- Dekalb County, Brooklet City, Georgia
About this file
This document is a technical specification for the Murphey Candler Dam rehabilitation project for the City of Brookhaven, Georgia. The work includes installing and maintaining erosion control measures, fully draining the lake around the low level drain pipe, modifying the existing riser structure, rehabilitating the low level drain pipe using cured-in-place pipe (CIPP) methods, replacing components of the sluice gate structure, restoring all disturbed areas, and cleaning up the work area. The project has a scheduled completion date of February 2024.
The document outlines measurement and payment terms for the various bid items, including lump sum and unit pricing for items such as mobilization, erosion and sedimentation controls, CIPP rehabilitation, flowable fill, dewatering, sidewalk replacement, guardrail, rip rap, riser modifications, grading, filter fabric, and storm drain pipe removal. An allowance is included for repairing, removing, or lowering an abandoned standpipe. Traffic control is also priced as a lump sum bid item. The City of Brookhaven will be responsible for reviewing and approving submittals, schedules, and requests for information provided by the contractor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_022_Exhibit K_rev2.pdf | ||
| Questionaire 2_Addendum 3.docx | DOCX document | |
| ITB No_ 24_022_Addendum 3.pdf | ||
| ITB No_ 24_022_Addendum 4.pdf | ||
| RFP No_ 24_022_Addendum 2.pdf | ||
| Questionaire 1 _Addendum 2.pdf | ||
| ITB No_ 24_022_Addendum 2.pdf | ||
| Document Takers_2024_11_12_planholders list.xlsx | XLSX spreadsheet | |
| 24_022_Exhibit K_rev1.pdf | ||
| Questionaire _11_06_2024.docx | DOCX document | |
| ITB No_ 24_022_Addendum 1.pdf | ||
| 24_022 2024 Low Water Drain Rehab Murphey Can.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section Number Title
DIVISION 31 - EARTHWORK
310519 GEOTEXTILES
311100 CLEARING AND GRUBBING
311311 FENCING
312300 EXCAVATION AND FILL
312319 DEWATERING
312333.33 FLOWABLE FILL
312500 EROSION AND SEDIMENTATION CONTROLS
313700 RIPRAP
DIVISION 32 – EXTERIOR IMPROVEMENTS
321216 ASPHALT PAVING
321613 SIDEWALKS, CURBS, AND GUTTERS
327300 WETLANDS PROTECTION
329200 TURF AND GRASSES
329343 TREES, SHRUBS, AND PLANTS
DIVISION 33 - UTILITIES
330130.16 TELEVISION INSPECTION
330130.52 STORM SEWER CLEANING
330130.72
334913
RELINING STORM SYSTEMS
STORM DRAINAGE STRUCTURES
DIVISION 34 – TRANSPORTATION
344116.10 TRAFFIC CONTROL
347100 ROADWAY CONSTRUCTION
CITY OF BROOKHAVEN GA FEBRUARY 2024
MURPHEY CANLDER DAM GENERAL REQUIREMENTS
01 00 00-1
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 – GENERAL
1.1 SUMMARY
A. SECTION INCLUDES:
Section Title
1.2 References
1.3 Definitions
1.4 System Description
1.5 Contract Drawings
1.6 Schedules
1.7 Or Equals
1.8 Submittals
3.1 Access
3.2 Aid to the Injured
3.3 Buildings and Shanties
3.4 Cleaning
3.5 Cleaning and Crowning of Streets
3.6 Cleaning Surfaces
3.7 Contractor’s Office
3.8 Dimensions and Elevations
3.9 Emergency Response
3.10 Environmental Contamination
3.11 Existing Irrigation and Sprinkler Systems
3.12 Existing Utilities
3.13 Experience
3.14 Inspections
3.15 Insufficiency of Safety Precautions
3.16 Intoxicating Liquors
3.17 Landscape Protection
3.18 Lighting
3.19 Means and Methods
3.20 Measures and Weights
3.21 Mill and Shop Tests and Inspection
3.22 Monuments and Landmarks
3.23 Obstructions Encountered
3.24 Overtime Work
3.25 Ownership of Materials
3.26 Painting and Coatings
3.27 Power
3.28 Protecting Existing Buildings and Structures
3.29 Protection
3.30 Record Drawings
01 00 00-2
3.31 Responsibility for Overflows and Spills
3.32 Roadway Right-of-Way, Working Facilities, and Easements
3.33 Safety
3.34 Sales Tax
3.35 Sanitary Measures.
3.36 Schedules
3.37 Shoring, Formwork, and Temporary Structures
3.38 Site Video
3.39 Sound Attenuation
3.40 Storage
3.41 Temporary Heat
3.42 Use of Facilities
3.43 Use of Streets
3.44 Utility Relocations or Modifications
3.45 Water Supply
3.46 Work in Inclement Weather
1.2 REFERENCES
A. Unless otherwise specified, references to documents shall mean the documents in effect at the time of Advertisement for Bids or Invitation to Bid (or on the effective date of the Agreement if there were no bids). If referenced documents have been discontinued by the issuing organization, references to those documents shall mean the replacement documents issued or otherwise identified by that organization or, if there are no replacement documents, the last version of the documents before it was discontinued shall apply.
B. This section contains references to the following documents in Section 1.3. They are a part of this section as specified and modified. Where a referenced document contains references to other standards, those documents are included as references under this section as if referenced directly. In the event of conflict between the requirements of this section and those of the listed documents, the requirements of the technical specifications shall prevail.
