This solicitation is for water and wastewater system improvements at the Kenai Lake Work Center in Seward, Alaska. The project scope includes extending the existing water system, installing a new advanced wastewater treatment system and leach field, running new sewer and building service laterals, and testing and commissioning all new piping and systems. Optional items include asbestos abatement and demolition of an existing mess hall, removing asbestos cement sewer piping, decommissioning existing septic systems, removing cabins, replacing well pumps and controls with new variable frequency drives, and installing a backup generator to power the well pumps. The estimated cost is between $1,000,000 to $5,000,000, with performance required through November 15, 2024. A pre-bid site visit will be held on April 3, 2023. The Department of Agriculture Forest Service intends to award a single firm fixed price contract subject to availability of funds.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, REGION 10
SEWARD RANGER DISTRICT
CHUGACH NATIONAL FOREST
MOOSE PASS, ALASKA
CONSTRUCTION PLANS FOR:
KENAI LAKE WORK CENTER:
WATER AND WASTEWATER
SYSTEM IMPROVEMENTS
N:\LOGOS\LOGOS\USFS\USFS_Logo.jpg
ENGINEERS
PLANNERS
SURVEYORS
AutoCAD SHX Text
VICINITY MAP
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DIRECTOR OF ENGINEERING
AutoCAD SHX Text
APPROVED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DISTRICT RANGER
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
FOREST SUPERVISOR
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
RO FACILITIES PROGRAM MANAGER
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FOREST ENGINEER
AutoCAD SHX Text
RECOMMENDED:
AutoCAD SHX Text
CHUGACH NATIONAL FOREST
AutoCAD SHX Text
LOCATION MAP
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
ALASKA REGION
AutoCAD SHX Text
SEWARD RANGER DISTRICT
AutoCAD SHX Text
CHUGACH NATIONAL FOREST
AutoCAD SHX Text
ALASKA REGION
LEGEND - PROPOSED
MAJOR CONTOUR
MINOR CONTOUR
SEWER MAIN
SEWER SERVICE
SEWER MANHOLE
SEWER CLEANOUT
SS SS SS
SS SS SS
WATER VALVE
TEE
WATER MAIN
W
REDUCER
S
COUPLING
MAJOR CONTOUR
ROAD - ASPHALT
MINOR CONTOUR
CONCRETE
UNDERGROUND POWER
UNDERGROUND TELEPHONE
UNDERGROUND GAS LINE
UGP UGP
UGT UGT UGT
NG NG NG
BUILDING
ELECTRIC METER
LEGEND - EXISTING
ELECTRIC TRANSFORMER
TELEPHONE PEDESTAL
X X X
UTILITY POLE
FENCE
ES
SEPTIC TANK
SEWER LINE
EW EW
WATER LINE
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:2 7 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_G
EN
ER
AL
S
HE
ET
S.
DW
G;
GENERAL NOTES,
LEGEND, ABBREVIATIONS,
AND SHEET INDEX
C1.1
1. ALL GRAVITY SEWER PIPE IS SDR 35 PVC UNLESS OTHERWISE NOTED ON THE DRAWING SHEETS.
2. ALL WATER PIPE IS HDPE DR9 UNLESS OTHERWISE NOTED ON THE DRAWING SHEETS.
3. THE SEWER LINES SHALL BE LAID SUCH THAT THEY GRAVITY DRAIN AS SHOWN ON THE DRAWING
SHEETS.
4. SANITARY SEWER SERVICES WILL BE TIED IN AT THE EXISTING SERVICES, 5 FT FROM ALL EXISTING
BUILDINGS; THE USFS HAS FIELD VERIFIED THE SEWER STUB OUT INVERTS AT THE BUILDINGS, HOWEVER, THE CONTRACTOR IS STILL RESPONSIBLE FOR FIELD VERIFYING THE GRADE AND SIZE OF
EXISTING SEWER SERVICES.
5. THRUST BLOCKS ON THE WATER LINES ARE ONLY REQUIRED AT THE PROPOSED TEES.
GENERAL NOTES:
WATER AND SEWER NOTES:
ABBREVIATIONS
1. ALL DISTURBED AREAS FROM CONSTRUCTION RELATED ACTIVITIES ARE TO BE BROUGHT BACK TO
PRE-CONSTRUCTION CONDITION USING MATERIALS PREVIOUSLY REMOVED FROM THE DISTURBED
AREAS.
2. DO NOT DAMAGE ANY TREES (LARGER THAN 6" DIA.) OR TREE ROOT SYSTEMS WITHOUT PRIOR
USFS APPROVAL.
3. DIGITAL CONTRACT DOCUMENT DEPICTING COORDINATES FOR ALL DESIGN ELEMENTS ARE
AVAILABLE UPON REQUEST.
4. THE LOCATIONS OF ALL EXISTING UTILITIES IS APPROXIMATE. THE CONTRACTOR SHALL VERIFY
THE TYPE, SIZE, AND LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION.
CONTRACTOR TO CALL "DIG LINE" 811 FOR UTILITY LOCATES OR CALL 907-278-3121 PRIOR TO
CONSTRUCTION.
5. ANY UTILITIES ENCOUNTERED IN THE TRENCH THAT ARE NOT TO BE ABANDONED ARE TO BE
RESTRAINED AND PROTECTED IN PLACE BY THE CONTRACTOR UNLESS OTHERWISE NOTED. ALL
UNDERGROUND POWER AND TELEPHONE LINES ARE ASSUMED TO BE BURIED AT 30" DEPTH.
6. CONTRACTOR TO OBTAIN A STORM WATER PERMIT PER SPECIFICATION SECTION 01 51 00
7. THE CONTRACTOR IS RESPONSIBLE FOR THE PREPARATION AND OBTAINING OF ALL LOCAL, STATE
AND FEDERAL PERMITS ASSOCIATED WITH THE CONSTRUCTION OF THE ITEMS SHOWN ON THE
PLANS AND SPECIFICATIONS.
8. DISPOSAL: LOCATION WILL BE DESIGNATED BY THE CO. PROJECT WASTE DISPOSAL SHALL OCCUR
IN ACCORDANCE WITH SPECIFICATION SECTION 01 74 19.
9. DUST ABATEMENT: DURING CONSTRUCTION THE CONTRACTOR SHALL APPLY WATER TO ALL
EXPOSED AREAS TO KEEP DUST DOWN.
10. ALL CONSTRUCTION SLASH AND STUMPS SHALL BE REMOVED & DISPOSED OF BY CONTRACTOR
FROM FOREST SERVICE LANDS.
11. ALL GRAVEL FOR THIS PROJECT SHALL BE OBTAINED FROM A CERTIFIED WEED FREE SOURCE.
12. TOPSOIL WILL BE REMOVED WITHIN CONSTRUCTION LIMITS AND STOCKPILED. PLACE TOPSOIL ON
DISTURBED AREAS AND AREAS DESIGNATED TO BE VEGETATED.
13. SELECT BORROW FROM EXISTING SOURCE AS SHOWN ON THE PLANS IS TO BE USED FOR
EMBANKMENT.
14.EVERY ATTEMPT HAS BEEN MADE TO ENSURE THE ACCURACY OF THE DRAWINGS THROUGH FIELD
VERIFICATION & EXISTING PLAN REVIEW. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO
VERIFY EXISTING CONDITIONS, SIZES, QUANTITIES, AND TO COORDINATE ALL ASPECTS OF THE
PROJECT BEFORE CONSTRUCTION, ORDERING, AND INSTALLATION OF ANY COMPONENT. NOTIFY
CONTRACTING OFFICER IMMEDIATELY FOR WRITTEN CLARIFICATION IF ANY DISCREPANCY EXISTS.
15.DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE
CONTRACTOR IS EXPECTED TO USE QUALITY, ACCEPTABLE, CONSTRUCTION PRACTICES AND
TECHNIQUES FOR THE EXTENT AND TYPE OF WORK DESCRIBED HEREIN.
16.DO NOT SCALE DRAWINGS. VERIFY ALL EXISTING DIMENSIONS IN THE FIELD. IF A DIMENSION
DOES NOT EXIST OR IS IN ERROR, CONTACT THE CONTRACTING OFFICER IMMEDIATELY FOR
WRITTEN CLARIFICATION.
17. ALL MINOR OBSTRUCTIONS MAY NOT BE SHOWN ON CONSTRUCTION DRAWINGS. THE
CONTRACTOR SHALL REVIEW THE SITE PLANS AND DETERMINE THE CONDITIONS WITH REGARD
TO THE EXISTENCE OF ROADWAYS, TREES, BOULDERS, SIDEWALKS, UTILITIES AND OTHER SITE
IMPROVEMENTS AND MISCELLANEOUS OBSTACLES THAT MAY INTERFERE WITH CONSTRUCTION
PRIOR TO SUBMITTING PROPOSALS.
18. THE CONTRACTOR SHALL ONLY DISTURB WITHIN THE LIMITS OF DISTURBANCE SPECIFIED AND
SHOWN ON THE CONSTRUCTION DRAWINGS, NO GROUND DISTURBANCE SHALL OCCUR OUTSIDE
THE LIMITS UNLESS APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. ALL
DISTURBANCE AREAS MUST BE RESTORED TO PRE-CONSTRUCTION OR BETTER CONDITIONS AT
THE COMPLETION OF WORK.
