This document is a Submittal Register that lists the contract requirements and submittal items for a federal contract opportunity titled "Repair Water Main Valve/Lines SE Zone". The scope includes removing and replacing 38 water valves and associated piping on the underground fire and potable water distribution system at Naval Submarine Base New London in Groton, CT.

The contract is limited to 7 contractors under MACC ML-C00068, listed in a separate attachment. Key submittal items include a Salvage Plan, Schedule of Prices, Preliminary and Initial Project Schedules, Submittal Register, Accident Prevention Plan, Quality Control Plan, Construction Site Plan, Traffic Control Plan, Environmental Protection Plan, and various test reports and closeout documents. The contract requires compliance with federal procurement, environmental, safety, and construction requirements.

View the file

Other files

File Type Posted
Amendment 00001.pdf PDF
(M) FAR 52.204-24.pdf PDF
(K) RFI Form.pdf PDF
(O) Sales Tax Exemption Form 2016-R-0149.pdf PDF
(J) Map to B135.pdf PDF
(H) General Requirements.pdf PDF
(B) Specifications.pdf PDF
(C) Drawings.pdf PDF
(F) PRICE PROPOSAL FORM.docx DOCX document
(E) NEPA.pdf PDF
(N) Guide to Taxes.pdf PDF
(A) MACC RFP.pdf PDF
(G) Wage Determination.pdf PDF
(P) CERT-141.pdf PDF
(I) Base Map.pdf PDF
(L) ECMS.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 12 PAGES

1705774

Repair Water Main Valve/Lines SE Zone

01 11 00 SD-01 Preconstruction Submittals

1.6 GSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.2.1.1List of Contact Personnel

01 20 00 SD-01 Preconstruction Submittals

1.3 GSchedule of Prices

01 30 00 SD-01 Preconstruction Submittals

1.3View Location Map

1.4Progress and Completion

Pictures

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 GProject Scheduler Qualifications

3.4.1 GPreliminary Project Schedule

3.4.2 GInitial Project Schedule

3.6.2 GPeriodic Schedule Update

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GBaseline Construction Schedule

SD-07 Certificates

1.4Monthly Updates

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.8.1 GAPP - Construction

1.8 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.4Monthly Exposure Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

01 35 26 1.13Notifications and Reports

1.13.2 GAccident Reports

SD-07 Certificates

1.5Contractor Safety Self-Evaluation

Checklist

1.7.1.4Crane Operators/Riggers

1.8.3.2 GStandard Lift Plan

1.8.3.3 GCritical Lift Plan

1.9Activity Hazard Analysis (AHA)

1.10.1Confined Space Entry Permit

1.10.1Hot Work Permit

1.13.4 GCertificate of Compliance

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

1.6.1.4 GContractor Computer

Cybersecurity Compliance

Statements

1.6.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

01 57 19 1.6.2 GRegulatory Notifications

1.6.4 GEnvironmental Manager

Qualifications

1.6.5 GEmployee Training Records

1.7 GEnvironmental Protection Plan

1.7.9.1 GDirt and Dust Control Plan

1.10 GSolid Waste Management Permit

3.2.1.1 GStormwater Pollution Prevention

Plan

3.10.2 GSpill Prevention Control And

Countermeasure (SPCC) Plan

SD-06 Test Reports

1.10.1 GMonthly Solid Waste Disposal

Report

3.7.1.1.2Laboratory Analysis

SD-07 Certificates

1.6.5 GEmployee Training Records

SD-11 Closeout Submittals

1.6.2 GRegulatory Notifications

1.6.5 GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.7.1 GWaste Determination

Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

01 57 19 3.7.2.1 GProject Solid Waste Disposal

Documentation Report

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

3.7.3.1 GHazardous Waste/Debris

Management

3.7.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

3.8.1 GContractor Hazardous Material

Inventory Log

01 74 19 SD-01 Preconstruction Submittals

1.6 GConstruction Waste Management

Plan

SD-11 Closeout Submittals

1.8 SFinal Construction Waste

Diversion Report

01 78 00 SD-03 Product Data

1.6.1Warranty Management Plan

1.6.4Warranty Tags

Final Cleaning

1.5Spare Parts Data

SD-08 Manufacturer’s Instructions

1.6.1Instructions

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

01 78 00 3.3 GOperation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.2 GRecord Drawings