1.3 DEFINITIONS
A. Whenever the following abbreviations are used, they shall refer to and designate:
“AASHTO” – American Association of State Highway and Transportation Officials
“ACI” - American Concrete Institute
“AISC” - American Institute of Steel Construction
“ANSI” - American National Standards Institute
“ASME” - American Society of Mechanical Engineers
“ASTM” - American Society for Testing and Materials
“AWWA” - American Water Works Association
“CITY” – City of Brookhaven
“CRSI” – Concrete Reinforcing Steel Institute
“GASDP” – Georgia Safe Dams Program
“GDOT” – Georgia Department of Transportation
“MUTCD” – Manual on Uniform Traffic Control Devices
01 00 00-3
“Owner” – City of Brookhaven
1.4 SYSTEM DESCRIPTION
A. Performance Requirements
The Work shall mean the furnishing of all labor, materials, equipment, superintendence, and other incidentals necessary to the successful completion of construction upgrades to the Murphey Candler Dam as identified in the Contract
Documents, including but not limited to, safety, removal, replacement, rehabilitation, and installation with any and all appurtenances in accordance with the Contract
Documents, complete and fully operational in compliance with federal, state, city, county, and local codes and regulations, standards, and specifications as applicable at the time of bid unless otherwise directed in writing by the CITY.
1.5 CONTRACT DRAWINGS
A. The approved plans, profiles, typical cross sections, working drawings, supplemental drawings, details, sketches, narratives, service request forms, geographic information system (GIS) data, maps, or exact reproductions thereof, which show the location, character, dimensions, and/or details of the Work.
B. Existing conditions shown on the Drawings were derived from the best available information at the time Drawings were prepared and do not purport to be completely correct. The CITY expressly disclaims any responsibility for the accuracy or completeness of the information given regarding these existing conditions on the
Drawings. The Contractor will not be entitled to any extra compensation on account of inaccuracy or incompleteness of such information. The Contractor is therefore directed to perform any and all field surveys that are deemed necessary to satisfy himself/herself to the actual surface and sub-surface conditions.
C. The Work proposed, its connections, routing, and design intent were based on the available information of the existing conditions. The Contractor shall field verify the nature and extent of the Work proposed prior to ordering any materials. Payment will be made only for materials retained as part of the CITY’s facilities and its appurtenances.
D. Additionally, the CITY reserves the right to require Contract Modifications during construction. Payment for these Contract Modifications will be made using appropriate unit prices for the Work.
E. The Contractor shall maintain one (1) complete set of Contract Documents at the site throughout the course of the Work and make available to the CITY upon request.
1.6 SCHEDULES
A. Contractors shall prepare, furnish, distribute, and periodically update the Project
Progress Schedule and Schedule of Submittals, as specified herein. Contractor shall also prepare and furnish a Schedule of Values, as specified herein.
B. Acceptance of the Contractor’s Project Progress Schedule, Schedule of Submittals, and
Schedule of Values, and revisions thereto, shall in no way relieve Contractor of any
01 00 00-4 duties and obligations under the Agreement. Such approval is limited to the format of the schedule, and does not in any way indicate approval of, or concurrence with, the
Contractor’s means, methods, and ability to carry out the Work.
C. Submit a monthly update of the Project Progress Schedule and Schedule of Submittals with each request for payment.
D. Failure the Contractor to meet the schedule submission milestones will result in withholding of monthly payments, until deliverables associated with the milestones are received. Payments will be withheld should the Contractor fail to deliver acceptable schedules within thirty (30) days after date of Notice to Proceed.
1.7 OR EQUALS
A. For the purposes of these Contract Documents, “or equal” item(s) shall be defined as:
1. A product or manufacturer offered as a replacement to a specified product or manufacturer where the term “or equal” is included after the list of acceptable manufacturers in the Specification.
B. An item which is offered where no specific product, manufacturer, means, methods, technique, sequence, or procedure of construction is specified or shown on the
Drawings, are not be considered a replacement, and will be at the option of the
Contractor, subject to the provisions in the Contract Documents for that item.
C. For products specified only by a referenced standard, the Contractor may select any product by any manufacturer, which meets the requirements of the Specifications, unless indicated otherwise in the Contract Documents.
D. If the manufacturer is named on the Drawings, or in the Specifications as an acceptable manufacturer, products of that manufacturer meeting all requirements of the
Specifications and Drawings are acceptable.
E. Whenever the design is based on a specific product of a particular manufacturer, that manufacturer will be shown on the Drawings and/or listed in the list of approved manufacturers in the Specifications. Any Contractor intending to furnish products other than the listed acceptable manufacturer(s) shall:
1. Verify that the item being furnished will fit in the space allowed, perform the same function(s), and have the same capabilities as the item specified,
2. Include in the item price the cost of all accessory items, which may be required by the “or equal” product,
3. Include the cost of any architectural, structural, mechanical, piping, electrical, instrumentation, or other modifications required, and
4. Include the cost of required additional work by the CITY and/or the Engineer, if any to accommodate the item.
F. Approval of the CITY and/or the Engineer and Owner of an “or equal” item as an acceptable manufacturer, is dependent on determination that the product offered:
1. Is maintenance, reliability, service life, availability of local technical support, and other criteria to that on which the design is based, and
2. Will require no major modifications to structures, electrical systems, control
01 00 00-5 systems, or piping systems.
G. “Or equal” items will be considered only if the term “or equal” is included after the list of acceptable manufacturers in the Specification.
H. The Contractor shall submit shop drawings on the “or equal” item for the CITY and/or the Engineer’s review in accordance with Specification Section 01 33 00 Submittal
Procedures.
