About this file

This document is an Invitation to Bid (ITB) from the City of Brookhaven, Georgia for the Low Water Drain CIPP Rehabilitation project at the Murphey Candler Lake Dam. The project involves the rehabilitation of the corrugated metal pipe (CMP) low water drain at the dam using a cured-in-place pipe (CIPP) lining solution. The scope of work also includes additional downstream CMP segment repairs, dam and spillway maintenance, and a lake bed survey. Bids are due by November 15, 2024 and a mandatory pre-bid conference will be held on October 25, 2024. The contract duration is 240 calendar days from the Notice to Proceed.

The contract will be awarded on a unit price basis up to the total bid price. Payment and performance bonds are required, as is a maintenance bond for one year after completion. The City reserves the right to terminate the contract for cause or convenience. The contract includes provisions for small and minority business participation, and liquidated damages of $500 per day for failure to reach substantial completion by the deadline.

View the file

Other files

File Type Posted
24_022_Exhibit K_rev2.pdf PDF
Questionaire 2_Addendum 3.docx DOCX document
ITB No_ 24_022_Addendum 3.pdf PDF
ITB No_ 24_022_Addendum 4.pdf PDF
RFP No_ 24_022_Addendum 2.pdf PDF
Questionaire 1 _Addendum 2.pdf PDF
ITB No_ 24_022_Addendum 2.pdf PDF
L2_Technical Specifications for MCD CIPP Reha.pdf PDF
Document Takers_2024_11_12_planholders list.xlsx XLSX spreadsheet
24_022_Exhibit K_rev1.pdf PDF
Questionaire _11_06_2024.docx DOCX document
ITB No_ 24_022_Addendum 1.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation to Bid, No. 24-022

LOW WATER DRAIN CIPP REHABILITATION

MURPHEY CANDLER LAKE DAM

October 17, 2024

***Mandatory/Optional Pre-Bid Conference*** October 25, 2024, at 11:00 a.m. EDT.

Brookhaven City Hall 4362 Peachtree Rd. NE, Brookhaven, GA 30319

BID DUE DATE and OPENING DATE:

November 15, 2024, at 04:00 p.m. EDT.

Bids shall only be accepted online through the Bonfire Portal at:

https://brookhavenga.bonfirehub.com/projects/view/158165

Any bid submitted in any other format (email, paper, fax, mail, etc.) will not be accepted.

Instructions to Bidders:

1. All communications regarding this solicitation must be with the Purchasing Manager, Purina

Alexander, purina.alexander@brookhavenga.gov.

2. All questions or requests for clarification must be sent via Bonfire under Message - Opportunity

Q&A: https://brookhavenga.bonfirehub.com/projects/view/158165. Questions are due no later than November 1, 2024, at 4:00 p.m. EDT. Questions received after this date and time may not be answered.

3. Questions and clarifications will be answered in the form of an addendum. Any addenda, schedule changes, and other important information regarding the solicitation related to this solicitation will be posted on Bonfire website at https://brookhavenga.bonfirehub.com/projects/view/158165 and it is the Offeror’s responsibility to check the Bonfire portal for any addendum or other communications related to this solicitation.

4. The City of Brookhaven reserves the right to reject all bids and to waive technicalities and informalities, and to make award in the best interest of the City of Brookhaven.

5. The City of Brookhaven is not responsible for any technical difficulties. It is highly recommended that all potential contractors submit their quotes prior to the due date of this solicitation.

6. ALL BIDDERS ARE REQUIRED TO SIGN, DATE AND RETURN THE FOLLOWING

‘CONTRACT’ (PAGES 2, 3, & 4) WITH THEIR BID PACKAGE SUBMISSION.

https://brookhavenga.bonfirehub.com/projects/view/70372 https://brookhavenga.bonfirehub.com/projects/view/70372 https://brookhavenga.bonfirehub.com/projects/view/70372

CONTRACT FOR ITB 24-022

LOW WATER DRAIN CIPP REHABILITATION

This CONTRACT FOR CONSTRUCTION (hereinafter “Contract” or “Agreement”) is made and entered into this_______ day of ______________, 2024 by and between the City of Brookhaven (hereinafter “City”), and ___________________________________________ (hereinafter “Contractor”).

NOW THEREFORE, for and in consideration of the mutual promises and obligations contained herein and under the conditions hereinafter set forth, the parties do hereby agree as follows:

1. THE WORK:

The city contracts with the Contractor as an independent contractor to provide all labor, materials, drawings, submittals, equipment, and/or services necessary or incidental to complete the work for Project 24-022: Low Water Drain CIPP Rehabilitation - Murphey Candler Lake Dam (“Project”). The Scope of work is described in further detail in Exhibit B and shall be delivered and installed in good and workman-like fashion, free of defects, and in accordance with industry standards as well as the Contract Documents, and consistent with the Project Schedule, as may change from time to time (hereinafter, the “Work”). The Contractor acknowledges and agrees that the Work includes the provision of all equipment, components, systems, materials, documentation and other services and items required to perform the Work and make it complete, functional and/or operational, notwithstanding the fact that each such service or item may not be expressly mentioned in the Contract Documents. The contractor shall obtain all required permits to perform the Work and shall furnish City with a copy of the same and shall comply with all codes, safety ordinances, local, state, and federal laws, rules, and regulations applicable to the Work. The contractor shall keep the Project site clean and free from debris resulting from Contractor’s Work. Approval of submittals or drawings proposed or submitted by Contractor for its Work by City or any person or entity acting on City’s behalf are for administrative purposes only and shall not relieve Contractor of its obligations to follow the terms of the Contract Documents.

