This document is a presentation from the Portland District's Industry Day held on January 22, 2026, providing an overview of the U.S. Army Corps of Engineers' operations and upcoming contract opportunities in the Pacific Northwest region.

The Portland District manages 22 dams and storage reservoirs, 14 harbors, 700 miles of maintained federal navigation channels, 4 high-lift locks, 4 visitor centers, and 132 recreation sites across Oregon and Washington. The District's mission encompasses navigation, water and flood risk management, hydropower, environmental stewardship, recreation, regulatory functions, emergency management, tribal coordination, and international support. Key expertise areas include the Hydroelectric Design Center, welding and metallurgy, coastal engineering, computational fluid dynamics, hydrographic surveys, aquatic ecosystem restoration, and fish passage. Major upcoming contract opportunities include the John Day Turbine Replacement Program (>$1 billion through 2051), Bonneville Lock and Dam projects ($1–100 million for powerhouse trash racks replacement, spillway rock removal, and headgate repairs in Q3FY26–Q4FY27), Columbia River Pile Dike repairs (Cottonwood $10–25 million Q3FY26; Miller-Rice $25–50 million Q3FY26; Skamokawa $10–25 million Q1FY27), navigation lock maintenance across three dams, maintenance dredging contracts ($5–100 million in Q2FY26–Q4FY26), and the Department of Veterans Affairs' White City Southern Oregon Rehab Center and Clinic Design-Build Contract ($250–500 million). The presentation also addresses the Revolutionary FAR Overhaul effective February 1, 2026, introducing significant procurement changes including increased micro-purchase thresholds ($15,000), simplified acquisition thresholds ($350,000), removal of mandatory acquisition plan elements, expanded simplified procedures for commercial services up to $9 million, increased subcontracting plan thresholds ($900,000), and discretionary pre-award site inspections. Contact information is provided for small business inquiries (Maura Timmermann, 402-370-0095) and contracting matters (Mitchell Johnson, 503-808-4600), with opportunities listed at www.sam.gov and the Portland District's known opportunities website.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PORTLAND DISTRICT’S

INDUSTRY DAY

COL L. Dale Caswell, PE, PMP Commander, Portland District

Mitchell Johnson Chief, Contracting Division

22 JAN 2026

Emergencies:

Use stairs to exit the building. The closest stairs are behind you, to the left after exiting this room. Follow the exit signs.

Evacuation Point:

Bathrooms:

To the left after exiting this room. Go past the glass double doors and the bathrooms will be on your left.

Coffee and Snacks:

Across the hall in the atrium.

Get Small Business Advice in Rm 304:

• Small Business Administration

Joe Smetak

• Oregon APEX Accelerator:

Nada Maisse

• Portland District Small Business Specialist Maura Timmermann

Lunch at 1130:

Portland Burger on main level of Block 300 Food halls to North and South

WELCOME

Morning:

General Session:

• Overview of the Portland District

• Upcoming Contract Opportunities

• Revolutionary FAR Overhaul (RFO)

• Cybersecurity Maturity Model Certification

(CMMC)

• John Day Dam Program Overview

• Hydroelectric Design Center Overview

• Pile Dikes Program Overview

Afternoon:

1230, Rm 310/311 - Mixed Discipline Q&A Panel 1230, Rm 306/309 - So you got a construction contract, what's next?

1300, Rm 310/311 - ACO Q&A Panel 1300, Rm 306/309 - Design-Build MATOC

1330, Rm 310/311 - PCO Q&A Panel 1330, Rm 306/309 - DVA White City

1415, Rm 310/311 - Senior Leaders Panel

1500, Rm 310/311 – Closing Comments

TODAY’S AGENDA

PORTLAND DISTRICT OVERVIEW &

UPCOMING CONTRACT OPPORTUNITIES

PORTLAND DISTRICT AREA OF OPERATIONS

Dams & Storage Reservoirs

13Willamette River Basin

3Rogue River Basin

6Columbia River

Channels & Harbors Projects

1Jetties only

14Harbors - Deep & Shallow Draft

3River Projects

Federal Navigation Channels

700Channels maintained (miles)

2 / 5Dredges / Survey Vessels

4High lift locks

Environmental Stewardship

1200Cultural Sites

13Fish Hatcheries

75Invasive Species Managed

Recreation

4Visitor Centers

132Recreation Sites

MCR

Baker Bay

Skipanon Channel

Chinook Skamokawa R.

