About this file
This document is a Request for Information (RFI) form related to a federal contract opportunity. The RFI is for Contract Number RFP 5997234, with the contract title and prime contractor/subcontractor information provided. The RFI requests information and a recommended solution regarding a drawing, detail, specification, and cost effect. The RFI requires a response by a specific date. The document also includes a recommendation section, a reply section, and instructions that this RFI does not constitute authorization to proceed with work.
The related federal contract opportunity is for Solicitation Number 6062471 to Repair Water Main Valves/Lines in the Southeast Zone at Naval Submarine Base New London in Groton, CT. The scope includes the removal and replacement of 38 water valves and associated piping. This requirement is limited to 7 contractors under MACC ML-C00068, and no other offers will be accepted. The contracting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 00001.pdf | ||
| (M) FAR 52.204-24.pdf | ||
| (O) Sales Tax Exemption Form 2016-R-0149.pdf | ||
| (J) Map to B135.pdf | ||
| (H) General Requirements.pdf | ||
| (B) Specifications.pdf | ||
| (D) SUBMITTAL REGISTER.pdf | ||
| (C) Drawings.pdf | ||
| (F) PRICE PROPOSAL FORM.docx | DOCX document | |
| (E) NEPA.pdf | ||
| (N) Guide to Taxes.pdf | ||
| (A) MACC RFP.pdf | ||
| (G) Wage Determination.pdf | ||
| (P) CERT-141.pdf | ||
| (I) Base Map.pdf | ||
| (L) ECMS.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
RFP 5997234
REQUEST FOR INFORMATION RFI NUMBER:
CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY NUMBER:
COST EFFECT: INCREASE: DECREASE: NONE:
INFORMATION REQUESTED & RECOMMENDED SOLUTION:
Date Response Required By: Date: Signature:
From:
To: Field Office Code
RECOMMENDATION:
Date: Signature:
From: Field Office To: Prime Contractor
REPLY:
Date: Signature:
This reply is given with the expressed understanding that it does not constitute basis for change in the amount or time of subject contract. If you do not concur, DO NOT PROCEED, and notify this office immediately.
Please assign PC # to this change. It is requested that a proposal be forwarded by . THIS DOES NOT
CONSTITUTE AUTHORIZATION TO PROCEED.
copy to: File 2L
Supv Civil Engineer Construction Representative
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a changed condition, written notice to the Contracting Officer is required within 20 calendar days.
DISTRIBUTION: Original to File via REICC PL/DM ET A/E PC # via AROICC/CONTRACT OFFICER