Construction Presentation Industry Day NWP 22JAN2026.pdf
PDF 7 MB Posted
- Attached to
- Industry Day - USACE Portland District
- Solicitation number
- Not on record
About this file
This is a presentation document from the U.S. Army Corps of Engineers (USACE) Portland District Construction Branch, delivered by Martha C. Brandl, P.E., PMP, Chief of Construction Branch on January 22, 2026. The presentation covers construction contract administration practices and recent updates within the Portland District. The district manages extensive waterway infrastructure across the Pacific Northwest, including 485 navigable river miles in the Columbia River Basin, 16 dams across multiple river systems, 3 locks, 10 deep draft ports, 12 shallow draft harbors, 12 large-scale jetty systems, and two hopper dredges. The Construction Branch employs over 50 personnel across three resident offices (Eugene, Bonneville, Vancouver) and provides construction services and cost engineering from the Portland office.
The presentation outlines the Construction Division's primary responsibilities: representing the owner on contractual matters, administering supply, service, and construction contracts, performing quality assurance and field oversight, ensuring safety oversight and reporting, and managing environmental compliance. Key contract administration activities include resolving engineering and design issues, preparing change orders and cost estimates, monitoring schedules, and managing fiscal operations through a Project Delivery Team structure. Contract administration roles include the Assistant Contracting Officer (ACO), Contracting Officer's Representative (COR), Quality Assurance Representative (QAR), and Government QAR (GQAR). Recent changes to contract administration include new security specification requirements (01 12 00.00 25) mandating background checks for contractor personnel working at NWP dams, implementation of the Cybersecurity Maturity Model Certification (CMMC) program for contractors handling Federal Controlled Information (FCI) and Controlled Unclassified Information (CUI), and FAR overhaul provisions affecting construction contract clauses. Quality assurance changes include mandatory use of the Resident Management System (RMS), transitioning to the Construction Management Platform (CMP) powered by Kahua beginning in November-December 2027, submittal register requirements, three-phase inspections, and completion inspections with daily reporting. Safety program updates include new mandatory forms (ENG Form 6293 for Accident Prevention Plan Worksheet, ENG Form 6282 for Site Safety and Health Officer Designation, ENG Form 6209 for Load Handling Equipment Certificate of Compliance) and references to updated EM 385-1-1 (March 2024) and NWP SAF 385-1 supplement documents. Additionally, Partnering Meetings and Red Zone Meetings are now required for civil works projects, with Red Zone Meetings scheduled 60 days prior to project completion or at approximately 75 percent completion to address facility turnover planning and remaining contractor activities.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Martha C. Brandl, P.E., PMP Chief, Construction Branch
CENWP-ECC
22 Jan 2026
Rising Better Together:
Construction Contract
Administration and Portland District
• Who we are
Portland District Overview
Construction Branch
• What we do
Contract Administration
Quality Assurance
Safety
• Recent Updates/Changes
Agenda
3Portland District Waterways
• 485 Columbia River Basin navigable river miles
• 700 miles of navigation channels
Dams
• Columbia River: 3
• Willamette River Basin: 11 dams (and 2 re-regulating)
• Rouge River Basin: 2 dams
• Willow Creek Dam and Reservoir
Locks
• Operate and maintain 3 of NWD’s 10 locks
• Pass 10 million tons of the 50.5 million tons of commerce shipped annually
Ports and harbors
• 10 deep draft (greater than 14 ft.) ports
• 12 shallow draft harbors
• 12 large-scale jetty systems
Dredging
• Two hopper dredges: Yaquina and Essayons
• Material dredged: 18.9 million cubic yards
• 50+ personnel (engineers, geologists, technicians, field inspectors, support personnel)
• Three Resident Offices (Eugene, Bonneville, Vancouver)
• Construction Services and Cost Engineering in Portland (Construction Planning, Cost Estimating)
• Contract Administration & Technical Section (Cascades Project Office)
NWP Construction Branch Structure
• Represent the Owner/Customer on Contractual Matters
• Contract Administration
• Supply, Service, and Construction Contracts
• Quality Assurance
• Safety Oversight
• Environmental Compliance
Construction Division / Branch Responsibilities
• Resolve Engineering and Design Issues
• Prepare and Issue Change Orders and Cost Estimates
• Perform Quality Assurance / Field Oversight
• Ensure Safety Oversight and reporting
• Schedule Monitoring
• Environmental Compliance
• Fiscal Management
• Project Delivery Team (PDT)
• ACO/COR/QA roles
• Submittals/Transmittals/RFIs
• Main POC for Contractor functions
Construction Contract Administration:
What We Do
PDT
7Resident Office Roles
Resident / Project Office Resident Engineer (RE)
Team Lead (TmL)
Project Engineers (PE)
Quality Assurance Representative (QAR) or Government QAR (GQAR)
Contract Administration Support Team (CAST Team)
Administrative Roles
Contractual Authority Roles ACO/Alternate ACO
Contracting Officer’s Representative (COR)
Quality Assurance Representative (QAR) or Government QAR (GQAR)
Office Role = Contractual Role??? (Often but NOT Always) ACO/Alternate ACO
– Enforces and CAN change contract (certain clauses, $500k warrants)
– Must be appointed to a specific contract by the Procuring Contracting Officer (PCO)
Contracting Officer’s Representative (COR)
– Enforces and can NOT change contract
– Must be appointed to a specific contract by the PCO
• Know your specs
• Key Clauses:
52.225-11 Buy American 52.219-14 Limitations on Subcontracting 52.232-27 Prompt Payment for Construction Contracts 52.211-12 Liquidated Damages
• Submittal Register – in Appendix
• Wage Determination
Contract Administration
• Preconstruction conference
• Project Specific Management Plan (PSMP):
Accident Prevention Plan (APP) Environmental Protection Plan (EPP) Contractor Quality Control Management Plan (CQCMP) Project Work Plan Schedule for Construction Submittal Register
• Lines of Authority
• Security/Background checks
NTP and GO!
