J1a - SAT TFIP_FINAL DESIGN v4_DRAWINGS_20250205.pdf
PDF 23 MB Posted
- Attached to
- IIJA FUNDED - SAT ATCT TERMINAL FACILITY IMPROVEMENT PROGRAM (TFIP) Federal contract opportunity
- Solicitation number
- 697DCK-25-R-00047
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SAT TFIP_ADDENDUM B_SPECIFICATIONS -- v3 10.01.2025.pdf | ||
| 697DCK-25-R-00047 0006.pdf | ||
| 697DCK-25-R-00047 0005.pdf | ||
| J1 SAT TFIP_ADDENDUM B_SPECIFICATIONS - Amend 0005.pdf | ||
| 697DCK-25-R-00047 0004.pdf | ||
| J2 WD - TX20250231 08.22.2025.pdf | ||
| J4 SAT ATCT RFI Set 2.pdf | ||
| J1b SAT TFIP_ADDENDUM B_DESIGN DATA HANDBOOK 1.pdf | ||
| J1 SAT TFIP_ADDENDUM B_SPECIFICATIONS.pdf | ||
| J1a SAT TFIP_ADDENDUM B_DRAWINGS 1.pdf | ||
| 697DCK-25-R-00047 0003.pdf | ||
| 697DCK-25-R-00047 0002.pdf | ||
| J3 SAT ATCT RFI - Set 1.pdf | ||
| 697DCK-25-R-00047 Amend 0001.pdf | ||
| J1b - SAT TFIP_FINAL DESIGN v4_DESIGN DATA HANDBOOK_20250205.pdf | ||
| J2 WD - TX20250241.pdf | ||
| L1 BidBond.pdf | ||
| L2 Past Performance Questionnaire.pdf | ||
| L3 Standardized Proposal Breakdown.xls | XLS spreadsheet | |
| 697DCK-25-R-00047.pdf | ||
| J1 - SAT TFIP_FINAL DESIGN v4_SPECIFICATIONS_20250205.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
Department of Transportation Federal Aviation Administration
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/3
/2
:5
:5
A
M
SAN ANTONIO TXSAN ANTONIO (SAT) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
TERMINAL
ENGINEERING
GROUP
02/07/2025 22004815
SAT - D - ATCT - G001
COVER SHEET
SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER
SAT ATCT MODERNIZATION
SS
CG
WS
SAN ANTONIO ATCT
SAN ANTONIO
TEXAS
SAT ATCT Modernization San Antonio (SAT) Airport Traffic Control Tower San Antonio, Texas
Addendum A February 2025
A 02/07/25 Addendum A
N
VICINITY MAP
NTS
SAT ATCT AND BASE
BUILDING
02/07/2025
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:5
A
M
SAN ANTONIO TXSAN ANTONIO (SAT) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
TERMINAL
ENGINEERING
GROUP
07/26/2024 22004815
SAT - D - ATCT - G002
SHEET INDEX
SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER
SAT ATCT MODERNIZATION
SS
CG
WS
SAN ANTONIO ATCT
SAN ANTONIO
TEXAS
INDEX OF DRAWINGS
REV
DRAWING
NUMBER
DRAWING TITLE
GENERAL
G001 COVER SHEET
G002 SHEET INDEX
G003 GENERAL NOTES, LOCATION & VACINITY MAPS, & BUILDING CODE ANALYSIS
G004 GENERAL ABBREVIATIONS
G005 GENERAL AND ARCHITECTURAL LEGENDS
G006 GENERAL LOCATION PLAN
G007 CONSTRUCTION PHASING AND STAGING PLAN
G100 CODE COMPLIANCE SITE PLAN
G101 BASE BUILDING LIFE SAFETY PLAN
G102 ATCT LIFE SAFETY PLAN
G103 TRAILER LIFE SAFETY PLAN
HAZMAT
H101 HAZMAT ABATEMENT - PLAN FIRST FLOOR PLAN - PART A AND B
H102 HAZMAT ABATEMENT - TOWER PLANS - PART B
H103 HAZMAT ABATEMENT- ROOF PLANS - PART A AND B
CIVIL
C001 CIVIL NOTES AND ABBREVIATIONS
CD100 DEMOLITION PLAN
C100 SITE PLAN
C200 GRADING PLAN
C300 EROSION CONTROL PLAN
C600 STRIPING PLAN
C800 SITE PAVEMENT AND WATER UTILITY DETAILS
C801 SITE PAVEMENT MARKING DETAILS
C802 SITE PAVEMENT MARKING DETAILS
C803 SITE VERTICAL PIVOT GATE DETAILS
C804 SANITARY SEWER UTILITY DETAILS
STRUCTURAL
S001 STRUCTURAL GENERAL NOTES
S002 STRUCTURAL ABBREVIATIONS AND SYMBOLS
S003 LOAD MAPS
SD101 FIRST FLOOR DEMOLITION PLAN - OVERALL
SD112 ATCT DEMOLITION PLAN - LEVELS 2 TO 10
SD114 ATCT DEMOLITION PLAN - SUBJUNCTION AND JUNCTION LEVELS
S101 FIRST FLOOR FRAMING PLAN - OVERALL
S112 ATCT FRAMING PLAN - LEVELS 2 TO 10
S114 ATCT FRAMING PLAN - SUBJUNCTION AND JUNCTION LEVELS
S115 ATCT FRAMING PLAN - CAB ROOF
S201 STRUCTURAL ELEVATIONS
S301 TRAINING TRAILER AND SMOKING SHED STRUCTURAL PLAN
S501 DETAILS - CONCRETE
S502 DETAILS - STEEL
REV
DRAWING
NUMBER
DRAWING TITLE
ARCHITECTURAL
AD101 DEMOLITION - BASE BUILDING - FLOOR PLAN
AD114 DEMOLITION - ATCT - FLOOR PLAN
AD121 DEMOLITION - BASE BUILDING - REFLECTED CEILING PLAN
AD131 DEMOLITION - ATCT - REFLECTED CEILING PLANS
AD134 DEMOLITION - ATCT - REFLECTED CEILING PLANS
A101 BASE BUILDING - FLOOR PLAN
A111 ATCT - FLOOR PLANS
A112 ATCT - FLOOR PLANS
A113 ATCT - FLOOR PLANS
A114 ATCT - FLOOR PLANS
A116 TRAILER AND SMOKE SHELTER PLANS
A121 BASE BUILDING - REFLECTED CEILING PLANS
A131 ATCT - REFLECTED CEILING PLANS
A134 ATCT - REFLECTED CEILING PLANS
A401 BASE BUILDING - ENLARGED PLANS AND INTERIOR ELEVATIONS
A402 BASE BUILDING - ENLARGED PLANS AND INTERIOR ELEVATIONS
A403 BASE BUILDING - ENLARGED PLANS AND INTERIOR ELEVATIONS
A404 ATCT - ENLARGED PLANS AND INTERIOR ELEVATIONS
A500 DOOR SCHEDULE
A530 INTERIOR MATERIALS FINISH SCHEDULE AND DETAILS
A531 INTERIOR ROOM FINISH SCHEDULE
A532 PARTITION TYPES
A533 MILLWORK DETAILS
A540 BASE BUILDING - SIGNAGE PLAN
A541 ATCT - SIGNAGE PLANS
A542 ATCT - SIGNAGE PLANS
A543 ATCT - SIGNAGE PLANS
A544 ATCT - SIGNAGE PLANS
A545 TRAILER - SIGNAGE PLAN
A546 INTERIOR SIGNAGE DETAILS AND MOUNTING HEIGHTS
A547 INTERIOR SIGNAGE SCHEDULES
FIRE PROTECTION
F001 FIRE ALARM GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
F101 BASE BUILDING FIRE ALARM PLAN
F102 ATCT FIRE ALARM PLAN
F301 FIRE ALARM MATRIX AND RISER DIAGRAM
PLUMBING
P001 PLUMBING LEGEND, NOTES AND SYMBOLS
PD101 DEMOLITION - BASE BUILDING - UNDERFLOOR PLAN
PD102 DEMOLITION - BASE BUILDING - FLOOR PLAN
PD111 DEMOLITION - ATCT - FLOOR PLANS
P101 BASE BUILDING - PLUMBING UNDERFLOOR PLAN
P102 BASE BUILDING - PLUMBING FLOOR PLAN
P111 ATCT - PLUMBING FLOOR PLANS
P401 BASE BUILDING - PLUMBING ENLARGED PLANS
P500 PLUMBING SCHEDULES
P600 PLUMBING DETAILS
P601 PLUMBING DETAILS
P901 PLUMBING RISER DIAGRAMS
P902 PLUMBING RISER DIAGRAMS
REV
DRAWING
NUMBER
DRAWING TITLE
MECHANICAL
M001 HVAC LEGEND, NOTES AND SYMBOLS
M002 MECHANICAL INSTRUMENTATION AND CONSTRUCTION SEQUENCE
M004 HVAC TEMPORARY WORK - BASE BUILDING
M005 HVAC TEMPORARY WORK - ATCT - CAB
MD101 HVAC DEMOLITION - BASE BUILDING
MD111 HVAC DEMOLITION - ATCT
MD112 HVAC DEMOLITION - ATCT
MD141 HVAC DEMOLITION - BASE BUILDING - ROOF PLAN
MD301 HVAC DEMO - BASE BUILDING SECTIONS
MD302 HVAC DEMO - JUNCTION LEVEL SECTIONS
M101 HVAC FLOOR PLAN - BASE BUILDING
M111 HVAC FLOOR PLAN - ATCT
M112 HVAC FLOOR PLAN - ATCT
M141 HVAC ROOF PLAN - BASE BUILDING
MP101 HVAC PIPING FLOOR PLAN - BASE BUILDING
MP111 HVAC PIPING FLOOR PLAN - ATCT
MP700 PIPING DIAGRAMS
M301 HVAC SECTION - BASE BUILDING
M302 HVAC SECTION - JUNCTION LEVEL
M500 HVAC EQUIPMENT SCHEDULES
