This document is a submittal register for a contract solicitation to repair and replace overruns on the center runway at Laughlin Air Force Base in Texas. The contractor will be required to provide all labor, equipment, materials, transportation, and other incidentals to repair sections of the runway overruns through milling and overlay, including edge lighting and threshold relocation to meet standards. Submittals include plans, shop drawings, product data, test reports, certificates, and closeout documentation. The contractor must submit items by the dates in the schedule, generally within 30 days of the notice to proceed, with a two week review period. The related federal contract opportunity provides additional details on the solicitation. The repair project value is estimated between $2-6 million. A site visit is scheduled for January 21, 2023 and interested parties must submit an entry authority list by January 18. The acquisition will be set aside for small businesses with a size standard of $39.5 million. The proposal due date is not provided.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register
| TITLE: | Replace Overruns on Center Runway | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | ||||||||||||||||||||
| LOCATION: | ||||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 02 41 00 | 01 | Preconstruction Submittals | Existing Conditions | 1.11 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 2 | 02 41 00 | 07 | Certificates | Demolition Plan | 1.2.1 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 3 | 02 41 00 | 07 | Certificates | Notification | 1.7 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 4 | 02 41 00 | 11 | Closeout Submittals | Receipts | 3.3.4 | Prior to Final Acceptance | Two Weeks after Submittal | |||||||||||||
| 5 | 03 30 53 | 02 | Shop Drawings | Installation Drawings | 1.5 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 6 | 03 30 53 | 03 | Product Data | Air-Entraining Admixture | 2.2.3.1 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 7 | 03 30 53 | 03 | Product Data | Water-Reducing or Retarding Admixture | 2.2.3.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 8 | 03 30 53 | 03 | Product Data | Curing Materials | 2.2.10 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 9 | 03 30 53 | 03 | Product Data | Expansion Joint Filler Strips, Premolded | 2.2.6 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 10 | 03 30 53 | 03 | Product Data | Batching and Mixing Equipment | 3.1.3.3 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 11 | 03 30 53 | 03 | Product Data | Conveying and Placing Concrete | 3.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 12 | 03 30 53 | 03 | Product Data | Formwork | 2.2.8 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 13 | 03 30 53 | 03 | Product Data | Mix Design Data | 2.3 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 14 | 03 30 53 | 03 | Product Data | Ready-Mix Concrete | 2.3 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 15 | 03 30 53 | 03 | Product Data | Curing Compound | 2.4.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 16 | 03 30 53 | 03 | Product Data | Mechanical Reinforcing Bar Connectors | 2.2.5 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 17 | 03 30 53 | 06 | Test Reports | Aggregates | 2.2.2 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 18 | 03 30 53 | 06 | Test Reports | Concrete Mixture Proportions | 2.1.3 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 19 | 03 30 53 | 06 | Test Reports | Compressive Strength Testing | 3.8.3 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 20 | 03 30 53 | 06 | Test Reports | Slump | 3.8.3 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 21 | 03 30 53 | 06 | Test Reports | Air Content | 3.8.3 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 22 | 03 30 53 | 06 | Test Reports | Water | 2.2.4 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 23 | 03 30 53 | 07 | Certificates | Cementitious Materials | 2.2.1 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 24 | 03 30 53 | 07 | Certificates | Pozzolan | 0 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 25 | 03 30 53 | 07 | Certificates | CPG for recycled materials or appropriate Waiver Form | 0 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 26 | 03 30 53 | 07 | Certificates | Aggregates | 2.2.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 27 | 03 30 53 | 07 | Certificates | Delivery Tickets | 2.3 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 28 | 03 30 53 | 08 | Manufacturer’s Instructions | Chemical Floor Hardener | 0 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 29 | 03 30 53 | 08 | Manufacturer’s Instructions | Curing Compound | 2.4.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 30 | 26 56 20.00 10 | 02 | Shop Drawings | Lighting and Visual Navigation Aids | 2.1 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 31 | 26 56 20.00 10 | 03 | Product Data | Materials and Equipment | 2.