ADEC ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CF CUBIC FEET
C.I. CAST IRON
CO CONTRACTING OFFICER
CY CUBIC YARD
DIA/Ø DIAMETER
DR DIMENSION RATIO
ELEV ELEVATION
HDPE HIGH DENSITY POLYETHYLENE
HORIZ HORIZONTAL
I.D. INSIDE DIAMETER
IE INVERT ELEVATION
INV INVERT
IPS IRON PIPE SIZE
KLWC KENAI LAKE WORK CENTER
LEO LAW ENFORCMENT OFFICER
LF LINEAR FEET
MAX MAXIMUM
MIN MINIMUM
MJ MECHANICAL JOINT
NTS NOT TO SCALE
O.D. OUTER DIAMETER
O.S.H.A. OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
PSI POUNDS PER SQUARE INCH
PT POINT
PVC POLYVINYL CHLORIDE
PWR POWER
SDR STANDARD DIMENSION RATIO
SET-AC SET-ALUMINUM CAP
SF SQUARE FEET
SSMH SANITARY SEWER MANHOLE
STA STATION
SWR SEWER
SWPPP STORM WATER POLLUTION PREVENTION PLAN
TYP TYPICAL
WTR WATER
VERT VERTICAL
SHEET INDEX
SHEET NO. SUB SHEET NO. SHEET TITLE
1 COVER PAGE
2 C1.1
GENERAL NOTES, LEGEND,
ABBREVIATIONS, AND SHEET INDEX
3 C1.2 PHASING PLAN
4 C1.3 SURVEY CONTROL POINTS MAP
5 C1.4 SURVEY CONTROL POINTS TABLE
6 C1.5
EXISTING CONDITIONS AND
DEMOLITION
7 C2.0 WATER LAYOUT AND SHEET INDEX
8 C2.1 WATER POINT TABLE
9 C2.2 WATER MAIN PLAN AND PROFILE
10 C2.3 WATER DETAILS
11 C3.0
SEWER COLLECTION LAYOUT AND
SHEET INDEX
12 C3.1 SEWER COLLECTION POINT TABLE
13 C3.2 SEWER MAIN PLAN AND PROFILE 1
14 C3.3 SEWER MAIN PLAN AND PROFILE 2
15 C3.4 SEWER MAIN PLAN AND PROFILE 3
16 C3.5 SEWER MAIN PLAN AND PROFILE 4
17 C3.7 SEWER COLLECTION DETAILS 1
18 C3.8 SEWER COLLECTION DETAILS 2
19 C3.9 SEWER COLLECTION DETAILS 3
20 C3.10 SEWER COLLECTION DETAILS 4
21 C4.0 ADVANCED TREATMENT AND DISPOSAL
22 C4.1
TREATMENT AND DISPOSAL PLAN AND
PROFILE
23 C4.2 DRAINFIELD GRADING
24 C4.3
ADVANCED TREATMENT AND DISPOSAL
DETAILS 1
25 C4.4
ADVANCED TREATMENT AND DISPOSAL
DETAILS 2
26 C4.5
ADVANCED TREATMENT AND DISPOSAL
DETAILS 3
27 C4.6 ADVANCED TREATMENT AND DISPOSAL
DETAILS 4
28 H0.1
HAZARDS ABATEMENT - GENERAL NOTES
AND QUANTITIES
H1.0 HAZARDS ABATEMENT - MESS HALL -
CREW HOUSE
E0.1 ELECTRICAL LEGEND AND SCHEDULES
E0.2 ENLARGED PLANS AND ONE-LINE
E1.1 ELECTRICAL DETAILS
SECTION OR DETAIL IDENTIFICATION SYMBOLS
DETAIL NOTE
A
NTS
DETAIL SHEET REFERENCE
A
C2.9
PLAN SHEET TO DETAIL SHEET REFERENCE
XXXXXXX
FINISHED
GROUND ELEV. AT
PIPE CENTERLINE
TOP OF PIPE ELEV.
1+00
PROFILE VIEW ELEVATION BAND
(BOTTOM OF PROFILE)
C2.9
6960.021_W-WW_GENERAL SHEETS.dwg
9/1 5/2
1 1 4:
L
EX
I F
:\6
0.0
K
EN
AI
L
AK
E
W
OR
K
CE
NT
ER
A
E D
ES
IG
N\
DW
G\
PH
AS
IN
G
PL
AN
\69
.02
1_
PH
AS
IN
G
PL
AN
.D
W G;
PHASING PLAN
C1.2
N
SCALE IN FEET
0 20 40
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
U
G
P
UGP
T
UGT
UGT
UGT
UGT
U
E
W
W
W
W
O H
UGT
UGT
UGT
UGT
TJ
S
ES
ES
ES ES ES ES ES
ES ES
ES ES ES
EJ
FT
FT
FT
FT
FT
FT
FT
FT
O
U G
P
UGP
U
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:2 7 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_G
EN
ER
AL
S
HE
ET
S.
DW
G;
SURVEY CONTROL
POINTS MAP
C1.3
N
SCALE IN FEET
0 50 100
KENAI LAKE
FLEX HOUSING UNIT
SOUTH DORM
EQUIPMENT
STORAGE
NORTH
DORM
MODULAR
OFFICE
KLWC OFFICE
CREW
HOUSE
CARPENTERS
SHOP
LEO OFFICE
LAKE HOUSE
STORAGE
YARD
A
L
A
S
K
A
R
I
L
R
O
A
D
EXISTING CABINS
EXISTING TURN
AROUND AND
LAKE ACCESS
SEE SHEET C1.4 FOR
SURVEY CONTROL TABLE
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:2 7 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_G
EN
ER
AL
S
HE
ET
S.
DW
G;
SURVEY CONTROL
POINTS TABLE
C1.4
A
W
T
D
R
C
A
F
O
L
S
U
U
N
E
P
D
Y
E
E
S
T
S
R
S
T
A
L A
V
I
R
V
E
R
U
S E
C
T
T
U
B
R
A
O
O
L
F
U
T
F G
R
I
S
D
I
C
L
U
E
U
R
PT3 - Found a 3 ¼” diam. Aluminum USDA Cap inside a 5” diam. PVC casing with aluminum cover in good condition. Cap found approx. 5” below ground. Cap is located near the southeast corner of Flex-housing front lawn approx. 7 ft. West of the gravel road to the
Flex-housing south parking area.. Cap is stamped as shown.
KLWC8
CP8
PT6 - Set a 5/8” diam. x 30” rebar with a yellow FS plastic cap approx. 1” below the ground. Rebar is located approx. 7 ft. northwest of a gravel loop road near the northwest corner of USS 7398, Lot 1 and approx. 14 ft. from the top of Kenai Lake's east bank.
KLWC10
CP10
PT7 - Set a 5/8” diam. x 30” rebar with a yellow FS plastic cap flush with the ground. Rebar is located approx. 2 ft. north of the KLWC gravel access road and approx. 2 ft. east of a private gravel road running north into USS 2497.
KLWC11
CP11
PT8 - Set a 2 ½” diam. Aluminum FS Cap on 5/8” diam. x 30” rebar approx. 1” below the ground. Cap is located approx. 44 ft. northeast of the northeast corner of the Crew House Building and approx. 2 ft. west of the curb. Cap is stamped as shown.
KLWC13
CP13
PT9 - Found a 3 ¼” diam. BLM Brass Cap flush with the ground in good condition. Cap set by BLM in 1983 for Corner 2 of USS 7398 Lot 1. Cap is located on the outside curve of the main paved access road into KLWC approx. 8 ft. east of the pavement edge and approx. 2
ft. northeast of a 4x4 wooden post with FS signs 54-2 and 54-9 attached. Cap is stamped as shown.
KLWC15
CP15
PT10 - Set a 2 ½” diam. Aluminum FS Cap on 5/8” diam. x 30” rebar approx. 2” below the ground. Cap is located in the grass approx. 30 ft.
northwest of the northwest corner of the Office Building and approx. 6 ft. east of the curb. Cap is stamped as shown.
A
W
T
D
R
C
A
F
O
L
S
U
U
N
E
P
D
Y
E
E
S
T
S
R
S
T
A
L A
V
I
R
V
E
R
U
S E
C
T
T
U
B
R
A
O
O
L
F
U
T
F G
R
I
S
D
I
C
L
U
E
U
R
PT 1 - Found a 3 ¼” diam. Aluminum USDA Cap inside a 5” diam. PVC casing with aluminum cover in good condition. Aluminum cover is flush with the gravel surface. Cap is located in the KLWC outside Storage
Area and is marked with an orange carsonite post with a 'survey marker' decal. Cap is stamped as shown.
PT2 - Set a 5/8” diam. x 30” rebar with a yellow FS plastic cap flush with the ground. Rebar is located in mixed spruce and alder approx. 45 ft. west of the SW corner of the outside storage area.
E
S
V IR
E
C
F
O
RES
T
KLWC4
CP4
PT4 - Set a 2 ½” diam. Aluminum FS Cap on 5/8” diam. x 30” rebar approx. 2” below the ground. Cap is located in the back yard of the Lake
House approx. 40 ft. southwest of the Northwest House corner and approx. 10 ft. from the edge of the lawn.
Cap is stamped as shown.
KLWC5
CP5
PT5 - Set a 2 ½” diam. Aluminum FS Cap on 5/8” diam. x 30” rebar flush with the ground. Cap is located approx. 25 ft. northwest of the Northwest corner of the KLWC Office Building and 40 ft. west of the flagpole. Cap is stamped as shown.