M501 HVAC CONTROL SCHEDULES
M600 HVAC TYPICAL DETAILS
M601 HVAC TYPICAL DETAILS
M602 HVAC TYPICAL DETAILS
M603 HVAC TYPICAL DETAILS
M800 HVAC CONTROL DIAGRAMS & SEQUENCES
M801 HVAC CONTROL DIAGRAMS & SEQUENCES
M802 HVAC CONTROL DIAGRAMS & SEQUENCES
M803 HVAC CONTROL DIAGRAMS & SEQUENCES
M804 HVAC CONTROL DIAGRAMS & SEQUENCES
M805 HVAC CONTROL DIAGRAMS & SEQUENCES
M806 HVAC CONTROL DIAGRAMS & SEQUENCES
M807 HVAC CONTROL DIAGRAMS & SEQUENCES
M808 HVAC CONTROL DIAGRAMS & SEQUENCES
M809 HVAC CONTROL DIAGRAMS & SEQUENCES
M810 HVAC CONTROL DIAGRAMS & SEQUENCES
M811 HVAC CONTROL DIAGRAMS & SEQUENCES
M812 DDCS POINT FUNCTION SCHEDULE
M813 DDCS POINT FUNCTION SCHEDULE
M814 DDCS POINT FUNCTION SCHEDULE
M815 DDCS POINT FUNCTION SCHEDULE
M816 DDCS POINT FUNCTION SCHEDULE
M817 NETWORK ARCHITECTURE DIAGRAM
REV
DRAWING
NUMBER
DRAWING TITLE
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS
E-002 ELECTRICAL SYMBOLS
ED100 POWER DEMOLITION PLAN - OVERALL
ED101 POWER DEMOLITION PLAN - BASE BUILDING - FIRST FLOOR
ED111 POWER DEMOLITION PLAN - ATCT
ED121 LIGHTING DEMOLITION PLAN - BASE BUILDING - FIRST FLOOR
ED131 LIGHTING DEMOLITION PLAN - ATCT
ED401 POWER DEMOLITION PLAN - ENLARGED PLANS
ED501 EXISTING PANEL SCHEDULES
ED502 EXISTING PANEL SCHEDULES
ED503 EXISTING PANEL SCHEDULES
ED504 EXISTING PANEL SCHEDULES
ED505 EXISTING PANEL SCHEDULES
ED506 EXISTING PANEL SCHEDULES
ED507 EXISTING PANEL SCHEDULES
ED801 DEMOLITION ONE-LINE DIAGRAM PART 1
ED802 DEMOLITION ONE-LINE DIAGRAM PART 2
EL101 LIGHTING PLAN - BASE BUILDING - FIRST FLOOR
EL111 LIGHTING PLAN - ATCT
EP100 POWER PLAN - BASE BUILDING - OVERALL
EP101 POWER PLAN - BASE BUILDING - FIRST FLOOR
EP111 POWER PLAN - ATCT
EP121 POWER PLAN - BASE BUILDING - ROOF
E401 POWER PLAN - ENLARGED PLANS
E501 PANEL SCHEDULES
E502 PANEL SCHEDULES
E503 PANEL SCHEDULES
E504 PANEL SCHEDULES
E505 PANEL SCHEDULES
E506 PANEL SCHEDULES
E551 LUMINAIRE AND CONTROL SCHEDULES
E552 EQUIPMENT CONNECTION SCHEDULE
E601 DETAILS
E602 DETAILS
E801 ONE-LINE DIAGRAM PART 1
E802 ONE-LINE DIAGRAM PART 2
07/26/2024
TRAILER
SMOKE
SHELTER
BASE BUILDING
ATCT
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:5
A
M
SAN ANTONIO TXSAN ANTONIO (SAT) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
TERMINAL
ENGINEERING
GROUP
07/26/2024 22004815
SAT - D - ATCT - G003
GENERAL NOTES, LOCATION & VACINITY MAPS, &
BUILDING CODE ANALYSIS
SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER
SAT ATCT MODERNIZATION
SS
CG
WS
SAN ANTONIO ATCT
SAN ANTONIO
TEXAS
GENERAL NOTES
A. DIMENSION LINES SHOWN ON ARCHITECTURAL SHEETS ARE FROM COLUMN CENTER LINES AND FACE OF
MASONRY, CONCRETE OR FINISHED FACE OF WALL, UNLESS OTHERWISE NOTED.
B. FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OF BUILDING SYSTEMS.
COORDINATE DEMOLITION WITH THE WORK AND NOTIFY COR OF CONFLICTS. NO DEMOLITION WORK MUST
PROCEED UNTIL CONFLICTS ARE RESOLVED TO SATISFACTION OF COR.
C. FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK MUST BE PATCHED AND REPAIRED TO MATCH EXISTING ADJACENT FINISHES TO THE SATISFACTION OF COR. PATCHING AND REPAIRING MUST BE OF EQUAL OR BETTER CONSTRUCTION AND QUALITY TO THE IMPACTED SURFACES. PATCH AND REPAIR
METHOD MUST BE APPROVED BY COR.
D. VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS. FOR DEMOLITION REQUIRED OUTSIDE OF AREA SHOWN ON ARCHITECTURAL DRAWINGS, REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION FOR
ITEMS TO BE REMOVED.
E. FACILITY WILL BE OCCUPIED BY FAA DURING CONSTRUCTION. COORDINATE THE WORK IN ADVANCE WITH COR TO AVOID DISRUPTING FAA OPERATIONS. MAINTAIN MEANS OF EGRESS DURING ABATEMENT, DEMOLITION, AND CONSTRUCTION ACTIVITIES. IF AN EXIT IS TEMPORARILY PLACED OUT OF USE DURING THE WORK, COORDINATE WITH COR FOR TEMPORARY EGRESS MEASURES. PROVIDE NECESSARY SIGNAGE WARNING BUILDING OCCUPANTS OF THE CHANGE, AND THE DIRECTION TO THE NEAREST EXIT. WORK AFFECTING EGRESS MUST BE COORDINATED WITH AND APPROVED IN WRITING BY COR, A MINIMUM OF 30
CALENDAR DAYS PRIOR TO PERFORMANCE OF WORK.
F. CLEAN CONSTRUCTION AREAS DAILY. DO NOT LEAVE CONSTRUCTION DEBRIS & EQUIPMENT IN OCCUPIED
AREAS.
G. MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, PARTITIONS, WALLS, CEILINGS, ROOFS OR SMOKE BARRIERS PENETRATED BY DUCTS, ELECTRICAL CONDUITS, PIPES AND OTHER PENETRATIONS CAUSED BY THE WORK OF THIS PROJECT WITH AN APPROVED U.L. SYSTEM. COORDINATE WITH COR TO VERIFY EXISTING CONDITION OF BUILDING SYSTEMS (INCLUDING EXTERIOR WALLS, PARTITIONS, FLOORS, CEILINGS AND ROOFS) BEFORE DEMOLITION OR CONSTRUCTION.
H. DO NOT SCALE DRAWINGS.
I. EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT MUST REMAIN OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK THAT MAY CAUSE VIBRATION OR DISRUPTION TO EQUIPMENT IN THE WORK AREA. PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS REQUIRED BY COR TO PROTECT ACTIVE EQUIPMENT. COORDINATE WITH COR NOT TO DISRUPT FAA OPERATIONS, TYP.
ACCOMODATE THE 24-HOUR OPERATIONAL FACILITY SCHEDULE AND REQUIREMENTS.
J. PROVIDE OPENINGS THROUGH EXISTING WALLS (GWB, MASONRY, AND CONCRETE) FOR PROVISION OF ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL & FIRE PROTECTION EQUIPMENT. COORDINATE SIZE
& LOCATION WITH MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION.
K. AREAS ADJACENT TO WORK AREA AND BUILDING(S) CONTAIN HAZARDOUS MATERIALS (HAZMAT) - ACM AND LCC. IF HAZMAT IS ENCOUNTERED, CEASE WORK IN THAT AREA AND NOTIFY COR TO PLAN HOW TO PROCEED
WITH THE WORK.
L. AS REQUIRED, REMOVE, SAVE FOR REUSE, AND REINSTALL FURNITURE THAT IS AFFECTED BY THE WORK.
PROTECT FURNITURE FROM DAMAGE. DOCUMENT EXISTING FURNITURE CONDITIONS AND COORDINATE WITH
COR.
M. UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES WILL NOT BE TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES MUST BE SCHEDULED AND APPROVED IN
WRITING BY COR AT LEAST 10 WORKING DAYS IN ADVANCE OF PERFORMANCE OF THE WORK.
N. EXISTING BUILDING FLOOR PLANS AND SITE PLANS FOR THE EXISTING BUILDING CONSTRUCTION PRESENTED IN THIS DOCUMENT WERE OBTAINED FROM THE FAA. FIELD VERIFY EXISTING CONDITION PRIOR TO
CONSTRUCTION WORK REQUIRED.
O. PROVIDE TEMPORARY DUST PROOF PARTITIONS (DP) WITH ACCESS DOORS AS DIRECTED BY COR.
TEMPORARY DP PARTITIONS MUST BE ACCESSIBLE TO FAA PERSONNEL AND NOT RESTRICT EGRESS, MECH, ELEC, FAA, OR FIRE PROTECTION EQUIPMENT. TEMPORARY DP ARE SHOWN SCHEMATICALLY ON DRAWINGS.
