J4_TANB-II_Deliverables.pdf

PDF 242 KB Posted

Attached to
Trailerable Aids to Navigation Boat, 2nd Generation (TANB II) Draft Request for Proposal (RFP)
Solicitation number
70Z02324R00090001
Issued by

About this file

This document is a list of data deliverables for the Trailerable Aids to Navigation Boat - Second Generation (TANB II) contract. The deliverables include an integrated master schedule, formal meeting agendas and minutes, design review documentation, 2D drawings, technical manuals, logistics and supply support documentation, and test plans and reports for builder's trials, incline tests, flotation tests, speed and power tests, and other performance requirements. The deliverables have specified milestones, submission timelines, contract line item numbers, and government acceptance requirements. This list of deliverables is associated with the draft Request for Proposal (RFP) for the TANB II contract, which is being released by the U.S. Coast Guard for market research and feedback purposes. The draft RFP describes the requirement to replace the existing 26' Trailerable Aids to Navigation Boat.

View the file

Other files

File Type Posted
Attachment 4- TANB II Responses to Draft RFP 70Z02324R00090001.docx DOCX document
Attachment 5 - TANB II ATON Equipment.pdf PDF
Section_C_TANB-II_SOW.pdf PDF
J5_TANB-II_References.pdf PDF
J3_TANB-II_Spares_Deliveries.pdf PDF
Attachment 3 - Draft Pricing Sheet.xlsx XLSX spreadsheet
Draft RFP TANB II 70Z02324R00090001.pdf PDF
J1_TANB-II_Spec.pdf PDF
J2_TANB-II_TDP.pdf PDF
J6_TANB-II_GFI List.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Trailerable Aids to Navigation Boat – Second Generation (TANB II) J4 – List of Data Deliverables

Prepared by:

Commandant (CG-731)

United States Coast Guard MSN 7800 2703 Martin Luther King Junior Ave SE

Washington, DC 20593-7800

Distribution Statement A: Approved for public release; distribution is unlimited.

# Reference Deliverable Milestone Submission Required Delivery CLIN Govt Acceptance

Required 1 C 3.1.1.3 Integrated Master Schedule Award Monthly #0001AA 2 C 3.1.1.4.3 Formal Meetings & Reviews, Agenda As. Req. 5 days prior #0001AA 3 C 3.1.1.4.3 Formal Meetings & Reviews, Minutes As. Req 5 days after #0001AA

C 3.1.1.4.3 C 3.1.1.4.4

Logistics Conference Agenda Logistics Conference 5 days prior #0001AA

C 3.1.1.4.3 C 3.1.1.4.4

Logistics Conference Minutes Logistics Conference 5 days after #0001AA

6 C 3.5.3.3.1 Preliminary Design Review (PDR) Deliverables (Calculations, MECL, Drawings/Models, Diagram-schematics)

PDR 45 days prior #0005AA X

7 C 3.5.3.4.1

Critical Design Review (CDR) Deliverables (Calculations, MECL, Drawings/Models, Diagram-schematics, OEM Certification of Supportability, OEM Certification Letter for Emissions Compliance)

CDR 45 days prior #0005AA X

8 C 3.5.3.5.1

Production Readiness Review (PRR) Deliverables (Calculations as req., MECL as req., Drawing/Models as req, Production Schedule, Facility Utilization Assessment)

PRR 45 days prior #0005AA X

C 3.5.5.1 J2 085.1 J2 085.3 – 085.5

2D Drawings PRR Preliminary NLT 120 days after #0005AC X

C 3.5.5.1 J2 085.1 J2 085.3 – 085.5

2D Drawings PRR Final 30 days after Govt comments

#0005AC X

C 3.5.5.1 J2 085.2

Drawing Number Assignment Report PRR 45 days prior #0005AC X

C 3.5.5.2 J2 086

Technical Manuals & Publications (excluding draft Boat Information Book)

