011000 SUMMARY OF WORK rev2.pdf

PDF 135 KB Posted

Attached to
Kenai Lake Work Center Water/Wastewater System Improvements
Solicitation number
1240BJ23R0004
Issued by

About this file

This document package includes a summary of work and related federal contract opportunity solicitation. The summary of work outlines the scope of a construction project located at the Kenai Lake Work Center in Seward, Alaska. The project includes extending the existing water system, installing a new wastewater treatment system and leach field, installing new sewer main and service laterals, and testing and commissioning all new systems. Optional items include hazardous material abatement and demolition of buildings, decommissioning existing septic systems, and upgrades to the well system including new pumps, controls, and a backup generator. The related federal contract opportunity solicitation seeks bids for the construction work with a government cost estimate between $1 million and $5 million. The period of performance is through November 15, 2024, with a pre-bid site visit scheduled for April 3, 2023. The solicitation will result in a single firm fixed price award subject to funding availability from the Department of Agriculture Forest Service.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1205G219D0003 / 12010920F0056

KLWC UTILITIES

1 011000

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 011000 SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This project is located at the US Forest Service Facility, Kenai Lake Work Center (KLWC). The address is Mile 24 Seward Highway, Seward AK 99664, on the West side of the highway. The KLWC is located approximately 6 miles south of Moose Pass, Alaska. This facility serves as the main Seward District Ranger Office and base of operations for seasonal field work on the District.

B. Project Summary Description: The following descriptions are provided as an outline of major work items, and shall not be constructed as an inclusive or complete listing of all items of Work under this Contract.

1. Base Bid includes the following work:

a) Extension of the existing water system to create a looped water system. This includes trenching and installation of about 450 feet of new 6” HDPE piping and all associated excavation, pipe bedding, fittings, valves, valve boxes, insulation, and all other appurtenances and incidentals associated with this scope of work.

b) Procurement and installation of a new centralized Advanced Treatment Wastewater System and associated new leach field with multiple zones. Scope includes site preparation and site electrical to bring power and telecom to the new wastewater system per the plans and specifications. The proposed Advanced Treatment System consists of two buried tanks and a buried treatment unit as well as a control system for the unit.

c) Site Electrical Work to provide power & telecom to the new Advanced Treatment Wastewater System. Includes coordinating with local utility companies to trench from existing transformer and telecom pedestal to new electrical service location adjacent to the Advanced Treatment Wastewater System. Includes site work such as trenching, installation of bedding materials, and installation of conduits. Includes electrical and telecom connections to the new Advanced Treatment Wastewater System. Note that there are parts of the system that must meet Class 1, Div 1 NEC requirements. See specifications and plans (E-series drawings) for more details.

d) Installation of a new sewer main throughout the facility. Scope includes site preparation and installation of approximately 1300 linear feet of 8” PVC sewer pipe. Sewer main installation includes cleanouts, manholes, and other appurtenances associated with the main per the plans and specifications.

e) Installation of building service laterals throughout the facility. Scope includes site preparation and installation of approximately 800 linear feet of 4” PVC sewer pipe and associated appurtenances. Laterals will be installed to eight

2 011000 existing buildings on the property (Warehouse, LEO Office, Carpenter Shop, KLWC Office, North Dorm, South Dorm, Lake House, Flex Housing Unit).

f) Testing and commissioning of all new piping and systems (water, wastewater, advanced WW treatment system, electrical). See specification documents for requirements. Water piping must be hydrostatically tested, cleaned, and disinfected and then sampled to ensure disinfection. Sewer piping and components must be leak tested. The Advanced Treatment Wastewater System and electrical components must be commissioned according to the manufacturer specifications.