PROVIDE TO COR DRAWINGS INDICATING LOCATIONS OF DUSTPROOF PARTITIONS FOR APPROVAL PRIOR TO THE WORK. VERIFY FINAL LOCATIONS & SPECIAL REQUIREMENTS WITH COR BEFORE INSTALLATION.
ANCHORING DEVICES FOR DUSTPROOF CONSTRUCTIONS, INTO CONCRETE OR OTHER BUILDING SURFACES, MUST BE REMOVED UPON COMPLETION OF THE WORK. ANCHORING HOLES MUST BE PATCHED AND
REPAIRED TO MATCH ADJACENT SURFACES. DUSTPROOF PARTITION CONFIGURATION MUST BE INCLUDED IN
RISK MITIGATION PLAN AND TEMPORARY EGRESS PLAN.
P. SECURITY RELATED WORK, INCLUDING ACCESS CONTROL AND COORDINATING ELECTRICAL DOOR HARDWARE, MUST BE DONE BY THE FAA'S APPROVED SECURITY CONTRACTOR (SSDI) WHO MUST BE
RETAINED BY CONTRACTOR FOR THIS PROJECT.
Q. WORK SPECIFIED IN ROOMS/AREAS WITH BREAKLINES INCLUDES WORK FOR ENTIRE AREA, UNLESS
OTHERWISE NOTED.
R. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR PIPE VALVES. REQUEST PERMISSION IN WRITING OF FAA 10 WORKING DAYS IN ADVANCE FOR EACH CASE OF BREAKER OR PIPE VALVE OPERATION.
DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER OR PIPE VALVE. COORDINATE DE-ENERGIZING, AND ENERGIZING, OF PANELBOARDS FOR CIRCUIT BREAKER REPLACEMENT WITH COR.
S. WORK IN CONFINED SPACES OR AREAS MUST BE DONE IN ACCORDANCE WITH OSHA REQUIREMENTS, 29 CFR
1910.146 AND 1926.21(B)(6).
T. PRIOR TO CUTTING CONCRETE, USE MAGNETIC STEEL LOCATOR TO LOCATE ELECTRICAL CONDUITS EMBEDDED IN CONCRETE. AVOID CUTTING CONDUITS AS THEY MAY BE CRITICAL TO THE OPERATION OF THE
FACILITY. CONCRETE WORK MUST COMPLY WITH SILICA MANAGEMENT REQUIREMENTS.
U. DIMENSIONS (LAYOUTS, MOUNTING HEIGHTS, HEIGHTS ABOVE FINISH FLOOR, ETC.) AND CLEARANCES SHOWN ON THE DRAWINGS, IDENTIFIED IN SPECIFICATIONS, IDENTIFIED IN MANUFACTURERS' PRODUCT DATA, OR REFERENCED IN APPLICABLE ABA DOCUMENTS, CODES, AND CRITERIA FOR HANDICAPPED ACCESSIBILITY MUST BE HELD TRUE; PLUS OR MINUS TOLERANCES FROM THESE DIMENSIONS ARE NOT ALLOWED.
V. REFER TO OTHER DISCIPLINES FOR ADDITIONAL DEMOLITION REQUIRED. COORDINATE REMOVING EXISTING PARTITIONS AND ENCLOSURES TO ENABLE DEMOLITION OF CONCEALED SYSTEMS TO BE DEMOLISHED.
PATCH AND REPAIR DAMAGED FINISHES, AND/OR FIRE RATED ASSEMBLIES TO MATCH EXISTING ADJACENT
SURFACES.
W. ROOM NAMES AND NUMBERS AS INDICATED ARE FOR PROJECT DOCUMENTATION PURPOSES ONLY.
COORDINATE WITH COR FINAL ROOM NAMES AND NUMBERS AS ESTABLISHED BY SAT FACILITY IMPROVEMENT ANALYSIS FOR ANY ROOM SIGNAGE, BUILDING AUTOMATION INTEGRATION, FIRE ALARM SYSTEM INTEGRATION, OR OTHER SYSTEM INTEGRATION WHICH RELIES ON ACTUAL FACILITY ROOM NAMES AND
NUMBERS.
X. ACCESSIBILITY STANDARDS FOR THIS PROJECT ARE THE: ‘ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS (2015)’ (ABA-2015), AND THE LOCAL JURISDICTION’S ACCESSIBILITY REQUIREMENTS. CONSTRUCTION MUST C0MPLY WITH ABA-2015, OR LOCAL JURISDICTION'S ACCESSIBILITY REQUIREMENTS OF WHICHEVER IS
STRICTER.
Y. MODULAR OFFICE SPACE MANUFACTURER'S DESIGNATED PROFESSIONAL ENGINEER MUST DESIGN FOUNDATIONS, STAIRS, AND A RAMP IN ACCORDANCE WITH THE PERFORMANCE REQUIREMENTS INDICATED.
BUILDING CODE ANALYSISLOCATION MAP
KEY PLAN
NOTE:
BUILDING FLOOR PLANS ARE
DIVIDED INTO BUILDING DRAWING
PARTS. THIS DIAGRAM
REPRESENTS THE DIVISION
INTENDED FOR THE DIFFERENT
AREAS OF THE BUILDING.
NPROJECT LOCATION:
FEDERAL AVIATION ADMINISTRATION
SAT ATCT AND BASE BUILDING
SAN ANTONIO INTERNATIONAL AIRPORT
SAN ANTONIO, TX
PROJECT
LOCATION
APPLICABLE CODES AND REGULATIONS INTERNATIONAL BUILDING CODE (IBC), 2021 EDITION
INTERNATIONAL EXISTING BUILDING CODE (IEBC), 2021 EDITION
ICC (ANSI) A117.1-2017, STANDARD FOR ACCESSIBLE AND USABLE
BUIDINGS AND FACILITIES
ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS (2015)
OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) INDUSTRY
SAFETY & HEALTH STANDARDS (29 CFR 1910 AND 1926 - CURRENT ISSUE)
FAA TERMINAL FACILITIES DESIGN STANDARDS (TFDS),
AUGUST 2022 VERSION
INTERNATIONAL FIRE CODE, 2021 EDITION
INTERNATIONAL MECHANICAL CODE, 2021 EDITION
INTERNATIONAL PLUMBING CODE, 2021 EDITION
NFPA 70 (NATIONAL ELECTRICAL CODE (NEC)), 2020 EDITION
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022 EDITION
NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION
TECHNOLOGY EQUIPMENT, 2020 EDITION
NFPA 101 - LIFE SAFETY CODE, 2021 EDITION
CODE SUMMARY AIR TRAFFIC CONTROL TOWER
CONSTRUCTION TYPE: TYPE IB
IBC: MIXED USE; GROUP B AND GROUP S
NFPA 101: EXISTING BUSINESS AND ACCESSORY STORAGE
SPRINKLERED: NO
FIRE ALARM: YES
HEIGHT: 195 FT (ACTUAL) / 240 FT (ALLOWABLE)
AREA: 750 SQFT (ACTUAL) / UNLIMITED (ALLOWABLE)
TRACON BASE BUILDING:
CONSTRUCTION TYPE: IIB
OFFICE TRAILER CONSTRUCTION TYPE: IIB (EQUIVALENT)
IBC: MIXED USE; GROUP B AND GROUP S
NFPA 101: EXISTING BUSINESS AND ACCESSORY STORAGE
SPRINKLERED: NO
FIRE ALARM: YES
STORIES 1 (ACTUAL) / 3 (ALLOWABLE)
HEIGHT: 20 FT (ACTUAL) / 55 FT (ALLOWABLE)
AREA: 17,577 SQFT (ACTUAL) / 23,000 SQFT (ALLOWABLE)
OFFICE TRAILER AREA: 705 SQFT (TRAILER) + 17,577 SQFT (BASE
BUILDING) = 18,282 SQFT (TOTAL)
EGRESS REQUIREMENTS MAX TRAVEL DISTANCE: 200 FT (BUSINESS)
MAX COMMON PATH OF TRAVEL (BUSINESS): 75 FEET
MAX DEAD END (BUSINESS): 20 FT
MIN CLEAR WIDTH (CORRIDOR): 44 INCHES
MIN CLEAR WIDTH (EXIT DOOR): 32 INCHES
SEISMIC DESIGN CATEGORY A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:5
A
M
SAN ANTONIO TXSAN ANTONIO (SAT) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
TERMINAL
ENGINEERING
GROUP
07/26/2024 22004815
SAT - D - ATCT - G004
GENERAL ABBREVIATIONS
SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER
SAT ATCT MODERNIZATION
SS
CG
WS
SAN ANTONIO ATCT
SAN ANTONIO
TEXAS
GENERAL ABBREVIATIONS
A A AMPERE
AAV AUTOMATIC AIR VENT
AC ALTERNATING CURRENT, ASPHALT CONCRETE, AIR
COMPRESSOR
ACC AIR COOLED LIQUID CHILLER
ACD ADDRESSABLE CONTROL DEVICE
ACF ACCESS FLOOR SYSTEM
ACM ASBESTOS CONTAINING MATERIAL
ACP ACOUSTICAL CEILING PANEL
ACT ACCESS CONTROL TERMINAL, ACOUSTICAL CEILING TILE
ACU AIR CONDITIONING UNIT
A/C AIR CONDITIONING
AD AREA DRAIN, ACCESS DOOR