PRR Preliminary NLT 120 days after #0005AC X

C 3.5.5.2 J2 086

Technical Manuals & Publications (excluding draft Boat Information Book)

PRR Final 30 days after Govt comments

#0005AC X

C 3.5.7 J2 086.3

Boat Information Book, Draft First Article Testing 45 days prior #0005AC X

C 3.5.5.3 J2 083

Logistics and Supply Support Documentation PRR Initial With #0005AC X

C 3.5.5.3 J2 083

Logistics and Supply Support Documentation PRR Updates 30 days after Govt comments

#0005AC X

17 J2 086.2.5 OEM Technical Manuals Index PRR 45 days prior #0005AC X

J1 086.1 J2 086.1.5

OEM Technical Manuals DVD Delivery of Each Boat With

#0002AA

#0002AB

#0002AC

TANB II List of Data Deliverables

# Reference Deliverable Milestone Submission Required Delivery CLIN Govt Acceptance

Required

C 3.5.7 J1 086.2 J2 086.3

Boat Information Book Delivery of Each Boat With

#0002AA

#0002AB

#0002AC

X (First Article)

C 3.5.3.6.1 J1 092.1.3.1.1

Builder's Trials Plan First Article Testing / Builder's Trials for Each Boat

30 days prior

#0002AA

#0002AB

#0002AC

X

C 3.5.3.6.2 J1 092.1.3.1.2

Builder's Trials Procedures First Article Testing / Builder's Trials for Each Boat

30 days prior

#0002AA

#0002AB

#0002AC

X

22 J1 092.1.3.1.3 Builder's Trials Reports First Article Testing / Builder's Trials for Each Boat

30 days after

#0002AA

#0002AB

#0002AC

X

23 J1 096.3.3 Scale Weighing Report Builder's Trials for Each Boat

30 days after

#0002AA

#0002AB

#0002AC

#0002AD

X

C 3.4.3.6.3 J1 092.3.2.4

Incline Test Plan First Article Testing 30 days prior #0005AA X

25 J1 092.3.2.7 Incline Test Report First Article Testing / As required by Govt.

30 days after

#0002AA

#0006AB

X

C 3.4.3.6.3 J1 092.3.3.1

Flotation Test Procedure First Article Testing 30 days prior #0005AA X

27 J1 092.3.3.3.1 Flotation Test Report First Article Testing / As required by Govt.

30 days after

#0002AA

#0002AC

X

28 J1 092.3.4.2 Trim and List Test Report First Article Testing / As required by Govt.

30 days after

#0002AA

#0006AC

X

C 3.4.3.6.3 J1 092.3.5.3

Speed, Power and Fuel Consumption Test Plan First Article Testing 30 days prior #0005AA X

30 J1 092.3.5.4 Speed, Power and Fuel Consumption Test Report First Article Testing / As required by Govt.

30 days after

#0002AA

#0006AC

X

C 3.4.3.6.3 J1 092.3.6.2

Steering Characteristics Test Plan First Article Testing 30 days prior #0005AA X

32 J1 092.3.6.3 Steering Characteristics Report First Article Testing / As required by Govt.

30 days after

#0002AA

#0006AC

X

33 J1 092.3.7.2 Mooring, Tie Down, Cargo, and Anchoring Fittings Test Report

First Article Testing / As required by Govt.

30 days after

#0002AA

#0006AC

X

C 3.4.3.6.3 J1 092.3.8.4

Buoy Handling System Test Plan First Article Testing 30 days prior #0005AA X

35 J1 092.3.8.5 Buoy Handling System Test Report First Article Testing / As required by Govt.

30 days after

#0002AA

#0006AC

X

36 J1 095.1.3 First Article Testing Schedule of Events First Article Testing 20 days prior #0002AA X 37 J1 910.1.1 Trailer Title / Certificate of Origin Each Trailer Delivery With #0002AD 38 J3 085.1.4 Training Syllabus Training Event 10 days prior #0004AA X

J-4 Title Page
TANB II List of Deliverables