2. Option Items include the following work:

a) Mess Hall (or “Crew House”) Hazmat abatement and disposal. This will include removal and disposal of asbestos-containing and other hazardous materials per EPA regulations. Some testing was done on the materials within the Mess Hall, and approximate quantities are provided in the plans (H0.1 & H1.0) and specifications.

b) Mess Hall demolition and disposal. This includes demolition and disposal of the Mess Hall building and foundation. The building is one story high and approximately 2,130 square feet in size.

c) Asbestos-cement sewer piping hazmat abatement and disposal. No visible asbestos-containing materials were found during the non-destructive visual investigation of the septic system. However, older (pre-1965) systems are expected to include asbestos-cement buried piping. Sewer piping at the Carpenter Shop, Lake House, Warehouse, Mess Hall, and LEO Office are the older systems that may contain asbestos-cement piping. The majority of this piping will be abandoned in place and excavated and disturbed only as necessary to complete the connection of the new septic system to the existing buildings. The estimated quantity of this material to be removed and disposed is 20 linear feet.

d) Decommissioning (and disposal, if necessary) of 10 existing septic systems.

Septic systems to be decommissioned are located at the following buildings:

Equipment Shop, Warehouse, LEO Office, Carpenter Shop, Mess Hall, North Dorm, KLWC Office, South Dorm, Lake House, and Flex-Housing.

Decommissioning of these septic systems will follow ADEC’s current requirements and guidelines.

e) Decommissioning and disposal of 8 cabins. This scope will include disconnecting the cabins from any connected utilities, removal of each cabin from its pile foundation, removal of the piles from the ground, and disposal of cabins and all associated materials. The approximate sizes of the cabins are Qty (6) - 240 square feet (Ea), Qty (1) - 263 square feet (Ea), and Qty (1) - 150 square feet (Ea).

f) Contract Line Item No. 13 - Replace Existing Well Pumps/Pipes/Wires & Install new VFD Controls and Replace 3 each ~275 gallon Pressure Tanks in the Pump House building. Note that this item is not included in the plan drawings. See attached reference materials: “KLWC Existing Water System As-builts.pdf”, “KLWC Water System References.pdf” for information on existing well, pumps, controls, and pressure tanks. The KLWC well has two

3 011000 pumps, each on separate risers & pitless adapters. Each existing pump is rated for 75 GPM, 175 TDH and motors are 5 hp, 230 V. The new motors should be 5 hp, 230 V, 3 phase. All wetted parts will be NSF compliant (less than 0.25% lead content for wetted parts). New VFD should be 1-phase input/3-phase output.

g) Contract Line Item No. 14 - Purchase and Install Back-up Generator to Power the Well Pumps, Controls, and Pumphouse Building. Note that this item is not included in the plan drawings. See attached reference materials: “KLWC Existing Water System As-builts.pdf”, “KLWC Water System References.pdf” for information on existing pumps, controls, and pumphouse building. Scope includes procuring and installing a propane back-up generator to power the KLWC drinking water system so that water can stay online during power outages. This will include installing a concrete pad near the pumphouse for the generator to mount to. Assume a concrete pad size of 7’ x 11’. Assume the following specifications for the generator package: 28 KW; engine meeting EPA/CARB emission regulations; 5 Amp, 5 stage battery charger; in-line block heater with thermostat; auto-start control module; noise-reducing weather enclosure; 200 Amp automatic transfer switch. Generator package to include all accessories needed for permanent mounting and operation outside in cold ambient conditions in Alaska. Generator size will need to be verified prior to purchasing, but the above specifications will be assumed for RFQ purposes.

Assume installation of a 250 gallon propane tank and associated concrete pad will be needed. This will be located near the pumphouse, following required clearances for propane tanks. Assume a concrete pad size of 5’ x 10’. Propane tank size will need to be verified prior to construction, but the above specifications will be assumed for RFQ purposes.

1.2 GENERAL SITE CONDITIONS AND WEATHER

A. The elevation of the site is approximately 450 feet above mean sea level. The construction site experiences heavy snowfall and cold temperatures (sometimes extreme), with snow on the ground typically from October through May. Precipitation averages 64 inches per year, with average total snowfall of 75 inches per year, as provided by www.weather-us.com.

1.3 USE OF PREMISES

A. General: Contractor shall have limited use of premises for construction operations, including use of Project Site, during construction period. Contractor's use of premises is limited by the Government's right to perform work at the site. The KLWC office is open year-round and several full-time staff occupy the premise. Seasonal staff arrive intermittently throughout the year occupying the residences on the jobsite.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees.