Astoria

Tillamook Bay

Chetco R.

Rogue R.

Port Orford

Coquille R.

Coos Bay

Umpqua R.

Siuslaw R.

Yaquina Bay

Depoe Bay

Cowlitz R.

Lewis R.Columbia R. & L. Willamette R.

Vancouver/ The Dalles

NAV Projects Key Cities NWP Projects

OUR MISSION & BUSINESS LINES

1. Navigation 2. Water & Flood

Risk Management

3. Hydropower

4. Environmental Stewardship

5. Recreation 6. Regulatory

7. Emergency Management

8. International & Interagency Support

10. Tribal Coordination

• Technical Centers of Expertise

• Nationally-Recognized Knowledge and Experience

9. Providing Engineering Expertise

Engineering Expertise

• Hydroelectric Design Center

• Welding and Metallurgy

Nationally-Recognized Knowledge and Experience

• Coastal Engineering

• Computational Fluid Dynamics

• Hydrographic surveys

• Aquatic ecosystem restoration

• Fish passage

Dredging

Flood Risk Management

Emergency Management

Department of Veterans Affairs

OUR EXPERTISE

ACCOMPLISHMENTS

DEPARTMENT OF VETERANS AFFAIRS

White City:

Southern Oregon Rehab Center and Clinic $250-500M Design-Build Contract

• Specialty and Primary Care

• Support and Infrastructure

• Administration

SORCC

HJTCUC(1

Old Navigation Lock Stoplogs - AWARDED

Powerhouse Trash Racks Replacement

$25M - $100M; Q3FY26

Spillway Rock Removal

$1-5M, Q1FY27

Powerhouse 1 Headgate Repair Pit

$1M - $5M; Q4FY27

BONNEVILLE LOCK AND DAM

JOHN DAY TURBINE REPLACEMENT PROGRAM

Replacement of up to 16 turbines at John Day Dam

Order of magnitude approximately >$1B through 2051

TRGR Program - ~50 current/future projects

• Fish Pump Rehabilitation, $1-5M (Q2FY26)(SB)

• Transportation and Site Access, $10-25M (Q2FY26)

• HVAC Upgrades, $25-100M, (Q3FY26)

• Powerhouse Security Upgrades, $5-10M (Q2FY27)(SB)

• Erection Bay and Storage Building, $5-10M (Q4FY26)

• Intake Bulkheads

• Fire Detection and life safety

• Powerhouse Control Systems, etc.

NAVIGATION LOCK MAINTENANCE – 2026 AND

FUTURE

COLUMBIA RIVER PILE DIKE REPAIRS

Sand Island: Complete

Baker Bay:

• FY25: Awarded construction contract

Future Actions

• Cottonwood Pile Dikes, $10-25M (Q3FY26)(SB)

• Miller-Rice Pile Dikes, $25-50M (Q3FY26)

• Skamokawa Pile Dikes, $10-25M (Q1FY27)

• Washougal Pile Dikes, Future

Note: All schedules are subject to appropriations.

Sand Island Baker Bay

Cottonwood Island Washougal TurnSkamokawa ReachMiller-Rice Islands

MAINTENANCE DREDGING:

• Lower Columbia River Turning Basins:

Chiefs Report

• OR / WA Clamshell, Various locations $5M - $10M, Q4FY26, Small Business**

• West Coast Hopper, various locations

(OR/WA/CA)

$25M - $100M, Q2FY26 (annual req.)

FEDERAL NAVIGATION CHANNELS

** FY26 WP dependent

THE REVOLUTIONARY FAR OVERHAUL

& POLICY UPDATES

EXECUTIVE ORDERS ON ACQUISITION REFORM

Shift toward modernizing acquisition to spur innovation, eliminating waste, prioritizing commercial solutions, and reducing bureaucracy within Federal Procurement

EO 14275

Restoring Common Sense to Federal

Procurement

15 APR 25

EO 14240

Eliminating Waste and

Saving Taxpayer Dollars by

Consolidating Procurement

20 MAR 25

EO 14222

Implementing the President's "Department of

Government Efficiency"

Cost Efficiency Initiative

26 FEB 25

EO 14332

Improving

Oversight of Federal

Grantmaking

7 AUG 25

EO 14265

Modernizing

Defense Acquisitions and Spurring Innovation in the Defense

Industrial Base

9 APR 25

EO 14271

Ensuring

Commercial, Cost-

Effective Solutions in

Federal Contracts

16 APR 25

Revolutionary FAR Overhaul

ACQUISITION CHANGES AND TIMELINES

Revolutionary Federal Acquisition Regulation Overhaul (RFO)