2. ATTACHMENTS:

The following documents are attached and are specifically incorporated herein by reference; and, along with any properly executed amendments thereto constitute the Contract Documents:

Exhibit A: General Conditions.

Exhibit B: Scope of Work (ITB 24-022 reference herein).

Exhibit C: Determination of Responsibility.

Exhibit D: Bond Documents: Payment Bond, Performance Bond, and Maintenance Bond.

Exhibit E: Georgia Security and Immigration Compliance Affidavit.

Exhibit F: Drug-Free Workplace.

Exhibit G: Purchasing Policy Addendum.

Exhibit H: Affidavit Verifying Status for Public Benefit Application.

Exhibit I: Bid Documents: References and Subcontractor Form.

Exhibit J: Non-Collusion Affidavit.

Exhibit K: Bid Schedule.

Exhibit L: Construction Drawing Package and Special Provisions, Project Background Materials.

The terms of the General Conditions (Exhibit A) are intended to expand upon, and not conflict with the, the terms in the main body of this Contract. However, in the event of any unresolvable conflict between the terms of the main body of this Contract and the terms in the General Condition, the term setting forth the more expansive scope of Work or otherwise greater obligation of the Contractor shall control.

CONTRACT ITB 24-022

3. CONTRACT SUM:

The City agrees to pay the Contractor, in exchange for the proper performance of the Work, on a Unit Price basis up to the Contract Sum, which shall be the amount reflected in Exhibit K. Periodic progress payments will be made, which reflect the quantity of work performed during the period covered

4. BONDS:

The contractor must procure, at its own expense payment and performance bonds with a penal amount no less than the Contract Sum. Such bonds shall be written in the AIA A312-2010 forms of such other forms as the City may approve in its sole discretion. The contractor shall also provide a maintenance bond in a substantially similar form to Exhibit D hereto.

5. TERMINATION FOR CAUSE:

The City may terminate this Contract for cause upon ten (10) days prior written notice to the Contractor of the Contractor’s default in the performance of any term of this Contract. Such termination shall be without prejudice to any City’s rights or remedies provided by law.

6. TERMINATION FOR CONVENIENCE:

The City may terminate this Contract for its convenience at any time upon 30 days written notice to the Contractor. In the event of the City’s termination of this Contract for convenience, the Contractor will be paid for those services actually performed. Partially completed performance of the Contract will be compensated based upon a signed statement of completion to be submitted by the Contractor who shall itemize each element of performance.

7. CONTRACT NOT TO DISCRIMINATE:

During the performance of this Contract, the Contractor will not discriminate against any employee or applicant for employment because of race, creed, color, color, sex, national origin, age, or disability which does not preclude the applicant or employee from performing the essential functions of the position. The Contractor will also, in all solicitations or advertisements for employees placed by qualified applicants, consider the same without regard to race, creed, color, sex, national origin, age, or disability which does not preclude the applicant from performing the essential functions of the job. The Contractor will cause the foregoing provisions to be inserted in all subcontracts for any work covered by this Contract so that such provision will be binding upon each sub-service provider for standard commercial supplies of raw materials.

8. ASSIGNMENT:

The Contractor shall not sublet, assign, transfer, pledge, convey, sell or otherwise dispose of the whole or any part of this Contract or his right, title, or interest therein to any person, firm, or corporation without the previous consent of the City in writing.

9. WAIVER:

A waiver by either party of any breach of any provision, term, covenant, or condition of this Contract shall not be deemed a waiver of any subsequent breach of the same or any other provision, term, covenant, or condition.

10. SEVERABILITY:

The parties agree that each of the provisions included in this Contract is separate, distinct and severable from the other and remaining provisions of this Contract and that the invalidity of any Contract provision shall not affect the validity of any other provision or provisions of this Contract.

11. GOVERNING LAW:

The parties agree that this Contract shall be governed and construed in accordance with the laws of the State of Georgia. This Contract has been signed in DeKalb County, Georgia.

12. MERGER CLAUSE:

The parties agree that the terms of this Contract included the entire Contract between the parties, and as such, shall exclusively bind the parties. No other representations, either oral or written, may be used to contradict the terms of this Contract.

13. SMALL AND MINORITY BUSINESSES CLAUSE:

The City of Brookhaven in maintaining its status as a Welcoming City and City of Ethics commissioned a study of its Social Justice, Race, and Equity practices. As a result of the study, recommendations have been made to the Brookhaven City Council to enhance and improve upon its efforts in providing opportunities to small and minority businesses in procuring goods and services. With respect to openness and transparency, the City of Brookhaven encourages all businesses regardless of size and status to engage in the City’s procurement process. The City gives equal attention to all submissions and will work with individual firms to ensure that their questions are answered on a timely basis.