PT11 - Set a 2 ½” diam. Aluminum FS Cap on 5/8” diam. x 30” rebar flush with the ground. Cap is located approx. 16 ft. south of the southeast corner of the Equipment Storage Building and approx. 1 ft. from the edge of the gravel road to the outside storage area. Cap is stamped as shown.
PT13 - Set a 2 ½” diam. Aluminum FS Cap on 5/8” diam. x 30” rebar approx. 1” below the ground. Cap is located in the grass approx. 5 ft. from the outside curve of the main gravel road and approx.
58 ft. southeast of the southeast corner of the KLWC
Office Building. Cap is stamped as shown.
PT15 - Set a 2 ½” diam. Aluminum FS Cap on 5/8” diam. x 30” rebar approx. 1” below the ground. Cap is located in the grass approx. 40 ft.
northeast of the northeast corner of the Modular Office
Building, approx. 40 ft. southeast of the southeast corner of the Crew House Building and approx. 7 ft.
west of the curb. Cap is stamped as shown.
P N
O
E
U
U
R
D
U
B
S
T
E
Y
A
T
R
A
L
N
D
S
F
D
C
A
A
L
S
G
N
A
M
A
U
V
R
E
N
E
M
R
U
N
T
S
A
L
F
O
T
W
F
U
L
E
HT
D
O T
I
I
E
R
O
R
B
I
T
PT12 - Set a 5/8” diam. x 8” long Duranail Spike approx. 2” below the road surface. Cap is located in the center of the driveway leading to the Lake House and approx. 5 ft. west of the main gravel road.
PT14 - Set a 5/8" diam. x 8” long Duranail Spike approx. 1” below the gravel road surface. Cap is located near the center of the KLWC gravel parking lot entrance approx. 85 ft. northeast of the northeast corner of the KLWC Office Building.
PT59 - Set a 5/8” diam. x 30” rebar with a yellow FS plastic cap flush with the ground. The rebar is located in the grass between Kenai Lake and the north Flex Housing Unit
Building gravel parking area. The cap is located approx. 69
ft. northwest of the northwest corner of the Flex Housing
Unit Building and approx. 35 ft. west of the north gravel parking area.
PT50 - Found a ½” diam. Magnail flush with the road pavement. The Magnail is located between the road curbs near a road intersection south of the KLWC main access road and approx. 51 ft. northeast of the northeast corner of the Crew House Building.
PT51 - Set a 5/8” diam. x 30” rebar with a yellow FS plastic cap approx. 2” below the ground. The rebar is located between two cabins in a cluster of three cabins north of the KLWC Office Building parking area and south of the KLWC gravel access road. Cap is located approx. 16 ft. southwest of the northwest deck corner of the northeastern most cabin.
PT52 - Set a 5/8” diam. x 30” rebar with a yellow FS plastic cap flush with the ground. The rebar is located approx. 8 ft. northwest of the southwest corner of the
Crew House Building and approx. 9 ft. east of a 5 ft.
diam. above ground fuel tank.
PT53 - Set a 5/8” diam. x 30” rebar with a yellow FS plastic cap approx. 1” below the ground. The rebar is located in the grass approx. 20 ft. north of the northeast corner of the Warehouse Building and approx. 8 ft. northwest of a 12” diam. utility pole marked 'T21 G'.
PT54 - Set a 1/2” diam. x 1” long Magnail flush with the pavement near the center of large paved parking area. The Magnail is located approx. 4 ft. south of a small gravel section of the parking area, approx. 18 ft.
southeast of the asphalt parking area corner and approx. 85 ft. south of the southeast corner of the
Carpenters Shop Building.
PT55 - Set a 5/8” diam. x 30” rebar with a yellow
FS plastic cap flush with the ground. The rebar is located in the grass southeast of a 4 way intersection approx. 10 ft. south of a gravel road leading to the gas pump and outside storage area and approx. 55 ft. southwest of the southeast corner of the North Dorm Building.
PT56 - Found a 5/8” diam. rebar, slightly bent and flush with the gravel surface. The rebar is located near the southwest corner of the South Dorm
Building gravel parking area and approx. 40 ft.
northwest of the northwest corner of the South
Dorm Building. A FS plastic cap was set on top of the rebar.
PT57 - Set a 5/8” diam. x 30” rebar with a yellow
FS plastic cap flush with the ground. The rebar is located in a cluster of five cabins east of the KLWC
Office Building and southwest of the Modular Office
Building. The cap is located approx. 18 ft.
northwest of the northwest corner of the southeastern most cabin.
E
S
V IR
E
C
F
O
RES
T
E
S
V I R
E
C
F
O
RES
T
E
S
V I R
E
C
F
O
RES
T
E
S
V IR
E
C
F
O
RE
S
T
E
S
V I R
E
C
F
O
R E
S
T
E
S
V I R
E
C
F
O
RES
T
PT58 - Set a 5/8” diam. x 30” rebar with a yellow FS plastic cap flush with the ground. The rebar is located near tree line near the southeast corner of the South Dorm
Building. The cap is located above a small depression approx. 21 ft. southeast of the southeast corner of the
South Dorm Building.
CONTROL TABLE
POINT
STATE PLANE COORDINATES US
Survey Ft
DESCRIPTION
NO. NORTH EAST ELEV.
1 2340660.38 1754151.63 455.5
(SRD3167) 3-1/4" DIAM. USDA ALUM. CAP
2 2340551.62 1754019.86 453.3 5/8" X 30" REBAR w/ YELLOW FS CAP
3 2340518.84 1753821.67 448.7
(SRD3168) 3-1/4" USDA ALUM. CAP
4 2340786.62 1753583.70 450.0 5/8" X 30" REBAR w/ 2-1/2" ALUM.FS CAP
5 2341085.28 1753525.81 450.5 5/8" X 30" REBAR w/ 2-1/2" ALUM.FS CAP
6 2341271.73 1753399.56 442.8 5/8" X 30" REBAR w/ YELLOW FS CAP
7 2341322.60 1753611.64 451.3 5/8" X 30" REBAR w/ YELLOW FS CAP
8 2341290.67 1753887.08 454.8 5/8" X 30" REBAR w/ 2-1/2" ALUM.FS CAP
9 2341356.61 1754180.24 459.6
(S7398) 3-1/4" DIAM. BLM BRASS CAP
10 2341232.33 1754103.82 456.9 5/8" X 30" REBAR w/ 2-1/2" ALUM.FS CAP
11 2340975.81 1754153.33 457.5 5/8" X 30" REBAR w/ 2-1/2" ALUM.FS CAP
12 2340807.71 1753769.08 451.2
5/8" X 8" DURANAIL
13 2340922.18 1753658.43 450.9 5/8" X 30" REBAR w/ YELLOW FS CAP
14 2341136.98 1753639.79 452.5
5/8" X 8" DURANAIL
15 2341149.21 1753887.87 454.9 5/8" X 30" REBAR w/ 2-1/2" ALUM.FS CAP
50 2341288.98 1753900.70 454.9
1/2" MAGNAIL
51 2341249.72 1753711.15 452.6 5/8" X 30" REBAR w/ YELLOW FS CAP
52 2341184.79 1753837.23 454.0 5/8" X 30" REBAR w/ YELLOW FS CAP
53 2341169.02 1754212.81 458.1 5/8" X 30" REBAR w/ YELLOW FS CAP
54 2341099.05 1754030.11 455.2
1/2" X 1" MAGNAIL
55 2340858.34 1753876.82 453.1 5/8" X 30" REBAR w/ YELLOW FS CAP
56 2340699.95 1753840.56 452.1 5/8" REBAR w/ YELLOW FS CAP
57 2340997.66 1753758.15 452.2 5/8" X 30" REBAR w/ YELLOW FS CAP
58 2340604.62 1753917.88 452.5 5/8" X 30" REBAR w/ YELLOW FS CAP
59 2340636.51 1753621.94 448.5 5/8" X 30" REBAR w/ YELLOW FS CAP
NOTES:
1. ALL BASE MAPPING HAS BEEN PROVIDED BY THE USFS.
BASE MAPPING WAS COMPLETED IN MAY OF 2016; USFS
PROJECT # 7035-16.
P
U
UGT
UGT
UGT
U
W
W
W
U G
T
UGT
UGT
UGT
ES
EJ
FT
FT
FT
FT
FT
FT
FT
O
U G
P
UGP
U
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:2 7 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_G
EN
ER
AL
S
HE
ET
S.
DW
G;
EXISTING
CONDITIONS AND
DEMOLITION
C1.5
N
SCALE IN FEET
0 50 100
CABINS TO BE REMOVED
PRIOR TO CONSTRUCTION
BY USFS
KENAI LAKE
EQUIPMENT STORAGE
CREW HOUSE TO BE
DECOMMISSIONED, SEE
SHEETS H0.1 AND H1.1
NOTES:
1. ALL OF THE EXISTING SEPTIC SYSTEM LOCATIONS ARE APPROXIMATE AND WERE PROVIDED BY THE
USFS; CONTRACTOR TO FIELD VERIFY.
2. ALL EXISTING SEPTIC SYSTEMS, INCLUDING TANKS, DRAINFIELDS, AND APPURTENANCES ARE TO BE
ABANDONED/DECOMMISSIONED IN ACCORDANCE WITH THE ALASKA PLUMBING CODE.
