L. Tenant Improvements Cost Summary TICS Table.xlsx

XLSX spreadsheet 588 KB Posted

Attached to
X1DZ--X1DZ--Space for Lease Hagerstown, MD for 11, 987 Net Usable Square Feet/ 13, 785 ABOA/ 18, 610 Rentable Square Feet
Solicitation number
36C24525R0070
Issued by

About this file

This is a Tenant Improvements Cost Summary (TICS) Excel template for tracking costs related to VA lease RLP No. 36C24525R0070. The template provides detailed breakdown worksheets for both tenant improvement (TI) and shell construction costs across 23 construction divisions including general requirements, site work, concrete, masonry, metals, woods/plastics, thermal/moisture, doors/windows, finishes, specialties, equipment, furnishings, special construction, HVAC, plumbing, electrical, lighting, communications, security, and exterior work.

The template is designed to capture material and labor costs separately, with fields for quantities, unit costs, labor hours, and labor rates. It includes sections for general contractor fees, architectural/engineering fees, lessor soft costs (project management, banking fees, permits, etc.), taxes, and lessor overhead/profit. While the template is blank with no actual cost data entered, it references lease number 36C24525L0005 and appears to be associated with a VA space lease requirement in Hagerstown, MD for approximately 11,987 net usable square feet.

View the file

Other files

File Type Posted
A. Global Lease 36C24525L0005 Oct. 2024 Hagerstown CBOC Replacement Lease.pdf PDF
36C24525R0070 0003.pdf PDF
1. Global Request for Lease Proposal (RLP) 36C24525R0070.pdf PDF
36C24525R0070 0002.pdf PDF
36C24525R0070 0001.pdf PDF
36C24525R0070 0001- Attachment 1- Questions and Answers.pdf PDF
W. Eye Clinic- Basis of Design.pdf PDF
J. DOL Wage Determination No. MD20250056- Mod 1 Pub. 1.10.25.pdf PDF
U. VA Medical Center Exterior Signage Standards August 2024.pdf PDF
1. Global Request for Lease Proposal 36C24525R0070.pdf PDF
M. Space Plan Requirement.pdf PDF
B. Agency Specific Requirements.pdf PDF
T. VA Medical Center Interior Signage Standards August 2024.pdf PDF
O. FAR 52.204-24 Representation Digital Nov. 2021.pdf PDF
A. Global Lease 36C24525L0005 Hagerstown CBOC Replacement Lease.pdf PDF
F. GSA Form 1364 Proposal to Lease Space Jan. 2023.pdf PDF
R. CBOC Concept Plan.pdf PDF
X. Audiology Booth- Basis of Design.pdf PDF
E. GSA 3517B General Clauses Oct. 2023.pdf PDF
Y. DIRTT Millwork- Basis of Design.pdf PDF
G. GSA Form 1217 Lessor Annual Cost Statement Nov. 2016.pdf PDF
P. FAR 52.204-25 Reporting Clause Nov 2021.pdf PDF
Q. FAR Clause 52.204-27 Prohibition on a ByteDance Covere.pdf PDF
V. Flag Display- Basis of Design.pdf PDF
S. CBOC Room Data Sheets.pdf PDF
H. GSA Form 12000 Prelease Fire Protection and Life Safety.pdf PDF
C. Security Requirements -FSL Level I- Aug. 2022.pdf PDF
K. Room Equipment Unit Price List.xlsx XLSX spreadsheet
I. Security Unit Price List FSL 1.xlsx XLSX spreadsheet
36C24525R0070.docx DOCX document
N. Past Performance Questionnaire.pdf PDF
D. 3516 Solicitation Provisions Oct. 2023.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TICS