C. Confine storage of materials to areas as approved by the CO.

http://www.weather-us.com/

4 011000

D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.

E. Preservation of Natural Features: Confine all operations to work limits of the project.

Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

F. Provide temporary barriers to protect existing trees and plants and root zones.

a) Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with CO and remove agreed-on roots and branches that interfere with construction.

b) Do not fasten ropes, cables, or guys to existing trees.

c) Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

G. Existing Utilities: Notify CO of proposed locations and times for excavation.

a) Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

b) Interruption of Existing Utility Service: Notify CO, 48 hours in advance of any interruption of existing utilities.

1.4 MEALS AND LODGING

A. Meals and lodging are commercially available in Seward, AK, within 25 miles of the construction site. Meals will not be available at Forest Service facilities. Camping at nearby campgrounds may be allowed if approved.

1.5 CAMPING

A. Camping is not allowed at the construction site. Permission may be granted to camp at a nearby location.

1.6 FIELD VERIFICATION

A. Field verify all new and existing dimensions affecting the work of this contract before ordering products

1.7 REQUIREMENTS OF THE OFFERER’S PROPOSAL

A. The Government Drawings and Specifications are the basis for this Contract.

B. The work shall conform to the Drawings as closely as possible. Those products listed in the Specifications are preferred products, chosen for compatibility, longevity, durability and quality. However, equal or better alternatives submitted by the Offerer will be considered.

5 011000

1.8 PERMITTING

A. The Contractor shall be responsible for obtaining all permits and associated fees required to complete the project.

B. Government-furnished permits/approvals include approval from the Alaska Department of Environmental Conservation (ADEC) for public water and wastewater installation.

C. All electrical permit and inspection is to be by the local AHJ.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01100

6 011000

This page was intentionally left blank

SECTION 011000 SUMMARY OF WORK
PART 1 - GENERAL
1.1 Summary
A. This project is located at the US Forest Service Facility, Kenai Lake Work Center (KLWC). The address is Mile 24 Seward Highway, Seward AK 99664, on the West side of the highway. The KLWC is located approximately 6 miles south of Moose Pass, Alaska...
B. Project Summary Description: The following descriptions are provided as an outline of major work items, and shall not be constructed as an inclusive or complete listing of all items of Work under this Contract.
1.2 General site conditions and weather
A. The elevation of the site is approximately 450 feet above mean sea level. The construction site experiences heavy snowfall and cold temperatures (sometimes extreme), with snow on the ground typically from October through May. Precipitation averag...
1.3 use of premises
A. General: Contractor shall have limited use of premises for construction operations, including use of Project Site, during construction period. Contractor's use of premises is limited by the Government's right to perform work at the site. The KLW...
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees.
C. Confine storage of materials to areas as approved by the CO.
D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.
E. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
F. Provide temporary barriers to protect existing trees and plants and root zones.
G. Existing Utilities: Notify CO of proposed locations and times for excavation.
1.4 meals and lodging
A. Meals and lodging are commercially available in Seward, AK, within 25 miles of the construction site. Meals will not be available at Forest Service facilities. Camping at nearby campgrounds may be allowed if approved.
1.5 camping
A. Camping is not allowed at the construction site. Permission may be granted to camp at a nearby location.
1.6 field verification
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products
1.7 Requirements of the Offerer’s proposal
A. The Government Drawings and Specifications are the basis for this Contract.
B. The work shall conform to the Drawings as closely as possible. Those products listed in the Specifications are preferred products, chosen for compatibility, longevity, durability and quality. However, equal or better alternatives submitted by the...
1.8 permitting
A. The Contractor shall be responsible for obtaining all permits and associated fees required to complete the project.
B. Government-furnished permits/approvals include approval from the Alaska Department of Environmental Conservation (ADEC) for public water and wastewater installation.
C. All electrical permit and inspection is to be by the local AHJ.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)

File details come from the government source that posted it. Updated .