3. EXISTING SEWER SERVICE PIPE FROM ALL BUILDINGS TO BE LEFT STUBBED OUT 5' FROM THE
BUILDING FOR NEW SERVICE CONNECTIONS.
4. WATER SERVICE TO CREW HOUSE TO BE CUT AND CAPPED AT THE MAIN. EXISTING WATER
SERVICE AND SEPTIC SYSTEM TO BE ABANDONED IN PLACE.
5. THE 8 CABINS BEING DECOMMISSIONED DO NOT HAVE WATER OR SEWER SERVICES.
6. ALL TANKS TO BE PUMPED AND CLEANED PRIOR TO DECOMMISSIONING.
7. SAW-CUT EXISTING ASPHALT FOR PIPE TRENCHING ACORDING TO TRENCH DETAILS ON SHEET
C3.9. DISPOSE OF ASPHALT OFF-SITE IN ACCORDANCE WITH LOCAL STATE, AND FEDERAL LAWS
AND REGULATIONS.
CABINS TO BE REMOVED
PRIOR TO CONSTRUCTION
BY USFS
EXISTING WATER DISTRIBUTION
TO STAY IN PLACE UNLESS
OTHERWISE NOTED
EXISTING PUMP HOUSE
STORAGE YARD
DECOMMISSIONING NOTES:
KLWC OFFICE
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
FLEX HOUSING UNIT
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
LAKE HOUSE
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
SOUTH DORM
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
NORTH DORM
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
MODULAR OFFICE
- SEPTIC TANK TO REMAIN UNTIL FUTURE
DECOMMISSIONING
- DRAINFIELD TO REMAIN UNTIL FUTURE
DECOMMISSIONING
CARPENTERS SHOP
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
LEO OFFICE
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
WAREHOUSE
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
CREW HOUSE
- ABANDON/REMOVE SEPTIC TANK
- ABANDON DRAINFIELD
EQUIPMENT
STAGING AREA
TOPSOIL AND GRAVEL
STOCKPILE AREA
SAW-CUT ASPHALT
ALONG HATCH FOR
SEWER MAIN TRENCHING
SEE SHEET C4.0 FOR TOPSIOL
STRIPPING AND TREE
REMOVAL FOR WASTEWATER
TREATMENT PLANT
UGT
UGT
UGT
U
W
W
W
UGT
UGT
UGT
UGT
ES
EJ
FT
FT
FT
FT
FT
FT
FT
O
U G
P
UGP
U
W
W
W
S
S
S S
S S
S S
S
S
S
S
S S
S S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
40+00
41+00
44+00
44+22
S
S
S S
S
S
S
S
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:2 7 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_W
AT
ER
S
HE
ET
S.
DW
G;
WATER LAYOUT AND
SHEET INDEX
C2.0
N
SCALE IN FEET
0 50 100
SHEET C2.2 - WATER MAIN PLAN AND PROFILE
EXISTING WATER MAINS
AND SERVICES TO BE
PROTECTED IN PLACE
PROPOSED WATER MAIN EXTENSION
KENAI LAKE
FLEX HOUSING UNIT
SOUTH DORM
EQUIPMENT
STORAGE
NORTH
DORM
MODULAR
OFFICE
KLWC OFFICE
CARPENTERS
SHOP
LEO OFFICE
LAKE HOUSE
WAREHOUSE
EXISTING PUMP
HOUSE AND
WELL
TO PTARMIGAN CREEK
STORAGE YARD
NOTES:
1. EXISTING WATER DISTRIBUTION SYSTEM TO BE
PROTECTED IN PLACE UNLESS OTHERWISE NOTED.
6960.021_W-WW_WATER SHEETS.dwg
200' OFFSET FROM
PUBLIC WELL
WASTEWATER TREATMENT
AND DISPOSAL SYSTEM,
SEE SHEETS C4.0-C4.6
SANITARY SEWER
COLLECTION SYSTEM, SEE
SHEETS C3.0-C3.10
P
U
W
W
W
ES
FT
FT
FT
FT
FT
FT
FT
O
U
W
W
W
S
S
S S
S S
S S
S
S
S
S
S S
S S
S
S
S
S
S
S
S S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
2011 2012
POINT TABLE
POINT #
NORTHING
2340914.49
2340913.25
2340898.06
2340899.45
2340894.46
2340889.47
2340904.44
2340909.49
2340911.31
2340919.41
2340924.34
2340869.00
2340869.92
2340907.20
EASTING
1754211.32
1754208.04
1753802.96
1753799.77
1753797.60
1753795.45
1753801.93
1753803.96
1754212.80
1754209.01
1754206.71
1753869.50
1753922.36
1754192.04
DESCRIPTION
6" X 6" X 6" TEE
6" GATE VALVE
6" GATE VALVE
6" X 6" X 6" TEE
6" GATE VALVE
4" MECHANICAL COUPLER WITH 4" X 6" REDUCER
6" GATE VALVE
4" MECHANICAL COUPLER WITH 4" X 6" REDUCER
4" MECHANICAL COUPLER WITH 4" X 6" REDUCER
6" GATE VALVE
4" MECHANICAL COUPLER WITH 4" X 6" REDUCER
6" 22.5° BEND
6" 11.25° BEND
6" 11.25° BEND
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:2 7 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_W
AT
ER
S
HE
ET
S.
DW
G;
WATER POINT TABLE
C2.1
N
SCALE IN FEET
0 50 100
6960.021_W-WW_WATER SHEETS.dwg
WATER FITTING POINT TABLE
U
P
U
EW
F
F T
F T
U
W
W W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
SS
S
S
S
40+00
44+00
44+22
39+8040+00 41+00 42+00 43+00 44+00 44+40
G
A T
E
V
A L V
E
M
J
S T
A
E L E
V
C O
N N
E C
T
T
O
E
X I S
T I N
G
S T
A
E L E
G
A T
E
V
A L V
E
M
J
S T
A
E L E
C O
N N
E C
T
T
O
E
X I S
T I N
G
S T
A
E L E
6" H
D
PE D
R9 I
PS P
IP
E
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:2 7 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_W
AT
ER
S
HE
ET
S.
DW
G;
WATER MAIN PLAN
AND PROFILE
C2.2
N
SCALE IN FEET
0 25 50
SCALE IN FEET
0 25 50
0 25
HORIZ
VERT
NORTH DORM
EQUIPMENT
STORAGE
6" GATE
VALVE, MJ
STA: 44+18.31
MIN. BURY
DEPTH 8'
FINISH GROUND
TIE INTO EXISTING
WATER MAIN EAST
TIE INTO EXISTING
WATER MAIN WEST
EXISTING
PUMP HOUSE
422' OF 6" HDPE
DR9 IPS PIPE
C
C2.3
D
C2.3
PROFILE
PLAN
6" GATE
VALVE, MJ
STA:40+03.50
B
C2.3
MAINTAIN MIN.
HORIZONTAL
SEPARATION OF 10'
E
C2.3
6" 22.5° BEND, MJ
STA: 40+76.09
6" 11.25° BEND, MJ
STA: 41+28.96
6" 11.25° BEND, MJ
STA: 44+01.30
B E N
D
M
J
S T A
B E N
D
M
J
S T A
B E N
D
M
J
S T A
PROTECT EXISTING
ELECTRICAL JUNCTION
BOX AND TRANSFORMER
IN PLACE
PROTECT EXISTING
HAZARDOUS MATERIAL
STORAGE ARE
GRAVEL ROADWAY
PATCH
PROTECT EXISTING
STORAGE CONTAINERS
AND LIGHT POLE IN
PLACE
EDGE OF GRAVEL
ROAD TYP.
B
C3.10
UNDERGROUND
POWER CROSSING
STA: 40+47.51
U N
D E R G
R O
U N
D
P O
W E R
C R O
S S I N
G
S T A
UNDERGROUND
POWER CROSSING
STA: 42+29.72
UNDERGROUND
POWER CROSSING
STA: 42+73.13
U N
D E R G
R O
U N
D
P O
W E R
C R O
S S I N
G
S T A
U N
D E R G
R O
U N
D
P O
W E R
C R O
S S I N
G
S T A
SEE SHEET C3.0 FOR
NEW SANITARY
SEWER LAYOUT
GRAVEL
STORAGE YARD
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:2 7 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_W
AT
ER
S
HE
ET
S.
DW
G;
WATER DETAILS
C2.3
1) NATIVE MATERIAL WILL BE USED FOR BEDDING ONLY WITH THE APPROVAL OF
CONTRACTING OFFICER.
2) ALL TRENCHING ACTIVITIES TO BE CONDUCTED IN ACCORDANCE WITH O.S.H.A.
CONSTRUCTION STANDARDS FOR EXCAVATIONS, SECTION 1926, SUBPART P.
6" HDPE DR9 IPS PIPE
PIPE BEDDING
4"
TRACE WIRE ON SIDE
OF PIPE
12" MIN.
NOTES :
* BACK SLOPE TO CONFORM
TO O.S.H.A. REGULATIONS.
(TYPE 2 EXC.)
INSTALL METAL CORE WARNING
TAPE 18" MAX. DEPTH
SUBGRADE OR
GROUND SURFACE
SLOPING, BENCHING AND/OR
SUPPORT SYSTEMS IN THIS
AREA TO CONFORM TO
O.S.H.A. REGULATIONS.
