KLWC Water System References.pdf
PDF 3 MB Posted
- Solicitation number
- 1240BJ23R0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation seeks proposals for a water and wastewater system improvements project at the Kenai Lake Work Center in Seward, Alaska. The project scope includes extending the existing water system into a loop, installing a new advanced wastewater treatment system and leach field, running new sewer and service laterals throughout the facility, and testing and commissioning all new systems. Optional items include asbestos abatement and demolition of an existing mess hall, replacing asbestos cement piping, decommissioning existing septic systems, removing cabins, and procuring and installing backup generators and wells. The estimated cost of construction is between $1 million and $5 million. The pre-bid site visit will take place on April 3, 2023. The Department of Agriculture Forest Service intends to award a single firm fixed price contract subject to availability of funds.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Photo Log
USFS Kenai Lake Work Center Sanitary Survey PWSID 2249966 June 2019
Photo # 1
The well head facing west.
Photo #3
The Pump House facing east.
A view of the inside of the Pump House.
The intake piping, two pipes; one for each submersible pump, Raw sampling tap located on the base of the intake piping.
Photo #5
The pressure controller.
Photo #6
A view of the master meter.
Photo #7
A view of the shut off valve and the piping leading out of the pump house.
The
Photo #8
The label that is on all three pressure tanks.
System Schematic’s
Well Log
File details come from the government source that posted it. Updated .