EXHIBIT L
RLP NO. 36C24525R0070
LEASE NO. 36C24525L0005
LESSOR __________ GOVERNMENT __________
TENANT IMPROVEMENTS COST SUMMARY (TICS)
for0NUSF SF=- 0
Agency:0TIA PER NUSF SF=$ - 0
0Location:0TOTAL TIA$ - 0
RU FactorERROR:#DIV/0!RSF=- 0
Masterformat CSISystem ElementsTI*SHELL**
Div 1General Requirements$ - 0$ - 0
Div 2Site work & Demolition$ - 0$ - 0
Div 3Concrete$ - 0$ - 0
Div 4Foundations / Masonry$ - 0$ - 0
Div 5Metals$ - 0$ - 0
Div 6Woods & Plastics$ - 0$ - 0
Div 7Thermal & Moisture$ - 0$ - 0
Div 8Doors & Windows$ - 0$ - 0
Div 9Finishes$ - 0$ - 0
Div 10Specialties$ - 0$ - 0
Div 11Equipment$ - 0$ - 0
Div 12Furnishings$ - 0$ - 0
Div 13Special Construction$ - 0$ - 0
Div 15General Construction$ - 0$ - 0
Div 21Fire Suppression$ - 0$ - 0
Div 22Plumbing$ - 0$ - 0
Div 23HVAC$ - 0$ - 0
Div 26.1Electrical$ - 0$ - 0
Div 26.2Lighting$ - 0$ - 0
Div 27Communications, Security & Other Elec. Systems$ - 0$ - 0
Div 28.1Electrical safety & Security$ - 0$ - 0
Div 28.2Security$ - 0$ - 0
Div 32Exterior$ - 0$ - 0
SubtotalTrade Costs$ - 0$ - 0
General Contractor FeePercent$ - 0$ - 0
SubtotalConstruction Costs$ - 0$ - 0
Architectural & Engineering Fees (NIC DID costs)$ - 0$ - 0
Other Lessor Soft Costs***$ -$ -
Taxes0.00%
SubtotalLessor's Costs:
Lessor's Overhead and ProfitPercent$ - 0$ - 0
TotalPrice to Government:GRAND TOTAL$ - 0$ - 0
Cost per NUSF SFERROR:#DIV/0!ERROR:#DIV/0!
Notes:Cost per RSFERROR:#DIV/0!ERROR:#DIV/0!
*Include all subcontractors' costs.
**Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the DEFINITIONS tablein the work book for the breakdown.
***Other Lessor Soft Costs: typically project management, mortgage banking fee, counsel, travel, appraisal, permits, etc. Provide separate breakdown separately or within the INPUT PROJECT INFO worksheet.
****Where document uses ANSI/BOMA or ABOA replace all occurrances with Net Usabel Square Feet (NUSF).

INPUT PROJECT INFO

INFORMATION NEEDED TO COMPLETE TICS TABLE
LEASE 36C24525L0005
Agency
Location: City, State
General contractor fee and Lessor's overhead and profit fields are structured to allow you to choose percentage or a lump sum.
ABOA SF =
TIA PER ABOA SF =
NUSF=
DATE:
General Contractor Fee$ - 0
taxes (if not included on contractor's bid), material onlyPercent
Lessor's Overhead and ProfitPercent$ - 0Lump Sum
Other Lessor Soft costs, i.e. project management, mortgage banking fee, counsel, travel, appraisal, permits, etc. list seperately.
TIShell
project management
mortgage banking fee
counsel
travel
appraisal
permits
TOTAL$ -$ -
General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum.
For A/E fees established as a cost per ABOA sf, convert

INSTRUCTIONS

INSTRUCTIONS
Read and understand SHELL DEFINITION tab.

Input project specific information as appropriate in the INPUT PROJECT INFO worksheet, in order to auto-populate the TICS worsheet. This includes ANSI-BOMA Office (ABOA) square footage, soft costs, overhead and profit, fees, and taxes.

Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below.
Material
Description Accurately describe each item being priced.
Quantity List the quantity e.g., 1,2, 3, etc.
Unit (Example) LS,EA,GAL,LF, SF, etc.
Cost Amount
Total Total cost of all material.
Labor
Hours Time projected to perform the task.
Labor Rate Cost per hour of labor.
Total Cost of labor.
TOTAL Combines overall materials and labor.
Shell

1. Fill out light green fields titled (SHELL), inputting only cost associated with shell as defined in the SHELL DEFINITION'S tab.

2. Fill each division tab 1-32 as needed for the construction to be preformed under the (SHELL) cost as indicated above.

Tenant Improvements (TI) TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.

1. Fill out fields titled (TI), inputting only costs associated with (TI).

2. Fill each division tab 1-32 as needed for the construction to be performed under the (TI) costs as indicated above.

DATE PREPARED
CONSTRUCTION COST ESTIMATE
DIVISION 9 - FINISHES (TI)
MATERIALLabor RateLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLabor RateTOTALHOURSLabor RateTOTAL
XYZ Paint1GAL$25.00$25.002.5$36.25$90.630.0$0.00$0.00
$0.00$0.00$0.00
$0.00$0.00$0.00
Total$25.00Total$90.63Total$0.00
TOTAL$115.63TOTAL$0.00
DIVISION 9 - FINISHES (SHELL)
ABC Paint10GAL$27.00$270.006.0$36.25$217.500.0$0.00$0.00
$0.00$0.00
$0.00$0.00
Total$217.50Total$0.00
TOTAL$423.75TOTAL$0.00