ADJ ADJACENT, ADJUSTABLE
ADR ACCESS DOOR
ADTN ADMINISTRATIVE DATA TRANSMISSION NETWORK
AED AUTOMATED EXTERNAL DEFIBRILLATOR
AF AMPERE FRAME, AIR FLOW SENSOR
AFF ABOVE FINISH FLOOR
AFMS AIR FLOW MEASURING STATION
AH AIR HANDLING UNIT
AHU AIR HANDLING UNIT
AIC AMPERES INTERRUPTING CAPACITY
AID ADDRESSABLE INTERFACE DEVICE
AIF AIR INTAKE FILTER
AL ALUMINUM
ALT ALTERNATE
AM AMP METER
AMM AMMETER
ANN ANNUNCIATOR
AO ANALOG OUTPUT
AP ANNUNCIATOR POINT
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATELY
ARCH ARCHITECT(URAL)
ARTCC AIR ROUTE TRAFFIC CONTROL CENTER
ARTS AUTOMATED RADAR TERMINAL SYSTEM
AS AIR SEPARATOR
ASSY ASSEMBLY
AT AMPERE TRIP, AIR TRAFFIC
ATB AIR TERMINAL BOX
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
AV ACID VENT
AVG AVERAGE
AWG AMERICAN WIRE GUAGE
AWP ACOUSTICAL WALL PANEL
AWR AUTOMATION WING REHABILITATION
& AND
@ AT
B B BOILER, BUILDING
BAT CHR BATTERY CHARGER
BC BARE COPPER
BD BOARD, BACK-DRAFT DAMPER, BLOWDOWN
BEL BELOW
BF BLIND FLANGE
BFP BACK FLOW PREVENTER
BFV BUTTERFLY VALVE
BFW BOILER FEED WATER
BHP BRAKE HORSE POWER
BKR BREAKER
BLDG BUILDING
BLKG BLOCKING
BLO BLOWER
BLV BALANCING VALVE
BM BENCH MARK, BEAM
BOCA BUILDING OFFICIALS AND CODE ADMINISTRATORS
INTERNATIONAL, INC
BOD BOTTOM OF DUCT, BASIS OF DESIGN
BOP BOTTOM OF PIPE
BOT, BOTT BOTTOM
BPU BREAKER PROGRAMMING UNIT
BRG BEARING
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTU/H BRITISH THERMAL UNIT PER HOUR
BV BALL VALVE
BWP BACK WATER PREVENTER
BWV BACK WATER VALVE
C C CONDUIT
CA COMBUSTION AIR
CAB CABINET
CB CIRBUIT BREAKER
CC COOLING COIL
CCMS CENTRAL CONTROL AND MONITORING SYSTEM
CD CONTROL DAMPER, CEILING DIFFUSER, CONDENSATE
DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FOOT
CG CEILING GRILLE
CH CHILLER
CI CURB INLET, CAST IRON
CIP CAST IRON PIPE, CAST IN PLACE
CIR CIRCULATING
CKT CIRCUIT
CL CENTER LINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CONDUIT ONLY
COL COLUMN
COMB COMBINATION, COMBINE, COMBUSTION AIR
COMM COMMUNICATIONS
COMP COMPRESSIBLE, COMPRESSED
CONC CONCRETE
COND CONDITION, CONDENSATE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS, CONTINUATION
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICERS REPRESENTATIVE
CP CONTROL PANEL, CIRCULATING PUMP
CPC CRITICAL POWER CENTER
CPDS CRITICAL POWER DISTRIBUTION SYSTEM
CPT CARPET
CPU CENTRAL PROCESSING UNIT
CR CEILING REGISTER, CONTROL RELAY
CRAC COMPUTER ROOM AIR CONDITIONING UNIT
CRAH COMPUTER ROOM AIR HANDLING UNIT
CRU COMPUTER ROOM UNIT
CS CONTROL SWITCH
CT CABLE TRAY, COOLING TOWER
CTR CENTER, COOLING TOWER WATER RETURN
CTS COOLING TOWER WATER SUPPLY
CU CONDENSING UNIT
CW DOMESTIC COLD WATER
CWR CHILLER WATER RETURN
CWS CHILLER WATER SUPPLY
CWV COMBINATION WASTE AND VENT
CU CONDENSING UNIT
CV CONTROL VALVE, CONSTANT VOLUME TERMINAL
CYD CUBIC YARD
D D DRAIN, DELTA CONNECTION, DIFFUSER, DAMPER
DB DIRECT BURIAL, DRY BULB
DBL DOUBLE
DC DIRECT CURRENT
DDCP DIRECT DIGITAL CONTROL PANEL
DEG DEGREE(S)
DET DETAIL
DGP DATA GATHERING PANEL
DI DROP INLET, DAMPER POSITION INDICATOR, DIGITAL
INPUT
DIA DIAMETER
DIAG DIAGONAL
DISC DISCONNECT
DISP DISPENSER
DIST DISTRIBUTION
DL DEAD LOAD
DM DEMAND METER
DN DOWN
DO DIGITAL OUTPUT
DOM DOMESTIC
DP DUSTPROOF PARTITION, DIFFERENTIAL PRESSURE
SWITCH
DPDT DOUBLE POLE DOUBLE THROW
DPNL DISTRIBUTION PANEL
DPST DOUBLE POLE SINGLE THROW
DR DOOR
DWG(S) DRAWING(S)
E EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM ELECTRICAL DATA ACQUISITION AND MONITORING
EF EXHAUST FAN
EFF EFFICIENCY
EG ENGINE GENERATOR, EXHAUST GRILLE
EH ELECTRIC HEATER
EHC ELECTRIC HEATING COIL
EL, ELEV ELEVATION, ELEVATOR
ELEC ELECTRIC(AL)
EMD ESTIMATED MAXIMUM DEMAND
EMERG EMERGENCY
EMT ELECTRICAL METAL TUBING
ENT, ENTR ENTRANCE
EOR ENGINEER OF RECORD
EP EXHAUST PIPE
EPMS ELECTRICAL POWER MONITORING SYSTEM
EPX EPOXY
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM
ES EXHAUST SILENCER
ESD ELECTROSTATIC DISSIPATIVE
ET ELECTRIC HEAT TRACE
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXH EXHAUST
EXIST, EX EXISTING
EXP EXPOSED
EXPN EXPANSION
EXT EXTERIOR
F F FILTER, FIRE LINE
FA FAN COOLED
FAA FEDERAL AVIATION ADMINISTRATION
FC FAN COIL UNIT
FCO FLOOR CLEANOUT
FCV FLOW CONTROL VALVE
FD FIRE DAMPER OR FLOOR DRAIN
FD/SD COMBINATION FIRE AND SMOKE DAMPER
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FEPC FRONT END PERSONAL COMPUTER
FFE FINISHED FLOOR ELEVATION
FHC FIRE HOSE CABINET
FI FLANGE INSULATION, FLOW INDICATOR
FIA FACILITY IMPROVEMENT ANALYSIS
FIN FINISH
FIX, FIXT FIXTURE
FL, FLR FLOOR
FLA FULL LOAD AMPERES
FLEX FLEXIBLE DUCT
FLG FLANGE
FLUOR FLUORESCENT
FM FLOW METER, FIRE MAIN
FO FIBER OPTIC
FOL FUEL OIL LEVEL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FIBER OPTIC TERMINAL
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPU FIELD PROGRAMMING UNIT
FRP FIBER GLASS REINFORCED PLASTIC
FS FLOW SWITCH
FT, ' FEET
FTR FINNED TUBE RADIATION
FV FULL VOLTAGE
FZ FREEZESTAT
G G GAS
GA GAGE, GAUGE
GALV GALVANIZED
GEN GENERATOR
GFE GOVERNMENT FURNISHED EQUIPMENT
GFM GOVERNMENT FURNISHED MATERIAL
GL GLASS
GND GROUND, GROUND CONNECTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
GRV GRAVITY VENT
GS GAS SENSOR
GV GATE VALVE
GW GLYCOL WASTE
GWB GPYSUM WALLBOARD
GWH GAS WATER HEATER
H H HUMIDISTAT
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HEATING COIL
HCS HOST COMPUTER ROOM
HDW HARDWARE
HE HEAT EXCHANGER
HERM HERMETIC
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER, HEAT PUMP, HIGH PRESSURE
HPL HIGH PRESSURE LAMINATE
HPS HIGH PRESSURE SODIUM, HIGH PRESSURE STEAM
HPT HIGH POINT
HR HOUR
HS HIGH STRENGTH, HUMIDITY SENSOR
HT HEIGHT
HTG HEATING
HTP HOT TAP (W/ STOPPLE FITTING)
HTR HEATER
HU HUMIDIFIER
HVAC HEATING/VENTILATING/AIR CONDITIONING
HW DOMESTIC HOT WATER
HWL HIGH WATER LEVEL
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HZ HERTZ
HWY HIGHWAY
I IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IEWH INSTANTANEOUS ELECTRIC WATER HEATER
IF INSIDE FACE, INTERNAL FILTER