1.6.1As-Built Record of Equipment and Materials

2.1 GCertification of EPA Designated

Items

GCertification Of USDA Designated

Items

3.5.1 GInterim DD FORM 1354

3.5.2 GChecklist for DD FORM 1354

01 78 23 SD-10 Operation and Maintenance

Data

GFacility Data Workbook

3.1.1 GTraining Plan

3.1.2 GTraining Content

3.2.2 GOperation And Maintenance

Manual, Prefinal Submittal

3.2.3 GOperation And Maintenance

Manual, Final Submittal

SD-11 Closeout Submittals

3.1.1 GTraining Plan

1.6.6.7 GRecord Drawings And Utility

Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

02 61 13 SD-01 Preconstruction Submittals

GWork Plan

SD-02 Shop Drawings

3.1Surveys

SD-06 Test Reports

3.8.2Compaction

3.10 GClosure Report

03 30 00 SD-01 Preconstruction Submittals

1.6.5 GQuality Control Plan

1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

1.6.8 GLaboratory Accreditation

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.1Formwork Materials

2.3.3.3Recycled Aggregate Materials

2.3.1Cementitious Materials

2.4.6Vapor Retarder

2.4.1Concrete Curing Materials

2.6Reinforcement

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

03 30 00 2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.6Reinforcing Fibers

2.6.2Mechanical Reinforcing Bar

Connectors

Waterstops

1.8.1Local/Regional Materials

2.2.3Biodegradable Form Release

Agent

2.4.2Nonshrink Grout

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.3.1Fly Ash

1.6.3.1Pozzolan

1.6.3.2Slag Cement

1.6.3.3Aggregates

3.14.3.3 GCompressive Strength Tests

3.14.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

03 30 00 1.8.2Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.5Joint Sealants

22 00 00 SD-03 Product Data

1.5.1Welding

3.7Tests, Flushing and Disinfection

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.7.1 GPlumbing System

31 00 00 SD-01 Preconstruction Submittals

3.3 GShoring

1.6.3 GDewatering Work Plan

SD-03 Product Data

3.7 GUtilization of Excavated Materials

3.2Opening of any Excavation or

Borrow Pit

3.13Shoulder Construction

31 23 00.00 20 SD-01 Preconstruction Submittals

1.7.1Shoring and Sheeting Plan

GDewatering work plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

31 23 00.00 20 SD-06 Test Reports

3.13.1.1Fill and backfill

3.13.1.2Select material

3.13.1.4Density tests

32 11 26 SD-03 Product Data

1.4.4Sources of Aggregates

2.4.2 GJob Mix Formula

SD-06 Test Reports

1.4.4Sources of Aggregates

1.4.6Bituminous Materials

2.2Bituminous Materials

1.6.2 GTest Section

1.4.4 GService Record

SD-09 Manufacturer’s Field

Reports

1.4.3Batch Tickets

32 12 13 SD-03 Product Data

1.1.3Waybills and Delivery Tickets

2.2.4Local/Regional Materials

SD-06 Test Reports

3.7Sampling and Testing

32 12 16.16 SD-02 Shop Drawings

2.1 GPlacement Plan

SD-03 Product Data

2.1.5 GDiamond Grinding Plan

2.4 GMix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

32 12 16.16 3.1 GContractor Quality Control

SD-04 Samples

2.2Aggregates

2.3Asphalt Cement Binder

SD-06 Test Reports

2.2 GAggregates

3.1.3.9QC Monitoring

SD-07 Certificates

2.3 GAsphalt Cement Binder

1.4.11Laboratory Accreditation and

Validation

32 92 19 SD-03 Product Data

2.4.2Wood Cellulose Fiber Mulch

SD-07 Certificates

2.1Seed

SD-08 Manufacturer’s Instructions

2.6Erosion Control Materials

33 11 00 SD-01 Preconstruction Submittals

3.1.1 GConnections

SD-03 Product Data

2.1.1 GPipe, Fittings, Joints and

Couplings

2.1.1.3.1.1GBall And Socket Joint

2.1.2 GValves

2.1.2.7 GValve Boxes

2.2.1 GPipe Restraint

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

33 11 00 GPrecast Concrete Thrust Blocks

3.2.2 GDisinfection Procedures

SD-06 Test Reports

3.3.1.4 GBacteriological Samples

3.2.1.5.1 GPost-Construction Fusion Report

3.2.1.1.6Hydrostatic Sewer Test

3.3.1.3Leakage Test

3.3.1.1Hydrostatic Test

SD-07 Certificates

2.1.1Pipe, Fittings, Joints and

Couplings

2.1.2Valves

33 52 23.15 SD-01 Preconstruction Submittals

1.6 GWelding Procedure Specifications

(WPS)

1.6 GWelder Performance Qualification

(WPQ)

1.6 GProcedure Qualification Record

(PQR)

3.1 GWelding Operations

SD-02 Shop Drawings

1.6.2 GPOL Service Piping

SD-06 Test Reports

3.2Examinations, Inspections and

Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 12 PAGES

Repair Water Main Valve/Lines SE Zone

33 52 23.15 1.6 GQualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .