIGNAL CABLE - 20 LF

HALFF ASSOCIATES, INC.

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FL 32309

No. Date Issue / Revision DWG NO.

SHEET NO.

ESCAMBIA 451524-1-38-01NORTH W

STREET

BRYAN P. HUBBARD, P.E.

PE NO. 70962 FLORIDA-ALABAMA TPO

TH

E O

F F

IC

IA

L

R E C

OR

D O

F T

H

IS

S H E E T

IS

T

H E E

LE

C

TR

ON

IC

F

IL

E D

IG

IT

AL

LY

S

IG

N E D A

N D S

E

AL

E D U

N D E R R

U

LE

1G

-2

3.

4, F

.A .C

2255 KILLEARN CENTER BLVD.

SUITE 200

TALLAHASSEE, FLORIDA 32309

TEL. (850) 224-4400

WARNING SIGN DETAILS

ITS107

1'

12" Red Flashing Beacon

NEMA Box W/ Flasher Relay

See DETAIL "A", Sheet 2

7' Stop Sign 30"x30"

Nominal 4" Aluminum Pole (Sch. 40)

8'

4' Dia.

Pull Box

12" Bed of Pearock or Crushed Stone For Drainage.

Circuit Conductors in Schedule 40 PVC Conduit. Circuit Conductors and Conduit Size as Shown in Plans.

(Typical)

Strain Relief

Fittings

Concrete Apron (Typ.)

Fo ot in g De pt h

Transformer Base Strain Relief Fitting

Finished Grade

U.L. Approved Ground Rod 5 8"Diameter 20' Long Copper

Clad with Approved Ground Connection (At all Pull Boxes)

One-Pole, Non-Fused, Watertight Breakaway Electrical Connectors

4" X 18" Anchor Bolts

Grounding Lug

#6 Ground Wire #6 Ground Wire

To Traffic Cabinet

6~#5 Bars Equally Spaced

#4 Stirrups Equally Spaced, 12" Max. 6" C ov er

6" Cover

Nominal 4" Aluminum Pole (Sch. 40)

Warning Sign 42"x24"

NOTES:

SIGN ASSEMBLY DETAIL

FRONT ELEVATION

DETAIL "A"

1. Meet the reqirements of Specifications 646 and 700.

2. Engage all threads on the transformer base and post unless the aluminum post is fully seated into base.

3. When wire entry holes are drilled in the sign column, use a bushing or rubber grommet to protect conductors.

4. Red flashing beacon will be configured to illuminate on the green phase when North W St. emergency signal is activated.

ITS100 - CONTROL ROOM VIDEO WALL PLAN
ITS101 - VIDEO WALL MONITOR LAYOUT
ITS102 - VIDEO WALL CONNECTION DIAGRAM
ITS103 - SERVER RACK LAYOUT
ITS104 - VIDEO WALL CUTSHEETS
2025-03-31T14:50:12-0400
Bryan P Hubbard

File details come from the government source that posted it. Updated .