IN, " INCH
INST INSTRUMENTATION
INSUL INSULATION
INT INTERIOR
INT'L INTERNATIONAL
INV INVERT
ITEA INFORMATION TECHNOLOGY EQUIPMENT AREA
ITER INFORMATION TECHNOLOGY EQUIPMENT ROOM
J J JUNCTION
JB JUNCTION BOX
JC JANITOR'S CLOSET
K KCMIL THOUSAND CIRCULAR MILS
KVA KILOVOLT AMPERE
KW KILOWATTS
L LAN LOCAL AREA NETWORK
LBP LEAD-BASED PAINT
LBS, # POUNDS
LCC LEAD CONTAINING COATING
LCP LOCAL CONTROL PANEL
LCV LEVEL CONTROL VALVE
LF LINEAR FEET
LG LEVEL GAUGE
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOD LIMIT OF DISTURBANCE
LONG LONGITUDINAL
LP LOW POINT
LPS LOW PRESSURE STEAM
LS LEVEL SWITCH
LT LIGHT
LTG LIGHTING
M M MOTOR
MAS MASONRY
MAT MATERIAL
MAX MAXIMUM
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MET METAL
MFG(R) MANUFACTURER
MG MOTOR GENERATOR
MIL MILLIMETER
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFICATION
MS MOISTURE SENSOR
MTG MOUNTING, MOUNTED
N N/A NOT APPLICABLE
NAM NEGATIVE AIR MACHINE
NARACS NATIONAL RADIO COMMUNICATIONS SYSTEM
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO, # NUMBER
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O OA OUTSIDE AIR
OC ON CENTER
OD OUTSIDE DIAMETER, OPEN DRAIN
OF OUTSIDE FACE
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFD OVERFLOW ROOF DRAIN
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION
OSW OPERATIONS SUPPORT WING
P P PUMP, PHASE, POLE
PACM PRESSUMED ASBESTOS CONTAINING MATERIAL
PBX PRIVATE BRANCH EXCHANGE
PC PRESSURE CONTROL SWITCH
PCB POLYCHLORINATED BIPHENYLS
PCF POUNDS PER CUBIC FOOT
PD PRESSURE DIFFERENTIAL
PDI PRESSURE DIFFERENTIAL INDICATOR
PDS PRESSURE DIFFERENTIAL SENSOR
PH PHASE
PHC PREHEAT COIL
PI POINT OF INTERSECTION, PRESSURE INDICATOR
PIV POST INDICATOR VALVE
PL PROPERTY LINE, PLATE
PLAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PNL PANEL
POC POINT OF CONNECTION
PRV PRESSURE REDUCING VALVE
PS PRESSURE SENSOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSM POWER SYSTEMS MODIFICATION
PT PAINT, POINT OF TANGENCY
PTVC POINT OF VERTICAL CURVATURE
PVC POLYVINYL CHLORIDE
PVDS PORTABLE VISUAL DISPLAY SYSTEM
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
R R RISER, RADIUS
RA RETURN AIR
RAD RADIUS
RCP REFLECTED CEILING PLAN
RCRA RESOURCE CONSERVATION AND RECOVERY ACT
RD ROOF DRAIN
RECEPT RECEPTACLE
REF REFERENCE
REG REGISTER
REINF REINFORCING
REQ'D REQUIRED
REV REVERSE, REVISION
RF RETURN FAN
RGS RIGID GALVANIZED STEEL
RHC REHEAT COIL
RM ROOM
RO ROUGH OPENING
RV REFRIGERANT VENT
S S SMOKE DETECTOR
SA SUPPLY AIR
SAN SANITARY
SAP SOUND ABSORBING PANEL
SCH, SCHED SCHEDULE
SCWD SOLID CORE WOOD
SD SMOKE DAMPER
SEC SECTION
SF SUPPLY FAN, SQUARE FEET
SHT SHEET
SIG SIGNAL
SIM SIMILAR
SM SPRINKLER MAIN
SP SUMP PUMP/SEWAGE PUMP, STATIC PRESSURE
INDICATOR
SPEC SPECIFICATIONS
SQ SQUARE
SRF SAFETY RUBBER FLOOR TILE
SRGG SIGNAL REFERENCE GROUND GRID
SRS SIGNAL REFERENCE STRUCTURE
SSDI SECURITY SYSTEMS DESIGN AND INTEGRATION
SSTL, SS STAINLESS STEEL
ST STEAM, STREET
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STE STANDARD TAPERED END
STGP SIGNAL TRANSPORT GROUND PLANE
STL STEEL
STOR STORAGE
STRUC STRUCTURAL, STRUCTURE
SUCT SUCTION
SUSP SUSPENDED
SW SWITCH
SYM SYMMETRICAL
T T THERMOSTAT, TREAD
TBD TO BE DETERMINED
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TC TEMPERATURE CONTROL SWITCH
TELCO TELECOMMUNICATION, TELEPHONE COMPANY LINE
TEMP TEMPERATURE
TI TEMPERATURE INDICATOR
TIC TEMPERATURE INDICATING CONTROLLER
TK TANK
TM&O TELECOMMUNICATIONS MANAGEMENT AND OPERATIONS
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TRACON TERMINAL RADAR APPROACH CONTROL FACILITY
TRANS TRANSVERSE
TS TEMPERATURE SENSOR, TAMPER SWITCH
TYP TYPICAL
U UBC UNIFORM BUILDING CODE
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES, INC.
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SYSTEM
UTIL UTILITY
UV UNIT VENTILATOR
V V VOLT
VAT VINYL ASBESTOS TILE
VAV VARIABLE VOLUME TERMINAL
VB VINYL BASE
VBT VINYL BASE & TRIM COMPONENTS
VC VERTICAL CURVE
VCT VINYL COMPOSITION TILE
VD VOLUME DAMPER
VERT VERTICAL
VF VERTICAL FEET, VENTILATION FAN
VFD VARIABLE FREQUENCY DRIVE
VGWB VINYL SURFACED GYPSUM WALL BOARD
VIF VERIFY IN FIELD
VP VELOCITY PRESSURE, VACUUM PRODUCER
VS VIBRATION SWITCH
W W WATT
W/ WITH
WD WOOD
WG WATER GAGE
WJHTC WILLIAM J. HUGHES TECHNICAL CENTER
W/O WITHOUT
WP WEATHERPROOF
WT WEIGHT
X XFER, XFR TRANSFER
XFMR TRANSFORMER
Y Y WYE CONNECTION
YD YARD
TEMPORARY INTERIOR
WALL WITH DOOR
TEMPORARY DUSTPROOF
PARTITION WITH DOOR
DOOR NUMBER
WALL TYPE NUMBER
SUPPLY AIR DUCT
EMERGENCY SHOWER AND EYEWASH
FLOOR DRAIN
ELECTRICAL PANEL
SYMBOLS
LOUVER NUMBER
FLOOR SINK
FLOOR HATCH
ROOF HATCH
LADDER
SUMP
LOCKERS
FIRE EXTINGUISHER
CABINET
ACOUSTICAL BAFFLES
DPDP
2A
FIRE RESISTANCE RATING
PARTITION TYPE DESIGNATION
FD FD
FS
RH
SURFACE MOUNTED SEMI-RECESSED
MATERIALS
EARTH
EARTH, ETC
GRAVEL SAND
CONCRETE TER ASPH
CONCRETE, ETC
STEEL ALUMINUM OTHER
METALS
CMU
MASONRY
BRICK TILE
FINISH EL BLKG STUD
PARTITION
WOOD
GYPSUM
GYPSUM
PLYWOOD
LARGE SCALE SMALL SCALE
GLASS
BATT OR
LOOSE
RIGID
INSULATION
ELEVATION
SYMBOLS
CONTRACTOR'S ACCESS ROUTE
VEHICULAR TRAFFIC DIRECTION
RAISED FLOOR PANELS
WALL
DEMOLITION WALL
SUSPENDED CEILING SYSTEM
RECESSED
LIGHT FIXTURES
LIGHT FIXTURES
SUPPLY AIR
CEILING DIFFUSER
RETURN AIR
CEILING REGISTER
TRANSFER AIR GRILLE
REFER TO ELECTRICAL
DRAWINGS FOR SYMBOLS
REFER TO MECHANICAL
DRAWINGS FOR SYMBOLS
LAVATORY
URINAL
WATER CLOSET
ELECTRIC WATER
COOLER
ARCHITECTURAL LEGEND
2 X 2 2 X 4
EXISTING NEW CONSTRUCTION
DEMOLITION DOOR AND FRAME
REFERENCE
COLUMN LINE GRID DESIGNATION
CENTER LINES
MATCH LINE SYMBOL
BREAK LINES
ELEVATION SYMBOL
DRAWING/DETAIL TITLE
DETAIL TITLE REFERENCE
SECTION CUT
ELEVATION REFERENCE
PLAN NORTH/PROJECT NORTH
ROOM/AREA NUMBER
DEMOLITION
REVISION
REVISION DESIGNATION
SHEET NOTE NUMBER
DEMOLITION NOTE
HAZMAT NOTE, ASBESTOS
REFERTO HAZMAT DWGS FOR
SPECIFIC INFORMATION.
HAZMAT NOTE, LEAD PAINT
REFERTO HAZMAT DWGS FOR
SPECIFIC INFORMATION.
