Attachment 3 - Draft Pricing Sheet.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Trailerable Aids to Navigation Boat, 2nd Generation (TANB II) Draft Request for Proposal (RFP)
Solicitation number
70Z02324R00090001
Issued by

About this file

The document provided is a draft pricing sheet for the Trailerable Aids to Navigation Boat, 2nd Generation (TANB II) procurement. It outlines the contract line items (CLINs) and associated pricing for program management, boat production, delivery/shipping, training, design development, testing, engineering support, and spare parts.

The key details include a first article production cost of 130% of the base production cost, low-rate initial production (LRIP) at 115% of the base production cost, and full production at the base production cost per boat. Other CLINs cover trailers, maintenance parts, warranty, transportation, training events, engineering support, and various spares. The draft pricing sheet is associated with a special notice for the TANB II Draft Request for Proposal (RFP) issued by the U.S. Coast Guard, with feedback and questions requested by 09/05/2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Ordering Period

Pricing Sheet for TANB IIPOP: TBD
CLIN/SLINCLIN TypeCLIN Description
#001FFPProgram ManagementPrice perUnit of MeasurementTotal QtyTotal Price
#00101FFPYearly Program Managementper year70
0
#002FFPTANB II0
#00201FFPTANB II First Article, Fully OutfittedProduction cost + 30%10
#00202FFPTANB II LRIP, Fully OutfittedProduction cost + 15%100
#00203FFPTANB II Full Production, Fully OufittedProduction cost of boat780
#00204FFPTrailerPer Trailer890
#00205FFPInitial Maintenance Parts (500 hours)Per Kit890
#00206FFPWarranty (included w/ boat)890
0
#003Delivery/Shipping0
#00301FFP?Per Mile Rate (CONUS)per mile196201.3820
0
#004Training0
#00401FFPOperation and Maintenance TrainingPer event70
#00402FFPTravel for Training (East Coast)Per event70
#00403FFPTravel for Training (Gulf Coast)Per event00
#00404FFPTravel for Training (West Coast)Per event00
0
#005Design Development & Logistics0
#00501FFPDesign and EngineeringOne time10
#00502FFPMockupsOne time10
#00503FFPInitial Drawings and Technical DataInitial10
#00504FFPUpdated Drawings and Tech ManualsAs needed30
#00505FFPBoat Information BookOne time10
0
#006Testing and Evaluation0
#00601FFPTesting PlansOne time10
#00602FFPIncliningOne time, First Art.10
#00603FFPSpecial Tests & TrialsOne time, First Art.10
0
#007Engineering and Maintenance Support0
#00701NTEEngineering LaborAs ordered00
#00702NTENon-Engineering LaborAs ordered00
#00703NTETravel CostsNot to exceed??00
0
#0008Spares0
#00801FFPOutboard Engine, Portper unit180
#00802FFPOutboard Engine, Starboardper unit180
#00803FFPLower Unit, Portper unit180
#00804FFPLower Unit, Starboardper unit180
#00805FFPPropeller, Portper unit180
#00806FFPPropeller, Starboardper unit180
#00807FFPBatteryper unit180
#00808FFPHoist Winchper unit180
#00809FFPCross Deck Winchper unit180

Total 0

File details come from the government source that posted it. Updated .