TYPE I BEDDING MATERIAL
PLACED IN 6" LAYERS &
COMPACTED AS SPECIFIED
IN SECTION 312100
TYPE I BEDDING MATERIAL
PLACED IN 6" MAX. LAYERS
AND THOROUGHLY
COMPACTED.
TRENCH WIDTH=O.D. OF PIPE PLUS
2' MIN. TRENCH WIDTH = 3.5'
TYPE 2 PIPE
BEDDING WHERE
REQUIRED FOR SOFT
OR UNSTABLE
FOUNDATION
TRENCH BACKFILL
AS SPECIFIED
* BACK SLOPE TO
CONFORM TO O.S.H.A.
REGULATIONS
NEW MECHANICAL JOINT
RESTRAINT
8'
MINIMUM
COVER
TRACER WIRE PLACED
INSIDE SMALL DIAMETER
PVC CONDUIT EXTENDED
TO TOP AND INSIDE OF
VALVE BOX. USE 12 GAGE
TRACER WIRE
NEW 5" ADJUSTABLE C.I.
VALVE BOX SET PLUMB
AND CENTER OVER VALVE
OPERATING NUT
NEW C.I. VALVE BOX BELL
NEW 6" DIA. GATE VALVE
NEW CONCRETE GATE
VALVE THRUST BLOCK
GATE VALVE DETAIL
NTS
TYPICAL WATER TRENCH DETAIL
NTS
3" STYROFOAM BOARD
INSULATION
6"
FITTING
SIZES
4" & 6"
TEES & PLUGS
REDUCERS &
22 1/2" BEND
DIMENSIONS FOR THRUST BLOCKING
A
2'-0"
B
1'-11"
A
1'-9"
B
0'-10"
B
A
MIN.
B
NOTES:
1. THIS TABLE IS BASED ON 2000 PSF SOIL
BEARING PRESSURE AND 150 PSI MAIN
PRESSURE.
2. WRAP ALL FITTINGS WITH POLYETHLENE PRIOR
TO PLACING CONCRETE.
TEE
NTS
C2.3
A
C2.3
C2.3
B
C
FINISH
GRADE
THRUST BLOCK DETAIL
TIE INTO EXISTING WATER MAIN EAST
NTS
C2.3
D
TIE INTO EXISTING WATER MAIN WEST
NTS
C2.3
E
UNDISTURBED SOIL
BEDDING MATERIAL
2' DIA. 6" THICK CONCRETE
COLLAR WITH WIRE MESH
REINFORCEMENT
6" GATE VALVE
6" X 6" X 6" TEE
4" ROMAC ALPHA COUPLING
OR APPROVED EQUAL TO TIE
INTO EXISTING WATER MAIN
4" ROMAC ALPHA COUPLING
OR APPROVED EQUAL TO TIE
INTO EXISTING WATER MAIN
ROMAC ALPHA COUPLING OR
APPROVED EQUAL TO TIE
INTO EXISTING WATER MAIN
ROMAC ALPHA COUPLING OR
APPROVED EQUAL TO TIE
INTO EXISTING WATER MAIN
PROPOSED 6" HDPE
DR 9 WATER MAIN
EXTENSION
EXISTING 4" HDPE
WATER MAIN,
CONTRACTOR TO
VERIFY DEPTH AND
LOCATION.
EXISTING 4" HDPE
WATER MAIN,
CONTRACTOR TO
VERIFY DEPTH AND
LOCATION.
PROPOSED 6" HDPE
DR 9 WATER MAIN
EXTENSION
6" GATE VALVE
EXISTING 4" HDPE
WATER MAIN,
CONTRACTOR TO
VERIFY DEPTH AND
LOCATION.
EXISTING 4" HDPE
WATER MAIN,
CONTRACTOR TO
VERIFY DEPTH AND
LOCATION.
TOWARDS PUMP
HOUSE
3.5' PIPE STUBS BETWEEN ALL FITTINGS
3.5' PIPE STUBS BETWEEN ALL FITTINGS
W
W
W
W
W
W
STORAGE CONTAINERS
LIGHT POLE
4" X 6" CONCENTRIC HDPE
DR 9 REDUCER
4" X 6" CONCENTRIC HDPE
DR 9 REDUCER 4" X 6" CONCENTRIC HDPE
DR 9 REDUCER
4" X 6" CONCENTRIC HDPE
DR 9 REDUCER
UG
UGP
U G P
UGP
UGP
U G P
U G T
U G
T
U G T
U G T
U G
T U G T
UGT
U G T
U G T
U G T
U G T
UGT UGT
UGT
UGT
UGT UGT UGT UGT UGT
U G T
U G T
U G T
U G T
U G T
UGT
UGT
UGT
U G
T U G
T U G
T U G
T
UG
T
UGT
UG
T
U G T
UGT
W
OHP
U G P
P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
UGT UGT UGT UGT
OHT
OHT
OHT
O H T
O H T
O
HP
UGT
U G T
U G
T U G
T U G
T
OHP
UGP
UGP
UGP
T
UG
T
UGT
UGT
ES
ES
ES
ES
FT
FT
FT
FT
FT
FT
FT
FT FT
FT
FT
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
U G P
UG
P
W
W
S
S
S
S
S
S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S
S
S
S
S
S
S
S
S
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER COLLECTION
LAYOUT AND SHEET
INDEX
C3.0
N
S H
E E T
C
S E W
E R
M
A I N
P L
N
D
P R O
F I L E
S
H
E
C
S
E
W
M
I N
P
L
D
O
F
I L
H
E
E
T
C
S
E
W
I N
P
L
O
F
I
H
E
W
I
N
P
L
O
F
I
SCALE IN FEET
0 75 150
KENAI LAKE
FLEX HOUSING UNIT
SOUTH DORM
EQUIPMENT
STORAGE
NORTH
DORM
MODULAR
OFFICE
KLWC OFFICE
LEO OFFICE
LAKE HOUSE
WAREHOUSE
PTARMIGAN CREEK
PROPOSED TANKS,
ADVANCED TREATMENT,
AND DRAINFIELD, SEE
SHEET C4.0 TO C4.6
STORAGE YARD
6960.021_W-WW_SEWER COLLECTION SHEETS.dwg
200' OFFSET FROM
PUBLIC WELL
UGP
UGP
UGP
UGP
UG
P
U G
P
UGP
UGP
UGP
UGP
UGP
UGP
U G P
U G P
U G P
UGP
U G
P
U G T
U G T
U G T
U G T
U G T
U G T
U G
T U G
T
U G T
UGT
U G T
U G T
U G T
U G T
U G T
U G T
UGT
UGT UGT
UGT
UGT UGT UGT UGT UGT UGT UGT
UGT
U G
T
U G T
U G T
U G T
U G T
U G T
U G T
U G T
UGT
UGT UGT
UGT
UGT
U G
T U G T
U G
T U G
T U G
T U G
T
UG
T
UG
T
UGT
UG
T
UGT
U G T
UGT
W
W W
OHP
UGP
U G P
U G P
H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
U G
T
UGT UGT UGT UGT UGT UGT
OHT OHT OHT OHT
O H T
O H T
O H T
U G
P
OHP
O
HP
O
HP
UGT
U G
T
U G T
U G T
U G
T U G
T U G
T U G
T
OHP
UGP UGP
TJ
ES
T
U G T
OHT
OHP
UG
T
UG
T
UGT
UGT
UGT
U G
P
OHT
ES
ES
FT
FT
FT
FT
FT
FT
FT
FT
FT
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
UGP
U G P
U G P
UGP
U G
P
UG
P
UG
P
UGP
UG
T
W
W
W
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
POINT TABLE
POINT #
NORTHING
2341080.23
2341153.92
2341141.21
2340915.51
2340678.05
2340578.88
2340571.62
2340946.63
2340896.85
2340881.05
EASTING
1754131.61
1754047.25
1753883.89
1753792.99
1753767.90
1753812.71
1753859.05
1753669.16
1754025.04
1753871.90
DESCRIPTION
SSMH-1
SSMH-2
SSMH-3
SSMH-4
SSMH-5
SSMH-6
TIE INTO TREATMENT SYSTEM
SSMH-7
SSMH-8
SSMH-9
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER COLLECTION
POINT TABLE
C3.1
N
SCALE IN FEET
0 50 100
6960.021_W-WW_SEWER COLLECTION SHEETS.dwg
SANITARY SEWER COLLECTION POINT TABLE
-0+20 0+00 1+00 2+00 3+00 4+00 5+00
S S M
H
S T A
R I
I N
V
O
U
S S M
H
S T A
R
I N
V
O
U
I N
V
S S M
H
S T A
R
I N
V
O
U
I N
V
243' of 8" SDR 35 @ 1.23%
164' of 8" SDR 35 @ 0.40%
112' of 8" SDR 35 @ 0.40%
UGP
UGP
UGP
U G
P
UGP UGP
UGP
UGP
UGP
U G
P U G
P U G
P U G
P
UG
P
UG
P
UGP
OHP
UGT
U G
T U G
T U G
T U G
T U G
T
UGT UGT
UGT
UGT
UGT
UGT
U G
T U G
T U G
T U G
T U G
T
UG
T
W W
W
W W
W W
U G
P U G
P
UGT
OHT
OHT
OHT
UGT
UGT
UGT
UGT
FT
FT
FT
FT
FT
U G
P
U G
P U G
P
U G
P U G
P
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
0+00
5+00
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S o f
C
C
C
C
C
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER MAIN PLAN
AND PROFILE 1
C3.2
N
SCALE IN FEET
0 25 50
SCALE IN FEET
0 25 50
0 25
HORIZ
VERT
CARPENTERS SHOP EXISTING
SEWER SERVICE INVERT AT
BUILDING = 451.10
PROFILE
PLAN
SSMH-1
STA : 0+00
RIM = 455.41
INV OUT = 449.21
SSMH-2
STA : 1+12
RIM = 455.37
INV IN = 448.76
INV OUT = 448.56
SSMH-3
STA : 2+76
RIM = 454.19
INV IN = 447.90
INV OUT = 447.70
SSMH-4
STA : 5+19
RIM = 451.71
INV IN = 444.70
INV IN = 444.70
INV IN = 444.70
INV OUT = 444.50
MIN. BURY
DEPTH 5'
EXISTING WATER
MAIN CROSSING
STA : 2+61.66
EXISTING WATER MAIN CROSSING
ESTIMATED 8' BURY DEPTH,
CONTRACTOR TO VERIFY, MAINTAIN
1.5" VERTICAL SEPARATION
STA : 2+61.66
FINISH GRADE
NORTH DORM EXISTING
SEWER SERVICE INVERT
AT BUILDING = 449.40
KLWC
OFFICE
A
C3.7
= MANHOLE DETAIL
A
C3.8
= MANHOLE CHANNEL DETAIL
LEO OFFICE
EXISTING SEWER
SERVICE INVERT AT
BUILDING = 452.50
PROPOSED WATER
MAIN EXTENSION,
SEE SHEET C2.2
C
C3.9
SEWER SERVICE
CONNECTION
STA: 0+95.36
SEWER SERVICE
CONNECTION
STA: 0+15.11
SEWER SERVICE
CONNECTION
STA: 1+30.84
SEWER SERVICE
CONNECTION
STA: 4+34.34
S E W
E R
S E R V I C E
C O
N N
E C T I O
N
S T A
S E W
E R
S E R V I C E
C O
N N
E C T I O
N
S T A
S E W
E R
S E R V I C E
C O
N N
E C T I O
N
S T A
S E W
E R
S E R V I C E
C O
N N
E C T I O
N
S T A
B
C3.9
SEWER
CLEANOUT
TYP.
