L1WC04 - CDRLs A007- Site Acceptance Test Plan.pdf
PDF 596 KB Posted
- Attached to
- Shot Peen Federal contract opportunity
- Solicitation number
- FA857121Q0034
About this file
This Contract Data Requirements List outlines requirements for a Site Acceptance Test Plan deliverable under contract FA857121Q0034. The contractor must submit one electronic copy of the test plan in PDF format to the 402nd Contracting Squadron at Robins Air Force Base within one week of installation completion for government approval. Once approved, the contractor will notify the government point of contact and schedule verification that all requirements have been met. The test plan is for one robotic shot peen system with a capacity to peen 280 and 550 steel shot sizes using a robotic arm in an internal area of at least 5 by 8 by 10 feet. The system will be installed at Building 142 to support the 402nd Aircraft Maintenance Group. This is a small business set-aside commercial supply and incidental services contract for the Air Force Sustainment Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| L1WC04 PD-Robotic Shot Peen.Final.pdf | ||
| Questions and Answers 27 May 2021.docx | DOCX document | |
| 20210525_130943 (002)_LI.jpg | JPG image | |
| Questions and Answers 26 May.docx | DOCX document | |
| 20210525_130921.jpg | JPG image | |
| L1WC04 - CDRLs A001- COTS.pdf | ||
| L1WC04 - PD-Robotic Shot Peen 17 May.pdf | ||
| L1WC04 - CDRLs A004- CDR.pdf | ||
| L1WC04 - CDRLs A009- Training.pdf | ||
| L1WC04 - CDRLs A010- Contractors Standard Operating Procedures.pdf | ||
| Solicitation - FA857121Q0034.FE.pdf | ||
| L1WC04 - SSJ - Robotic Shot Peen.Redacted_Redacted.FE.pdf | ||
| L1WC04 - CDRLs A006- Factory Acceptance Test Plan.pdf | ||
| L1WC04 - CDRLs A008- Chart.pdf | ||
| L1WC04 - CDRLs A011- Mishap.pdf | ||
| L1WC04 - CDRLs A002- Cyber.pdf | ||
| L1WC04 - Appendix C for Robotic Shot Peen.docx | DOCX document | |
| L1WC04 - CDRLs A003- PDR.pdf | ||
| L1WC04 - CDRLs A005- FDR.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER __X__
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-80553
5. CONTRACT REFERENCE
PD paras 5.3
6. REQUIRING OFFICE
402 CMXG/MXDEE
7. DD 250 REQ
NO
9. DIST
STATEMENT
REQUIRED
A
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
0 0
15. TOTAL 0 1 0
I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _ _ of __Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
L1WC04
1 1
G. PREPARED BY H. DATE
16. REMARKS
Block 4: Will be done for the factory acceptance. One electrionic copy. Electronic files shall be in .pdf format.
Blocks 12, 13: .5.3.1 Once installation at Robins AFB is completed and the Government has approved the test plan, the contractor shall notify the Government POC via email and within one (1) week the Government representative(s) shall verify all the requirements in Section 3 have been met.
E-mail Addresses:
chad.steger@us.af.mil james.prince.4@us.af.mil scott.swartz@us.af.mil
SEE BLK 16
HARD COPY
ELECTRONIC 0 1 0
A007
2. TITLE OF DATA ITEM
SITE ACCEPTANCE TEST PLAN
Christine L. Clark 17 May 2021 Christine L. Clark 17 May 2021
File details come from the government source that posted it. Updated .