I - Schedule of Material Submittals.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Repositioning Aircraft Mooring Points, A-K Rows
Solicitation number
FA309922R0016
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA309922R00160002 SF 30.pdf PDF
Reposition Aircraft Mooring Points QA.pdf PDF
Site Visit.pdf PDF
SDS Ennis 985202 Yellow.pdf PDF
MXDP 20-1021 Statement of Work (SOW).pdf PDF
T-6 Phase 2 (Rows A-E).pdf PDF
SDS Swarco Glass Beads.pdf PDF
T-6 Phase 1 (Rows F-J).pdf PDF
I - Schedule of Material Submittals V2.xlsx XLSX spreadsheet
SDS Ennis 985203 Black.pdf PDF
Solicitation Amendment FA309922R00160001 SF 30.pdf PDF
SDS Swarco Yellow 1166.pdf PDF
N - Wage Determination.pdf PDF
G - LAFB CAD Standards.pdf PDF
J - Progress Schedule and Progress Report.xlsx XLSX spreadsheet
M - Notification of Compliance with Contract Insurance Requirements.pdf PDF
Solicitation - FA309922R0016.pdf PDF
O - EAL Template.pdf PDF
A - Division 01 Specifications.pdf PDF
L - Limitations on Subcontracting.xlsx XLSX spreadsheet
B - UFC 3-575-01 - Lightning and Static Electricity Protection Systems.pdf PDF
H - Proposed Mooring Point and Tie-down Locations.pdf PDF
D - Laughlin AFB Short-Term Contractor Hazmat Usage Log.docx DOCX document
C - Environmental Quality Construction Specifications LAFB.pdf PDF
E - Conceptual Drawings.pdf PDF
F - UFC 3-260-04 - Airfield and Heliport Marking.pdf PDF
K - AETC 47.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittals Schedule SCHEDULE OF SUBMITTALS PROJECT # MXDP 20-1021 PROJECT TITLE REPOSITION AIRCRAFT MOORING POINTS, ROWS A-K ROWS SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALSTATEMENT OF WORK REFERENCECERTIFICATION OF COMPLIANCEDESIGN DRAWINGSSPECIFICATIONSDESIGN CALCULATIONSSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSPRODUCT DATA/ SDSTEST REPORTSFIELD REPORTSMEMORADUM, APPROVAL LETTERSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPR

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

DIS

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal fergusog: Enter the due date from the Contractor (MM/DD/YY) fergusog: Enter the date received from the Contractor. (MM/DD/YY) fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) fergusog: Enter the date the submittal is due back from CE fergusog: Enter the Submittal Number fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

