24_022_Exhibit K_rev1.pdf
PDF 130 KB Posted
- Solicitation number
- PE-64496-NONST-2025-000000030
- Issued by
- Dekalb County, Brooklet City, Georgia
About this file
This document is an Exhibit K Bid Schedule for ITB 24-022, the Low Water Drain CIPP Rehabilitation project for the Murphey Candler Lake Dam, issued by the City of Brookhaven, Georgia. The project involves the cured-in-place pipe (CIPP) rehabilitation of the 30-inch corrugated metal pipe (CMP) Low Water Drain at the Murphey Candler Lake Dam, as well as various other dam and spillway maintenance and repair work. The bid schedule includes 27 line items for the Low Water Drain CIPP Rehabilitation portion and 11 line items for the Dam and Spillway Maintenance/Repairs portion, with quantities and unit prices provided. Contractors must submit a total bid price for both portions to be considered responsive.
The bid schedule also includes a note that the project scope of work encompasses all work listed, and the contractor must complete both bid forms. Pricing terms, funding sources, and any set-asides are not explicitly stated in this document. However, it is indicated that the work is to be performed in accordance with the contract documents, including drawings, technical specifications, standard details, and pay item index.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24_022_Exhibit K_rev2.pdf | ||
| Questionaire 2_Addendum 3.docx | DOCX document | |
| ITB No_ 24_022_Addendum 3.pdf | ||
| ITB No_ 24_022_Addendum 4.pdf | ||
| RFP No_ 24_022_Addendum 2.pdf | ||
| Questionaire 1 _Addendum 2.pdf | ||
| ITB No_ 24_022_Addendum 2.pdf | ||
| L2_Technical Specifications for MCD CIPP Reha.pdf | ||
| Document Takers_2024_11_12_planholders list.xlsx | XLSX spreadsheet | |
| Questionaire _11_06_2024.docx | DOCX document | |
| ITB No_ 24_022_Addendum 1.pdf | ||
| 24_022 2024 Low Water Drain Rehab Murphey Can.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT K
BID SCHEDULE
ITB 24-022, Low Water Drain CIPP Rehabilitation, Murphey Candler Lake Dam
Item Description Qty Unit Unit Price Total Price
1 Mobilization 1 LS
2 Mud Mats 375 SY
3 Mulch Complete 850 SY
4 Sodding and Permanent Seeding Complete 850 SY
5 Temporary Seeding Complete 850 SY
6 Silt Fence Complete, Type C 800 LF
7 Tree Protection Fence Complete 100 LF
8 Construction Entrance Complete 1 EA
9-A Cured In Place Pipe Rehabilitation, 30-IN CMP 165 LF
9-B Point Repairs, 30-IN CMP 1 EA
10 Flowable Fill 5 CY
11-A Control of Water (Dewatering and Construction) 130 DAY
11-B Control of Water (Reservoir Refilling) 90 DAY
12 Sidewalk Replacement 35 SY
13 W-Beam Guardrail 55 LF
14 Rip Rap, Type 3, 24-IN Thickness 65 SY
15 Riser Modifications 1 LS
16 Grading Complete 1 LS
17 Plastic Filter Fabric 75 SY
18 Removal of Existing Storm Drain Pipe 5 LF
19 Traffic Control 1 LS
Hoist Head Complete – Sluice Gate Structure
Component System
1 EA
Stem Guides Complete - Sluice Gate Structure
Component System
1 EA
Pedestal Complete – Sluice Gate Structure
Component System
1 EA
Operating Stem Complete – Sluice Gate Structure
Component System
1 EA
Gate Complete – Sluice Gate Structure Component
System
1 EA
25 Compost Filter Sock 2000 LF
Allowance – Repair/Remove/Lower Abandoned
Standpipe
1 LS $10,000.00 $10,000.00
27 LiDAR Survey – Dewatered Lake Bed (Area = 40 Ac) 1 LS
Low Water Drain CIPP Rehabilitation - Total Bid Price
* Please provide a unit price for items listed in the table above that do not have quantities.
*** Include completed bid schedule with your bid.
ITB 24-022, Dam & Spillway Maintenance / Repairs
Murphey Candler Lake Dam
Item Description Qty Unit Unit Price Total
Price
Remove All Trees within 3 feet of Spillway, Sheet C-
1 LS
Remove All Vegetation on Upstream Slope, Sheet C-
Replace Missing Animal Guards on Toe Drain Outfalls, Sheet C-001
4 EA
Make Designated Repairs, NE Side of Spillway, Sheet
C-002
Remove All Vegetation On and Around Spillway
Masonry Wall, Sheet C-002
Repair Wall Grout, Seal Transverse Joints, Sheet C-
300 LF
Repair and Seal Joints on Spillway / Repair Broken
Concrete, Sheet C-002
900 Rip Rap 400 TN
Install and Maintain Orange Tree Barrier Fencing
Around Work Areas
1100 Double Row Type C Silt Fence 100 LF
Dam & Spillway Maintenance / Repairs Bid - Total Bid Price
*** Include completed bid schedule with your bid.
ITB 24-022, Low Water Drain CIPP Rehabilitation, Murphey Candler Lake Dam
THE PROJECT SCOPE OF WORK IS FOR ALL WORK LISTED.
CONTRACTOR MUST COMPLETE BOTH BID FORMS TO BE CONSIDERED RESPONSTIVE
Total Bid Amount:
Total Bid Amount (written):
Contractor: ___________________________________________________________________
Signature: ____________________________________________________________________
Print: ________________________________________________________________________
Date: ________________________________________________________________________
THIS PAGE MUST BE COMPLETED AND SUBMITTED AS A PART OF YOUR BID
File details come from the government source that posted it. Updated .