I. The cost of the CITY and/or Engineer’s and Owner’s factory inspection, reference project tour, or mill inspection, required to evaluate the acceptance of the “or equal” product shall be paid by the Contractor.
1.8 SUBMITTALS
A. Contractor shall be required to prepare each project specific submittal, utilizing the approved bid schedule, and shall include scope of work defined, and for any scope not included in defined bid schedule, shall attach individual cost estimate sheets based on the Additional Work provision
B. Submit Shop Drawings and other required submittals to the CITY and/or the Engineer.
Submittals will only be accepted directly from the Contractor which include the
Contractor certification that they have been reviewed and found acceptable to submit to the City and/or Engineer for review.
C. Each submittal, with variations from the requirements of the Contract Documents, shall make specific mention of such variations. Those declared variations found acceptable by the CITY shall require the Contractor to take suitable action for the proper installation in accordance with the Contract Documents. Variation not declared or suitable action not taken by the Contractor shall not relieve him/her of the responsibility for executing the Work or error and cost for remedial actions deemed necessary by the
CITY.
PART 2 – PRODUCTS – (NOT USED)
PART 3 – EXECUTION
3.1 ACCESS
A. The Contractor shall enable and facilitate access to all parts of the Work to the
CITY and/or its authorized representatives.
3.2 AID TO THE INJURED
A. The Contractor shall furnish, maintain, and make ready and available for immediate use, first aid to the injured with standing arrangements for the immediate removal, transport, and hospital treatment of any personnel who may be injured on the Site, as required by federal, state, city, county and local laws, codes and regulations.
3.3 BUILDINGS AND SHANTIES
01 00 00-6
A. No provision shall be allowed for the housing of men/women employed for the Work on the project site.
3.4 CLEANING
A. With completion of the Work, the Contractor shall return the surface conditions of the work area to pre-work status, unless where otherwise specified in the Contract
Documents. The finished surface Work shall leave the grounds in a neat and approved condition, including but not limited to, the removal of material, debris, equipment, structures, and the Contractor’s office.
B. Contractor shall terminate utilities as applicable or as required by the Contract
Documents. Contractor shall also clean out all drains, pipes, inlets, and miscellaneous and appurtenant structures of debris from its operations.
3.5 CLEANING AND CROWNING OF STREETS
A. The Contractor shall thoroughly clean all streets, roads, sidewalks, and lawns free from all debris and dirt resulting from the construction, shall open all gutters and open channels so they drain freely, and completely crown the roadway as construction progresses and maintain these conditions to final acceptance of the Work.
3.6 CLEANING SURFACES
A. Contact surfaces between existing and new Work shall be free from debris, dirt, grease, or foreign matter as recommended by the manufacturer or directed by the CITY. The cost for cleaning shall be included in the Prices Bid and stipulated for the various items of the bid.
3.7 CONTRACTOR’S OFFICE
A. Facilities are not required to be on the project site. The Contractor shall be responsible for providing adequate indoor facilities for conducting project meetings. At a minimum, the facilities shall be equipped with power, water, lighting, heating ventilation and air conditioning, a conference room, table and chairs. If in the opinion of the CITY, the location of the facilities are not convenient to project personnel, the CITY may provide suitable facilities for project meetings.
3.8 DIMENSIONS AND ELEVATIONS
A. In the Contract Documents, figured dimensions shall take precedence over scaled dimensions; detailed drawings shall take precedence over general drawings, and where elevations are denoted, shall be in accordance with the section titled Survey.
3.9 EMERGENCY RESPONSE
A. The Contractor shall respond within four (4) hours to any emergency that may arise in connection with the Work on a twenty-four (24) hour per day, seven (7) days per week basis. Should CITY maintenance forces be called upon by the CITY to rectify a problem created by the Contractor, the Contractor shall be responsible for all costs incurred by the CITY, plus twenty-five (25) percent, with a minimum charge of one hundred (100) dollars per occurrence. This charge is subject to change depending upon the severity of
01 00 00-7 the emergency and will be determined by the CITY.
3.10 ENVIRONMENTAL CONTAMINATION
A. Precautions against property endangerment and/or damages from water, sewage, seepage, storm, stormwater, and flood flows shall be active during the course of Work.
Cost for precautions shall be included in the Prices Bid and stipulated for the items of
Work.
3.11 EXISTING IRRIGATION AND SPRINKLER SYSTEMS
A. The Contractor shall be responsible for repairing existing irrigation or sprinkler systems disturbed and/or damaged by the Work. No additional compensation shall be made for this Work.
3.12 EXISTING UTILITIES
A. Before the Work commences, the Contractor shall locate all utilities in the Work area and investigate any potential conflicts between the Work and existing utilities. All provisions of Georgia law relating to notification and protection of utilities shall be met by the Contractor.
B. Existing utilities shall be maintained, except when a utility or a utility feature requires moving. In such circumstances, the Contractor shall notify the utility before any such
Work is started for approval. In the event that the utility grants approval for such movement that results in damage, it shall be repaired by the authorities having control of the same, and the expense of said repairs shall be paid by the Contractor or deducted from the monies which are due or to become due to said Contractor. No underground or overhead facilities encountered shall be disturbed without proper authority and then only in such manner as said owner may prescribe and approve.
C. Should it become necessary to change the position, or permanently or temporarily remove part of a utility in order to clear the structure being built or to permit the
Contractor to use a particular method of construction, the Contractor shall notify the
CITY of the location and circumstances and shall cease work if necessary, until satisfactory arrangements have been made by the Owners of the said utility to properly care for or relocate the same as necessary to permit the Work to proceed as specified.
No claims for damages shall be allowed the Contractor on account of any delay occasioned thereby. The entire cost of the changes or temporary or permanent removal of such utilities shall be borne by the Contractor and the cost thereof shall be included in the Prices Bid and stipulated for the various Items of the Bid.
D. Nothing contained herein shall relieve the Contractor of doing such Work at his cost and expense as is specifically included in the Contract Documents.
E. Nothing contained herein shall relieve the Contractor of his obligation to support and protect all pipes, conduits, utilities, and other structures which may be encountered during the construction of Work, and to make good all damages done to such pipes, conduits, utilities, and other structures, as provided in this specification. Any such damages must be repaired without delay and the cost of such repairs must be paid by the Contractor.
01 00 00-8
F. No separate payment will be made for the location, protection, support, or maintaining service for any existing utility. Such items shall be considered incidental to the work and no additional compensation will be allowed. The Contractor shall also be responsible for the cost of repairing utilities damaged by the Work.
3.13 EXPERIENCE
A. Contractor shall not make any changes to the personnel, subcontractors, materials, products or rehabilitation systems used on this project without the prior written approval of the CITY. Additionally, the Contractor shall not use personnel, subcontractors, materials, products or rehabilitation systems on this project other than those the Contractor proposed in their Prequalification Proposal.
B. Subcontractors shall not make any changes to the personnel, materials, products or rehabilitation systems used on this project without the prior written approval of the
CITY. Additionally, subcontractors shall not use personnel, materials, products or rehabilitation systems on this project other than those the Contractor proposed in their
Prequalification Proposal.
C. The CITY reserves the right to waive these requirements, at its sole discretion, whenever doing so is deemed to serve the interest of the CITY.
3.14 INSPECTIONS
A. The Contractor shall schedule a pre-construction meeting with the CITY a minimum of 2 weeks prior to construction. During construction the CITY’s Inspector shall be the lead person for scheduling, coordination, and overseeing, witness to sampling and work that may be required or determined necessary by the CITY. Should existing conditions necessitate a change or cost to the Contract Documents, the CITY shall be notified for approval prior to proceeding.
B. The CITY shall review and approve unit items installed in the Work by the Contractor prior to its submittal for payment to the CITY. Failure to do so may result in delays in processing payments.
C. Upon notification by the Contractor, the CITY shall perform an inspection of the finished surface features and conditions for acceptance of the Work. Should discrepancies exist, the Contractor shall make restorations as directed, until acceptance is granted by the CITY, upon which final payment shall be made for the Work.
D. Contractor shall pay for second inspections, if so required by the CITY.
3.15 INSUFFICIENCY OF SAFETY PRECAUTIONS
A. If at any time, in the opinion of the CITY, the Work is not properly instituted or maintained and is not in accordance with federal, state, city, county and local laws, codes and regulations, the Contractor shall execute immediate measures to bring into compliance unsatisfactory surroundings. In the event that the Contractor is not readily available at the Work to be notified of the insufficiency of safety precautions, then the
CITY may elect to institute or restore such Work to a state deemed safe. Such actions by the CITY shall in no way release the Contractor from its judiciary duty specified.
Costs to correct safety precautions shall be at the Contractor’s expense.
01 00 00-9
3.16 INTOXICATING LIQUORS
A. The Contractor shall neither permit nor suffer the introduction or use of intoxicating substances, such as but not limited to, alcohol or illegal drugs upon or about the Work jobsite.
3.17 LANDSCAPE PROTECTION
A. Landscaping, such as but not limited to, ornamental trees, shrubbery, hedges, flower beds, decorative berms, decorative rocks, ponds, timbers, and their appurtenances shall not be removed or disturbed without approval from the CITY. However, should it be required to remove or disturb such items, the Contractor shall seek approval no later than 2 weeks in advance of conflict. If and when approval is granted by the CITY, the
Contractor shall take the proper precautions to preserve, protect, and reestablish such items along the line of or contiguous to the Work. All landscaping shall be restored to the same or better general conditions as existed prior to commencement of the Work. If deemed damaged by the CITY, each item damaged shall be replaced with the same type and like size. Cost for removal and relocation shall be considered as having been included in the Prices Bid and stipulated for the various items of Work. Cost for restitution shall be borne by the Contractor.
3.18 LIGHTING
A. Except for acts of nature, the Work shall be secured by such means to prevent loss to health, limb, and property. Adequate lighting shall be provided and maintained during periods of Overtime Work, from one-half (½) hour before sunset to one-half (½) hour after sunrise. Contractor shall provide adequate lighting for safety and performance of construction operations and provide the necessary safety and other facilities required for work during normal working hours and for work at night.
3.19 MEANS AND METHODS
A. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction.
B. If the Contract Documents note, or Contractor determines, that professional engineering or other design services are needed to carry out Contractor’s responsibilities for construction means, methods, techniques, sequences, and procedures, or for Site safety, then Contractor shall cause such services to be provided by a properly licensed design professional, at Contractor’s expense. Such services are not Owner-delegated professional design services under this Contract, and neither Owner nor Engineer has any responsibility with respect to (1) Contractor’s determination of the need for such services, (2) the qualifications or licensing of the design professionals retained or employed by Contractor, (3) the performance of such services, or (4) any errors, omissions, or defects in such services.