SHELL-TI DEFINITIONS

COST SUMMARY

CONSTRUCTION COST ESTIMATEMaterials
TIShell
DIVISION 1 GENERAL REQUIREMENTS$ - 0$ - 0$ - 0
DIVISION 2 SITE WORK AND DEMOLITION$ - 0$ - 0$ - 0
DIVISION 3 CONCRETE$ - 0$ - 0$ - 0
DIVISION 4 MASONRY$ - 0$ - 0$ - 0
DIVISION 5 METALS$ - 0$ - 0$ - 0
DIVISION 6 WOOD AND PLASTICS$ - 0$ - 0$ - 0
DIVISION 7 THERMAL & MOISTURE$ - 0$ - 0$ - 0
DIVISION 8 DOORS AND WINDOWS$ - 0$ - 0$ - 0
DIVISION 9 FINISHES$ - 0$ - 0$ - 0
DIVISION 10 SPECIALTIES$ - 0$ - 0$ - 0
DIVISION 11 EQUIPMENT$ - 0$ - 0$ - 0
DIVISION 12 FURNISHINGS & EQUIPMENT$ - 0$ - 0$ - 0
DIVISION 13 SPECIAL CONSTRUCTION$ - 0$ - 0$ - 0
DIVISION 15 GEN CONSTRUCTION$ - 0$ - 0$ - 0
DIVISION 21 FIRE SUPPRESSION SYSTEMS$ - 0$ - 0$ - 0
DIVISION 22 PLUMBING$ - 0$ - 0$ - 0
DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING$ - 0$ - 0$ - 0
DIVISION 26.1 ELECTRICAL$ - 0$ - 0$ - 0
DIVISION 26.2 LIGHTING$ - 0$ - 0$ - 0
DIVISION 27 COMMUNICATIONS$ - 0$ - 0$ - 0
DIVISION 28.1 ELECTRONIC, SAFETY$ - 0$ - 0$ - 0
DIVISION 28.2 SECURITY$ - 0$ - 0$ - 0
DIVISION 32 EXTERIOR$ - 0$ - 0$ - 0

TOTAL $ - 0 $ - 0 $ - 0

A&E DESIGN

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
A & E DESIGN (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
A & E DESIGN (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 1 - GENERAL REQUIREMENTS

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 1- GENERAL REQUIREMENTS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 1 - GENERAL REQUIREMENTS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 2 - SITE WORK AND DEMO

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 2 - SITE WORK AND DEMO (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 2 - SITE WORK AND DEMO (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 3 - CONCRETE

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 3 - CONCRETE (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 3 - CONCRETE (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 4 - MASONARY

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 4 - MASONARY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 4 - MASONARY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 5 - METAL

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 5 - METAL (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 5 - METAL (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 6 - WOOD & PLASTICS

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 6 - WOOD & PLASTICS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 6 - WOOD & PLASTICS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 7 - THERMAL & MOISTURE

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 7 - THERMAL & MOISTURE (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 7 - THERMAL & MOISTURE (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 8 - DOORS & WINDOWS

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 8 - DOORS & WINDOWS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 8 - DOORS & WINDOWS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 9 - FINISHES

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 9 - FINISHES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 9 - FINISHES (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 10 - SPECIALTIES

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 10 - SPECIALTIES (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 10 - SPECIALTIES (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 11 - EQUIPMENT

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 11 - EQUIPMENT (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 11 - EQUIPMEN (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 12 - FURNISHINGS & EQUIP

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 12 - FURNISHINGS & EQUIPMENT (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 12 - FURNISHINGS & EQUIPMENT (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 13 - SPECIAL CONSTRUCTION

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 13 - SPECIAL CONSTRUCTION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 13 - SPECIAL CONSTRUCTION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 15 - GEN CONSTRUCTION

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 15 - GENERAL CONSTRUCTION (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 15 - GENERAL CONSTRUCTION (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 21 - FIRE SUPPRESSION

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 21 - FIRE SUPPRESSION SYSTEMS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 22 - PLUMBING

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 22 - PLUMBING (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 22 - PLUMBING (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 23 - HVAC

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 23 - HVAC (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 23 - HVAC (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 26.1 - ELECTRICAL

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 26.1 - ELECTRICAL (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 26.1 - ELECTRICAL (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 26.2 - LIGHTING

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 26.2 - LIGHTING (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 26.2 - LIGHTING (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 27 - COMMUNICATIONS

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 27 - COMMUNICATIONS (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 27 - COMMUNICATIONS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 28.1 - ELECTRIC, SAFETY

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 28.1 - ELECTRICAL SAFETY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 28.1 - ELECTRICAL SAFETY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 28.2 - SECURITY

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 28.2 - SECURITY (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 28.2 - SECURITY (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

DIV 32 - EXTERIOR

CONSTRUCTION COST ESTIMATEDATE PREPARED
January 0, 1900
DIVISION 32 - EXTERIOR (TI)
MATERIALLABOR
DESCRIPTIONQUAN.UNITCOSTTOTALHOURSLABOR RATETOTAL
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
DIVISION 1 - GENERAL REQUIREMENTS (SHELL)TOTAL$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
$0.00$0.00
TOTAL$0.00TOTAL$0.00
TOTAL$0.00

Sheet1 image1.jpeg

File details come from the government source that posted it. Updated .