L1WC04 - CDRLs A010- Contractors Standard Operating Procedures.pdf
PDF 745 KB Posted
- Attached to
- Shot Peen Federal contract opportunity
- Solicitation number
- FA857121Q0034
About this file
This Contract Data Requirements List (CDRL) outlines requirements for a contractor's standard operating procedures document related to a federal contract for a robotic shot peen system. The system must be capable of shot peening steel shot sizes 280 and 550 using a robotic arm within an internal area of at least 5 feet by 8 feet by 10 feet. The system will be installed in Building 142 at Robins Air Force Base to support the 402nd Commodities Maintenance Group.
The contractor must submit a health and safety plan within 10 working days of award that complies with the elements in Appendix C. The government will provide acceptance comments within 10 working days of receipt, and the contractor must submit any final revisions within 10 working days of receiving comments. The contractor must also submit any revised safety plans to both the 402nd Commodities Maintenance Group and Robins AFB Safety Office if changes are required during contract performance. Electronic submission by CD/DVD in Microsoft Office format is required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| L1WC04 PD-Robotic Shot Peen.Final.pdf | ||
| Questions and Answers 27 May 2021.docx | DOCX document | |
| 20210525_130943 (002)_LI.jpg | JPG image | |
| Questions and Answers 26 May.docx | DOCX document | |
| 20210525_130921.jpg | JPG image | |
| L1WC04 - PD-Robotic Shot Peen 17 May.pdf | ||
| L1WC04 - CDRLs A004- CDR.pdf | ||
| L1WC04 - CDRLs A009- Training.pdf | ||
| L1WC04 - CDRLs A001- COTS.pdf | ||
| L1WC04 - CDRLs A007- Site Acceptance Test Plan.pdf | ||
| Solicitation - FA857121Q0034.FE.pdf | ||
| L1WC04 - SSJ - Robotic Shot Peen.Redacted_Redacted.FE.pdf | ||
| L1WC04 - CDRLs A006- Factory Acceptance Test Plan.pdf | ||
| L1WC04 - CDRLs A008- Chart.pdf | ||
| L1WC04 - CDRLs A011- Mishap.pdf | ||
| L1WC04 - CDRLs A002- Cyber.pdf | ||
| L1WC04 - Appendix C for Robotic Shot Peen.docx | DOCX document | |
| L1WC04 - CDRLs A003- PDR.pdf | ||
| L1WC04 - CDRLs A005- FDR.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER __X__
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM
CONTRACTOR'S STANDARD
OPERATING PROCEDURES
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82080/T
5. CONTRACT REFERENCE
PD paras 10.5.1
6. REQUIRING OFFICE
402 CMXG/MXDEE
7. DD 250 REQ
DD
9. DIST
STATEMENT
REQUIRED
D
10. FREQUENCY
AS REQUIRED
12. DATE OF 1ST SUBMISSION
AS REQUIRED
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft
Final
Reg Repro
1 1
15. TOTAL 1 1 0
I. APPROVED BY J. DATE
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page _ _ of __Pages
18. ESTIMATED
TOTAL PRICE
17. PRICE
GROUP
L1WC04
A010
See Block 16
1 1
16. REMARKS
Block 4 & 5: Contractor format is acceptable. Contractor shall submit a Safety and Health Plan in accordance with the elements listed in Appendix C.
Block 7: The Government will accept the Receiving Report through WAWF.
Block 8, 10-12: Contractor shall submit a Health and Safety Plan within 10 working days after contract award. Written Government acceptance/comments will be within 10 working days after receipt of data. Contractor final submission shall be submitted within 10 working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Other requests shall be referred to the contract management team, AFSC/PZIO, 375 Perry Street, Bldg 255, Robins AFB, GA 31098.
Block 11, 13: If, during the performance of this contract, changes to the Safety and Health Plan are required, submit the revised Safety and Health Plan to AFSC/PZIMA, 375 Perry Street, Bldg 255, Robins AFB, GA 31098 and the Safety Office,WR-ALC/SE. Procedures identified for blocks 8, 10-12 will apply.
Block 14: Procurement Officer(s) e-mail along with Integrated Product Team email distro list will be provided as required. Electronic media shall be provided by CD/DVD media in Microsoft Office compatible format.
Block16: Notification to be sent to the following e-mail addresses:
G. PREPARED BY H. DATE
Chirstine L. Clark 17 May 2021 Christine L. Clark 17 May 2021
Kathya Prescott
WR-ALC/SE
420 Richard Ray Blvd.
Robins AFB, GA 31098 kathya.prescott@us.af.mil
File details come from the government source that posted it. Updated .