53 FAR Parts Updated

• DFARS Class Deviation adoption via Class Deviations effective 1 Feb 2026 (Phase 1)

• DFARS updates will align with RFO changes concurrent with Class Deviations issuance

• Rulemaking in progress to codify RFO changes seeking feedback on practical application of Class Deviations (Phase 2)

• USACE will revise UAI/UDG onceAFARS changes resulting from RFO and DFARS Class Deviations and updates are finalized

Implementation Hierarchy: FAR DFARS AFARS UAI/UDG

NOTABLE RFO CHANGES

Part 36Part 16Part 15Part 12/13Part 7

• Mandatory AE eval criteria removed

• Removed self-performance (12%) requirement

• Pre-award Site Inspection now discretionary

• Allows for innovative contract types

• Added HTRO-FRP

• Phased Acquisition

• Change in definitions

• Negotiation flexibilities added

• Encourages innovation

• Construction included as a commercial service

• SAP to $9M for commercial

• No mandatory Acq Plan elements

The micro-purchase threshold (MPT) at FAR 2.101 is increased from $10,000 to $15,000

The simplified acquisition threshold (SAT) is increased from $250,000 to $350,000

The threshold for reporting first-tier subcontract information including executive compensation is increased from $30,000 to $40,000 (FAR 4.1401).

The threshold for simplified procedures for certain commercial products and commercial services (FAR 13.500(a)) is increased from $7.5 million to $9 million; and the threshold for acquisitions described at FAR 13.500(c) is not increased.

FAR 15.403-4, cost or pricing data threshold, is increased from $750,000 to $950,000 for contracts awarded before July 1, 2018, and from $2 million to $2.5 million for contracts awarded after July 1, 2018.

The threshold for prime contractor subcontracting plan required by FAR 19.702 increases from $750,000 to $900,000 and the associated threshold for construction is increased from $1.5 million to $2 million.

FY26 REGULATION THRESHOLD INCREASES

• RFO Changes: https://www.acquisition.gov/far-overhaul

• FAR Companion: https://www.acquisition.gov/sites/default/files/page_file_uploads/far-companion.pdf

• FAR Practitioner Albums: https://www.acquisition.gov/far-overhaul/practitioner-albums

• DFARS Class Deviations effective 1 February 2026:

https://www.acq.osd.mil/dpap/dars/dfars_far_overhaul_class_deviations.html

• Warfighting Acquisition University Trainings:

• Revolutionary FAR Overhaul: Announcements > CONNECT Live! RFO Videos: https://www.dau.edu/revolutionary-far-overhaul/announcements

ACQUISITION POLICY RESOURCES

FEDERAL BUSINESS OPPORTUNITIES: WWW.SAM.GOV

(KEYWORD/SOLICITATION # W9127N)

WASHINGTON STATE APEX ACCELERATOR (PTAC):

WASHINGTONPTAC.ORG/

OREGON STATE APEX ACCELERATOR (PTAC):

WWW.GCAP.ORG/

SMALL BUSINESS AND CONTRACTING INFORMATION

Small Business Maura Timmermann Maura.J.Timmermann@usace.army.mil 402-370-0095

Contracting Mitchell Johnson Mitchell.J.Johnson@usace.army.mil 503-808-4600

Upcoming FY26 Known Opportunities Listing https://www.nwp.usace.army.mil/Business-With- Us/Small-Business/ https://www.nwp.usace.army.mil/Business-With- Us/Contracting/

Follow us on social media @PortlandCorps and online: www.nwp.usace.army.mil

THANK YOU!

CONNECT WITH US

THIS AFTERNOON:

Program and Project Management Jeff Hicks Jeffrey.T.Hicks@usace.army.mil 503-710-8256

1230, Rm 310/311 - Mixed Discipline Q&A Panel 1230, Rm 306/309 - So you got a construction contract, what's next?

1300, Rm 310/311 - ACO Q&A Panel 1300, Rm 306/309 - Design-Build

MATOC

1330, Rm 310/311 - PCO Q&A Panel 1330, Rm 306/309 - DVA White City 1415, Rm 310/311 - Senior Leaders Panel 1500, Rm 310/311 – Closing Comments

File details come from the government source that posted it. Updated .