GRAPHIC SCALE
Name Elevation
A8 View Name
1/8" = 1'-0"AXXX
SHEET ON WHICH DETAIL
IS DRAWN OR SCHEDULED
DETAIL NUMBER
A1
A001
SHEET ON WHICH
DETAIL IS DRAWN
DETAIL DESIGNATION
A1
A001
A701
A7
A6
A5
A8 E1
A001
PROJECT NORTH
MAGNETIC NORTH
KEY NORTH
Room Name
BLS202BLS202
CLOUD TO ENCOMPASS
REVISED AREA
1 RFI-0000
04 8 16268
SCALE: 1/8"=1'-0"
GENERAL LEGEND
1,2,3
1,2,3
N
A1
A001
DETAIL DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN DETAIL
DESIGNATION
SHEET ON WHICH
DETAIL IS DRAWN
ABATE ACM MANAGE ACM
IN PLACE
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
REV. APPROVED
DATE
DESCRIPTION JCN
REDLINE
DATE
APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
P L O
T D
A T
E /T
IM
E
/2
/2
:2
:5
A
M
SAN ANTONIO TXSAN ANTONIO (SAT) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
TERMINAL
ENGINEERING
GROUP
07/26/2024 22004815
SAT - D - ATCT - G005
GENERAL AND ARCHITECTURAL LEGENDS
SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER
SAT ATCT MODERNIZATION
SS
CG
WS
SAN ANTONIO ATCT
SAN ANTONIO
TEXAS
Twy T
Twy T
Skyplace Boulevard
Twy R W
I
N
D
S
O
C
K
RSA / OFZ
RSA / OFZ
RSA / OFZ
Runway 13L-31R
5519' X 100'
RSA / OFZ
RSA / OFZ
RSA / OFZ
RSA / OFZ
W
I
N
D
S
O
C
K
RSA / OFZ
RSA / OFZ
P
A
P
I
S
Twy R
Twy R
RSA / OFZ
Twy R
Twy J
W
I
N
D
S
O
C
K
RSA
RSA
RSA
RSA
Runway 13R-31L
8502' X 150'
P
A
P
I
S
RSA
RSA
RSA
Twy G
Twy H
Twy H
Twy H
Twy H
B7
B6
Twy N12
A17
A12
B8B5
A13
A9
Twy N11
B3
B4
A10
A8
Twy N2
B1
B2
A7
A11
Twy N10
Sandau Road
A6 A5
A4
Twy N9
A3
A2A1
Twy F
Twy N1
A15 A14
RSA
Twy G
W
I
N
D
S
O
C
K
Twy G
Twy N13
Twy N3
Twy E
RSA
RSA
RSA
RSA
Twy G
P
A
P
I
S
RSA
W
I
N
D
S
O
C
K
RSA
RSA
RSA
RSA
I-410
E Bitters Rd.
Twy D
Twy D
GS
RVR
REIL
REIL
BEACON
RTR
RTR
TERMINAL
B
ATC
CONRAC
LONG TERM
PARKING
TERMINAL
A
LOC
RVR
PCU
GS
IM
I-410
RED
PARKING LOT
IM
Northern Boulevard
GREEN
PARKING LOT
Dee Howard Way
RTR
ORANGE
PARKING LOT
QTA
RGL
RGL
GS
RGL
RVR
ILS
PURPLE
PARKING LOT
RGL
RTR
REIL
REIL
RVR
Twy D
Tw y Z
Tw y K
Tw y Y
Tw y J
Tw y S
Tw y S
Tw y A
Tw y A
Tw y A
Tw y D
Tw y D
G3
G2
G1 Tw y W
Tw y N
RSA
RSA
W
I
N
D
S
O
C
K
M
A
L
S
RSA
RSA
RSA
R
G
L
R
G
L
Run way
4-
' X
0'
RSA
Tw y N
Tw y N
RSA
Tw y N RSA
Tw y N
RSA
M c Allister Fwy.
(Hwy. 281)
Tw y P
Airport Boulevard
John Saunders D rive
John C ape
Jones-M altsberger R oad
NE Entr an ce Roa d
First Ave.
Paul Wilkins
W. Cargo
S. Terminal Drive
Twy J
Twy V
Twy M
Tw y L
Tw y B
Tw y B
A
R
P
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
PL
O
T D
AT
E/
TI
M
E:
SAN ANTONIO TXSAN ANTONIO (SAT) ATCT
CENTRAL SERVICE AREA FORT WORTH, TX
TERMINAL
ENGINEERING
GROUP
22004815
SAT-D-ATCT-G006
GENERAL LOCATION PLAN
SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER
SAT ATC MODERNIZATION
T. RECINE
T. MLSEK
S. BUTLER / S. DAVIS
G006
A8 GENERAL LOCATION PLAN
NTS
LEGEND
HAUL ROUTE
-SHEET NOTES
1. HAUL ROUTE FROM HWY I-410 WESTBOUND
2. HAUL ROUTE TO HWY I-410 EASTBOUND
3. HAUL ROUTE FROM HWY I-410 EASTBOUND
4. HAUL ROUTE TO HWY I-410 WESTBOUND
5. HAUL ROUTE FROM HWY 281 NORTHBOUND
6. HAUL ROUTE FROM HWY 281 SOUTHBOUND
7. HAUL ROUTE TO HWY 281 NORTHBOUND AND SOUTHBOUND
WORK SITE LOCATION
SAN ANTONIO ATCT
SAN ANTONIO
TEXAS
07/26/2024
TEXAS REGISTERED
ENGINEERING FIRM F-2966
THE RECORD
COPY OF THIS DRAWING
IS ON FILE AT THE OFFICES OF
FOR THE PURPOSES OF REFERENCE,
MANAGEMENT UNDER THE AUTHORITY OF
COORDINATION, AND/OR FACILITY
ARCHITECT/ENGINEER OF RECORD
THIS ELECTRONIC DOCUMENT IS RELEASED
NOT BE MODIFIED BY ANY PERSON
IT IS RELEASED.
UNDER WHOSE AUTHORITY
OTHER THAN THE PROFESSIONAL
THIS ELECTRONIC DOCUMENT MAY
JACOBS ENGINEERING GROUP INC
777 MAIN ST., FORT WORTH TX, 76102
11/17/23
TEXAS REGISTERED
ENGINEERING FIRM F-2966
TX94575
ANTHONY T. RECINE
THE RECORD
COPY OF THIS DRAWING
IS ON FILE AT THE OFFICES OF
FOR THE PURPOSES OF REFERENCE,
MANAGEMENT UNDER THE AUTHORITY OF
COORDINATION, AND/OR FACILITY
ARCHITECT/ENGINEER OF RECORD
THIS ELECTRONIC DOCUMENT IS RELEASED
NOT BE MODIFIED BY ANY PERSON
IT IS RELEASED.
UNDER WHOSE AUTHORITY
OTHER THAN THE PROFESSIONAL
THIS ELECTRONIC DOCUMENT MAY
JACOBS ENGINEERING GROUP INC
777 MAIN ST., FORT WORTH TX, 76102
11/17/23
TEXAS REGISTERED
07/28/2023 01/26/2024
7/
/2
:5 3:
P
M
F.H.
UGP
UGP
UGP
UGP
G.P.
G.P.
7/
/2
:5 3:
P
M
SAN ANTONIO TXSAN ANTONIO (SAT) ATCT
CENTRAL SERVICE AREA
TERMINAL
ENGINEERING
GROUP
CONSTRUCTION PHASING AND
STAGING PLAN
G007
A8 CONSTRUCTION PHASING AND STAGING PLAN
1" = 30'
PHASES 1 THROUGH 6
STAGING AREA
ATC TOWER
PHASE 3: USE TECH OPS AND AIR TRAFFIC FOR
FLEX/SWING SPACES DURING BASE BUILDING WORK.
LEGEND
PHASE 2: PROVIDE TEMPORARY PORTABLE RESTROOMS
OUTSIDE, AND USE CONFERENCE ROOM IN TECH OPS FOR
TEMPORARY BREAK ROOM DURING THE PLUMBING WORK.
COMPLETE ALL WORK IN ROOM 41 BEFORE ANY WORK IN THE
EXISTING TSS ROOM (ROOM 39).
W
TER
M
IN
AL D
R
IVE
STAGING AREA
PHASE 7
STAGING AREA
A. GENERAL
A.1. THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS. DIVISION 01 SPECIFICATIONS HAVE PRECEDENCE
OVER THESE NOTES.
A.2. CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA IF REQUIRED MUST BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH ONGOING PROJECTS. LOCATION OF CONSTRUCTION STAGING AREA TO BE DETERMINED AT PRECONSTRUCTION
CONFERENCE.
A.3. COORDINATE CONSTRUCTION ACTIVITY WITH THE COR SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ATCT.
A.4. OFFICE TRAILER IS REQUIRED TO BE READY FOR INSTALLATION WITHIN 5 WORKING DAYS PRIOR TO THE REMOVAL
OF THE EXISTING TRAILER.
A.5. MOVE ALL FURNITURE AND APPLIANCES OUT OF (AND BACK INTO) ALL ROOM SPACES AS NEEDED TO PERFORM
WORK. CONTRACTOR IS RESPONSIBLE FOR TEMPORARY STORAGE OF FURNITURE AND APPLICANCES.
A.6. CONTRACTOR ACCEPTANCE INSPECTION IS REQUIRED AFTER EACH PHASE OF WORK. FAA WILL RE-OCCUPY
WORKSPACES ONCE FAA ISSUED PUNCHLIST IS CLEARED.
A.7. COORDINATE WITH THE COR FOR TEMPORARY BREAKROOM REQUIREMENTS.
B. RISK MITIGATION PLAN
B.1. DEVELOP A RISK MITIGATION PLAN TO ACCOMODATE REMOVING AND PROVIDING EQUIPMENT AS PART OF THE WORK. COORDINATE FINAL PLAN REQUIREMENTS WITH THE COR. RISK MITIGATION PLAN MUST AT A MINIMUM
ADDRESS PROTECTION OF BUILDING, OCCUPANTS, AND BUILDING SECURITY.
B.2. DEVELOP A RISK MITIGATION PLAN TO ACCOMMODATE REMOVAL OF EXISTING EQUIPMENT FROM BUILDING TO ALLOW FOR THE WORK AND TO MAINTAIN REQUIRED EGRESS FROM AREAS IMPACTED BY CONSTRUCTION.