D
C3.9
SEE SHEET C3.4
S
H
E
S
H
E
WAREHOUSE EXISTING
SEWER SERVICE INVERT AT
BUILDING = 453.70
INSTALL 107 LF OF
4" SDR 35 SANITARY
SEWER PIPE
INSTALL 108 LF OF
4" SDR 35 SANITARY
SEWER PIPE
INSTALL 106 LF OF
4" SDR 35 SANITARY
SEWER PIPE
INSTALL 64 LF OF
4" SDR 35 SANITARY
SEWER PIPE
8" SDR 35 PVC
SEWER MAIN
EDGE OF ASPHALT
ROAD TYP.
EDGE OF GRAVEL
ROAD TYP.
SEE SHEET C3.5
WATER SERVICE
CROSSING
STA : 4+73.30
W A T E R
S E R V I C E
C R O
S S I N
G
S T A
6960.021_W-WW_SEWER COLLECTION SHEETS.dwg
A
C3.9
= SEWER TRENCH DETAIL
6+00 7+00 8+00 9+00 10+00
5+00 6+00 7+00 8+00 9+00 9+50
239' of 8" SDR 35 @ 0.40%
109' of 8" SDR 35 @ 0.40%
S S M
H
S T A
R
I N
V
O
U
I N
V
S S M
H
S T A
R
I N
V
O
U
I N
V
I N
V
I N
V
47' of 8" SDR 35 @ 0.40%
UG
P
UG
P
UG
P
U G P
UGP
UGP UGP
UGP
UGP
U G P
U G P
UGP
U G
P
U G
P
UGT UGT UGT
UGT UG
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT UGT UGT UGT
UGT
UGT
UGT UGT UGT
UGT
UGT
UGT
UGT
T U G T
UGT
UGT
FT
UGP
UGP
UGP
UGP
UGP
UGP
UGP UGP UGP UGP
UGP
W
S
S
S
S
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
9+14
5+00
8+00
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S S
C
109' o f 8
SDR 3
5 P
VC
0' o f 8 " S
DR
.0
0%
C
C
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER MAIN PLAN
AND PROFILE 2
C3.3
N
SCALE IN FEET
0 25 50
0 25
HORIZ
VERT
PROFILE
PLAN
SSMH-5
STA : 7+58
RIM = 450.67
INV IN =443.55
INV OUT = 443.35
MIN. BURY
DEPTH 5'
SOUTH DORM EXISTING
SEWER SERVICE INVERT
AT BUILDING = 449.84
A
C3.7
= MANHOLE DETAIL
A
C3.8
= MANHOLE CHANNEL DETAIL
SSMH-6
STA : 8+67
RIM = 448.81
INV IN =442.88
INV OUT = 442.68
SCALE IN FEET
0 25 50
EXISTING WATER
MAIN CROSSING
STA : 5+61.10
EXISTING WATER
MAIN CROSSING
STA : 7+92.09
EXISTING WATER MAIN CROSSING
ESTIMATED 8' BURY DEPTH,
CONTRACTOR TO VERIFY
STA : 5+61.10
EXISTING WATER MAIN CROSSING
ESTIMATED 8' BURY DEPTH,
CONTRACTOR TO VERIFY MAINTAIN
1.5' VERTICAL SEPERATION
STA : 7+92.09
OUTLET TO ADVANCED
TREATMENT SYSTEM,
SEE SHEET C4.3
C
C3.9
SEWER SERVICE
CONNECTION
STA: 7+05.24
SEWER SERVICE
CONNECTION
STA: 7+98.31
B
C3.9
SEWER
CLEANOUT
TYP.
D
C3.9
S E W
E R
S E R V I C E
C O
N N
E C T I O
N
S T A
S E W
E R
S E R V I C E
C O
N N
E C T I O
N
S T A
TIE INTO ADVANCED TREATMENT
SYSTEM, SEE SHEET C4.0
S
H
E
S
H
E
INSTALL 135 LF OF
4" SDR 35 SANITARY
SEWER PIPE
INSTALL 90 LF OF
4" SDR 35 SANITARY
SEWER PIPE
INSTALL 79 LF OF
4" SDR 35 SANITARY
SEWER PIPE
LAKE HOUSE EXISTING
SEWER SERVICE INVERT
AT BUILDING = 448.15
FLEX HOUSING EXISTING
SEWER SERVICE INVERT
AT BUILDING = 444.30
SEWER SERVICE
CONNECTION
STA: 8+57.42
S E W
E R
S E R V I C E
C O
N N
E C T I O
N
S T A
EDGE OF GRAVEL
ROAD TYP.
S S M
H
S T A
R
I N
V
I N
V
O
U
EXISTING
CLEANOUT
FLEX HOUSING
BUILDING
SSMH-4
STA : 5+19
RIM = 451.71
INV IN = 444.70
INV IN = 444.70
INV IN = 444.70
INV OUT = 444.50
SEE SHEET C2.2
6960.021_W-WW_SEWER COLLECTION SHEETS.dwg
A
C3.9
= SEWER TRENCH DETAIL
SEE SHEET C3.4
SEE SHEET C3.5
EXISTING WATER
SERVICE CROSSING
STA : 5+75.93
EXISTING WATER MAIN SERVICE
ESTIMATED 8' BURY DEPTH,
CONTRACTOR TO VERIFY
STA : 5+75.93
UNDERGROOUND
UTILITY CROSSINGS
STA : 6+01.83 -
STA : 6+16.99
UNDERGROOUND
UTILITY CROSSINGS
STA : 6+01.83 -
STA : 6+16.99
19+8020+00 21+00 21+50
128' of 8" SDR 35 @ 0.40%
UGP
UGP
UGP
UGP
UG
P
UG
P
UGP
UG
P
UG
P
UG
P
U G
P U G
P
UGP
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
U G T
W
W
UGP
U G T
U G T
U G T
FT
UGP
UGP
UGP
UGP
U G P
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S S
SS
SS
S S
SS
SS
S S
SS
21+28
20+00
21+00
S S
S S
S
S
S
S o f S
D R
P
V C o f
S
C
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER MAIN PLAN
AND PROFILE 3
C3.4
N
SCALE IN FEET
0 25 50
0 25
HORIZ
VERT
SCALE IN FEET
0 25 50
PROFILE
PLAN
SSMH-7
STA : 20+00
RIM = 450.89
INV IN = 445.62 (4" SERVICE)
INV OUT = 445.22
SSMH-4
STA : 21+28
RIM = 451.71
INV IN = 444.70
INV IN = 444.70
INV IN = 444.70
INV OUT = 444.50
A
C3.7
= MANHOLE DETAIL
A
C3.8
= MANHOLE CHANNEL DETAIL
MIN. BURY
DEPTH 5'
KENAI LAKE WORK CENTER OFFICE
EXISTING SEWER SERVICE INVERT
AT BUILDING = 448.90
PROPOSED WATER MAIN
EXTENSION, SEE SHEET C2.2
SEWER
CLEANOUT
D
C3.9
CONNECT SEWER
SERVICE TO SSMH-7
INSTALL 69 LF OF
4" SDR 35 SANITARY
SEWER PIPE
SEE SHEET C3.2
SEE SHEET C3.3
SEE SHEET C3.5
EDGE OF GRAVEL
ROAD TYP.
