ITB No_ 24_022_Addendum 4.pdf

PDF 177 KB Posted

Attached to
24-022 LOW WATER DRAIN CIPP REHABILITATION MURPHEY CANDLER LAKE DAM
Solicitation number
PE-64496-NONST-2025-000000030
Issued by
Dekalb County, Brooklet City, Georgia

About this file

This document is an Addendum to Request for Proposal (RFP) No. 24-022 issued by the City of Brookhaven, Georgia for the LOW WATER DRAIN CIPP REHABILITATION MURPHEY CANDLER LAKE DAM project. The addendum extends the due date for bids to November 22, 2024 and adds a plan holder list. The project involves the cured-in-place pipe (CIPP) rehabilitation of the corrugated metal pipe (CMP) Low Water Drain (LWD) at the Murphey Candler Lake Dam for the Department of Public Works. The work will be performed in accordance with the Contract Documents, including drawings, technical specifications, and standard details.

The solicitation is open to qualified contractors to submit competitive sealed bids. Pricing terms, funding sources, and set-asides are not specified in the addendum. The contract term and any renewal options are also not provided.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 4

RFP 24-022 – LOW WATER DRAIN CIPP REHABILITATION MURPHEY CANDLER LAKE DAM

Date: November 12, 2024

To: All Offerors’

From: City of Brookhaven Purchasing Department

RE: RFP 24-022 - LOW WATER DRAIN CIPP REHABILITATION MURPHEY CANDLER LAKE DAM

Please see Addendum No. 4 for the above-referenced solicitation.

1. ADD: Plan holder Lists

2. Due Date extension 11.22.2024

Please acknowledge this Addendum by signing below. Submit this Addendum 4 with the ITB requirement.

(Signature) (Date)

Sincerely, Purchasing Manager

Date:

File details come from the government source that posted it. Updated .