14. SUBSTANTIAL COMPLETION AND LIQUIDATED DAMAGES:

(A) “Substantial Completion” means the stage in the progress of the Work when construction of the entire Work (or, for less than the entire Work, a specifically designated portion thereof) is fully completed in accordance with the terms of this Agreement, and in a good and workmanship manner, subject only to minor punch list work and final cleaning and is sufficiently complete so as to allow the City to occupy or utilize the Work (or such specifically designated portion thereof) for the use for which it is intended with all of the installations, parts and systems relating thereto functional and usable by City, and the Contractor shall have delivered to the City a certificate of occupancy or other approval necessary for legal occupancy for the Work.

(B) City and Contractor agree that the damages caused by the Contractor’s failure to complete the Work timely will be difficult if not impossible to estimate accurately. Therefore, the City and Contractor agree that, if the Contractor fails to reach Substantial Completion of the entire Work within the times provided for in Exhibit B of this Agreement (or elsewhere herein as the case may be), as the times may be amended in accordance with the terms of this Agreement, Contractor agrees to pay, as Liquidated Damages, five hundred dollars ($500.00) per calendar day for which Substantial Completion of the entire Work has not been achieved after the expiration of the deadlines set forth in Exhibit B of this Agreement (or elsewhere herein as the case may be). The City and Contractor, by their signatures hereto, agree that these Liquidated Damages are not meant to constitute or function as a penalty, but are instead a reasonable estimate of the probable loss to be suffered upon untimely completion of the Work. Such Liquidated Damages are not the exclusive measure of monetary or other damages which may be due from Contractor to City under this Agreement and are only meant to estimate direct damages incurred by the City due to the failure of Contractor to timely reach Substantial Completion of the entire Work as noted above.

(C) In addition to any other remedies, it may have under this Agreement or at law, the City may at any time demand payment from Contractor of the then current balance of Liquidated Damages due to or incurred by the City within 10 days from such written demand. The City may, but is not required to, credit or set off the amount of unpaid Liquidated Damages against any amounts owed by the City to the Contractor.

15. COUNTERPARTS:

This Contract of any Task Order may be executed and delivered in one or more counterparts, any one of which need not contain the signatures of more than one person, but all such counterparts taken together will constitute one and the same instrument. Delivery of an executed counterpart of a signature page to this Contract or any Task Order by electronic mail or facsimile shall be as effective as an original of the same.

IN WITNESS WHEREOF, the parties hereto, acting through their duly authorized agents, have caused this

CONTRACT to be signed, sealed and delivered.

Signatures on the following page.

Brookhaven, GEORGIA

By:

John Park, Mayor, City of Brookhaven, Georgia

OR

By:

John Funny, Mayor Tempore, City of Brookhaven, Georgia

ATTEST: _

Sandra Bryant, City Clerk

APPROVED AS TO FORM:

Jeremy Berry, City Attorney

SERVICE PROVIDER:

Signature___________________________________ Date _____________

Print Name__________________________________

Print Title ___________________________________

ATTEST:

____________________________________________ Date _____________ Signature

Print Name__________________________________

Print Title ___________________________________

EXHIBIT A

GENERAL CONDITIONS

PLACEHOLDER FOR EXHIBIT A – GENERAL CONDITIONS

****** END OF EXHIBIT A*****

EXHIBIT B

SPECIFICATIONS AND SCOPE OF WORK

Contract Duration:

240 calendar days from the date of issuance of the Notice to Proceed

Project Description:

The City of Brookhaven is soliciting competitive sealed bids from qualified contractors for a cured-in-place pipe (CIPP) rehabilitation of the corrugated metal pipe (CMP) Low Water Drain (LWD) at Murphey Candler Lake Dam for the Department of Public Works. Work will be done in accordance with the Contract Documents: Agreement, Drawings (100% Construction Plan for: Murphey Candler Lake Park Dam CMP Spillway and Riser Repair, Permit #MS23-00094, dated February 15, 2024), Special Technical Specifications (Specifications for Murphey Candler Dam CIPP Rehabilitation for City of Brookhaven, February 2024), Special Details, City of Brookhaven Standard Details, Georgia Department of Transportation’s Standard Drawings, Standard Specifications, and Pay Items Index as the standards for the construction and completion of the work required, except as noted or directed by Engineer.

Scope

The contractor shall furnish all materials, equipment, and labor to complete the required construction as described in its entirety to the specification directed and the terms of this contract including all incidentals as directed by the City of Brookhaven Director of Public Works or his representative. Unless otherwise specified in the Contract Documents, all work shall be completed in accordance with Georgia Department of Transportation Standard Specifications (current edition), by the completion date.

The LWD is located near the bottom of the earthen dam in Murphey Candler Lake, and, as such, dewatering of the work area will be required to be maintained for the duration of the work. A CIPP solution has been designed for the LWD and additional downstream CMP segment(s). All erosion & sediment control practices must be installed, inspected on a daily basis, and maintained to prevent the discharge of sediment from the construction area into downstream areas throughout the duration of the project.

Dam & Spillway Maintenance / Repair:

In addition to the repairs to the low water drain, other maintenance activities around the spillway will be completed by the selected Contractor. This work is summarized in the Additional Construction Document titled: Murphey Candler Park Dam Maintenance, City of Brookhaven, July 28,2021, Special Details, City of Brookhaven Standard Details, Georgia Department of Transportation’s Standard Drawings, Standard Specifications, and Pay Items Index as the standards for the construction and completion of the work required, except as noted or directed by Engineer.

