L - Limitations on Subcontracting.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Repositioning Aircraft Mooring Points, A-K Rows
Solicitation number
FA309922R0016
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA309922R00160002 SF 30.pdf PDF
Reposition Aircraft Mooring Points QA.pdf PDF
Site Visit.pdf PDF
SDS Ennis 985202 Yellow.pdf PDF
MXDP 20-1021 Statement of Work (SOW).pdf PDF
T-6 Phase 2 (Rows A-E).pdf PDF
SDS Swarco Glass Beads.pdf PDF
T-6 Phase 1 (Rows F-J).pdf PDF
I - Schedule of Material Submittals V2.xlsx XLSX spreadsheet
SDS Ennis 985203 Black.pdf PDF
Solicitation Amendment FA309922R00160001 SF 30.pdf PDF
SDS Swarco Yellow 1166.pdf PDF
N - Wage Determination.pdf PDF
G - LAFB CAD Standards.pdf PDF
I - Schedule of Material Submittals.xlsx XLSX spreadsheet
J - Progress Schedule and Progress Report.xlsx XLSX spreadsheet
M - Notification of Compliance with Contract Insurance Requirements.pdf PDF
Solicitation - FA309922R0016.pdf PDF
O - EAL Template.pdf PDF
A - Division 01 Specifications.pdf PDF
B - UFC 3-575-01 - Lightning and Static Electricity Protection Systems.pdf PDF
H - Proposed Mooring Point and Tie-down Locations.pdf PDF
D - Laughlin AFB Short-Term Contractor Hazmat Usage Log.docx DOCX document
C - Environmental Quality Construction Specifications LAFB.pdf PDF
E - Conceptual Drawings.pdf PDF
F - UFC 3-260-04 - Airfield and Heliport Marking.pdf PDF
K - AETC 47.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Validation Limitations on Subcontracting

Name of ContractorsTotal PaidCost of MaterialsDifference
1Prime$100,000.00$20,000.00$80,000.00
2$100,000.00$20,000.00$80,000.00
3$100,000.00$20,000.00$80,000.00
4$0.00$0.00$0.00
5$0.00$0.00$0.00
6$0.00$0.00$0.00
7$0.00$0.00$0.00
8$0.00$0.00$0.00
9$0.00$0.00$0.00
10$0.00$0.00$0.00
11$0.00$0.00$0.00
12$0.00$0.00$0.00
13$0.00$0.00$0.00
14$0.00$0.00$0.00
15$0.00$0.00$0.00
16$0.00$0.00$0.00
17$0.00$0.00$0.00
18$0.00$0.00$0.00
19$0.00$0.00$0.00
20$0.00$0.00$0.00
Totals:$300,000.00

ARMBRUSTER, KURT C CIV USAF AETC 47 CONS/PKA: Needs to equal total value of the contract $60,000.00 $240,000.00

Percentage Paid Out:

ARMBRUSTER, KURT C CIV USAF AETC 47 CONS/PKA: Percentage is obtained by adding difference of all contractors that are not similarly situated and dividing by total difference. 66.67%

This is to certify that, to the best of my knowledge and belief, the costs listed above and required under the terms of the contract, in support of FAR clause 52.219-14 are accurate, complete, and current as of ________.

JOHN Q. DOE
President, ABC

52.219-14

Limitations on Subcontracting (Sep 2021)

(a) This clause does not apply to the unrestricted portion of a partial set-aside.

(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—

(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and

(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.

(c) Applicability. This clause applies only to—

(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);

(3) Contracts that have been awarded on a sole-source basis in accordance with subparts 19.8, 19.13, 19.14, and 19.15;

(4) Orders expected to exceed the simplified acquisition threshold and that are— (i)Set aside for small business concerns under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or (ii)Issued directly to small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii);

(5 )Orders, regardless of dollar value, that are— (i)Set aside in accordance with subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 8.405-5 and 16.505(b)(2)(i)(F); or (ii)Issued directly to concerns that qualify for the programs described in subparts 19.8, 19.13, 19.14, or 19.15 under multiple-award contracts, as described in 19.504(c)(1)(ii); and

(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.

(d) Independent contractors. An independent contractor shall be considered a subcontractor.

(e) Limitations on subcontracting. By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—

(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;

(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;

(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or

(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.

(f) The Contractor shall comply with the limitations on subcontracting as follows:

(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause— [Contracting Officer check as appropriate.]

□ By the end of the base term of the contract and then by the end of each subsequent option period; or

□ By the end of the performance period for each order issued under the contract.

(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.

(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.

(End of clause)

File details come from the government source that posted it. Updated .