B.3. THE RISK MITIGATION PLAN MUST IDENTIFY AND DOCUMENT RISKS/HAZARDS POSED BY THE WORK AND IDENTIFY ACTION REQUIRED TO REDUCE THE RISK.THE PLAN MUST INCLUDE DAILY CONSTRUCTION BRIEFINGS WITH THE THE COR AND REGULAR INSPECTIONS. RISK MITIGATION PLANS MUST ADDRESS, BUT IS NOT LIMITED TO, INFORMING OCCUPANTS AND VISITORS OF ANY CONSTRUCTION ACTIVITY THAT AFFECT THE FIRE PROTECTION AND LIFE SAFETY WITHIN THE FACILITY. RISK MITIGATION MUST ADDRESS ALTERNATE MEANS OF EGRESS FOR BUILDING OCCUPANTS, SIGNAGE, AND IF REQUIRED BY THE COR, TRAINING WHEN EGRESS ROUTES ARE REVISED
AS A RESULT OF THE WORK.
C. CONSTRUCTION ACCESS
C.1. VISITORS AND DELIVERIES TO SITE MUST BE THROUGH THE MAIN ENTRANCE SECURITY GATE IDENTIFIED BY THE
THE COR.
C.2. PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE.
PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT PERSONS
NEAR CONSTRUCTION AREAS.
C.3. ACCESS TO BUILDING MUST BE LIMITED. COORDINATE WITH THE COR.
C.4. KEEP LOADING AREA ACCESSIBLE FOR FAA DELIVERIES.
C.5. DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH THE COR AND AT TIMES OTHER THAN FAA
EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES OCCUR AT: 5:30AM - 6:45AM, 12:30PM-2:30PM, AND 10:15PM, VERIFY TIME WITH THE COR. DELIVERY VEHICLES MUST ONLY CONTAIN ITEMS BEING DELIVERED TO FAA. IF VEHICLE CONTAINS OTHER DELIVERIES, VEHICLE MUST NOT BE ALLOWED ON SITE.
C.6. DO NOT BLOCK ACCESS OR EGRESS FROM BUILDING EXITS. COORDINATE WITH THE COR AND THE RISK MITIGATION PLAN IF THE FOLLOWING EXITS WILL BE TEMPORARILY BLOCKED: EMPLOYEE ENTRANCE/EXIT, OR
AREAWAY.
C.7. COORDINATE WORK WITH THE CITY OF SAN ANTONIO FIRE DEPARTMENT TO ENSURE EMERGENCY ACCESS IS
MAINTAINED DURING ALL PHASES OF CONSTRUCTION.
D. CONTRACTOR PARKING
D.1. PARKING IS LIMITED TO THE CONSTRUCTION STAGING AREA AND AS NOTED. IF ADDITIONAL PARKING IS NEEDED, PROVIDE OFF-SITE. EXISTING PARKING SPACES AT ATCT ARE OFF-LIMITS FOR CONTRACTOR PARKING.
E. FAA SECURITY REQUIREMENTS
E.1. AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO THE COR.
TEMPORARY SECURITY BADGES WILL BE ISSUED TO QUALIFIED CONSTRUCTION PERSONNEL. CONTRACTOR'S SUPERVISORY PERSONNEL MUST BE RESPONSIBLE FOR CONDUCT OF THEIR PERSONNEL. VEHICLES ASSOCIATED WITH CONTRACTOR'S WORK MUST BE MARKED. REFER TO DIVISION 1 FOR MORE DETAILED REQUIREMENTS.
E.2. SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS AND COMPLY
WITH FAA'S SECURITY REQUIREMENTS.
E.3. FAA VISITORS BADGES ARE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN THE BUILDING. OBTAIN FAA SECURITY BADGES FOR PROJECT SUPERINTENDENT AND ONE REPRESENTATIVE FOR EACH SUB CONTRACTOR ON SITE FOR MORE THAN 60 WORKING DAYS. THE BADGED CONTRACTOR MUST ESCORT SUB CONTRACTORS AND OTHER WORKERS ON THE SITE. TEMPORARY BADGES ARE REQUIRED FOR CONTRACTORS
AND OTHER WORKERS FOR DURATION LESS THAN 60 WORKING DAYS.
E.4. USE GREAT CARE AND CAUTION WHILE WORKING ON THIS FACILITY. WORK MUST BE COORDINATED WITH THE
COR. DISRUPTION OF THIS FACILITY IS NOT PERMITTED.
E.5. EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF THIS CONTRACT. ENSURE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO UNITS. NOTIFY THE COR IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES.
REPAIRS AND RESTORATIONS ARE AT NO COST TO THE FAA.
F. CONSTRUCTION MATERIAL STORAGE
F.1. STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE IS LIMITED TO THE CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A FENCE. MATERIALS MUST BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED AT THE DISCRETION OF THE COR. DO NOT DIG WITHOUT PRIOR PERMISSION FROM THE COR. BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE. INSTALL A PADLOCK ON GATE FOR CONSTRUCTION STAGING AREA. PROVIDE KEY TO THE
COR.
F.2. COORDINATE DELIVERY OF MATERIALS THROUGH THE COR. HAVE PERSONNEL ON SITE TO RECEIVE DELIVERIES.
G. CONSTRUCTION DEBRIS
G.1. PROVIDE ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS WITHIN THE CONSTRUCTION STAGING AREA. COORDINATE LOCATIONS WITH THE COR. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN AND
FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. REMOVE DEBRIS DAILY. DISPOSE OF WASTE IN AN
APPROVED OFF-SITE WASTE DISPOSAL FACILITY.
G.2. USING FAA DUMPSTERS IS NOT ALLOWED.
G.3. WATER WILL BE USED AS A DUST CONTROL MEASURE AS NEEDED OR AS DIRECTED BY THE CONTRACTING
OFFICER. IF, IN THE OPINION OF THE AIRPORT, DUST FROM CONSTRUCTION ACTIVITIES CREATES A NUISANCE OR LIMITED VISIBILITY CONDITIONS ON ADJACENT PAVEMENTS, CONSTRUCTION ACTIVITY WILL BE STOPPED AND NOT RESUMED UNTIL APPROPRIATE SPRINKLING HAS BEEN ACCOMPLISHED TO THE SATISFACTION OF THE AIRPORT.
TIME LOST DUE TO WORK STOPPAGE FOR THIS ACTIVITY WILL NOT CONSTITUTE AN EXTENSION OF CONTRACT
TIME.
G.4. ALL HAUL TRUCKS ARE TO BE CONVERED WHEN OPERATING IN THE AIRPORT.
H. CONSTRUCTION OFFICE
H.1. LOCATE MATERIALS AND EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREA. TEMPORARY POWER IS AVAILABLE AT ATCT. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATION WITH THE CPS ENERGY TO SET UP A TEMPORARY POWER SERVICE FOR THE CONSTRUCTION TRAILERS. NO TRAILER POWER CAN BE TAKEN
FROM WITHIN THE ATCT / TRACON FACILITY.
H.2. COMMERCIAL POWER IS AVAILABLE AT THE POWER PANEL, VERIFY LOCATION W/ THE COR. THE CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL CONNECTION FROM THE POWER PANEL TO THEIR CONSTRUCTION TRAILERS.
H.3. COORDINATE WITH THE COR USE OF MOBILE CELL PHONE USE INSIDE AND OUTSIDE BUILDING. CERTAIN AREAS OF
THE FACILITY ARE SENSITIVE TO CELL PHONE USAGE.
I. DEMOLITION AND CONSTRUCTION HOURS (NORMAL WORK HOURS BETWEEN 6:00 AM TO 4:30 PM)
I.1. DO NOT INTERFERE WITH AIR TRAFFIC CONTROL FUNCTIONS OF THE ATCT AND BASE BUILDING. DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 5:00 AM - 12:00 AM FOR THE ATCT, AND BETWEEN 5:30 AM -
10:00 PM FOR THE BASE BUILDING.
I.2. COORDINATE WORK WITH THE COR ON CRITICAL EQUIPMENT WITHIN THE ATCT AND BASE BUILDING MODIFICATION WORK AREA. WORK ON CRITICAL EQUIPMENT MUST BE ACCOMPLISHED DURING ATCT OFF-HOURS 12:00 AM - 5:00
AM AND BASE BUILDING OFF-HOURS 10:00 PM - 5:30 AM, OR AS DIRECTED BY THE COR.
I.3. NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY THE COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF THE WORK. DEMOLITION WORK CREATING DISRUPTIVE NOISE, DUST, ODORS, OR
FUMES WILL BE CONDUCTED DURING OFF-HOURS.
I.4. CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING MUST BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY THE COR. SCHEDULE, COORDINATE AND HAVE APPROVAL BY THE COR IN WRITING, A MINIMUM OF 10 WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK IF ACTIVITY INTERUPTS NORMAL OPERATIONS. CONCRETE WORK PRODUCING EXCESSIVE NOISE ,DUST, ODORS, OR FUMES THAT CAN
DISRUPT OPERATIONS WILL BE CONDUCTED DURING OFF-HOURS.
J. EQUIPMENT PROTECTION
J.1. PROTECT FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, ASBESTOS, DEBRIS AND DUST, INCLUDING CORE DRILLING.
J.2. SHUTDOWNS AND SWITCH OVERS OF MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED DURING OFF-HOURS. FACILITY OFF-HOURS ARE IDENTIFIED IN NOTE J3. PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND SWITCH OVER. SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY THE COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME.
