L. Tenant Improvements Cost Summary TICS Table.xlsx
XLSX spreadsheet 588 KB Posted
- Solicitation number
- 36C24525R0070
About this file
This is a Tenant Improvements Cost Summary (TICS) Excel template for tracking costs related to VA lease RLP No. 36C24525R0070. The template provides detailed breakdown worksheets for both tenant improvement (TI) and shell construction costs across 23 construction divisions including general requirements, site work, concrete, masonry, metals, woods/plastics, thermal/moisture, doors/windows, finishes, specialties, equipment, furnishings, special construction, HVAC, plumbing, electrical, lighting, communications, security, and exterior work.
The template is designed to capture material and labor costs separately, with fields for quantities, unit costs, labor hours, and labor rates. It includes sections for general contractor fees, architectural/engineering fees, lessor soft costs (project management, banking fees, permits, etc.), taxes, and lessor overhead/profit. While the template is blank with no actual cost data entered, it references lease number 36C24525L0005 and appears to be associated with a VA space lease requirement in Hagerstown, MD for approximately 11,987 net usable square feet.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TICS
| EXHIBIT L | ||||
| RLP NO. 36C24525R0070 | ||||
| LEASE NO. 36C24525L0005 | ||||
| LESSOR __________ GOVERNMENT __________ | ||||
| TENANT IMPROVEMENTS COST SUMMARY (TICS) | ||||
| for | 0 | NUSF SF= | - 0 | |
| Agency: | 0 | TIA PER NUSF SF= | $ - 0 | |
| 0 | Location: | 0 | TOTAL TIA | $ - 0 |
| RU Factor | ERROR:#DIV/0! | RSF= | - 0 | |
| Masterformat CSI | System Elements | TI* | SHELL** | |
| Div 1 | General Requirements | $ - 0 | $ - 0 | |
| Div 2 | Site work & Demolition | $ - 0 | $ - 0 | |
| Div 3 | Concrete | $ - 0 | $ - 0 | |
| Div 4 | Foundations / Masonry | $ - 0 | $ - 0 | |
| Div 5 | Metals | $ - 0 | $ - 0 | |
| Div 6 | Woods & Plastics | $ - 0 | $ - 0 | |
| Div 7 | Thermal & Moisture | $ - 0 | $ - 0 | |
| Div 8 | Doors & Windows | $ - 0 | $ - 0 | |
| Div 9 | Finishes | $ - 0 | $ - 0 | |
| Div 10 | Specialties | $ - 0 | $ - 0 | |
| Div 11 | Equipment | $ - 0 | $ - 0 | |
| Div 12 | Furnishings | $ - 0 | $ - 0 | |
| Div 13 | Special Construction | $ - 0 | $ - 0 | |
| Div 15 | General Construction | $ - 0 | $ - 0 | |
| Div 21 | Fire Suppression | $ - 0 | $ - 0 | |
| Div 22 | Plumbing | $ - 0 | $ - 0 | |
| Div 23 | HVAC | $ - 0 | $ - 0 | |
| Div 26.1 | Electrical | $ - 0 | $ - 0 | |
| Div 26.2 | Lighting | $ - 0 | $ - 0 | |
| Div 27 | Communications, Security & Other Elec. Systems | $ - 0 | $ - 0 | |
| Div 28.1 | Electrical safety & Security | $ - 0 | $ - 0 | |
| Div 28.2 | Security | $ - 0 | $ - 0 | |
| Div 32 | Exterior | $ - 0 | $ - 0 | |
| Subtotal | Trade Costs | $ - 0 | $ - 0 | |
| General Contractor Fee | Percent | $ - 0 | $ - 0 | |
| Subtotal | Construction Costs | $ - 0 | $ - 0 | |
| Architectural & Engineering Fees (NIC DID costs) | $ - 0 | $ - 0 | ||
| Other Lessor Soft Costs*** | $ - | $ - | ||
| Taxes | 0.00% | |||
| Subtotal | Lessor's Costs: | |||