S S M
H
S T A
R
I N
V
S E R V I C E
I N
V
O
U
U N
D E R G
R O
U N
D
P O
W E R
A N
D
T E L E P H
O N
E
C R O
S S I N
G
S T A
UNDERGROUND
POWER AND
TELEPHONE CROSSING
STA : 20+60.81
S S M
H
S T A
R
I N
V
I N
V
I N
V
I N
V
O
U
6960.021_W-WW_SEWER COLLECTION SHEETS.dwg
A
29+8030+00 31+00 32+00 32+60
154' of 8" SD R 35 @
1.50%
' o f 8 " S
D R
.0
UGP
UGP
UGP
UGP
UGP
U G
P
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
U G P
U G P
UGP
U G P
UG
T
UG
T
U G
T
UGT
UGT
U G
T
U G T
U G
T U G
T
FT
FT
FT
U G
P U G
P
W
W
W
W
W
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
32+40
30+00
S
S
S o f
S D
R
P V C
C o f
C
C
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER MAIN PLAN
AND PROFILE 4
C3.5
N
PROFILE
PLAN
A
C3.7
= MANHOLE DETAIL
A
C3.8
= MANHOLE CHANNEL DETAIL
SCALE IN FEET
0 25 50
0 25
HORIZ
VERT
SCALE IN FEET
0 25 50
SSMH-8
STA : 30+00
RIM = 455.12
INV OUT = 448.94
SSMH-4
STA : 32+40
RIM = 451.71
INV IN = 444.70
INV IN = 444.70
INV IN = 444.70
INV OUT = 444.50
MIN. BURY
DEPTH 5'
SSMH-9
STA : 31+54
RIM = 452.79
INV IN = 446.63
INV OUT = 446.43
MAINTAIN MIN.
HORIZONTAL
SEPARATION OF 10'
EXISTING WATER MAIN CROSSING
ESTIMATED 8' BURY DEPTH,
CONTRACTOR TO VERIFY
STA : 2+27.60
5' STUB OF SDR 35
PVC FOR FUTURE
SEWER SERVICE
CONNECTION
STA: 30+05.00
S T U
B
O
F
S D
R
P V C
F O
R
F U
T U
R E
S E W
E R
S E R V I C E
C O
N N
E C T I O
N
S T A
B
C3.9
SEE SHEET C3.2
SEE SHEET C3.3
SEE SHEET C3.4
EDGE OF GRAVEL
ROAD TYP.
UNDERGROUND
POWER CROSSING
STA: 31+74.39
UNDERGROUND
POWER CROSSING
STA: 30+06.93
S S M
H
S T A
R
I N
V
O
U
S S M
H
S T A
R
I N
V
I N
V
O
U
S S M
H
S T A
R
I N
V
I N
V
I N
V
I N
V
O
U
U N
D E R G
R O
U N
D
P O
W E R
C R O
S S I N
G
S T A
U N
D E R G
R O
U N
D
P O
W E R
C R O
S S I N
G
S T A
6960.021_W-WW_SEWER COLLECTION SHEETS.dwg
A
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER COLLECTION
DETAILS 1
C3.7
FILL CONCRETE AROUND PIPE
6"
8"
FILL CONCRETE
RUBBER GASKET
SLOPE 2"
3" MIN.
RUBBER GASKET
MANHOLE STEPS 90° FROM PIPE
RUBBER GASKET
VIEW FROM TOP
SECTION A-A
FLEXIBLE JOINT 2' TO
3' FROM MANHOLE
(SEE NOTE 9)
PIPE INSERTED INTO
M.H. 8" MIN.
3" EXCEPT MAY
BE OMITTED
WHEN BASE AND
FILL CONC. ARE
POURED MONO-
LITHICALLY.
0.8 X PIPE I.D.
PRECAST OR CAST
IN PLACE BASE
NTS
NTS
SEWER MANHOLE DETAIL
NTS
A
C3.7
NOTES:
1. POURED-IN-PLACE OR PRECAST BASE MAY BE USED.
POURED-IN-PLACE BASE: MINIMUM CONCRETE
THICKNESS MUST BE EIGHT (8") INCHES. PRECAST
BASE: MINIMUM THICKNESS MUST BE EIGHT (8")
INCHES.
2. THE POURED-IN-PLACE CONCRETE BASE MUST
START OUTSIDE THE MANHOLE AND MUST BE A
MINIMUM OF EIGHT (8") INCHES DEEP UNDER THE
MANHOLE WITH A COLLAR AROUND THE PIPE, AS
SHOWN IN THE DETAILS.
3. POUR AGAINST UNDISTURBED EARTH SIX (6")
INCHES OF CONCRETE ENCASEMENT TO SPRING
LINE AND FIRST JOINT OF INLET PIPE.
4. ALL JOINTS BETWEEN MANHOLE SECTIONS,
ADJUSTING RINGS, MANHOLE RING AND TOP
SECTION, AND AROUND SEWER PIPE INTO MANHOLE
SHALL BE WATERTIGHT. JOINTING MATERIAL SHALL
BE "RAM-NEK®" OR APPROVED EQUAL FOR ALL
JOINTS EXCEPT BETWEEN SEWER PIPE AND
MANHOLE WALL.
5. ALL MANHOLE PENETRATIONS SHALL BE PRECAST
OR MADE BY CORE DRILLING.
6. INVERT PIPE ELEVATIONS IN AND OUT OF THE
MANHOLE ARE SHOWN ON SEWER PLAN AND
PROFILE SHEETS.
7. BASE AND FILL CONCRETE MAY BE POURED
MONOLITHICALLY.
8. ONE-HALF (1/2") INCH SPACING MAY BE OMITTED
WHEN BASE AND FILL CONCRETE ARE POURED
MONOLITHICALLY.
9. ALL P.V.C. TO P.V.C. DEFLECTON JOINTS SHALL BE
MADE WITH A GASKETED P.V.C. REPAIR COUPLING
AS A GPK 906 STYLE COUPLING OR EQUIVALENT.
THE USE OF A PIPE BELL AND SPIGOT ASSEMBLY
WILL ALSO BE ALLOWED.
10. ALL FLOW ACROSS MANHOLES SHALL BE A MINIMUM
OF TWO-TENTH (2/10') OF A FOOT FALL, AS SHOWN
ON SEWER PLAN AND PROFILE SHEETS.
4' DIA.
PRECAST SECTION
4"
AT STANDARD
MANHOLE
TYPICAL PIPING
2'-3'
(TYP.)
6"
4"(MIN.)
(TYP.)
8" MIN.
TYP.
TYPICAL GRAVITY MAIN
PIPING AT STANDARD
MANHOLE
VARIABLE
AS REQUIRED
12"
HEAVY DUTY MANHOLE RING &
COVER, LETTERING TO
INDICATE "SEWER", OR
APPROVED EQUAL
CONCRETE ADJUSTMENT RINGS
SET IN MASTIC: 8" MAX. - 4"
MIN.
WATER TIGHT SEAL
WATER TIGHT
GASKET
6" CONCRETE
ENCASEMENT TO SPRING
LINE AND FIRST JOINT OF
INLET PIPE. POUR
AGAINST UNDISTURBED
EARTH.
INV. (OUT)
ELEVATION 0.2'
BELOW INV. (IN)
ELEVATION (TYP.)
S T E P
S P A C I N
G
FINISH GRADE MATCH
EXISTING SURFACE, PATCH
PER SHEET C3.10
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER COLLECTION
DETAILS 2
C3.8
SSMH-1 SSMH-2
SSMH-3
SSMH-4 SSMH-5
SSMH-6
SSMH-7 SSMH-8 SSMH-9
C H
A N
N E
L
C H
A N
N E
L
148°
212°
C H
A N
N E
L
N
C
H
A
N
N
E
L
SHELF
SHELF
C
H
A
N
N
E
L
127°
233°
SHELF
SHELF
116°
SHELF
SHELF
C H
A N
N E
L
98°
72°
91°
98°
C
H
A
N
N
E
L
SHELF
SHELF
SHELF
S
H
E
L
F
C
H
A
N
N
E
L
SHELF
SHELF
C
H
A
N
N
E
L
151°
209°
SHELF
SHELF
SHELF
SHELF
SEWER MANHOLE CHANNEL DETAILS
NTS
A
C3.8
SHELF
SHELF
SHELF
SHELF
244°
173°
187°
123°
237°
NOTES:
1. ALL INLET AND OUTLET PIPES TO
BE 8" SDR 35 PVC UNLESS
OTHERWISE NOTED
4" SDR 35 SEWER
SERVICE INLET
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER COLLECTION
DETAILS 3
C3.9
ONE 45° BENDS ROTATED UP AND TO
MATCH HORIZONTAL DIRECTION AS
SHOWN IN DRAWINGS
4" SDR 35 PVC
SANITARY SEWER SERVICE LINE
SLOPE: 2% MIN.
SEWER MAIN
WYE FITTING
TO SERVICE
CLEANOUT
SANITARY SEWER DETAIL NOTES:
1. SANITARY SEWER PIPING JOINTS SHOULD BE AS FAR AWAY AS POSSIBLE
FROM WATER PIPING JOINTS.
2. INSTALL #14 TRACE WIRE ALONG ALL SERVICE PIPE.
3. ALL SANITARY SEWER SERVICE PIPE TO HAVE 3" OF STYROFOAM BOARD
INSULATION PER DETAIL A/C3.9.
COMPACTED
BACKFILL
(SEE PROJECT
SPECIFICATIONS)
SANITARY SEWER SERVICE CONNECTION DETAIL
B
NTS
4" DIA. SCH 40 PVC SERVICE PIPE
26" TOP PIECE OF RISER
SCH 40 W/THREADED PLUG
TRACER WIRE
EJIW HEAVY DUTY CAST IRON
VALVE BOX W/ DROP LID
W/MARKING TO READ "SEWER"
OR APPROVED EQUAL
FLOW
DIRECTION
FLOW
DIRECTION
MAIN LINE WYE FITTING
W/45° BEND
CONNECT TO EXISTING SERVICE
LINE 5' FROM BUILDING
4" SDR 35 SEWER SERVICE
TRANSITION COUPLING
NOTE:
1. CONCRETE COLLAR AND CAST IRON VALVE
BOX ARE ONLY REQUIRED WHEN
CLEANOUTS ARE PLACED IN ASPHALT
PAVEMENT.
2. ALL PIPE FROM WYE TO BE SOLVENT
WELD.
3. CONTRACTOR TO FIELD VERIFY EXISTING
PIPE MATERIAL AT CONNECTION POINT
AND SUBMIT CONNECTION DETAILS TO
THE CONTRACTING OFFICER FOR
APPROVAL PRIOR TO CONSTRUCTION
SEWER SERVICE CLEANOUT DETAIL
D
NTS
TRACE
WIRE TO BE
INSTALLED ON
SIDE OF PIPE
SUBGRADE OR
GROUND
SURFACE
INSTALL WARNING
TAPE 18" MAX. DEPTH
* BACK SLOPE AS
SPECIFIED TO CONFORM
TO O.S.H.A. REGULATIONS.
* BACK SLOPE TO
CONFORM TO O.S.H.A.
REGULATIONS.
TRENCH BACKFILL AS
SPECIFIED
PIPE SPRING LINE
PIPE BEDDING MATERIAL
PLACED IN 6" MAX.
LAYERS AND COMPACTED
AS SPECIFIED.
TYPE 2 PIPE BEDDING
WHERE REQUIRED FOR
SOFT OR UNSTABLE
FOUNDATION
TRENCH NOTES:
1. INSULATION REQUIRED ON ANY PIPE BURIED LESS THAN 8' BELOW FINISH GRADE.
2. NATIVE MATERIAL WILL BE USED FOR BEDDING ONLY WITH THE APPROVAL OF
CONTRACTING OFFICER.
3. ALL TRENCHING ACTIVITIES TO BE CONDUCTED IN ACCORDANCE WITH O.S.H.A.
CONSTRUCTION STANDARDS FOR EXCAVATIONS, SECTION 1926, SUBPART P.
TRENCH WIDTH=O.D. OF PIPE PLUS
24" MINIMUM TRENCH WIDTH = 3.5'
SLOPING, BENCHING AND/OR
SUPPORT SYSTEMS IN THIS
AREA TO CONFORM TO
O.S.H.A. REGULATIONS.
12" MIN.
TYPICAL SEWER PIPE TRENCH DETAIL
A
NTS
WATER SEWER SEPARATION DETAIL
C
NTS
C3.9
3" STYROFOAM BOARD INSULATION
ON THREE SIDES
C3.9
C3.9
C3.9
PIPE SEGMENT
LENGTH "L"
L/2
PIPE SEGMENT
LENGTH "L"
L/2
6" MIN.
SEWER
LINE
WATER LINE
SEWER LINE
M I N
WATER
LINE
WATER
LINE
M I N
WATER-SEWER SEPARATION NOTES:
1. SPECIFIC ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION APPROVAL IS REQUIRED FOR A DISTANCE LESS THAN 10 FT BETWEEN WATER
MAIN AND GRAVITY SEWER MAINS.
2. AT CROSSING ONE FULL LENGTH OF WATER MAIN PIPE SHALL BE LOCATED SO THAT BOTH JOINTS WILL BE AS FAR FROM THE SANITARY SEWER
MAIN AS POSSIBLE.
3. SPECIFIC ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION APPROVAL IS REQUIRED FOR A SEPARATION OF LESS THAN SHOWN BETWEEN
WATER MAIN AND SANITARY SEWER.
4. "L" IS A STANDARD LENGTH OF PIPE AS SUPPLIED BY A PIPE MANUFACTURER.
5. WHERE A WATER MAIN CROSSES UNDER A SEWER, ADEQUATE STRUCTURAL SUPPORT MUST BE PROVIDED FOR THE SEWER TO MAINTAIN LINE AND
GRADE AND TO PREVENT DAMAGE TO THE WATER MAIN.
6. SEWER PIPE JOINTS ARE TO BE A MINIMUM OF 9 FT FROM WATER MAIN CROSSINGS.
7. SEWER PIPE TO BE BEDDED WITH TYPE 4 OR 5 PIPE BEDDING MATERIAL FOR ENTIRE PIPE SECTIONS WHERE THE SEWER MAIN CROSSES THE
WATER MAIN.
PARALLEL ARRANGEMENT
PERPENDICULAR ARRANGEMENT
12"
CUT ASPHALT
EDGE WHERE
REQUIRED
1.5' DIA. 6" THICK
CONCRETE COLLAR WITH
WIRE MESH REINFORCEMENT
10' - 0" MIN.
UGP
U G
P
UGP
UGP
UGP
UGP
UGP
UGP
UG
P
U G
P
UGP
UGP
UGP
UGP
UGP
UGP
UGP
UGP
U G P
U G P
U G P
UGP
UGP
U G
P
U G T
U G T
U G T
U G T
U G T
U G T
U G T
U G
T U G
T
U G T
UGT
UGT
U G T
U G T
U G T
U G T
U G T
U G T
U G T
U G T
U G T
U G T
UGT
UGT
UGT UGT
UGT
U G T
U G
T
UGT
U G T
U G
T U G
T U G
T U G
T U G
T
UG
T
UG
T
UGT
UGT
UG
T
UGT
UGT
W
W
W W
OHP
UGP
U G P
U G P
U G P
H P
O H P
O H P
O H P
O H P
O H P
O H P
O H P
OHT OHT
OHT OHT OHT OHT OHT
O H T
O H T
O H T
O H T
U G P
UGP
OHP
O
HP
O
HP
UGT
U G
T
U G T
U G T
U G T
U G
T U G
T U G
T U G
T U G
T
G T
OHP
UG
T
UG
T
UG
T
UGT
UGT
UGT
||||ES
FT
FT
FT
FT
FT
FT
FT FT
FT
FT
O H T
O H T
O H T
O H T
O H T
O H T
O H T
O H T
FT
FT
U G P
U G P
U G P
UG
P
U G
P
UG
P
UG
P
UG
T
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S S
S S
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
S
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
6960.021
/16
/21
:3 2 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_S
EW
ER
C
OL
LE
CT
IO
N
SH
EE
TS
.D W
G;
SEWER COLLECTION
DETAILS 4
C3.10
ASPHALT SECTION DETAIL
A
NTS
C3.10
2" HOT ASPHALT
2" D-1 GRADED AGGREGATE BASE
8" COMPACTED TYPE
A, 6" MAXIMUM AGGREGATE
SIZE CRUSHED SUBBASE
GRAVEL SECTION DETAIL
B
NTS
C3.10
4"-6" COMPACTED E-1
AGGREGATE SURFACE COURSE
20" COMPACTED TYPE A, 6"
MAXIMUM AGGREGATE SIZE
CRUSHED SUBBASE
GRAVEL
PATCH AREA
B
C3.10
N
SCALE IN FEET
0 40 80
B
C3.10
A
C3.10
ROADWAY PATCHING DETAILS
1. ALL TRENCHES WITHIN ASPHALT PAVED AREA ARE TO BE PATCHED PER
2. ALL TRENCHES WITHIN GRAVEL PAVED AREA ARE TO BE PATCHED PER
3. ANY TRENCH OUTSIDE OF ROADWAY TO BE FINISHED PER
ASPHALT
PATCH AREA
A
C3.10
TOPSOIL SECTION DETAIL
C
NTS
C3.10
4"-6" TOPSOIL
20" COMPACTED
NATIVE BACKFIL
C3.10
U
S
S
S
S
S
S
S
S
S
S
S
S
S
S
/2/
:2 0 T
YL
ER
.F
RA
NC
IS
F :\6
0.0
K
EN
AI
L
AK
E W
OR
K
CE
NT
ER
A
E
D
ES
IG
N\
DW
G\
1.0 W
AT
ER
W
AS
TE
W
AT
ER
\69
.02
1_ W
-W W
_T
RE
AT
ME
NT
S
HE
ET
S.
DW
G;
ADVANCED
TREATMENT AND
DISPOSAL
C4.0
DRAWING
TITLE
PROJECT NAME
DRAWN
DESIGNER
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DWG SHEET NO.
OF
SHEET
United States Department of Agriculture Forest Service
(R-10)
REGION TEN
KENAI LAKE
WORK CENTER
WATER/WASTEWATER
SYSTEM
IMPROVEMENTS
CHUGACH NATIONAL
FOREST
SEWARD
RANGER DISTRICT
December 17, 2021
T. FRANCIS
T. FRANCIS
B. ELKINS
696…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .