This is an informational briefing presentation on the John Day Turbine Replacement and Generator Rewind (JDA TRGR) Program, presented by the U.S. Army Corps of Engineers on January 22, 2026. The program focuses on replacing and rewinding up to 16 turbines and stators at the John Day Lock and Dam, with units currently nearly 60 years old. New turbines will feature improved efficiency, higher generation capacity, enhanced fish passage performance, and oil-free hubs. Onsite work is estimated to begin in summer 2035, following several years of design and iterative modeling. The estimated program contract value exceeds $500,000,000, with the contractor expected to work on two units at a time after initial testing of the first unit.
Two major FY26 Design-Build solicitations are currently live on SAM.Gov: (1) John Day Turbine Replacement and Generator Rewind with an estimated value greater than $500M, live since January 9, 2026; and (2) John Day Transportation and Site Access with an estimated value between $1M and $5M, live since December 30, 2025. Additional planned solicitations include the John Day Fish Pump Emergency Repair (FY26 Q2, $5M–$10M), John Day HVAC upgrades (FY26 Q3/4, $25M–$100M), security system upgrades (FY27 Q2, $5M–$10M), tailrace crane replacement (FY27 Q3, $5M–$10M), TRGR storage building (FY27 Q4, $5M–$10M), unwatering system (FY28 Q2, $10M–$25M), transformers and fire protection (FY28 Q3, $250M–$500M), and generator fire protection (FY30 Q2, $25M–$100M). The program manager is Brian Bell, P.E., contactable at Brian.p.bell@usace.army.mil.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JDA TRGR*
Program
Brian Bell, P.E.
JDA TRGR Program Manager
JAN 22, 2026
• JDA TRGR = John Day Turbine Replacement + Generator Rewind
Best Contact:
Brian.p.bell@usace.army.mil
Purpose: Informational Briefing
JDA TRGR Program background, upcoming solicitations
Agenda
1. JDA TRGR Fast Facts
2. Program Overview
3. Program Schedule
4. Near Term Solicitations Planned
5. Questions / Comments
The John Day TRGR Project will replace and rewind up to 16 turbines and stators, respectively. Units are nearly 60 years old. New Units will be more efficient for higher generation capacity and have improved fish passage performance.
New Turbine hubs will be oil-free.
Start of onsite work estimated to be summer of 2035, with several years of design and iterative modeling prior to that. After first unit testing, the contractor will work on 2 units at a time. Estimated magnitude of contract cost is greater than $500,000,000.00.
Contract solicitation is now live, on SAM.Gov:
• https://sam.gov/workspace/contract/opp/3bb4c896d6554c71a673f4596edd3669/view
JDA TRGR Fast Facts
The John Day TRGR Program is focused on the holistic integration of current and future work at the John Day Lock and Dam (JDA) Operating Project, with a particular emphasis on deconflicting execution of the Turbine Runner Replacement and Generator Rewind Project and ensuring necessary projects are prioritized and scheduled appropriately, including contingency.
Priorities:
• Program Project Schedule/Sequencing
• Program and Project Risk Management
• Program and Project Staffing Plans
Summary (48 projects other than TRGR)
• 25 JDA Projects have risks related to TRGR.
• 23 JDA Projects have risks that are not.
• Program contracts estimated greater than $500M https://usace.dps.mil/sites/TDL-CENWP-PMF-P-JDATRGRProgram/ ^^ Internal to USACE only ^^
Program Overview – JDA TRGR Program
Program Schedule – TRGR impacts only
Solicitation Live on 30 Dec 2025
Solicitation Live on 9 Jan 2026
This slide does not represent the status of funding, nor is USACE able to speak to that. This merely represents known needs at John Day.
Program Schedule – Non-TRGR impacts
FY26
John Day Turbine Replacement and
Generator Rewind Replace and rewind up to 16 turbines and stators, respectively. 12 units are in the base scope of work with 4 optional units. Turbines will have higher efficiency, higher generation capability, and have improved fish passage.
Turbine hubs will be oil-free.
https://sam.gov/workspace/contract/opp/3bb4c896d6554c 71a673f4596edd3669/view
Solicitation Live 9 Jan 2026 (Design-Build) Estimated value > $500M
John Day Transportation and Site Access Re-develop site access roadways and associated security facilities to include widened turns, multi-lane incoming traffic to the powerhouse, a rejection route, an additional parking lot for contractors, and lay-down areas for USACE and Contractors https://sam.gov/workspace/contract/opp/acda8636c8174e 8e8fba44ec272c9fa1/view
Solicitation Live 30 Dec 2026 (Design-Build) Estimated value between $1M and $5M
Near Term Solicitations Planned
FY26
John Day Fish Pump Emergency Repair There are 3 fish pump units at John Day. Replace several components on Unit 2 including gearbox, propeller, upper and lower bearing housings, greaseless bushing liners.
Assemble, align, and test equipment.
Optional item for Unit 1 work (similar).
Solicitation Planned for FY26 Q2. (Design-Bid-Build) Estimated value between $5M and $10M.
The is a planned follow-on contract for full rehabilitation of all 3 fish pump units, excluding work already done in this contract.
John Day HVAC Comprehensive upgrades to JDA Powerhouse HVAC including installation of new primary and secondary chillers, ducting, heat pump systems for localized needs, fire dampers and smoke egress system to tie into existing fire protection system.
Solicitation Planned for FY26, Q3/4 (Design-Bid-Build) Estimated value between $25M and $100M
FY27
John Day Powerhouse Security System
Upgrades Overhaul security system to include updated physical security cameras, networked video recorder, physical access control systems (card readers) and associated workstations, servers, and wiring.
Solicitation planned for FY27 Q2 (Design-Bid-Build) Estimated value between $5M and $10M
* This image is not an actual USACE facility, generated by AI *
John Day Tailrace Crane Replace 50-ton tailrace gantry crane with similar height and capacity crane, up to current design standards and codes. If necessary, reinforce tailrace deck and beams.
Solicitation planned for FY27 Q3 Estimated value between $5M and $10M
FY27
John Day TRGR Storage Building Provide engineering and construction services to design and erect a 30,000 sf (approximately) pre-engineered metal building. Additional scope includes but is not limited to: underground conductor installation, electrical service transformers to the building, and associated building mechanical and electrical work.
Solicitation planned for FY27 Q4 Estimated value between $5M and $10M
FY28
John Day Unwatering System Replace 4 Unwatering Pumps and 2 Drainage Pumps at
John Day Dam, uprated from 10,000GPM to 20,000GPM.
Replace some discharge piping with larger diameter or additional pipes. Potentially modify sump geometry (pending physical modeling results, ongoing).
Solicitation planned for FY28 Q2 (Design-Bid-Build) Estimated value between $10M and $25M
FY28
John Day Transformers and Transformer
Fire Protection Replace 4 banks of Generator Step Up Transformers.
Each bank consists of 3 single phase oil-filled transformers (A/B/C) rated for170/226.7MVA (13.2kV to 500kV step up) each. Install new firewalls and upgrade containment areas.
Solicitation planned for FY28 Q3 Estimated value between $250M and $500M
FY30
John Day Generator Fire Protection Remove and replace existing aged CO2 generator fire suppression system. Alternatives analysis will inform the direction of the project, when completed.
Solicitation Planned for FY30 Q2 Estimated value between $25M and $100M
Honorable Mentions through FY30:
Bridge Crane Rails – FY27 Q1 John Day Unwatering System – FY27 Q2 TDA / JDA Navigation Lock Tainter Valves – Iterative design and install contracts, FY28/29 Control System Upgrade – FY28 Q4 Stop Log Fillers – FY28 Q4 Isophase, XJ breakers + disconnects – FY29 Q1 Exciters – FY29 Q2 Intake Bulkheads – FY30 Q1 John Day North Fish Ladder Elevator – FY30
Questions?
Concerns?
Comments?
Open Discussion
Question / Comments