09 Attachment A ALS Lead Shielding Panel Pricing and Delivery Matrix REV. 1.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
ALS Lead Shielding Panels
Solicitation number
JS-2025-003
Issued by

About this file

The document is an Excel-based Pricing and Delivery Matrix for ALS Lead Shielding Panels, associated with Solicitation Number JS-2025-003 from the Department of Energy. The matrix contains detailed pricing instructions for 71 different lead panel assemblies, with specific requirements for shipping, delivery, and storage. Key pricing parameters include:

Vendors must quote firm fixed prices for panel delivery in two shipments, with a base storage period of 6 months and optional monthly extensions up to 12 additional months. The panels are part of a radiation shielding improvement project for the Advanced Light Source Upgrade storage ring, involving installation of lead panels on the inside face of storage ring outer precast walls. The structural design follows ASCE 7-16, California Building Code, and other specified seismic and geotechnical standards. Delivery of panels to Lawrence Berkeley National Laboratory (LBNL) is to be determined but must occur prior to June 2027.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table (IMPERIAL)

Lead Shielding Panel Pricing and Delivery Matrix REV. A
Instructions:
Please input only in the green shaded locations - the sheet will calculate the totals
1Delivery of Panels from the storage location to LBNL will be determined at a later date that will occur prior to June 2027
2Shipping / Delivery should be quoted as Firm Fixed Price per-panel per shipment in 2 shipments per panel as indicated below
3Storage should be quoted as a Firm Fixed Price with a base of 6 months. Optional Storage beyond this 6 months may be extended and exercised on a monthly basis, up to an additional 12 months, if deemed necessary by the Project.

Please price the base storage plus the one month increment price in the appropriate space on the Lead Shileding Panel Pricing and Delivery Matrix.

4 Installation Consulting should be quoted as Firm Fixed Price in accordance with the Statement of Work Section 3.1.3.

Unit PriceShipping CostsDelivery
Panel Index NumberLead Panel AssemblyPanel PriceCost of Delivery of Panel to Storage Location / Shipping 1Cost of Delivery of Panel to LBNL Lab / Shipping 2Scheduled Delivery Date of Panel to Storage Location*
Manufacturing of Panels11S1.2W-LP$ - 0$ - 0$ - 012/31/99Sample / please write over
21S1.3W-LP$ - 0$ - 0$ - 0
31S1.4W-LP$ - 0$ - 0$ - 0
42S1.2W-LP$ - 0$ - 0$ - 0
52S1.3W-LP$ - 0$ - 0$ - 0
62S1.4W-LP$ - 0$ - 0$ - 0
72S2.1W-LP$ - 0$ - 0$ - 0
82S2.2W-LP$ - 0$ - 0$ - 0
92S3.1W-LP$ - 0$ - 0$ - 0
102S4.0W-LP$ - 0$ - 0$ - 0
112S4.1W-LP$ - 0$ - 0$ - 0
123S1.0W-LP$ - 0$ - 0$ - 0
133S1.1W-LP$ - 0$ - 0$ - 0
143S1.2W-LP$ - 0$ - 0$ - 0
153S1.3W-LP$ - 0$ - 0$ - 0
163S2.1W-LP$ - 0$ - 0$ - 0
173S3.0W-LP$ - 0$ - 0$ - 0
183S3.1W-LP$ - 0$ - 0$ - 0
194S2.0W-LP$ - 0$ - 0$ - 0
204S2.1W-LP$ - 0$ - 0$ - 0
214S2.2W-LP$ - 0$ - 0$ - 0
225S1.1LD-LP$ - 0$ - 0$ - 0
235S1.2W-LP$ - 0$ - 0$ - 0
245S1.3W-LP$ - 0$ - 0$ - 0
255S1.4W-LP$ - 0$ - 0$ - 0
265S2.1W-LP$ - 0$ - 0$ - 0
275S2.2W-LP$ - 0$ - 0$ - 0
286S1.1LD-LP$ - 0$ - 0$ - 0
296S1.2W-LP$ - 0$ - 0$ - 0
306S1.3W-LP$ - 0$ - 0$ - 0
316S1.4W-LP$ - 0$ - 0$ - 0
326S2.1W-LP$ - 0$ - 0$ - 0
336S2.2W-LP$ - 0$ - 0$ - 0
347S1.1LD-LP$ - 0$ - 0$ - 0
357S1.2W-LP$ - 0$ - 0$ - 0
367S1.3W-LP$ - 0$ - 0$ - 0
377S1.4W-LP$ - 0$ - 0$ - 0
387S2.1W-LP$ - 0$ - 0$ - 0
397S2.2W-LP$ - 0$ - 0$ - 0
408S1.1LD-LP$ - 0$ - 0$ - 0
418S1.2W-LP$ - 0$ - 0$ - 0
428S1.3W-LP$ - 0$ - 0$ - 0
438S1.4W-LP$ - 0$ - 0$ - 0
448S2.1W-LP$ - 0$ - 0$ - 0
458S2.2W-LP$ - 0$ - 0$ - 0
469S1.1LD-LP$ - 0$ - 0$ - 0
479S1.2W-LP$ - 0$ - 0$ - 0
489S1.3W-LP$ - 0$ - 0$ - 0
499S1.4W-LP$ - 0$ - 0$ - 0
509S2.1W-LP$ - 0$ - 0$ - 0
519S2.2W-LP$ - 0$ - 0$ - 0
5210S1.1LD-LP$ - 0$ - 0$ - 0
5310S1.2W-LP$ - 0$ - 0$ - 0
5410S1.3W-LP$ - 0$ - 0$ - 0
5510S1.4W-LP$ - 0$ - 0$ - 0
5610S2.1W-LP$ - 0$ - 0$ - 0
5710S2.2W-LP$ - 0$ - 0$ - 0
5811S1.1LD-LP$ - 0$ - 0$ - 0
5911S1.2W-LP$ - 0$ - 0$ - 0
6011S1.3W-LP$ - 0$ - 0$ - 0
6111S1.4W-LP$ - 0$ - 0$ - 0
6211S2.1W-LP$ - 0$ - 0$ - 0
6311S2.2W-LP$ - 0$ - 0$ - 0
6412S1.1LD-LP$ - 0$ - 0$ - 0
6512S1.1-LP$ - 0$ - 0$ - 0
6612S1.2W-LP$ - 0$ - 0$ - 0
6712S1.3W-LP$ - 0$ - 0$ - 0
6812S1.4W-LP$ - 0$ - 0$ - 0
6912S2.1W-LP$ - 0$ - 0$ - 0
7012S2.2W-LP$ - 0$ - 0$ - 0
7112T2.1W2-LP$ - 0$ - 0$ - 0
Subtotal for QTY 71 Panels$ - 0
Subtotal for Shipments 1 & 2$ - 0
Installation Consulting$ - 0
6 Month Storage for QTY 71 Panels$ - 0Option Pricing per month for extd Panel storage$ - 0

TOTAL PRICE (inclusive of panels, shipments, installation consulting and 6 months of storage) $ - 0

File details come from the government source that posted it. Updated .