24-022 LOW WATER DRAIN CIPP REHABILITATION MURPHEY CANDLER LAKE DAM
Solicitation number
PE-64496-NONST-2025-000000030
Issued by
Dekalb County, Brooklet City, Georgia

About this file

This document is an Exhibit K Bid Schedule for ITB 24-022, the Low Water Drain CIPP Rehabilitation project for the Murphey Candler Lake Dam, issued by the City of Brookhaven, Georgia. The project involves the cured-in-place pipe (CIPP) rehabilitation of the 30-inch corrugated metal pipe (CMP) Low Water Drain at the Murphey Candler Lake Dam, as well as various other dam and spillway maintenance and repair work. The bid schedule includes 27 line items for the Low Water Drain CIPP Rehabilitation portion and 11 line items for the Dam and Spillway Maintenance/Repairs portion, with quantities and unit prices provided. Contractors must submit a total bid price for both portions to be considered responsive.

The bid schedule also includes a note that the project scope of work encompasses all work listed, and the contractor must complete both bid forms. Pricing terms, funding sources, and any set-asides are not explicitly stated in this document. However, it is indicated that the work is to be performed in accordance with the contract documents, including drawings, technical specifications, standard details, and pay item index.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT K

BID SCHEDULE

ITB 24-022, Low Water Drain CIPP Rehabilitation, Murphey Candler Lake Dam

Item Description Qty Unit Unit Price Total Price

1 Mobilization 1 LS

2 Mud Mats 375 SY

3 Mulch Complete 850 SY

4 Sodding and Permanent Seeding Complete 850 SY

5 Temporary Seeding Complete 850 SY

6 Silt Fence Complete, Type C 800 LF

7 Tree Protection Fence Complete 100 LF

8 Construction Entrance Complete 1 EA

9-A Cured In Place Pipe Rehabilitation, 30-IN CMP 165 LF

9-B Point Repairs, 30-IN CMP 1 EA

10 Flowable Fill 5 CY

11-A Control of Water (Dewatering and Construction) 130 DAY

11-B Control of Water (Reservoir Refilling) 90 DAY

12 Sidewalk Replacement 35 SY

13 W-Beam Guardrail 55 LF

14 Rip Rap, Type 3, 24-IN Thickness 65 SY

15 Riser Modifications 1 LS

16 Grading Complete 1 LS

17 Plastic Filter Fabric 75 SY

18 Removal of Existing Storm Drain Pipe 5 LF

19 Traffic Control 1 LS

Hoist Head Complete – Sluice Gate Structure

Component System

1 EA

Stem Guides Complete - Sluice Gate Structure

Component System

1 EA

Pedestal Complete – Sluice Gate Structure

Component System

1 EA

Operating Stem Complete – Sluice Gate Structure

Component System

1 EA

Gate Complete – Sluice Gate Structure Component

System

1 EA

25 Compost Filter Sock 2000 LF

Allowance – Repair/Remove/Lower Abandoned

Standpipe

1 LS $10,000.00 $10,000.00

27 LiDAR Survey – Dewatered Lake Bed (Area = 40 Ac) 1 LS

Low Water Drain CIPP Rehabilitation - Total Bid Price

* Please provide a unit price for items listed in the table above that do not have quantities.

*** Include completed bid schedule with your bid.

ITB 24-022, Dam & Spillway Maintenance / Repairs

Murphey Candler Lake Dam

Item Description Qty Unit Unit Price Total

Price

Remove All Trees within 3 feet of Spillway, Sheet C-

1 LS

Remove All Vegetation on Upstream Slope, Sheet C-

Replace Missing Animal Guards on Toe Drain Outfalls, Sheet C-001

4 EA

Make Designated Repairs, NE Side of Spillway, Sheet

C-002

Remove All Vegetation On and Around Spillway

Masonry Wall, Sheet C-002

Repair Wall Grout, Seal Transverse Joints, Sheet C-

300 LF

Repair and Seal Joints on Spillway / Repair Broken

Concrete, Sheet C-002

900 Rip Rap 400 TN

Install and Maintain Orange Tree Barrier Fencing

Around Work Areas

1100 Double Row Type C Silt Fence 100 LF

Dam & Spillway Maintenance / Repairs Bid - Total Bid Price

*** Include completed bid schedule with your bid.

ITB 24-022, Low Water Drain CIPP Rehabilitation, Murphey Candler Lake Dam

THE PROJECT SCOPE OF WORK IS FOR ALL WORK LISTED.

CONTRACTOR MUST COMPLETE BOTH BID FORMS TO BE CONSIDERED RESPONSTIVE

Total Bid Amount:

Total Bid Amount (written):

Contractor: ___________________________________________________________________

Signature: ____________________________________________________________________

Print: ________________________________________________________________________

Date: ________________________________________________________________________

THIS PAGE MUST BE COMPLETED AND SUBMITTED AS A PART OF YOUR BID