10Recent Changes to Administering Contracts New Security Specification Section – 01 12 00.00 25 Security Requirements.
• All contractor personnel will need a background check to work at NWP dams.
• Contractor personnel who do not have a background check will have to be escorted by a contractor employee that has completed a tier 1 background check.
Cybersecurity Maturity Model Certification (CMMC) Program A DoD cybersecurity assurance framework that verifies contractors have implemented required safeguards to protect FCI and CUI on contractor-owned information systems.
FAR Overhaul
• Limited impact to non-commercial construction contracts or design-build contracts.
• Impacts more on the type of contract or acquisition methodology (e.g. design-build to budget approach).
• Each District may have adaptations different then a sister District – example is 52.211-10 and what is used in lieu of that clause.
• Several clauses are going away from our construction contracts
52.211-10 Commencement, Prosecution, and Completion of Work 52.211-18 Variation in Estimated Quantity 52.236-1 Performance of Work by the Contractor 52.236-26 Preconstruction Contract 52.236-27 Site Visit (Construction) 52.236-4 Physical Data
Partnering Meeting
– Establish positive relationships between the Government, Contractor, and stakeholders
– Introduce issue resolution processes and identifies lines of communication
– Promote open/honest communication
• Does not minimize or delete any contract requirements
• May be formal or informal type of facilitation
• 3 levels of Partnering Intensity
• Now required.
Red Zone Meeting
- The facility turnover planning meeting
• Covers remaining Contractor activities o Remaining Inspections / Testing o O&Ms o Spare parts o User Trainings o Warranty management
• Red zones to occur 60 days prior to completion or at approximately 75% completion
• Now required for Civil Works
Recent Changes to Administering Contracts
• Resident Management System (RMS) (soon to be CMP) -required to be used on Construction Contracts -tracks and documents all contract admin activities
• Submittal Register
• CQC Personnel: Superintendent vs CQM
• Definable Features of Work
• 3 phase inspection
• Testing
• Completion Inspections
• Daily Reports
Quality
13RMS vs CMP Resident Management System (RMS)
• USACE application for construction contract administration and management.
• Construction Division/Branch required system of record.
• Used by both the Government and Contractor.
• In future, RMS sunsetting and new Construction Management Platform (CMP) – Kahua based
Construction Management Planform (CMP) – Powered by Kahua
• Commercial Software Program
• Project Lifecycle Data
• Real time access to drawings, specification, and documentation in the field.
• Full mobile functionality
• Expect less redundant data entry and fewer steps
• Six phases to roll out to enterprise
– 1st Phase is Jan 2027
– NWP – in Phase 6: Nov-Dec 2027 https://usace.dps.mil/sites/TDL-CECW-EC-CMA/SitePages/RMS_cmi.aspx https://usace.dps.mil/sites/TDL-CECW-EC-CMA/SitePages/CMP_cmi.aspx
• Site Safety Health Officer (SSHO)
• Competent Person/Qualified Person
• Activity Hazard Analysis (AHA)
• Accident Prevention Plan (APP)
• Hazardous Energy Control
Procedure (HECP)
• Critical Lift plans
• Safety Reporting
• Process and POC
• High Hazard Areas
Safety
New EM 385-1-1, Mar 2024.
NWP SAF 385-1. Supplement to USACE HECP. Reviewed every 2 years.
NEW FORMS:
Accident Prevention Plan (APP) Worksheet (Mandatory) – ENG Form 6293
• All encompassing
Site Safety and Health Office (SSHO) Designation Letter (Mandatory) – ENG Form 6282
• SSHOs is designated.
• Identifies Level 1, 2 or 3. Note: Most NWP contracts will require Level 1.
Certificate of Compliance for Load Handling Equipment (Mandatory) – ENG Form 6209
• Approved prior to mobilizing equipment for all Load Handling Equipment.
• Identifies Operator Names.
Activity Hazard Analysis (AHA) Form (Non-Mandatory) – ENG Form 6206 Critical Lift Plan Form (Non-Mandatory) – ENG Form 6213 Standard Lift Plan Form (Non-Mandatory) – ENG Form 6203
Recent Changes to Safety Program
• CQM - 17 April next course
What challenges have you had with USACE’s Construction Contract Administration?
What have you seen be successful in other USACE District Construction administration?
What do you wish to communicate to the Government for continuing to work together?
Continuing the Mission
Pre-construction Condition
Post-construction Condition
17Questions?
| Rising Better Together:�Construction Contract Administration and Portland District | |
| Agenda | |
| Portland District | |
| NWP Construction Branch Structure | |
| Construction Division / Branch Responsibilities | |
| Construction Contract Administration: � | What We Do |
| Resident Office Roles | |
| Contract Administration | |
| NTP and GO! | |
| Recent Changes to Administering Contracts | |
| Recent Changes to Administering Contracts | |
| Quality | |
| RMS vs CMP | |
| Safety | |
| Recent Changes to Safety Program | |
| Continuing the Mission | |
| Questions? |