SD-01 PRE-CONSTRUCTION SUBMITTALS
1CONTRACTOR QUALITY CONTROL PLANDIV 01 SECTION 4.2.41NTL 30 DAYS AFTER NTP1
2ENTRY ACCESS LISTDIV 01 SECTION 1.8.21MONTHLY
3PROOF OF TEMPORARY FIRE PROTECTION EQUIPMENT ON SITEDIV 01 SECTION 1.8.71NLT 30 DAYS AFTER NTP1
4AF FORM 103 WORK CLEARANCE REQUESTDIV 01 SECTION 2.21BEFORE MOBILIZATION
5HEALTH AND SAFETY PLANDIV 01 SECTION 3.2.21BEFORE MOBILIZATION
6CERTIFICATES OF CONTRACTOR'S SAFETY COMPLIANCEDIV 01 SECTION 3.2.311NLT 30 DAYS AFTER NTP1
7PRE-EXISTING SITE CONDITIONSSOW SECTION 3.21NLT 30 DAYS AFTER NTP1
8CONSTRUCTION SITE PLANDIV 01 SECTION 12.11NLT 30 DAYS AFTER NTP1
9TRAFFIC CONTROL PLANSOW SECTION 3.71NLT 30 DAYS AFTER NTP1
10FAA FORM 7460-1 DETERMINATION OF NO HAZARD TO AIR NAVIGATIONSOW SECTION 3.4160 DAYS BEFORE MOBILIZATION
11ENVIRONMENTAL PROTECTION PLANSOW SECTION 3.81NLT 30 DAYS AFTER NTP1
12FOD PLANDIV 01 SECTION 14.101NLT 30 DAYS AFTER NTP1
13APPROVED DUMP LOCATIONSOW SECTION 3.91PRIOR TO START OF CONSTRUCTION
14EMS AWARENESS TRAINING ACKNOWLEDGEMENT LISTSOW SECTION 4.31NLT 30 DAYS AFTER NTP1
SD-02 SHOP DRAWING SUBMITTALS
1565% DESIGNSOW SECTION 4.41NLT 30 DAYS AFTER NTP1
16100% DESIGNSOW SECTION 4.41NLT 60 DAYS AFTER NTP1
SD-03 PRODUCT DATA SUBMITTALS
17DAILY INSPECTION REPORTSDIV 01 SECTION 4.2.61WEEKLY
18PROJECT SCHEDULEDIV 01 SECTION 6.1.11WITHIN 7 DAYS AFTER NTP 1
19PROGRESS SCHEDULEDIV 01 SECTION 6.1.21BI-WEEKLY
20PROGRESS REPORTDIV 01 SECTION 6.1.31BI-WEEKLY
SD-04 PRODUCT DATA SUBMITTALS
21PAINT COMPLIANCESOW SECTION 2.711NLT 30 DAYS AFTER NTP1
22GLASS BEAD COMPLIANCESOW SECTION 2.711NLT 30 DAYS AFTER NTP1
23MOORING POINTSSOW SECTION 2.61NLT 30 DAYS AFTER NTP1
24TIE-DOWNSSOW SECTION 2.61NLT 30 DAYS AFTER NTP1
25HIGH STRENGTH EPOXY OR GROUTSOW SECTION 2.61NLT 30 DAYS AFTER NTP1
SD-05 DESIGN DATA SUBMITTALS
SD-06 TEST REPORT SUBMITTALS
26GROUNDING TEST REPORTSOW SECTION 2.11DAY OF TEST COMPLETION
SD-07 CERTIFICATE SUBMITTALS
27SUPERVISOR REQUIREMENTDIV 01 SECTION 4.2.21NLT 30 DAYS AFTER NTP1
28PERSONNEL REQUIREMENT FOR QUALITY CONTROLDIV 01 SECTION 4.2.31NLT 30 DAYS AFTER NTP1
SD-08 MANUFACTURER'S INSTRUCTION SUBMITTALS
29AF FORM 3952 & SAFETY DATA SHEETS FOR PAINTSOW SECTION 4.41NLT 7 DAYS AFTER NTP
30AF FORM 3952 & SAFETY DATA SHEETS FOR GLASS BEADSSOW SECTION 4.41NLT 7 DAYS AFTER NTP
SD-09 MANUFACTURER'S FIELD REPORT SUBMITTALS
SD-10 OPERATION AND MAINTENANCE DATA SUBMITTALS
SD-11 CLOSE OUT SUBMITTALS
31WASTE WEIGHT TICKETSOW SECTION 3.91PRIOR TO FINAL ACCEPTANCE
32AS BUILT DRAWINGSSOW SECTION 4.427 DAYS PRIOR TO FINAL INSPECTION
33CONSTRUCTION WARRANTY MANAGEMENT PLANDIV 01 SECTION 13.217 DAYS PRIOR TO FINAL INSPECTION
34DD FORM 1354 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTYDIV 01 SECTION 13.31AT FINAL INSPECTION
Schedule of Submittals Template, Feb 05 (SAF/AQCP)

Task Order # FA3099-16-D-0002-0002 SOW Atch 2

&"Times New Roman,Regular"&12Page &P of &N

File details come from the government source that posted it. Updated .