J.3. ATCT IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. THE BASE BUILDING OPERATES UNDER NORMAL BUSINESS HOURS (5:30AM - 10:00PM, 7 DAYS A WEEK). SELECT CONSTRUCTION ACTIVITY WILL BE LIMITED TO OFF-HOURS WORK TO MINIMIZE RISK TO THE OPERATIONAL FACILITIES. ATCT OFF-HOURS WORK IS 12:00 AM - 5:00 PM, AND BASE BUILDING OFF-HOURS WORK IS 10:00 PM - 5:30 AM. IT WILL BE NECESSARY TO COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ATCT AND BASE BUILDING.
J.4. NO WELDING, OR ANY OTHER SPARK OR FLAME EQUIPMENT MUST BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING MUST NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY THE COR. REVIEW WITH THE COR TYPE OF WELDING CUTTING TO BE PERFORMED AT FACILITY 10 WORKING DAYS PRIOR TO USE. OBTAIN A HOT WORK PERMIT FROM THE FACILITY MANAGER VIA THE COR PRIOR TO ANY WELDING, TORCHING, OR USE OF AN OPEN FLAME.
J.5. THE ATCT STANDPIPE SYSTEM AND SITE FIRE HYDRANTS WILL BE TEMPORARILY OUT OF SERVICE DURING THE REPLACEMENT OF THE EXISTING POST INDICATOR VALVES (PIVS) ON THE 6" FIRE SERVICE. FOLLOW THE PROCEDURES OUTLINED IN NFPA 25, SECTION 15.5 FOR THE PREPLANNED IMPAIRMENT OF THE FIRE SUPPRESSION SYSTEM BY NOTIFYING THE FAA, FIRE DEPARTMENT, ALARM COMPANY, OR OTHER AUTHORITIES HAVING JURISDICTION WITH REGARD TO THE IMPAIRMENT'S EXTENT, EXPECTED DURATION, AND MITIGATION MEASURES. A CONTINUOUS FIRE WATCH OF IMPAIRED BUILDING AREA(S) WILL BE CONDUCTED BY A DESIGNATED PERSON IF THE FACILITY SPRINKLER SYSTEM IS OUT OF SERVICE FOR MORE THAN 10 HOURS IN A 24-HOUR
PERIOD.
K. CONSTRUCTION TOILET FACILITIES
K.1. PROVIDE AND MAINTAIN PORTABLE CHEMICAL TOILETS AS REQUIRED AT THE TEMPORARY CONSTRUCTION
STAGING AREA. COORDINATE WITH THE COR FOR SCHEDULING OF SERVICE.
K.2. PROVIDE PORTABLE WASH STATIONS WITH FOOT-PEDAL ACTIVATED FAUCET, SOAP DISPENSER, AND A HAND
DRYING OPTION IN ADDITION TO PORTABLE TOILETS TO CONSTRUCTION STAGING AREA.
K.3. LOCATE PORTABLE TOILETS A MINIMUM OF 25 FEET AWAY FROM THE NEAREST STORMWATER INLETS.
L. TEMPORARY PORTABLE RESTROOM TRAILERS
L.1. PROVIDE TEMPORARY RESTROOM FACILITES FOR BUILDING STAFF DURING CONSTRUCTION HOUSED IN A PORTABLE TRAILER. THE 60' X 12' TRAILER WILL CONTAIN 3 TOILETS AND 2 URINALS FOR MEN, AND 5 TOILETS FOR
WOMEN, RUNNING PORCELAIN SINK, BATTERY, AND LIGHTING.
L.2. CLEAN THE TEMPORARY RESTROOMS ON A DAILY BASIS WHILE BUILDING TOILET FACILITES ARE OUT OF SERVICE.
L.3. CONNECT TEMPORARY RESTROOM'S SEWER SERVICE TO STUB UP ON NEW SANITARY SEWER LATERAL.
CONNECT POTABLE WATER SERVICE TO NEAREST 3/4" WALL HYDRANT; PROTECT SERVICE LINE FROM FREEZING
TEMPERATURES DURING WINTER MONTHS.
SAT-D-ATCT-G007
T. RECINE
T. MLSEK
S. BUTLER / S. DAVIS
FORT WORTH, TX
22004815
SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER
SAT ATC MODERNIZATION
SAN ANTONIO ATCT
SAN ANTONIO
TEXAS
FEET
Scale: 1 INCH = 30 FEET
60300 15
PHASE 1: TRACON WORK MUST BE PERFORMED
DURING THE NIGHT. COORDINATE WITH THE COR.
USE AF TECH OFFICE FOR TEMPORARY CBI LAB AND
AT COACH LAB DURING THE PLUMBING WORK.
INTERIOR BUILDING
RENOVATION AND SITE
WORK PHASING SEQUENCE
7A
8B
8A
7B
7C
7D
7H
7F
REV. APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE APVD
REVIEWED BY SUBMITTED BY APPROVED BY
SUBMITTER'S TITLE APPROVER'S TITLE
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
DRAWING NO.
JCN:
REV.
ISSUED BY
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
8 7 6 5 4 3 2 1
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
JACOBS
1100 N GLEBE RD.
SUITE 500
ARLINGTON, VA 22201
PL
O
T D
AT
E/
TI
M
E:
PHASE 5: OFFICE TRAILER
PHASE 4: CORRIDORS
PHASE 8: MILL, OVERLAY, AND STRIPE ASPHALT
PAVEMENT, AND REPLACE VERTICAL LIFT GATES.
PHASE 7: MILL, OVERLAY, AND STRIPE ASPHALT
PAVEMENT. AND INSTALL CONCRETE V-CHANNELS AND
UTILITY TRENCH FOR PIV CAD READER TELECOM CONDUIT.
TEMPORARY
BREAK ROOM
EXISTING BASE BUILDING
L.
M. MOBILE CRANE OPERATION
M.1. PROVIDE MOBILE CRANE EQUIPMENT CAPABLE OF LIFTING 305 LB LOAD
APPROXIMATELY 221 FEET TO THE ATC TOWER ROOFTOP FROM LOCATION
INDICATED ON THIS SHEET.
M.2. CRANE WILL MOBILIZED TWICE DURING CONSTRUCTION: ONCE TO LIFT
TEMPORARY HVAC EQUIPMENT ONTO ATC TOWER ROOF, AND ONCE TO
LIFT THE HVAC EQUIPMENT OFF THE ROOF.
M.3. SUBMIT CRANE LIFTING PLAN TO THE FAA FOR APPROVAL.
MOBILE CRANE
LOCATION
07/26/2024
PHASE 6: ATCT (INCLUDES ROOFTOP HVAC
INSTALLATION WITH CRANE) AND SMOKE
SHELTER. CONSTRUCTION ACTIVITY IN ATCT
STAIR IS LIMITED TO OFF-HOURS WORK TO
ENSURE STAIR REMAINS OPEN AS A MEANS OF
EGRESS DURING OPERATIONAL HOURS.
7G
7E
TEMPORARY
PORTABLE
RESTROOM
TRAILER
3A 3B
2B
2C
4A
2A
6A 1A
1B
1D
1C
1E
3/4" WALL HYDRANT
7A
5A
1A
6B
6B
6B
6B
1A
1A
1A
TEXAS REGISTERED
ENGINEERING FIRM F-2966
THE RECORD
COPY OF THIS DRAWING
IS ON FILE AT THE OFFICES OF
FOR THE PURPOSES OF REFERENCE,
MANAGEMENT UNDER THE AUTHORITY OF
COORDINATION, AND/OR FACILITY
ARCHITECT/ENGINEER OF RECORD
THIS ELECTRONIC DOCUMENT IS RELEASED
NOT BE MODIFIED BY ANY PERSON
IT IS RELEASED.
UNDER WHOSE AUTHORITY
OTHER THAN THE PROFESSIONAL
THIS ELECTRONIC DOCUMENT MAY
JACOBS ENGINEERING GROUP INC
777 MAIN ST., FORT WORTH TX, 76102
11/17/23
TEXAS REGISTERED
ENGINEERING FIRM F-2966
TX94575
ANTHONY T. RECINE
THE RECORD
COPY OF THIS DRAWING
IS ON FILE AT THE OFFICES OF
FOR THE PURPOSES OF REFERENCE,
MANAGEMENT UNDER THE AUTHORITY OF
COORDINATION, AND/OR FACILITY
ARCHITECT/ENGINEER OF RECORD
THIS ELECTRONIC DOCUMENT IS RELEASED
NOT BE MODIFIED BY ANY PERSON
IT IS RELEASED.
UNDER WHOSE AUTHORITY
OTHER THAN THE PROFESSIONAL
THIS ELECTRONIC DOCUMENT MAY
JACOBS ENGINEERING GROUP INC
777 MAIN ST., FORT WORTH TX, 76102
11/17/23
TEXAS REGISTERED
07/28/2023 01/26/202407/26/2024
UPUP UP
DN
LIFE SAFETY SYMBOLS:
TD = #FT
TRAVEL DISTANCE (MAX: 200 FT)
COMMON PATH OF TRAVEL (MAX: 75 FT)
DEAD END CORRIDOR (MAX: 50 FT)
1 HOUR FIRE RATED ASSEMBLY
2 HOUR FIRE RATED ASSEMBLY
ITE ROOMS
CP = #FT
OCCUPANT LOAD TABLE
EXIT CAPACITY:
W = EXIT CAPACITY FACTOR (IN/PERSON)
X = OCCUPANTS USING EXIT (PERSONS)
Y = EXIT CAPACITY (PERSONS)
Z = EXIT CLEAR WIDTH (IN)
DE = #FT
X
Y
W
Z
OCCUPANT LOAD:
3 FILE STORAGE 76
STORAGE
300 1
# ROOM NAME
AREA
(SQ. FT)…