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 32 | 26 56 20.00 10 | 03 | Product Data | Protection Plan | 1.3.3 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 33 | 26 56 20.00 10 | 03 | Product Data | Training | 3.20 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 34 | 26 56 20.00 10 | 03 | Product Data | Special Tools | 3.20 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 35 | 26 56 20.00 10 | 03 | Product Data | List of Parts | 3.20 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 36 | 26 56 20.00 10 | 03 | Product Data | Maintenance and Repair | 3.20 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 37 | 26 56 20.00 10 | 03 | Product Data | Posted Instructions | 3.22 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 38 | 26 56 20.00 10 | 06 | Test Reports | Field Quality Control | 3.19 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 39 | 26 56 20.00 10 | 06 | Test Reports | Visual Inspection | 3.19.3 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 40 | 26 56 20.00 10 | 07 | Certificates | Qualifications | 1.3.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 41 | 26 56 20.00 10 | 07 | Certificates | Materials and Equipment | 2.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 42 | 26 56 20.00 10 | 10 | Operation and Maintenance Data | Operation and Maintenance Procedures | 3.20 | At Final Inspection | Two Weeks after Submittal | |||||||||||||
| 43 | 31 00 00 | 03 | Product Data | Utilization of Excavated Materials | 3.6 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 44 | 31 00 00 | 06 | Test Reports | Testing | 3.15 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 45 | 31 00 00 | 07 | Certificates | Testing | 3.15 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 46 | 32 01 19 | 03 | Product Data | Manufacturer's Recommendations | 0 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 47 | 32 01 19 | 03 | Product Data | Equipment | 3.1 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 48 | 32 01 19 | 04 | Samples | Materials | 1.4.1 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 49 | 32 01 19 | 06 | Test Reports | Certified copies of the test reports | 0 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 50 | 32 11 23 | 03 | Product Data | Plant, Equipment, and Tools | 0 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 51 | 32 11 23 | 03 | Product Data | Waybills and Delivery Tickets | 1.1.3 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 52 | 32 11 23 | 06 | Test Reports | Sampling and Testing | 1.5 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 53 | 32 11 23 | 06 | Test Reports | Field Density Tests | 1.5.2.4 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 54 | 32 12 10 | 03 | Product Data | Waybills and Delivery Tickets | 1.1.3 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 55 | 32 12 10 | 06 | Test Reports | Sampling and Testing | 3.7 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 56 | 32 12 15.13 | 02 | Shop Drawings | Placement Plan | 1.4 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 57 | 32 12 15.13 | 03 | Product Data | Mix Design | 2.3 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 58 | 32 12 15.13 | 03 | Product Data | Contractor Quality Control | 3.1 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 59 | 32 12 15.13 | 04 | Samples | Asphalt Cement Binder | 2.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 60 | 32 12 15.13 | 04 | Samples | Aggregates | 2.1 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 61 | 32 12 15.13 | 06 | Test Reports | Aggregates | 2.1 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 62 | 32 12 15.13 | 06 | Test Reports | QC Monitoring | 3.1.3.10 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 63 | 32 12 15.13 | 07 | Certificates | Asphalt Cement Binder | 2.2 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 64 | 32 12 15.13 | 07 | Certificates | Testing Laboratory | 3.7 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 65 | 32 17 24.00 10 | 03 | Product Data | Equipment | 1.3 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 66 | 32 17 24.00 10 | 03 | Product Data | Composition Requirements | 0 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 67 | 32 17 24.00 10 | 03 | Product Data | Qualifications | 1.5.1 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 68 | 32 17 24.00 10 | 06 | Test Reports | Sampling and Testing | 2.3 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 69 | 32 17 24.00 10 | 07 | Certificates | Volatile Organic Compound (VOC) | 0 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 70 | 32 92 19 | 03 | Product Data | Wood cellulose fiber mulch | 2.4.3 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 71 | 32 92 19 | 03 | Product Data | Fertilizer | 2.3 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 72 | 32 92 19 | 06 | Test Reports | Topsoil composition tests | 2.2.3 | Day of Test Completion | Two Weeks after Submittal | |||||||||||||
| 73 | 32 92 19 | 07 | Certificates | seed | 2.1 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 74 | 32 92 19 | 08 | Manufacturer’s Instructions | Erosion Control Materials | 2.6 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 75 | 33 71 02 | 02 | Shop Drawings | Precast underground structures | 1.4.1 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 76 | 33 71 02 | 03 | Product Data | Medium voltage cable | 2.5 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 77 | 33 71 02 | 03 | Product Data | Medium voltage cable joints | 2.7 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 78 | 33 71 02 | 03 | Product Data | Medium voltage cable terminations | 2.6 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 79 | 33 71 02 | 03 | Product Data | Precast concrete structures | 2.12.1.1 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 80 | 33 71 02 | 03 | Product Data | Sealing Material | 2.12.1.4 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 81 | 33 71 02 | 03 | Product Data | Pulling-In Irons | 3.4.2 | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 82 | 33 71 02 | 03 | Product Data | Manhole frames and covers | 2.12.2 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 83 | 33 71 02 | 03 | Product Data | Handhole frames and covers | 2.12.3 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 84 | 33 71 02 | 03 | Product Data | Frames and Covers for Airfield Facilities | 2.12.4 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 85 | 33 71 02 | 03 | Product Data | Ductile Iron Frames and Covers for Airfield Facilities | 2.12.5 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 86 | 33 71 02 | 03 | Product Data | Cable supports | 2.13 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 87 | 33 71 02 | 06 | Test Reports | Medium voltage cable qualification and production tests | 2.15.2 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 88 | 33 71 02 | 06 | Test Reports | Field Acceptance Checks and Tests | 3.18.1 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 89 | 33 71 02 | 06 | Test Reports | Cable Installation Plan and Procedure | 3.3 | G | Day of Test Completion | Two Weeks after Submittal | ||||||||||||
| 90 | 33 71 02 | 07 | Certificates | Cable splicer/terminator | 1.4.2 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 91 | 33 71 02 | 07 | Certificates | Cable Installer Qualifications | 1.4.3 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 92 | 01-3 | 01 | Preconstruction Submittals | Progress Schedule | 4 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 93 | 01-3 | 01 | Preconstruction Submittals | Designation Letter of Personell Responsible for Schedule | 4 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 94 | 01-5 | 01 | Preconstruction Submittals | FAA Form 7460 | 5.2 | G | As Soon as Possible but NLT 7 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 95 | 01-5 | 01 | Preconstruction Submittals | FOD Plan | 5.5 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 96 | 01-6 | 01 | Preconstruction Submittals | Contractors Safety Plan | 3 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 97 | 01-6 | 01 | Certificates | Certifcate of Contractor Safety Compliance | 4 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 98 | 01-7 | 01 | Preconstruction Submittals | Contractor Quality Control Plan | 3 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 99 | 01-7 | 01 | Preconstruction Submittals | Quality Contol Manager Qualifications | 4 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 100 | 01-8 | 01 | Preconstruction Submittals | Construction Site Plan | 2 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 101 | 01-8 | 01 | Preconstruction Submittals | Traffic Control Plan | 3 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 102 | 01-8 | 01 | Preconstruction Submittals | Temporary Trailer Information | 9 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 103 | 01-9 | 01 | Preconstruction Submittals | Environmental Protection Plan | 5 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 104 | 01-9 | 01 | Preconstruction Submittals | SDS Sheets | 12 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 105 | 01-9 | 01 | Preconstruction Submittals | Hazardous Waste Disposal Documentation | 12 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | ||||||||||||
| 106 | SOW 2 | Preconstruction Submittals | Stabilized Construction Entrances Plan | 10 | G | NLT 30 Days after NTP1 | Two Weeks after Submittal | |||||||||||||
| 107 | 01-3 | Construction Submittal | Progress Report | 5 | G | Bi-Weekly | Two Weeks after Submittal | |||||||||||||
| 108 | SOW 4 | Construction Submittal | Meeting Minutes | 3 | G | NLT 3 Days After Meeting is Held | Two Weeks after Submittal | |||||||||||||
| 109 | SOW 2 | Construction Submittal | Daily Logs (AF Form 1477) | 2 | G | Weekly | Two Weeks after Submittal | |||||||||||||
| 110 | 01-10 | 11 | Closeout Submittals | As- Built Drawings | 2 | G | 7 Days Prior to Final Inspection | Two Weeks after Submittal | ||||||||||||
| 111 | 01-10 | 11 | Closeout Submittals | Construction Warranty Management Plan | 3 | G | 7 Days Prior to Final Inspection | Two Weeks after Submittal | ||||||||||||
| 112 | 01-10 | 11 | Closeout Submittals | DD Form 1354 Draft | 4 | G | 14 Days Prior to Final Inspection | Two Weeks after Submittal | ||||||||||||
| 113 | 01-10 | 11 | Closeout Submittals | DD Form 1354 Final | 4 | G | At Final Inspection | Two Weeks after Submittal |
&RPage &P of &N