| Lessor's Overhead and Profit | Percent | $ - 0 | $ - 0 | |
| Total | Price to Government: | GRAND TOTAL | $ - 0 | $ - 0 |
| Cost per NUSF SF | ERROR:#DIV/0! | ERROR:#DIV/0! | ||
| Notes: | Cost per RSF | ERROR:#DIV/0! | ERROR:#DIV/0! | |
| * | Include all subcontractors' costs. | |||
| ** | Shell and core work items within tenant space will include those items for a warm lit shell. Please refer to the DEFINITIONS tablein the work book for the breakdown. | |||
| *** | Other Lessor Soft Costs: typically project management, mortgage banking fee, counsel, travel, appraisal, permits, etc. Provide separate breakdown separately or within the INPUT PROJECT INFO worksheet. | |||
| **** | Where document uses ANSI/BOMA or ABOA replace all occurrances with Net Usabel Square Feet (NUSF). |
INPUT PROJECT INFO
| INFORMATION NEEDED TO COMPLETE TICS TABLE | |
| LEASE 36C24525L0005 | |
| Agency | |
| Location: City, State | |
| General contractor fee and Lessor's overhead and profit fields are structured to allow you to choose percentage or a lump sum. | |
| ABOA SF = | |
| TIA PER ABOA SF = | |
| NUSF= | |
| DATE: |
| General Contractor Fee | $ - 0 | ||
| taxes (if not included on contractor's bid), material only | Percent | ||
| Lessor's Overhead and Profit | Percent | $ - 0 | Lump Sum |
| Other Lessor Soft costs, i.e. project management, mortgage banking fee, counsel, travel, appraisal, permits, etc. list seperately. |
| TI | Shell | |
| project management | ||
| mortgage banking fee | ||
| counsel | ||
| travel | ||
| appraisal | ||
| permits |
| TOTAL | $ - | $ - |
| General contractor fee, A/E Fee and Lessor's Project Management Fee fields are structured to allow you to choose percentage or a lump sum. | ||
| For A/E fees established as a cost per ABOA sf, convert |
INSTRUCTIONS
| INSTRUCTIONS |
| Read and understand SHELL DEFINITION tab. |
Input project specific information as appropriate in the INPUT PROJECT INFO worksheet, in order to auto-populate the TICS worsheet. This includes ANSI-BOMA Office (ABOA) square footage, soft costs, overhead and profit, fees, and taxes.
| Fill in each line for all Shell and TI items in the corresponding division tabs included in the Tenant Improvement Cost Summary (TICS). Include all subcontractors' soft costs. Example shown below. |
| Material |
| Description Accurately describe each item being priced. |
| Quantity List the quantity e.g., 1,2, 3, etc. |
| Unit (Example) LS,EA,GAL,LF, SF, etc. |
| Cost Amount |
| Total Total cost of all material. |
| Labor |
| Hours Time projected to perform the task. |
| Labor Rate Cost per hour of labor. |
| Total Cost of labor. |
| TOTAL Combines overall materials and labor. |
| Shell |
1. Fill out light green fields titled (SHELL), inputting only cost associated with shell as defined in the SHELL DEFINITION'S tab.
2. Fill each division tab 1-32 as needed for the construction to be preformed under the (SHELL) cost as indicated above.
Tenant Improvements (TI) TIs include the finishes and fixtures that take space from the shell condition to a finished, usable condition.
1. Fill out fields titled (TI), inputting only costs associated with (TI).
2. Fill each division tab 1-32 as needed for the construction to be performed under the (TI) costs as indicated above.
| DATE PREPARED | ||||||||||
| CONSTRUCTION COST ESTIMATE | ||||||||||
| DIVISION 9 - FINISHES (TI) | ||||||||||
| MATERIAL | Labor Rate | LABOR | ||||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | Labor Rate | TOTAL | HOURS | Labor Rate | TOTAL |
| XYZ Paint | 1 | GAL | $25.00 | $25.00 | 2.5 | $36.25 | $90.63 | 0.0 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Total | $25.00 | Total | $90.63 | Total | $0.00 | |||||
| TOTAL | $115.63 | TOTAL | $0.00 | |||||||
| DIVISION 9 - FINISHES (SHELL) | ||||||||||
| ABC Paint | 10 | GAL | $27.00 | $270.00 | 6.0 | $36.25 | $217.50 | 0.0 | $0.00 | $0.00 |
| $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | |||||||||
| Total | $217.50 | Total | $0.00 | |||||||
| TOTAL | $423.75 | TOTAL | $0.00 |
SHELL-TI DEFINITIONS
COST SUMMARY
| CONSTRUCTION COST ESTIMATE | Materials | ||
| TI | Shell | ||
| DIVISION 1 GENERAL REQUIREMENTS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 2 SITE WORK AND DEMOLITION | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 3 CONCRETE | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 4 MASONRY | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 5 METALS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 6 WOOD AND PLASTICS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 7 THERMAL & MOISTURE | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 8 DOORS AND WINDOWS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 9 FINISHES | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 10 SPECIALTIES | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 11 EQUIPMENT | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 12 FURNISHINGS & EQUIPMENT | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 13 SPECIAL CONSTRUCTION | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 15 GEN CONSTRUCTION | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 21 FIRE SUPPRESSION SYSTEMS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 22 PLUMBING | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 23 HEATING VENTILATION AND AIR CONDITIONING | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 26.1 ELECTRICAL | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 26.2 LIGHTING | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 27 COMMUNICATIONS | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 28.1 ELECTRONIC, SAFETY | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 28.2 SECURITY | $ - 0 | $ - 0 | $ - 0 |
| DIVISION 32 EXTERIOR | $ - 0 | $ - 0 | $ - 0 |
TOTAL $ - 0 $ - 0 $ - 0
A&E DESIGN
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| A & E DESIGN (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| A & E DESIGN (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 1 - GENERAL REQUIREMENTS
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 1- GENERAL REQUIREMENTS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 1 - GENERAL REQUIREMENTS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 2 - SITE WORK AND DEMO
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 2 - SITE WORK AND DEMO (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 2 - SITE WORK AND DEMO (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 3 - CONCRETE
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 3 - CONCRETE (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 3 - CONCRETE (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 4 - MASONARY
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 4 - MASONARY (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 4 - MASONARY (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 5 - METAL
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 5 - METAL (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 5 - METAL (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 6 - WOOD & PLASTICS
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 6 - WOOD & PLASTICS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 6 - WOOD & PLASTICS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 7 - THERMAL & MOISTURE
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 7 - THERMAL & MOISTURE (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 7 - THERMAL & MOISTURE (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 8 - DOORS & WINDOWS
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 8 - DOORS & WINDOWS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 8 - DOORS & WINDOWS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 9 - FINISHES
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 9 - FINISHES (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 9 - FINISHES (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 10 - SPECIALTIES
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 10 - SPECIALTIES (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 10 - SPECIALTIES (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 11 - EQUIPMENT
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 11 - EQUIPMENT (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 11 - EQUIPMEN (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 12 - FURNISHINGS & EQUIP
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 12 - FURNISHINGS & EQUIPMENT (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 12 - FURNISHINGS & EQUIPMENT (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 13 - SPECIAL CONSTRUCTION
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 13 - SPECIAL CONSTRUCTION (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 13 - SPECIAL CONSTRUCTION (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 15 - GEN CONSTRUCTION
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 15 - GENERAL CONSTRUCTION (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 15 - GENERAL CONSTRUCTION (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 21 - FIRE SUPPRESSION
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 21 - FIRE SUPPRESSION SYSTEMS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 21 - FIRE SUPPRESSION SYSTEMS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 22 - PLUMBING
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 22 - PLUMBING (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 22 - PLUMBING (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 23 - HVAC
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 23 - HVAC (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 23 - HVAC (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 26.1 - ELECTRICAL
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 26.1 - ELECTRICAL (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 26.1 - ELECTRICAL (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 26.2 - LIGHTING
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 26.2 - LIGHTING (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 26.2 - LIGHTING (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 27 - COMMUNICATIONS
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 27 - COMMUNICATIONS (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 27 - COMMUNICATIONS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 28.1 - ELECTRIC, SAFETY
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 28.1 - ELECTRICAL SAFETY (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 28.1 - ELECTRICAL SAFETY (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 28.2 - SECURITY
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 28.2 - SECURITY (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 28.2 - SECURITY (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
DIV 32 - EXTERIOR
| CONSTRUCTION COST ESTIMATE | DATE PREPARED | ||||||
| January 0, 1900 | |||||||
| DIVISION 32 - EXTERIOR (TI) | |||||||
| MATERIAL | LABOR | ||||||
| DESCRIPTION | QUAN. | UNIT | COST | TOTAL | HOURS | LABOR RATE | TOTAL |
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| DIVISION 1 - GENERAL REQUIREMENTS (SHELL) | TOTAL | $0.00 | |||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | TOTAL | $0.00 | ||||
| TOTAL | $0.00 |
Sheet1 image1.jpeg
File details come from the government source that posted it. Updated .