Lake and Spillway Dewatering:

Lake levels will be lowered to the levels and for the period of time indicated in the Contract Documents.

While the lake water levels are below the spillway invert elevation, a detailed inspection of the spillway and stilling basin below (by others) will be conducted. Therefore, the dewatering operations extend to a location below the stilling basin at the toe of the dam. The invert of the stilling basin is lower than the bottom of the channel at the spillway outfall. Consequently, the discharge end of the lake-lowering syphons will need to be extended downstream below the stilling basin.

Lake Bed Survey:

During drawdown of the reservoir, the Contractor shall conduct an Aerial LiDAR (Light Detection and Ranging) survey of the dewatered or partially dewatered lakebed to comply with the standards of Georgia Department of Transportation (GDOT) Automated Survey Manual and all applicable FAA requirements.

The objective of this survey is to provide City with volumetric information of the Murphey Candler Reservoir. The Contractor shall submit a Survey Plan to the City prior to performing the Work for approval by the City. The Survey should be performed to Quality Level 2 (QL2). The survey area will be approximately 40 acres. Deliverables required will include a report of survey, LiDAR point cloud data, and a digital elevation model (DEM) of the surveyed area.

General Notes:

1. Work is expected to begin within 10 days of the official “Notice to Proceed” with all work be substantially completed within 150 calendar days. Refilling of the reservoir to normal pool elevation shall be performed in accordance with the schedule provided in the Contract Documents for a duration of up to 90 calendar days following substantial completion of the Work. Time extensions will be considered for rain events that raise water levels to levels that prevent work or present unsafe working conditions. The Engineer shall make those determinations. Time extensions due to fabrication lead times for specific products as indicated in the Contract Documents will be considered.

2. Scheduling: On a weekly basis, the Contractor shall submit a schedule of work to be performed two (2) weeks in advance (e.g. a two week look ahead). This schedule will be published on the City’s Project Website to keep residents informed and current on project progress.

3. The contractor will notify all affected residents & stakeholders of upcoming road closures / lane closures through the use and placement of at least four Variable Messaging Boards placed at strategic locations.

4. The Contractor shall perform project housekeeping/clean-up on a daily basis: this includes sweeping and/or vacuuming for dust and debris along the roadway and cleaning of driveways if applicable. Cleanliness is a point of emphasis for the City of Brookhaven and our citizens and great attention must be paid to keeping the streets and properties affected by this work as clean and in order as possible.

5. The Contractor’s performance will be measured based on the following:

- Compliance with the Scope of Work and GDOT Specifications

- Cleanliness of the worksite

- Meeting agreed upon schedule dates

- Submission of all deliverables as specified

6. The contractor is responsible for calling for utility locations prior to the start of each phase of work. It shall be the contractor’s responsibility to coordinate his work with any utility owner who maybe in conflict with his work. No claims will be considered for extra compensation.

7. Any item which must be removed during the construction work and is not specially called for shall be removed by the contractor. The cost shall be included in other, unit price bid. No claims will be considered for extra compensation.

8. All traffic control shall be provided by the contractor in accordance with GDOT’s “shelf” Special Provision 150. Assistance from police officers will not be provided by the City, but the contractor shall coordinate with the City of Brookhaven Police Department to provide a work zone officer as needed or as directed by the engineer. Traffic control costs shall be included in contract pay items pricing. The contractor shall maintain through traffic via single lane closure while also allowing adequate access to driveways and side roads. At no time will a street be closed completely unless approved and directed by the Engineer. Post-mounted traffic control signs are not required.

9. It is the intent of this contract for each unit price bid to include all labor, materials, equipment, tools, transportation, and supplies as required as necessary to complete the work in accordance with the plans, specifications as directed, and the terms of this contract.

10. The general descriptions of each item of work are as described in the Georgia Department of Transportation’s standards and specifications, complete and accepted. Any conflicts which might occur during the course of the construction work or any conflicts which might be related to the compensation of any work shall be decided based on the Georgia DOT’s standards and specifications, or, if the Special Technical Specifications, Special Details, or Broohaven Standard Details address the issue, the specification and/or detail most closely tied to the actual Scope of Work shall prevail. No claims will be considered for extra compensation.

11. Upon the completion of each work item, any excess items which might be left over from the construction related work shall be removed and disposed of properly by the contractor. The cost for such removal and disposal of such items will be included in other unit price bid. No claims will be considered for extra compensation.

12. Under this scope, “Department”, “Engineer”, and “Resident Engineer” shall mean the “City of Brookhaven, Georgia, Public Works Director or City of Brookhaven, Georgia or Public Works Designee”.

13. Working hours are limited to Monday thru Friday, 7:00 AM to 7:00 PM, & Saturday 8:00 AM to 5:00 PM, unless prior approval is granted by the Department of Public Works. Lane closures on non-neighborhood streets will only be permissible between the hours of 9 a.m.

and 4 p.m.

14. Temporary striping where required shall follow within twenty-four (24) hours of resurfacing.

Permanent Pavement markings must be installed no sooner than 15 days after paving but no later than 30 days after paving. If the contractor fails to meet these requirements, the City will remove these items from the contract and deduct from the contract any additional costs incurred by the City to complete this work.

15. Marking tape is permissible for temporary pavement markings on milled surfaces and freshly paved asphalt. All Crosswalks, Speed Humps, and/or Speed Tables shall be remarked with marking tape IMMEDIATELY upon milling or placement of asphalt.

16. The pre-marking layout shall be approved by the City prior to temporary or permanent pavement marking.

17. Manhole, Storm Drain Structures and Utility Valve Box Adjustments-It shall be the Contractor’s responsibility to note and mark the location of each utility valve box and manhole cover on the streets prior to resurfacing then locate and adjust each of these after resurfacing. Water utility valve adjustments may be made with adjustable rings and shall conform with DeKalb County Watershed standards. Sewer manhole adjustments shall be made in accordance with DeKalb County Watershed standards. Adjustments shall be completed within 30 days of paving. High and Early strength Concrete shall be used and protected from traffic for a minimum of 3 days with steel plates, or other measures. In the event an existing casting or structure is found to be structurally deficient, it shall be reported to the engineer for evaluation.

18. The standard edge mill width will be 6 feet. Existing pavement shall be milled at the gutter line to a depth equal to or greater than the depth of overlay to be installed at a minimum. The finished grade of the final asphalt at the gutter line shall be no higher than the existing finished grade or as directed by engineer.

19. A material transfer vehicle is not required unless the plant and mix used require one as noted on GDOT’s QPL 45.

20. Contractor shall have all vehicles marked with their company name.

21. In addition to the weekly meetings, the contractor will, at a minimum, conduct one (1) overall contract pre-construction meeting shortly after award of the contract at Brookhaven City Hall, and one (1) additional meeting substantial completion meeting. A representative authorized to make management / contract related decisions shall be present.

22. The City of Brookhaven will not provide restroom facilities.

23. The Contractor shall perform project housekeeping/clean-up on a daily basis. A 24-hour contact must be provided to the City of Brookhaven for all issues as needed in regard to the project for any safety, signage, or other emergency as needed.

24. The contractor shall obtain permission from any private property owner on whose property construction equipment may be parked. Failure to obtain permission from property owners may result in citations. Limited space for parking of equipment may be available at city owned parks, depending on the schedule of events at the park.

25. The City of Brookhaven reserves the right to extend this contract by mutual consent for a limited period of time, not to exceed six (6) months, and extend the contract for additional work to the awarded vendor. This action should be taken in writing prior to the expiration of the current contract.

26. Proof of Commercial general liability insurance with coverage of not less than ONE MILLION DOLLARS ($1,000,000.00) combined single limit per occurrence, and with contractual liability coverage for Contractor’s covenants to and indemnification of the City under the Contract.

27. All Bidders are required to submit a Bid Bond or a certified check made payable to the City of Brookhaven in the amount of five percent (5%) of the total amount bid. The Bid Bond or certified check must be enclosed in the envelope with the sealed bid.

28. The awarded bidder will be required to furnish a contract Performance Bond and Payment Bond, each in the sum of 100% of the total amount bid and provide insurance coverage as required by the contract documents. Bonding Company must be licensed to do business in Georgia, licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by the Georgia Insurance Department, listed in the Department of the Treasury's Publication of Companies Holding Certificates of Authority as Acceptable Surety on Federal Bonds and as Acceptable Reinsuring Companies and have an A.M. Best rating of A-V or higher.

29. The awarded bidder will be required to submit a Maintenance Bond valid for 12 months in the amount of the total bid.

The City of Brookhaven does not warrant or guarantee the accuracy of the quantities depicted within this bid. Contractor is responsible for the verification of all quantities prior to submittal of their bid.

This bid will require bonds. Please see bonding documents at the end of this procurement.

******END OF EXHIBIT B******

EXHIBIT C

DETERMINATION OF RESPONSIBILITY

Bidders shall provide the following information on attached sheets; this information shall be submitted with the bid in the format specified. Provide the response, to each section of the information, on a separate sheet of paper, preferably typewritten, and attached to the bid at the time it is submitted. Failure to provide information requested in complete and accurate detail may result in rejection of the bid.

1. History and Organizational Structure of the Firm

Provide a cover letter introducing the company and including the corporate name, address and telephone number of the corporate headquarters and local office. The name and phone number of one individual who will be the company’s primary contact with the City of Brookhaven for contract negotiation and the name of the project manager. A brief history of the company and the present organizational structure of the firm describing the management organization, permanent employees by discipline, and this project’s coordination structure; if the firm is a partnership, indicate the name of all partners; if incorporated indicate where and when. If the Contractor has changed names or incorporation status within the last five (5) years, then please list all of such preceding organizations and a brief reason for the change. Contractor shall also provide a business license indicating that the Contractor can conduct business in Dekalb County, Georgia. Further, Contractor shall provide documentation showing that the Contractor is properly registered to conduct business in the State of Georgia, and is licensed to conduct utility business in the State of Georgia.

Contractor acknowledges and agrees that any business license and registration must remain current for the duration of the contract and such documents are material term to this agreement.

2. References

List as references (names, addresses, contact persons and toll-free phone numbers) a minimum of three (3) government municipalities or other clients of similar size and nature to City of Brookhaven for which a project comparable to the scope of this project was completed. See forms provided as Exhibit I.

3. Subcontractors

Indicate the names and addresses and degree of utilization of any and all subcontractors which would be used in the performance of this contract. See forms provided as Exhibit I.