C. The Contractor shall have the right to deny access to the Work during construction except to third parties to inspect, certify, or observe when required by law; or to those who require reasonable access to the Work by reason of specific contractual relationship to the Work.
01 00 00-10
3.20 MEASURES AND WEIGHTS
A. Whenever so requested as deemed necessary by the CITY, the Contractor shall provide accurate scales, adequate equipment, and the necessary assistance for weighing and/or measuring materials for the installed Work as specified. It is understood and agreed that a “ton” shall mean the short ton of two thousand (2,000) pounds.
3.21 MILL AND SHOP TESTS AND INSPECTION
A. Where the specifications call for mill or shop tests, the Contractor shall furnish triplicate copies of attested certificates signed by a duly authorized representative of the manufacturer, showing details of quality or performance sufficient to demonstrate compliance with the Contract Documents. Inspection of materials shall be made as required by these specifications.
3.22 MONUMENTS AND LANDMARKS
A. Monuments or landmarks shall not be damaged or removed by the Contractor or any of its employees without the written consent of the CITY. Any monument or landmark so removed shall be replaced by the CITY at the expense of the Contractor. The cost thereof shall be retained from the monies due or to become due the Contractor under this agreement.
3.23 OBSTRUCTION ENCOUNTERED
A. The giving of this information upon the Project specific scope of work and field survey determinations shall not relieve the Contractor of his obligation to support and protect all pipes, conduits, and other structures which may be encountered during the construction of Work, and to make good all damages done to such pipes, conduits, and other structures, as provided in this Specification. Any such damages must be repaired without delay and the costs of such repairs must be borne by the Contractor. The
Contractor shall locate obstructions ahead of the Work without cost to the CITY. Should the Contractor determine that the existing information is not correct and an obstruction shall be encountered, it shall immediately contact the CITY.
3.24 OVERTIME WORK
A. It is the intent of the contract that the Contractor provide sufficient work force at all times during normal working hours and days of each week to complete the Work without resort to overtime work. The definition of normal working hours and days is
Monday through Friday, trade recognized legal holidays excepted, during a consecutive period as agreed upon in the area of the Work, not counting the lunch period; and the definition of normal work week is the aggregate of the five (5) consecutive eight (8) hour days, Monday through Friday inclusive, maximum, the same holidays excepted.
B. Night work or work on Saturdays, Sundays, or trade recognized legal holidays, requiring the presence of CITY personnel or an inspector, shall not be permitted except in case of emergency, and then only to such extent as is absolutely necessary, and with the written permission of the CITY.
C. Should the Contractor, for his convenience, request permission to work overtime or to
01 00 00-11 work on Saturdays, Sundays, or trade recognized legal holidays in the area of the Work, the CITY shall have the right to deduct sufficient sums from the monies due the
Contractor to cover payment of additional salaries for the CITY personnel and such inspectors as are normally employed on the Work.
D. Should it become necessary for Work to be accomplished at the direction of the CITY for the convenience and/or requirement of the CITY outside of normal working hours, then full inspection and engineering shall be provided at no additional cost to the
Contractor during those hours.
E. During periods of overtime work, the Contractor shall provide the necessary facilities required for work during normal working hours and for work at night. The Contractor shall be in readiness in time of emergency even nights, Saturdays, Sundays, and holidays at no cost to the CITY.
3.25 OWNERSHIP OF MATERIALS
A. Existing material removed that shall not be relocated or reused in the Work shall be moved off site within 48 hours after completion of the project, becoming the property of the Contractor. The cost for such Work shall be as stipulated by the Prices Bid, for the various items of the Work.
B. Existing material recovered that shall be relocated or reused in the Work shall be refurbished or renovated as required, unless otherwise directed by the CITY.
C. Existing material removed shall be disposed of in a manner approved by the CITY at the Contractor’s expense.
D. New material not installed in the Work shall be moved offsite and remain the property of the Contractor. Only material that is installed by the Contractor will be paid for.
However, the Contractor may submit pay applications for stored material in accordance with the General Conditions.
3.26 PAINTING AND COATINGS
A. It is the intention of these specifications that metal permanently installed in the Work shall be protected by a durable coating of paint, or other approved material, and that all such metal surfaces not buried in the earth or masonry shall be left clean and well painted at the completion of the Contract, and in accordance with detailed requirements as may hereinafter be set forth.
3.27 POWER
A. The Contractor shall make his own arrangements for power. No payment shall be made for cost of obtaining power. The cost for power shall be as stipulated by the Prices Bid, for the various items of the Work.
3.28 PROTECTING EXISTING BUILDINGS AND STRUCTURES
A. The Contractor shall take the necessary precautions to protect, including but not limited to, buildings, structures, and substantial walls or fences which may be encountered or endangered in the execution of the Work, not otherwise provided for, shall repair and make good any damages caused by reason of his operations and restore such property
01 00 00-12 to its state before the damages. Existing walls and fences that are removed due to the execution of the Work shall be replaced by the Contractor and, where required or directed by the CITY.
3.29 PROTECTION
A. The Contractor shall furnish and maintain satisfactory protection to the Work against injury by weather, flooding, or breakage thereby permitting all Work to be left in a perfect condition at the completion of the Work.
3.30 RECORD DRAWINGS
A. The Contractor shall be furnished one set of Contract Drawings for the purpose of recording information on the as-installed Work. The information shall be correct and presented on the Drawings and returned to the CITY for acceptance.
B. The Contractor shall provide Georgia State Plane GPS coordinates for all fire hydrants, manholes, junction boxes, drainage structures, vault, headwalls, and valves (new or existing) associated with the Work.
3.31 RESPONSIBILITY FOR OVERFLOWS AND SPILLS
A. It shall be the responsibility of the Contractor to schedule and perform his work so as to result in no overflows or spills from the system. If flows are such that they interfere with the Contractor’s ability to perform work, the Contractor shall be responsible for scheduling his work during low flow periods or provide bypass pumping.
B. In the event of overflows caused by the Contractor’s work activities, the Contractor shall immediately take appropriate action to contain and stop the overflow, clean up the spillage, disinfect the area affected by the spill, and notify the CITY in a timely manner.
The Contractor shall prepare his own written Standard Operating Procedure (SOP) for handling and reporting spills.
C. Contractor will indemnify and hold harmless the CITY for any fines or third-party claims for personal or property damage arising out of a spill or overflow that is fully or partially the responsibility of the Contractor. Should fines subsequently be imposed as a result of any overflow for which the Contractor is fully or partially responsible, the
Contractor shall pay all such fines and all of the CITY’s legal, engineering, and administrative costs in defending such fines and claims associated with the overflow.
3.32 ROADWAY RIGHT-OF-WAY, WORKING FACILITIES, AND EASEMENTS
A. Work within the limits of private property and rights-of-way shall be done in conformity with all applicable permits and agreements with the CITY and the owners of such private property, easements, or rights-of-way. Whether or not such a condition be part of the agreement, care shall be taken to avoid injury to the premises entered, which premises shall be left in a neat and orderly condition by the removal of rubbish and the grading of surplus materials, and the restoration of said private property to the same or better general conditions as at the time of entry for Work to be performed under this contract. The Contractor shall not enter any easement without first confirming with the
CITY that such easement is fully executed.
01 00 00-13
B. The Contractor shall not (except after consent from the proper parties), enter or occupy with employees, tools, or equipment on any land outside the right-of-way or property of the CITY.
C. The Contractor shall be allowed use of the site designated for construction as necessary for the Work. However, existing access to properties shall be maintained or adequate access provided during the course of the Work. Cost for access shall be included in the
Prices Bid and stipulated for the various items of the Work to be done under this contract.
D. Work that shall be performed on private property or easements that requires granted access beyond the established road right-of-ways shall be done in conformity with all permits and agreements between the CITY and property owners. Should the Contractor desire or require additional space outside the limits of Work, it must arrange for such space with property and easement owners at its own expense. Legal binding agreements for such additional space must be in writing and a copy filed with the CITY, prior to accessing such lands. In such agreements, care shall be taken to avoid injury to the premises entered and shall be left in a neat and orderly condition as existed at the time of entry for Work.
E. When working on easements or property that was acquired by the CITY through condemnation, the Contractor shall install Tree Save Barriers along all boundaries of the work area, unless otherwise specifically directed by the CITY, prior to any Work.
Work premises shall be left in a neat and orderly condition by the removal of rubbish, debris, and the grading of surplus materials and the restoration of said private property to the same general conditions as existed at the time of entry for Work.
3.33 SAFETY
A. Comply with Laws and Regulations during the course of the Work.
3.34 SALES TAX
A. The Contractor shall furnish the CITY with certified copies of paid invoices or their equivalent proof covering sales tax paid on items which the CITY is eligible for tax refund; none of which shall be refunded or credited to the Contractor.
3.35 SANITARY MEASURES
A. Sanitary conveniences shall be employed prior to beginning the Work in sufficient number, in such manner and in such places as shall satisfy the CITY. Such sanitary conveniences shall be operated and maintained in such a manner as to remove harmful effects to personnel or environment. All persons connected with the Work are obliged to use the conveniences provided and shall in no way violate these provisions.
Violations shall result in an immediate dismissal of the employee and removal from the
Work. Only upon written consent by the CITY shall the violator regain access to the
Work. Sanitary conveniences shall be maintained during the Work and in compliance with the local Health Department and the CITY. When possible, sanitary conveniences shall be placed in locations that least impact public view. Upon completion of the Work, the Contractor shall remove sanitary conveniences without deleterious effect.
01 00 00-14
3.36 SCHEDULES
A. The Project Progress Schedule shall be plotted on a minimum eleven-inch by seventeen-inch (11” x 17”) size sheets with the flow of activities from left to right. Printing shall be in color and suitable for half-size reproduction. No lettering or numbering shall be less than one eighth-inch (1/8”) in height for capital letters and numbers. The critical path shall be clearly marked and readily identifiable.
B. The Project Progress Schedule shall be a Critical Path Method (CPM) Network
Diagram, and include the following:
1. Furnish an updated diagram with all activities and restraints. This includes providing an “As-Built” Schedule with completion dates for all key monthly completion and delivery dates,
2. Provide updated Project Progress Schedule graphics in color showing progress to-date and completion schedule. The critical path shall be clearly identified,
3. A legend clearly identifying each symbol used,
4. Be prepared in the form of a time-scaled CPM network,
5. Group activities by facility and major area of work. The identification number of the individual activities shall be coded such to provide the grouping,
6. Be prepared in chronological order of the beginning of each item of work,
7. Have a horizontal time scale based on calendar days and identify the Monday of each week,
8. Show the order and interdependencies of the activities and the sequence in which the work is to be accomplished as planned by the Contractor. The diagram shall show how the start of a given activity is dependent upon the completion of the preceding activities, and how its completion restricts the start of following activities. Float need not be shown on the network diagram,
9. Show all activities relating to the construction of the work, and include the following information related to the activities:
a. Activity number
b. Activity description
c. Percent complete
d. Estimated duration, in working days, of each activity
e. Start date
f. Finish date
10. Show all planned facility shutdowns, including temporary relocations, temporary bypasses, and transitions from existing to temporary, temporary to new, and the like.
a. For each anticipated shutdown included in the schedule, submit within thirty
(30) days prior to the planned shutdown, a description of the shutdown, duration, anticipated start and completion dates, related preparation work, 01 00 00-15 and related temporary facilities to be provided.
11. Show adverse weather days on the critical path.
a. The total number of adverse weather days shall be monitored and agreed to monthly by Contractor, the CITY and/or Engineer. The Project Progress
Schedule shall be updated to reflect the accrual of adverse weather days agreed to and enacted by a Contract Time extension.
12. Show the following for specified submittals of Shop Drawings, product data, samples, and materials:
a. Submittal date,
b. Review period, based on fourteen (14) calendar day review period,
c. Fabrication duration,
d. Delivery dates.
13. Show the following events and milestones in addition to construction activities:
a. Notice to Proceed,
b. Milestones,
c. Schedule of Submittals,
d. Operational Testing (including ait testing, chlorination, CCTV, etc.),
e. Owner Coordination,
f. Notification Periods,
g. Coordination with separate contracts/contractors,
h. Owner activities impacting the Work.
C. The Project Progress Schedule update shall coincide with the end of the pay period. The update shall be used to create the monthly payment application request. No monthly payment request will be processed unless the Project Progress Schedule is updated and submitted to the CITY and/or the Engineer.
D. The Schedule of Values shall be of the following form:
1. Type schedule on eight and one-half –inch by eleven-inch (8½” x 11”) white paper,
2. Contractor’s standard forms and automated printouts may be used,
3. Identify Schedule of Values information with:
a. Title of Project
b. Project Location
c. Purchase Order and Bid Number
d. Name and Address of Contractor
e. Date of Submission
E. The Schedule of Values shall list the installed value of the component parts of the Work
01 00 00-16 in sufficient detail to serve as a basis for computing values for progress payments during construction. Breakdown shall be by utility, then by CSI Format, for ease of field verification.
F. For Schedule of Values, follow the Bid Form as the format for listing component items.
Identify each item with number and title of the respective major section of the
Specifications.
G. For each major line item, list sub values of major products or operations under this item.
H. For the various portions of the Work:
1. Each item shall include a directly proportional amount of the Contractor’s overhead and profit.
2. For items on which progress payments will be requested for stored materials, breakdown the value into:
a. The delivered and unloaded cost of the materials, with taxes paid. Owner shall require invoices for proof of purchase.
b. The total installed value, including Contractor’s overhead and profit, less value of stored material item a. above.
3.37 SHORING, FORMWORK, AND TEMPORARY STRUCTURES
A. The Contractor shall take full responsibility including the hiring of practicing
Professional Engineer licensed in the State of Georgia that may be needed for the adequacy and safety throughout erection, use and removal of all temporary Work such as shoring and supports during all phases of the Work, formwork, and supports for concrete, temporary protection, and structures of all kinds.
3.38 SITE VIDEO
A. No sooner than one (1) week prior to commencing the Work and within 48 hours after completing the project once all materials and equipment have been removed, the
Contractor shall perform and supply the CITY thoroughly detailed video(s) of the worksite and its contiguous area. The video(s) shall be of such quality as to view and establish existing conditions in detail and used to render a decision where no other documentation is available. If videos are not maintained by the Contractor, the
Contractor shall be liable for any and all accused damages. Site video(s) made from a moving vehicle will not be accepted.
3.39 SOUND ATTENUATION
A. The Contractor shall, during the course of the Work, comply with the CITY’s Noise
Ordinance.
B. Work operations, machinery, equipment, and material handling shall be performed in such a manner as to avoid and eliminate unnecessary noise. Noise deemed unacceptable by the CITY shall be immediately terminated.
3.40 STORAGE
01 00 00-17
A. Materials, equipment, tools, and machinery required for the Work shall be neatly and compactly piled in such a manner as to cause the least inconvenience to property owners and traffic. Storage shall be in areas approved by the CITY. Fire hydrants, water and gas shut-off boxes, underground power and telephone line manholes shall, at all times, be kept free and unobstructed, and shall be left uncovered by such materials.
B. Stringing of pipe may not be used to stockpile pipe. Stringing of pipe on CITY’s rights-of- ways must be approved by the CITY and may be limited to the amount of pipe which will be installed during a work day. Should stringing of pipe be permitted, no pipe may be stored nearer than 10-feet to the edge of pavement.
C. All materials, equipment, tools, and machinery stored upon public thoroughfares must be provided with sufficient lights at night time to warn traffic of such obstructions.
D. The Contractor shall be responsible for any loss of or damage to materials, equipment, tools, machinery, public rights-of-way, and/or private property. Storage of materials, equipment, tools, and machinery shall be at no cost to the CITY.
3.41 TEMPORARY HEAT
A. The Contractor shall supply temporary heat for such period of time and at such temperature as needed for the proper protection and execution of the Work. No cost shall be paid for temporary heat and shall be incidental to the contract price.
3.42 USE OF FACILITIES
A. The CITY shall have the right or grant permits to connect any conduit, pipe line, or structure with the Work and its appurtenances at any time before the Work is accepted.
The Contractor shall not interfere or be granted compensation for such Work.
3.43 USE OF STREETS
A. Access: During the progress of the Work, the Contractor shall make ample provisions for both vehicular and foot traffic on public roadways except during periods of road closures approved by the CITY, and shall indemnify and save harmless the CITY from any expense whatsoever due to the Work. The Contractor shall provide, but not limited to, free access to all driveways unless temporary closure is specified on the Contract
Documents and/or drawings, fire hydrants, water, and gas valves located along the line of Work. Gutters and waterways must be kept open or other provisions made for the removal of stormwater.
Street intersections may not be blocked, except for one-half (½) the roadway at any given time, and the Contractor shall lay and maintain temporary driveways and crossings, such as in the opinion of the CITY are necessary to reasonably accommodate the public.
B. Traffic Control: Adequate signs, barricades, and lights, in accordance with the standards of the GDOT and/or CITY necessary to protect the public shall be provided.
Flagmen to direct traffic shall be employed continuously during periods when only one-way traffic can be maintained or when equipment is operated back and forth across the pavement areas.
Roadway disturbances shall not be left unfilled overnight, except in emergencies, and
01 00 00-18 in such cases adequate precautions shall be exercised to protect traffic.
C. Procedural Rules: Work in roads shall be in accordance with the rules and regulations of the controlling agency.
In the event of the Contractor's failure to comply with these provisions, the CITY may cause the same to be done, and shall deduct the cost of such Work from any monies due or to become due the Contractor under this agreement, but the performance of such
Work by the CITY or at its instance, shall serve in no way to release the Contractor from his general or particular liability for the safety of the public or of the Work.
3.44 UTILITY RELOCATIONS OR MODIFICATIONS
A. Should, in the course of the Work, a need arise to relocate or modify a portion of the
DeKalb County’s existing piping system, the Contractor shall immediately notify the the CITY and DeKalb County for approval to proceed with such Work in accordance with the Contract Documents, or as directed by the CITY and/or DeKalb County.
Removal of the existing piping system shall include, but not be limited to, the removal of its bulkheads, thrust restraints, piping appurtenances, concrete, and/or masonry that was exposed by excavation in part or whole, except for tie-rods beyond the limits of trenching. Without exception, any part of an existing restraint system relevant to the remaining existing piping system shall remain and be supplemented with additional restraint to maintain an unimpaired piping system. The cost for such Work shall be as stipulated by the Prices Bid, for the various items of the Work.
3.45 WATER SUPPLY
A. In the vicinity of the Work, the Contractor shall be responsible to acquire all water required to execute the Work. The Contractor shall be responsible for the retrieval, transport, and delivery of such water with all means to protect and maintain the integrity of DeKalb County’s water system at its own cost in accordance with all applicable rules and regulations. When water is required for the Work, the Contractor shall obtain a hydrant water meter from DeKalb County. The cost of the meter and water usage shall be incidental to the Work and will not be measured and paid for separately.
3.46 WORK IN INCLEMENT WEATHER
A. The Contractor shall take into account historical weather conditions and potential difficulties that may be encountered for completing the Work demonstrated in the work schedule and provide adequate protection against unfavorable weather to the satisfaction of the CITY. Weather shall not be grounds for contract extension of available work days, unless such should be most abnormal and then only when reasonable effort was exercised. Use the form (“Weather Delay Monthly Report”) to track monthly weather delays, this form is provided in the Appendix A.
END OF SECTION 01 00 00
MURPHEY CANDLER DAM SUMMARY OF WORK
01 11 00-1
SECTION 01 11 00
SUMMARY OF WORK
Section Title
1.2 Work Covered by Contract Documents
1.3 Scheduling and Sequence of Work
1.4 Use of Premises
1.5 Communication
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Work to be performed under this Contract is as described in the Notice of Bid
Advertisement and shall consist of furnishing all labor, materials, tools, equipment, and incidentals and performing all work required for upgrade to the Murphey Candler
Dam in a complete and functioning manner including the following work as indicated on the Contract Documents and/or Drawings or as directed by the CITY:
1. Install and maintain erosion control measures throughout the duration of the project. Maintain traffic control throughout the duration of construction.
2. Fully drain lake to work area around low level drain pipe. Provide the necessary bypass pumping, temporary diversion, and/or groundwater control for execution of the Work, while allowing flow to continue through the system and around the work area, as well as dewatering of stilling basin for Intrusive Testing by Engineer.
3. Modify existing riser structure and construct extended riser outlet structure.
4. Provide and install all necessary cured-in-place-pipe materials to rehabilitate the existing low level drain pipe.
5. Replace hoist head and stem guides for sluice gate structure, and any inoperable system components.
6. Restore all disturbed areas including roadways, retaining walls, curb and gutter, and sidewalks, restore all disturbed areas with final landscaping.
7. Clean-up the project work area and return the area to its pre-construction conditions.
8. Furnish and provide all other labor, materials, equipment, and other incidentals required to complete the Work as shown in the Contract Documents.
1.3 SCHEDULING AND SEQUENCE OF WORK
A. Install and maintain erosion control measures as required by the Contract Documents and/or Drawings.
B. Positive drainage for existing stormwater conveyance systems must remain in service throughout the duration of the Work. Provide bypass pumping or temporary diversion(s) as required.
C. Construct the Work as indicated on the Contract Documents and/or Drawings.
MURPHEY CANDLER DAM SUMMARY OF WORK
01 11 00-2
D. Prepare and submit a detailed plan for setup, operation, monitoring, and shutdown of the bypass system, as outlined in Section 31 23 19 Dewatering.
E. Construct upgrades to the Murphey Candler Dam as indicated on the Contract
Documents…