This document is a submittal register for a contract solicitation to repair and replace overruns on the center runway at Laughlin Air Force Base in Texas. The contractor will be required to provide all labor, equipment, materials, transportation, and other incidentals to repair sections of the runway overruns through milling and overlay, including edge lighting and threshold relocation to meet standards. Submittals include plans, shop drawings, product data, test reports, certificates, and closeout documentation. The contractor must submit items by the dates in the schedule, generally within 30 days of the notice to proceed, with a two week review period. The related federal contract opportunity provides additional details on the solicitation. The repair project value is estimated between $2-6 million. A site visit is scheduled for January 21, 2023 and interested parties must submit an entry authority list by January 18. The acquisition will be set aside for small businesses with a size standard of $39.5 million. The proposal due date is not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Overruns on Center Runway, newest first.
File Type Posted
T. Pre-Bid Questions Revised GOV Response 10FEB23.pdf PDF
Amendment 0002 Pre-Bid QA Revise 27 and 57.pdf PDF
S-3 Pre-Bid Photos.pdf PDF
S-1. Geotech Report.pdf PDF
S-2. Nets Data.pdf PDF
S-4 Superpave C PG70-22 Specs.pdf PDF
S. Pre-Bid Questions CE Response LATEST.pdf PDF
L. Schedule of Material Submittals LATEST 8FEB23.xls XLS spreadsheet
Amendment 0001 Pre-Bid QA - Ext Proposal Due Date.pdf PDF
1. Amendment EAL Deadline Extension CO Signed.pdf PDF
Q. AF 103 Work Clearance Request.pdf PDF
N. EAL Template.pdf PDF
K. Hazmat Usage Log.pdf PDF
F - UFC 3-250-03 Standard Practice for Flexible Pave.pdf PDF
A - 100 Design Drawings.pdf PDF
Solicitation - FA309923R0001.pdf PDF
M - Progress Schedule and Progress Report1.pdf PDF
G - UFC 3-535-01 Visual Air Navigation Facilities.pdf PDF
E - UFC 3-260-02 Pavement for Airfields.pdf PDF
D - UFC 3-260-04 Airfield and Heliport Marking.pdf PDF
R. Past Performance Questionnaire.pdf PDF
P. Wage Determination Rate.pdf PDF
O. Notification of Compliance with Contract Insurance Requirements.pdf PDF
I - DD 1354 Real Property.pdf PDF
H - UFGS 32 12 15.13 Asphalt Paving for Airfields.pdf PDF
C - Environmental Quality Construction Specs.pdf PDF
J - Division 01 Specifications.docx DOCX document
B - 100 Design Specifications.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register

TITLE:Replace Overruns on Center RunwaySUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Trans-mittal #Specification SectionSD #Submittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E RevwrSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other RevwrAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
102 41 0001Preconstruction SubmittalsExisting Conditions1.11GNLT 30 Days after NTP1Two Weeks after Submittal
202 41 0007CertificatesDemolition Plan1.2.1GNLT 30 Days after NTP1Two Weeks after Submittal
302 41 0007CertificatesNotification1.7GNLT 30 Days after NTP1Two Weeks after Submittal
402 41 0011Closeout SubmittalsReceipts3.3.4Prior to Final AcceptanceTwo Weeks after Submittal
503 30 5302Shop DrawingsInstallation Drawings1.5GNLT 30 Days after NTP1Two Weeks after Submittal
603 30 5303Product DataAir-Entraining Admixture2.2.3.1NLT 30 Days after NTP1Two Weeks after Submittal
703 30 5303Product DataWater-Reducing or Retarding Admixture2.2.3.2NLT 30 Days after NTP1Two Weeks after Submittal
803 30 5303Product DataCuring Materials2.2.10NLT 30 Days after NTP1Two Weeks after Submittal
903 30 5303Product DataExpansion Joint Filler Strips, Premolded2.2.6NLT 30 Days after NTP1Two Weeks after Submittal
1003 30 5303Product DataBatching and Mixing Equipment3.1.3.3NLT 30 Days after NTP1Two Weeks after Submittal
1103 30 5303Product DataConveying and Placing Concrete3.2NLT 30 Days after NTP1Two Weeks after Submittal
1203 30 5303Product DataFormwork2.2.8NLT 30 Days after NTP1Two Weeks after Submittal
1303 30 5303Product DataMix Design Data2.3GNLT 30 Days after NTP1Two Weeks after Submittal
1403 30 5303Product DataReady-Mix Concrete2.3NLT 30 Days after NTP1Two Weeks after Submittal
1503 30 5303Product DataCuring Compound2.4.2NLT 30 Days after NTP1Two Weeks after Submittal
1603 30 5303Product DataMechanical Reinforcing Bar Connectors2.2.5NLT 30 Days after NTP1Two Weeks after Submittal
1703 30 5306Test ReportsAggregates2.2.2Day of Test CompletionTwo Weeks after Submittal
1803 30 5306Test ReportsConcrete Mixture Proportions2.1.3GDay of Test CompletionTwo Weeks after Submittal
1903 30 5306Test ReportsCompressive Strength Testing3.8.3GDay of Test CompletionTwo Weeks after Submittal
2003 30 5306Test ReportsSlump3.8.3GDay of Test CompletionTwo Weeks after Submittal
2103 30 5306Test ReportsAir Content3.8.3Day of Test CompletionTwo Weeks after Submittal
2203 30 5306Test ReportsWater2.2.4Day of Test CompletionTwo Weeks after Submittal
2303 30 5307CertificatesCementitious Materials2.2.1NLT 30 Days after NTP1Two Weeks after Submittal
2403 30 5307CertificatesPozzolan0NLT 30 Days after NTP1Two Weeks after Submittal
2503 30 5307CertificatesCPG for recycled materials or appropriate Waiver Form0NLT 30 Days after NTP1Two Weeks after Submittal
2603 30 5307CertificatesAggregates2.2.2NLT 30 Days after NTP1Two Weeks after Submittal
2703 30 5307CertificatesDelivery Tickets2.3NLT 30 Days after NTP1Two Weeks after Submittal
2803 30 5308Manufacturer’s InstructionsChemical Floor Hardener0NLT 30 Days after NTP1Two Weeks after Submittal
2903 30 5308Manufacturer’s InstructionsCuring Compound2.4.2NLT 30 Days after NTP1Two Weeks after Submittal
3026 56 20.00 1002Shop DrawingsLighting and Visual Navigation Aids2.1NLT 30 Days after NTP1Two Weeks after Submittal
3126 56 20.00 1003Product DataMaterials and Equipment2.2NLT 30 Days after NTP1Two Weeks after Submittal
3226 56 20.00 1003Product DataProtection Plan1.3.3NLT 30 Days after NTP1Two Weeks after Submittal
3326 56 20.00 1003Product DataTraining3.20NLT 30 Days after NTP1Two Weeks after Submittal
3426 56 20.00 1003Product DataSpecial Tools3.20NLT 30 Days after NTP1Two Weeks after Submittal
3526 56 20.00 1003Product DataList of Parts3.20NLT 30 Days after NTP1Two Weeks after Submittal
3626 56 20.00 1003Product DataMaintenance and Repair3.20NLT 30 Days after NTP1Two Weeks after Submittal
3726 56 20.00 1003Product DataPosted Instructions3.22GNLT 30 Days after NTP1Two Weeks after Submittal
3826 56 20.00 1006Test ReportsField Quality Control3.19Day of Test CompletionTwo Weeks after Submittal
3926 56 20.00 1006Test ReportsVisual Inspection3.19.3Day of Test CompletionTwo Weeks after Submittal
4026 56 20.00 1007CertificatesQualifications1.3.2NLT 30 Days after NTP1Two Weeks after Submittal
4126 56 20.00 1007CertificatesMaterials and Equipment2.2NLT 30 Days after NTP1Two Weeks after Submittal
4226 56 20.00 1010Operation and Maintenance DataOperation and Maintenance Procedures3.20At Final InspectionTwo Weeks after Submittal
4331 00 0003Product DataUtilization of Excavated Materials3.6GNLT 30 Days after NTP1Two Weeks after Submittal
4431 00 0006Test ReportsTesting3.15Day of Test CompletionTwo Weeks after Submittal
4531 00 0007CertificatesTesting3.15NLT 30 Days after NTP1Two Weeks after Submittal
4632 01 1903Product DataManufacturer's Recommendations0GNLT 30 Days after NTP1Two Weeks after Submittal
4732 01 1903Product DataEquipment3.1NLT 30 Days after NTP1Two Weeks after Submittal
4832 01 1904SamplesMaterials1.4.1GNLT 30 Days after NTP1Two Weeks after Submittal
4932 01 1906Test ReportsCertified copies of the test reports0GDay of Test CompletionTwo Weeks after Submittal
5032 11 2303Product DataPlant, Equipment, and Tools0NLT 30 Days after NTP1Two Weeks after Submittal
5132 11 2303Product DataWaybills and Delivery Tickets1.1.3NLT 30 Days after NTP1Two Weeks after Submittal
5232 11 2306Test ReportsSampling and Testing1.5GDay of Test CompletionTwo Weeks after Submittal
5332 11 2306Test ReportsField Density Tests1.5.2.4GDay of Test CompletionTwo Weeks after Submittal
5432 12 1003Product DataWaybills and Delivery Tickets1.1.3NLT 30 Days after NTP1Two Weeks after Submittal
5532 12 1006Test ReportsSampling and Testing3.7Day of Test CompletionTwo Weeks after Submittal
5632 12 15.1302Shop DrawingsPlacement Plan1.4GNLT 30 Days after NTP1Two Weeks after Submittal
5732 12 15.1303Product DataMix Design2.3GNLT 30 Days after NTP1Two Weeks after Submittal
5832 12 15.1303Product DataContractor Quality Control3.1GNLT 30 Days after NTP1Two Weeks after Submittal
5932 12 15.1304SamplesAsphalt Cement Binder2.2NLT 30 Days after NTP1Two Weeks after Submittal
6032 12 15.1304SamplesAggregates2.1NLT 30 Days after NTP1Two Weeks after Submittal
6132 12 15.1306Test ReportsAggregates2.1GDay of Test CompletionTwo Weeks after Submittal
6232 12 15.1306Test ReportsQC Monitoring3.1.3.10Day of Test CompletionTwo Weeks after Submittal
6332 12 15.1307CertificatesAsphalt Cement Binder2.2GNLT 30 Days after NTP1Two Weeks after Submittal
6432 12 15.1307CertificatesTesting Laboratory3.7NLT 30 Days after NTP1Two Weeks after Submittal
6532 17 24.00 1003Product DataEquipment1.3GNLT 30 Days after NTP1Two Weeks after Submittal
6632 17 24.00 1003Product DataComposition Requirements0NLT 30 Days after NTP1Two Weeks after Submittal
6732 17 24.00 1003Product DataQualifications1.5.1NLT 30 Days after NTP1Two Weeks after Submittal
6832 17 24.00 1006Test ReportsSampling and Testing2.3Day of Test CompletionTwo Weeks after Submittal
6932 17 24.00 1007CertificatesVolatile Organic Compound (VOC)0NLT 30 Days after NTP1Two Weeks after Submittal
7032 92 1903Product DataWood cellulose fiber mulch2.4.3NLT 30 Days after NTP1Two Weeks after Submittal
7132 92 1903Product DataFertilizer2.3NLT 30 Days after NTP1Two Weeks after Submittal
7232 92 1906Test ReportsTopsoil composition tests2.2.3Day of Test CompletionTwo Weeks after Submittal
7332 92 1907Certificatesseed2.1NLT 30 Days after NTP1Two Weeks after Submittal
7432 92 1908Manufacturer’s InstructionsErosion Control Materials2.6NLT 30 Days after NTP1Two Weeks after Submittal
7533 71 0202Shop DrawingsPrecast underground structures1.4.1GNLT 30 Days after NTP1Two Weeks after Submittal
7633 71 0203Product DataMedium voltage cable2.5GNLT 30 Days after NTP1Two Weeks after Submittal
7733 71 0203Product DataMedium voltage cable joints2.7GNLT 30 Days after NTP1Two Weeks after Submittal
7833 71 0203Product DataMedium voltage cable terminations2.6GNLT 30 Days after NTP1Two Weeks after Submittal
7933 71 0203Product DataPrecast concrete structures2.12.1.1GNLT 30 Days after NTP1Two Weeks after Submittal
8033 71 0203Product DataSealing Material2.12.1.4NLT 30 Days after NTP1Two Weeks after Submittal
8133 71 0203Product DataPulling-In Irons3.4.2NLT 30 Days after NTP1Two Weeks after Submittal
8233 71 0203Product DataManhole frames and covers2.12.2GNLT 30 Days after NTP1Two Weeks after Submittal
8333 71 0203Product DataHandhole frames and covers2.12.3GNLT 30 Days after NTP1Two Weeks after Submittal
8433 71 0203Product DataFrames and Covers for Airfield Facilities2.12.4GNLT 30 Days after NTP1Two Weeks after Submittal
8533 71 0203Product DataDuctile Iron Frames and Covers for Airfield Facilities2.12.5GNLT 30 Days after NTP1Two Weeks after Submittal
8633 71 0203Product DataCable supports2.13GNLT 30 Days after NTP1Two Weeks after Submittal
8733 71 0206Test ReportsMedium voltage cable qualification and production tests2.15.2GDay of Test CompletionTwo Weeks after Submittal
8833 71 0206Test ReportsField Acceptance Checks and Tests3.18.1GDay of Test CompletionTwo Weeks after Submittal
8933 71 0206Test ReportsCable Installation Plan and Procedure3.3GDay of Test CompletionTwo Weeks after Submittal
9033 71 0207CertificatesCable splicer/terminator1.4.2GNLT 30 Days after NTP1Two Weeks after Submittal
9133 71 0207CertificatesCable Installer Qualifications1.4.3GNLT 30 Days after NTP1Two Weeks after Submittal
9201-301Preconstruction SubmittalsProgress Schedule4GNLT 30 Days after NTP1Two Weeks after Submittal
9301-301Preconstruction SubmittalsDesignation Letter of Personell Responsible for Schedule4GNLT 30 Days after NTP1Two Weeks after Submittal
9401-501Preconstruction SubmittalsFAA Form 74605.2GAs Soon as Possible but NLT 7 Days after NTP1Two Weeks after Submittal
9501-501Preconstruction SubmittalsFOD Plan5.5GNLT 30 Days after NTP1Two Weeks after Submittal
9601-601Preconstruction SubmittalsContractors Safety Plan3GNLT 30 Days after NTP1Two Weeks after Submittal
9701-601CertificatesCertifcate of Contractor Safety Compliance4GNLT 30 Days after NTP1Two Weeks after Submittal
9801-701Preconstruction SubmittalsContractor Quality Control Plan3GNLT 30 Days after NTP1Two Weeks after Submittal
9901-701Preconstruction SubmittalsQuality Contol Manager Qualifications4GNLT 30 Days after NTP1Two Weeks after Submittal
10001-801Preconstruction SubmittalsConstruction Site Plan2GNLT 30 Days after NTP1Two Weeks after Submittal
10101-801Preconstruction SubmittalsTraffic Control Plan3GNLT 30 Days after NTP1Two Weeks after Submittal
10201-801Preconstruction SubmittalsTemporary Trailer Information9GNLT 30 Days after NTP1Two Weeks after Submittal
10301-901Preconstruction SubmittalsEnvironmental Protection Plan5GNLT 30 Days after NTP1Two Weeks after Submittal
10401-901Preconstruction SubmittalsSDS Sheets12GNLT 30 Days after NTP1Two Weeks after Submittal
10501-901Preconstruction SubmittalsHazardous Waste Disposal Documentation12GNLT 30 Days after NTP1Two Weeks after Submittal
106SOW 2Preconstruction SubmittalsStabilized Construction Entrances Plan10GNLT 30 Days after NTP1Two Weeks after Submittal
10701-3Construction SubmittalProgress Report5GBi-WeeklyTwo Weeks after Submittal
108SOW 4Construction SubmittalMeeting Minutes3GNLT 3 Days After Meeting is HeldTwo Weeks after Submittal
109SOW 2Construction SubmittalDaily Logs (AF Form 1477)2GWeeklyTwo Weeks after Submittal
11001-1011Closeout SubmittalsAs- Built Drawings2G7 Days Prior to Final InspectionTwo Weeks after Submittal
11101-1011Closeout SubmittalsConstruction Warranty Management Plan3G7 Days Prior to Final InspectionTwo Weeks after Submittal
11201-1011Closeout SubmittalsDD Form 1354 Draft4G14 Days Prior to Final InspectionTwo Weeks after Submittal
11301-1011Closeout SubmittalsDD Form 1354 Final4GAt Final InspectionTwo Weeks after Submittal