4. Previous Default

Indicate if you or any predecessor organization have ever defaulted on a contract or denied a bid due to non-responsibility to perform. If so, provide the facts and circumstances. If your firm or any successor organization is now involved in any litigation or in the past ten (10) years have been involved in litigation with owners, please list the parties to the litigation, the civil action number and a brief explanation of the matter.

****** END OF EXHIBIT C*****

EXHIBIT D

BOND DOCUMENTS

BONDING REQUIREMENTS

Each bid must be accompanied with a BID BOND (bond only: certified checks or other forms are not acceptable) in an amount equal to five percent (5%) of the base bid, payable to the City of Brookhaven.

Said bid bond guarantees the bidder will enter into a contract to construct the project strictly within the terms and conditions stated in this bid and in the bidding and contract documents, should the construction contract be awarded.

The Successful Bidder shall be required to furnish a bond for the faithful performance on the contract and a bond to secure payment of all claims for materials furnished and/or labor performed in performance of the project, both in amounts equal to one hundred percent (100%) of the contract price.

The Successful Bidder shall also be required to furnish a Maintenance Bond, in the amount of one-third (1/3) of the contract price, guaranteeing the repair or replacement caused by defective workmanship or materials for a period of one (1) year from the completion of construction.

Bonds shall be issued by a corporate surety appearing on the Treasury Department’s most current list (Circular 570 as amended) and be authorized to do business in the State of Georgia.

Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners shall execute Bond.

BID BOND

KNOW ALL MEN BY THESE PRESENTS, THAT

(Name of Contractor)

(Address of Contractor) at

Corporation, Partnership and or Individual) hereinafter called Principal, and

(Name of Surety)

(Address of Surety

A corporation of the State of , and a Surety authorized by law to do business in the State of Georgia, hereinafter called Surety, are held, and firmly bound unto City of Brookhaven Georgia

(Name of Obligee)

4362 Peachtree Road NE, Brookhaven, Georgia 30319 , herein after referred to as Obligee, in the penal (Address of Obligee) sum of Dollars ($ ) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.

WHEREAS, the Principal is about to submit, or has submitted, to the City of Brookhaven, Georgia, a proposal for furnishing materials, labor, and equipment for:

Invitation to Bid, No.24-020

ITB 24-020, Low Water Drain CIPP Rehabilitation, Murphey Candler Lake Dam

WHEREAS the Principal desires to file this Bond in accordance with law in lieu of a certified Bidder’s check otherwise required to accompany this Proposal.

NOW, THEREFORE, the conditions of this obligation are such that if the bid is accepted, the Principal shall within ten days after receipt of notification of the acceptance execute a Contract in accordance with the Bid and upon the terms, conditions, and prices set forth in the form and manner required by the City of Brookhaven, Georgia, and execute a sufficient and satisfactory Performance Bond and Payment Bond payable to the City of Brookhaven, Georgia, each in an amount of 100% of the total Contract Price, in form and with Security satisfactory to said the City of Brookhaven, Georgia, and otherwise, to be and remain in full force and virtue in law; and the Surety shall, upon failure of the Principal to comply with any or all of the foregoing requirements within the time specified above, immediately pay to the City of Brookhaven, Georgia, upon demand, the amount hereof in good and lawful money of the United States of America, not as a penalty, but as liquidated damages.

PROVIDED, FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant, to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as Amended, including, but not limited to, O.C.G.A. SS 13-10-1, et. Seg.

And SS 36-86-101, et. Seg. And is intended to be and shall be constructed as a bond in compliance with the requirements thereof.

Signed, sealed, and dated this day of 2024.

ATTEST:

_________________ (Signature) ________________ (Signature) (Principal Secretary): (Principal):

(SEAL) BY: __________________________

_______________________________ (Signature) _______________ (Address)

(Witness to Principal):______________ (Print)

(Address) (Surety): (Print)

ATTEST:

BY: ___________________________ (Signature)

(Attorney-in-Fact) and Resident Agent: (Print) ___________________________

(Attorney-in-Fact): (Print)

(SEAL)

_________________________________ (Signature)

(Witness as to Surety):_______________ (Print)

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS: THAT

(Name of Contractor)

(Address of Contractor)

(Corporation, Partnership or Individual)

Hereinafter called Principal, and

(Name of Surety)

(Address of Surety)

A Corporation of the State of _________________and a surety authorized by law to do business in the

State of Georgia, hereinafter called Surety, are held and firmly bound unto:

The City of Brookhaven Georgia (Name of Obligee)

4362 Peachtree Road NE, Brookhaven, Georgia 30319 (Address of Obligee)

Hereinafter referred to as Obligee; for the use and protection of all subcontractors and all persons supplying labor, services, skill, tools, machinery, materials and/or equipment in the prosecution of the work provided for in the contract hereinafter referred to in the full and just sum of _____________________________ Dollars ($_____________) in lawful money of the United States, for the payment of which sum well and truly to be made, the Principal and Surety bind themselves, their, and each of their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

The condition of this obligation is such, as whereas the Principal entered into a certain contract, hereto attached, with the Obligee, dated____________________ for ____________________.

NOW, THEREFORE, the conditions of this obligation are such that if the Principal shall well, truly, and faithfully perform said Contract in accordance to its terms, covenants, and conditions, and shall promptly pay all persons furnishing labor, materials, services, skill, tools, machinery and/or equipment for use in the performance of said Contract, then this obligation shall be void; otherwise, it shall remain in full force and effect.

All persons who have furnished labor, materials, services, skill, tools, machinery and/or equipment for use in the performance of said Contract shall have a direct right of action on this Bond, provided payment has not been made in full within ninety (90) days after the last day on which labor was performed, materials service, skill, tools, machinery, and equipment furnished or the subcontract completed.

PROVIDED FURTHER, that said Surety to this Bond, for value received, hereby stipulates and agrees that no change, extension of time, alterations, or additions, to the terms of the Contract or to the Work to be performed thereunder shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alterations, or additions to the terms of the Contract or to the work to be performed thereunder.

PROVIDED, HOWEVER, that no suit or action shall be commenced hereunder by any person furnishing labor, materials, services, skill, tools, machinery, and /or equipment having a direct contractual relationship with a subcontractor, but no contractual relationship express or implied with the Principal:

Unless such person shall have given notice to the Principal within 120 days after such person did, or performed the last of the work or labor, or furnished the last of the materials, services, skill, tools, machinery and/or equipment for which claim is made, stating with substantial accuracy the amount claimed and the name of the party to whom the materials, services, skill, tools, machinery, and/or equipment were furnished, or for whom they work or labor was done or performed. Such a notice shall be served by mailing the same by registered mail, postage prepaid, in an envelope addressed to the Principal, at any place where an office is regularly maintained for the transaction of business, or served in any manner in which legal process may be served in the State in which the aforesaid project is located, save that such service need not be made by a public officer, and a copy of such notice shall be delivered to the Obligee, to the person and at the address provided for in the Contract, within five days of the mailing of the notice to the Principal.

PROVIDED FURTHER, that any suit under this Bond must be instituted before the expiration of one year after the acceptance of the public works covered by the Contract by the proper authorities.

PROVIDED FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant to and in accordance with the applicable provision of the Official Code of Georgia Annotated, as amended, including, but not limited to, O.C.G.A. SS 13-10-1, et. Eq. and SS 36-86-101, et. Seg., and is intended to be and shall be construed as a bond in compliance with the requirements, therefore.

Signed, sealed, and dated this___________day of_______________, 2024

(Principal Secretary) (Principal) (Seal)

By:__________________________

(Witness to Principal) (Address)

___________________________________ (Surety)

ATTEST BY:

Agent

(Attorney-in-Fact)

(Seal)

(Witness as to Surety)

PERFORMANCE BOND

KNOW ALL MEN BY THESE PRESENTS: THAT

(Name of Contractor)

(Address of Contractor)

(Corporation, Partnership or Individual)

Hereinafter called Principal, and

(Name of Surety)

(Address of Surety)

A Corporation of the State of _________________and a surety authorized by law to do business in the

State of Georgia, hereinafter called Surety, are held and firmly bound unto:

The City of Brookhaven Georgia (Name of Obligee)

4362 Peachtree Road NE, Brookhaven, Georgia 30319 (Address of Obligee)

Hereinafter referred to as Obligee; are held firmly bound unto said Obligee and all persons doing work or furnishing skill, tools, machinery, supplies, or material under or for the purpose of the Contract hereinafter referred to, in the penal sum of: __________________________Dollars ($______________), in lawful money of United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

The condition of this obligation is such, as whereas the Principal entered into a certain contract, hereto attached, with the Obligee, dated_______________ for: _____________.

NOW THEREFORE, the conditions of this obligation are such that if the above-bound Principal shall well, truly, fully and faithfully perform said contract according to its terms, covenants, conditions, and agreements of said contract during the original term of said contract and any extensions thereof that may be granted by the oblige, with or without notice to the Surety, and during the life of any guaranty required under the contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions and agreement of any and all duly authorized modifications of said contract that may hereafter be made, then his obligation shall be void, otherwise to remain in full force and effect.

PROVIDED FURTHER, that said Surety to this Bond, for value received, hereby stipulates and agrees that no change, extension of time, alterations, or additions to the terms of the Contract or to the Work to be performed thereunder shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alterations, or additions to the terms of the Contract or to the work to be performed thereunder.

PROVIDED FURTHER, that Principal and Surety agree and represent that this bond is executed pursuant to and in accordance with the applicable provisions of the Official Code of Georgia Annotated, as amended, including but not limited t. O. C.G.A. SS 13-10-1 et. Eq. and SS 36-86-101, et Seg., and is intended to be and shall be construed as a bond in compliance with the requirements thereof.

Signed, sealed, and dated this________day of __________________, 2024

ATTEST:

(Principal)

(Principal Secretary)

By: ____________________________________________________

(Witness to Principal)

(Address)

(Surety)

(Attorney-in-Fact) and Resident Agent

(Attorney-in-Fact)

(Address)

(Witness as to Surety)

MAINTENANCE BOND

PROJECT NO: __24-022__

BOND NO: ________________

KNOW ALL MEN BY THESE PRESENTS that we, _______________________ as Principal, and

________________________as Surety, are held and firmly bound unto the CITY OF BROOKHAVEN, GEORGIA, as Obligee in the sum of one-third of the contract bid for the payment of which said Principal and Surety bind themselves, their heirs, administrators, executors, successors and assigns jointly and severally, firmly by these presents.

WHEREAS, the Principal has entered into an agreement with the City of Brookhaven for the Recreation and

Parks Restroom Project. Said work has now been completed and the Obligee desires a maintenance bond guarantee said streets and improvements for a period of one-year beginning_____________ and ending_________________.

NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall fully indemnify and save harmless the City of Brookhaven from any and all loss, costs, expenses or damages, for any repairs or replacements required because of defective workmanship or materials in said construction, then this obligation shall be null and void; otherwise to be and remain in full force and effect as to any such claim arising within one year from the completion of said construction as set forth in said agreement.

Signed, sealed and dated this_______ day of ________________, 2022 Witness:

(Principal)

(Name of Surety Company)

(Attorney-in-fact)

****** END OF EXHIBIT D*****

EXHIBIT E

GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT

Contractor(s) Name:

Address:

By executing this affidavit, the undersigned person or entity verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm, or corporation which is registered with, is authorized to participate in, and is participating in the federal work authorization program commonly known as E-Verify,* in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.

The undersigned person or entity further agrees that it will continue to use the federal work authorization program throughout the contract period, and it will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the undersigned with the information required by O.C.GA. § 13-10-91(b).

The undersigned person or entity further agrees to maintain records of such compliance and provide a copy of each such verification to the City of Brookhaven within five (5) business days after any subcontractor(s) is/are retained to perform such service.

E Verify TM Company Identification Number Date of Authorization

BY: Authorized Officer or Agent Date (Name of Person or Entity)

SUBSCRIBED AND SWORN BEFORE

ME ON THIS THE

DAY OF , 202_

[NOTARY SEAL]

Notary Public

My Commission Expires: _________________

* or any subsequent replacement operated by the United States Department of Homeland Security or any equivalent federal work authorization program operated by the United States Department of Homeland Security to verify information of newly hired employees, pursuant to the Immigration Reform and Control Act of 1986

(IRCA), P.L. 99-603.

EXHIBIT E

Subcontractor Affidavit under O.C.G.A. § 13-10-91(b)(3)

By executing this affidavit, the undersigned subcontractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services under a contract with (name of contractor) on behalf of (name of public employer) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned subcontractor will continue to use the federal work authorization program throughout the contract period and the undersigned subcontractor will contract for the physical performance of services in satisfaction of such contract only with sub-subcontractors who present an affidavit to the subcontractor with the information required by O.C.G.A.§ 13-10-91(b). Additionally, the undersigned subcontractor will forward notice of the receipt of an affidavit from a sub-subcontractor to the contractor within five business days of receipt. If the undersigned subcontractor receives notice that a sub-subcontractor has received an affidavit from any other contracted sub-subcontractor, the undersigned subcontractor must forward, within five business days of receipt, a copy of the notice to the contractor.

Subcontractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number

Date of Authorization

Name of Subcontractor

Name of Project

Name of Public Employer

SUBSCRIBED AND SWORN

BEFORE ME ON THIS THE

DAY OF ___________, 202_

[NOTARY SEAL]

Notary Public

My Commission Expires: ____________________

****** END OF EXHIBIT E*****

EXHIBIT F

DRUG-FREE WORKPLACE

The undersigned certifies that the provisions of Code Sections 50-24-1 through 50-24-6 of the Official Code of

Georgia Annotated, relating to the “Drug-free Workplace Act”, have been complied with in full.

The undersigned further certifies that:

(1) A drug-free workplace will be provided for the Service Provider’s employees during the performance of the Contract; and

(2) Each Service Provider who hires a subcontractor to work in a drug-free workplace shall secure from the subcontractor the following written certification:

“As part of the subcontracting agreement with __________________ (Service Provider), _______________________________(subcontractor) certifies to the Service Provider that a drug-free workplace will be provided for the subcontractor’s employees during the performance of this Contract pursuant to paragraph

(7) of the subsection (b) of Code Section 50-24-03.”

Also, the undersigned further certifies that he/she will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of the Contract.

Company Name

(Service Provider Signature)

Title of Authorized Officer or Agent of Service Provider

Printed Name of Authorized Officer or Agent

****** END OF EXHIBIT F*****

EXHIBIT G

PURCHASING POLICY ADDENDUM

I, _____________________, hereby certify that I have received a copy of the City of Brookhaven, GA, Financial

Management Policies Purchasing Policy which can be found at https://brookhavenga.gov/finance/page/purchasing and agree to comply with all requirements of the City of Brookhaven, GA Financial Management Policies

Purchasing Policy to the extent the policy is applicable to the undersigned.

(Service Provider Signature)

Title of Authorized Officer or Agent of Service Provider

Printed Name of Authorized Officer or Agent Date

****** END OF EXHIBIT G*****

https://brookhavenga.gov/finance/page/purchasing

EXHIBIT H

AFFIDAVIT VERIFYING STATUS FOR CITY PUBLIC BENEFIT APPLICATION

By executing this affidavit under oath, as an applicant for a City of Brookhaven, Georgia Business License or Occupation Tax Certificate, Alcohol License, Taxi Permit, execution of contract or other public benefit as referenced in O.C.G.A.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .