J1a SAT TFIP_ADDENDUM B_DRAWINGS 1.pdf

PDF 30 MB Posted

Attached to
IIJA FUNDED - SAT ATCT TERMINAL FACILITY IMPROVEMENT PROGRAM (TFIP) Federal contract opportunity
Solicitation number
697DCK-25-R-00047
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

View the file

Other files for this federal contract opportunity

Other files attached to IIJA FUNDED - SAT ATCT TERMINAL FACILITY IMPROVEMENT PROGRAM (TFIP), newest first.
File Type Posted
697DCK-25-R-00047 0006.pdf PDF
SAT TFIP_ADDENDUM B_SPECIFICATIONS -- v3 10.01.2025.pdf PDF
697DCK-25-R-00047 0005.pdf PDF
J1 SAT TFIP_ADDENDUM B_SPECIFICATIONS - Amend 0005.pdf PDF
J1b SAT TFIP_ADDENDUM B_DESIGN DATA HANDBOOK 1.pdf PDF
J1 SAT TFIP_ADDENDUM B_SPECIFICATIONS.pdf PDF
697DCK-25-R-00047 0004.pdf PDF
J2 WD - TX20250231 08.22.2025.pdf PDF
J4 SAT ATCT RFI Set 2.pdf PDF
697DCK-25-R-00047 0003.pdf PDF
J3 SAT ATCT RFI - Set 1.pdf PDF
697DCK-25-R-00047 0002.pdf PDF
697DCK-25-R-00047 Amend 0001.pdf PDF
J2 WD - TX20250241.pdf PDF
L1 BidBond.pdf PDF
L2 Past Performance Questionnaire.pdf PDF
L3 Standardized Proposal Breakdown.xls XLS spreadsheet
697DCK-25-R-00047.pdf PDF
J1 - SAT TFIP_FINAL DESIGN v4_SPECIFICATIONS_20250205.pdf PDF
J1a - SAT TFIP_FINAL DESIGN v4_DRAWINGS_20250205.pdf PDF
J1b - SAT TFIP_FINAL DESIGN v4_DESIGN DATA HANDBOOK_20250205.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

REV. APPROVED

DATE

DESCRIPTION JCN

REDLINE

DATE

APVD

REVIEWED BY SUBMITTED BY APPROVED BY

SUBMITTER'S TITLE APPROVER'S TITLE

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

Department of Transportation Federal Aviation Administration

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

P L O

T D

A T

E /T

IM

E

/1

/2

:4 :3

P

M

SAN ANTONIO TXSAN ANTONIO (SAT) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

TERMINAL

ENGINEERING

GROUP

02/07/2025 22004815

SAT - D - ATCT - G001

COVER SHEET

SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER

SAT ATCT MODERNIZATION

SS

CG

WS

SAN ANTONIO ATCT

SAN ANTONIO

TEXAS

SAT ATCT Modernization San Antonio (SAT) Airport Traffic Control Tower San Antonio, Texas

Addendum A February 2025

A 02/07/25 Addendum A

B 06/20/25 Addendum B

N

VICINITY MAP

NTS

SAT ATCT AND BASE

BUILDING

A

B

Addendum B June 2025

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

REV. APPROVED

DATE

DESCRIPTION JCN

REDLINE

DATE

APVD

REVIEWED BY SUBMITTED BY APPROVED BY

SUBMITTER'S TITLE APPROVER'S TITLE

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

P L O

T D

A T

E /T

IM

E

/1

/2

:4

:2

P

M

SAN ANTONIO TXSAN ANTONIO (SAT) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

TERMINAL

ENGINEERING

GROUP

6/20/2025 22004815

SAT - D - ATCT - G002

SHEET INDEX

SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER

SAT ATCT MODERNIZATION

SS

CG

WS

SAN ANTONIO ATCT

SAN ANTONIO

TEXAS

INDEX OF DRAWINGS

REV

DRAWING

NUMBER

DRAWING TITLE

GENERAL

B G001 COVER SHEET

B G002 SHEET INDEX

G003 GENERAL NOTES, LOCATION & VACINITY MAPS, & BUILDING CODE ANALYSIS

G004 GENERAL ABBREVIATIONS

G005 GENERAL AND ARCHITECTURAL LEGENDS

G006 GENERAL LOCATION PLAN

G007 CONSTRUCTION PHASING AND STAGING PLAN

G100 CODE COMPLIANCE SITE PLAN

G101 BASE BUILDING LIFE SAFETY PLAN

G102 ATCT LIFE SAFETY PLAN

G103 TRAILER LIFE SAFETY PLAN

HAZMAT

H101 HAZMAT ABATEMENT - PLAN FIRST FLOOR PLAN - PART A AND B

H102 HAZMAT ABATEMENT - TOWER PLANS - PART B

H103 HAZMAT ABATEMENT- ROOF PLANS - PART A AND B

CIVIL

C001 CIVIL NOTES AND ABBREVIATIONS

CD100 DEMOLITION PLAN

CD101 ALTERNATIVE #2 - ASPHALT MILLING PLAN

C100 SITE PLAN

C101 ALTERNATIVE #2 - ASPHALT OVERLAY PLAN

C200 GRADING PLAN

C201 ALTERNATIVE #2 - GRADING PLAN

C300 EROSION CONTROL PLAN

C600 ALTERNATIVE #2 - STRIPING PLAN

C800 SITE PAVEMENT AND WATER UTILITY DETAILS

C801 SITE PAVEMENT MARKING DETAILS

C802 ALTERNATIVE #2 - SITE PAVEMENT MARKING DETAILS

C803 SITE VERTICAL PIVOT GATE DETAILS

C804 SANITARY SEWER UTILITY DETAILS

STRUCTURAL

S001 STRUCTURAL GENERAL NOTES

S002 STRUCTURAL ABBREVIATIONS AND SYMBOLS

S003 LOAD MAPS

SD101 FIRST FLOOR DEMOLITION PLAN - OVERALL

SD112 ATCT DEMOLITION PLAN - LEVELS 2 TO 10

SD114 ATCT DEMOLITION PLAN - SUBJUNCTION AND JUNCTION LEVELS

S101 FIRST FLOOR FRAMING PLAN - OVERALL

S112 ATCT FRAMING PLAN - LEVELS 2 TO 10

S114 ATCT FRAMING PLAN - SUBJUNCTION AND JUNCTION LEVELS

S115 ATCT FRAMING PLAN - CAB ROOF

S201 STRUCTURAL ELEVATIONS

A 02/07/25 Addendum A

B 06/20/25 Addendum B

REV

DRAWING

NUMBER

DRAWING TITLE

S301 TRAINING TRAILER AND SMOKING SHED STRUCTURAL PLAN

S501 DETAILS - CONCRETE

S502 DETAILS - STEEL

ARCHITECTURAL

B AD101 DEMOLITION - BASE BUILDING - FLOOR PLAN

AD114 DEMOLITION - ATCT - FLOOR PLAN

AD121 DEMOLITION - BASE BUILDING - REFLECTED CEILING PLAN

AD131 DEMOLITION - ATCT - REFLECTED CEILING PLANS

AD134 DEMOLITION - ATCT - REFLECTED CEILING PLANS

B A101 BASE BUILDING - FLOOR PLAN

A111 ATCT - FLOOR PLANS

A112 ATCT - FLOOR PLANS

A113 ATCT - FLOOR PLANS

A114 ATCT - FLOOR PLANS

A A116 TRAILER AND SMOKE SHELTER PLANS

A A121 BASE BUILDING - REFLECTED CEILING PLANS

A131 ATCT - REFLECTED CEILING PLANS

A134 ATCT - REFLECTED CEILING PLANS

A401 BASE BUILDING - ENLARGED PLANS AND INTERIOR ELEVATIONS

A402 BASE BUILDING - ENLARGED PLANS AND INTERIOR ELEVATIONS

A403 BASE BUILDING - ENLARGED PLANS AND INTERIOR ELEVATIONS

A404 ATCT - ENLARGED PLANS AND INTERIOR ELEVATIONS

A500 DOOR SCHEDULE

A530 INTERIOR MATERIALS FINISH SCHEDULE AND DETAILS

A A531 INTERIOR ROOM FINISH SCHEDULE

A532 PARTITION TYPES

A A533 MILLWORK DETAILS

A A540 BASE BUILDING - SIGNAGE PLAN

A541 ATCT - SIGNAGE PLANS

A542 ATCT - SIGNAGE PLANS

A543 ATCT - SIGNAGE PLANS

A544 ATCT - SIGNAGE PLANS

A545 TRAILER - SIGNAGE PLAN

A546 INTERIOR SIGNAGE DETAILS AND MOUNTING HEIGHTS

A A547 INTERIOR SIGNAGE SCHEDULES

FIRE PROTECTION

F001 FIRE ALARM GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS

F101 BASE BUILDING FIRE ALARM PLAN

F102 ATCT FIRE ALARM PLAN

F301 FIRE ALARM MATRIX AND RISER DIAGRAM

PLUMBING

P001 PLUMBING LEGEND, NOTES AND SYMBOLS

PD101 DEMOLITION - BASE BUILDING - UNDERFLOOR PLAN

PD102 DEMOLITION - BASE BUILDING - FLOOR PLAN

PD111 DEMOLITION - ATCT - FLOOR PLANS

P101 BASE BUILDING - PLUMBING UNDERFLOOR PLAN

P102 BASE BUILDING - PLUMBING FLOOR PLAN

P111 ATCT - PLUMBING FLOOR PLANS

P401 BASE BUILDING - PLUMBING ENLARGED PLANS

P500 PLUMBING SCHEDULES

P600 PLUMBING DETAILS

REV

DRAWING

NUMBER

DRAWING TITLE

P601 PLUMBING DETAILS

P901 PLUMBING RISER DIAGRAMS

P902 PLUMBING RISER DIAGRAMS

MECHANICAL

M001 HVAC LEGEND, NOTES AND SYMBOLS

M002 MECHANICAL INSTRUMENTATION AND CONSTRUCTION SEQUENCE

M004 HVAC TEMPORARY WORK - BASE BUILDING

M005 HVAC TEMPORARY WORK - ATCT - CAB

MD101 HVAC DEMOLITION - BASE BUILDING

MD111 HVAC DEMOLITION - ATCT

MD112 HVAC DEMOLITION - ATCT

MD141 HVAC DEMOLITION - BASE BUILDING - ROOF PLAN

MD301 HVAC DEMO - BASE BUILDING SECTIONS

MD302 HVAC DEMO - JUNCTION LEVEL SECTIONS

0 M101 HVAC FLOOR PLAN - BASE BUILDING

M111 HVAC FLOOR PLAN - ATCT

M112 HVAC FLOOR PLAN - ATCT

M141 HVAC ROOF PLAN - BASE BUILDING

MP101 HVAC PIPING FLOOR PLAN - BASE BUILDING

MP111 HVAC PIPING FLOOR PLAN - ATCT

MP700 PIPING DIAGRAMS

M301 HVAC SECTION - BASE BUILDING

M302 HVAC SECTION - JUNCTION LEVEL

0 M500 HVAC EQUIPMENT SCHEDULES

M501 HVAC CONTROL SCHEDULES

M600 HVAC TYPICAL DETAILS

M601 HVAC TYPICAL DETAILS

M602 HVAC TYPICAL DETAILS

M603 HVAC TYPICAL DETAILS

M800 HVAC CONTROL DIAGRAMS & SEQUENCES

M801 HVAC CONTROL DIAGRAMS & SEQUENCES

M802 HVAC CONTROL DIAGRAMS & SEQUENCES

M803 HVAC CONTROL DIAGRAMS & SEQUENCES

M804 HVAC CONTROL DIAGRAMS & SEQUENCES

M805 HVAC CONTROL DIAGRAMS & SEQUENCES

M806 HVAC CONTROL DIAGRAMS & SEQUENCES

M807 HVAC CONTROL DIAGRAMS & SEQUENCES

M808 HVAC CONTROL DIAGRAMS & SEQUENCES

M809 HVAC CONTROL DIAGRAMS & SEQUENCES

M810 HVAC CONTROL DIAGRAMS & SEQUENCES

M811 HVAC CONTROL DIAGRAMS & SEQUENCES

M812 DDCS POINT FUNCTION SCHEDULE

M813 DDCS POINT FUNCTION SCHEDULE

M814 DDCS POINT FUNCTION SCHEDULE

REV

DRAWING

NUMBER

DRAWING TITLE

M815 DDCS POINT FUNCTION SCHEDULE

M816 DDCS POINT FUNCTION SCHEDULE

M817 NETWORK ARCHITECTURE DIAGRAM

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS

A E-002 ELECTRICAL SYMBOLS

ED100 POWER DEMOLITION PLAN - OVERALL

A ED101 POWER DEMOLITION PLAN - BASE BUILDING - FIRST FLOOR

ED111 POWER DEMOLITION PLAN - ATCT

ED121 LIGHTING DEMOLITION PLAN - BASE BUILDING - FIRST FLOOR

ED131 LIGHTING DEMOLITION PLAN - ATCT

ED401 POWER DEMOLITION PLAN - ENLARGED PLANS

ED501 EXISTING PANEL SCHEDULES

ED502 EXISTING PANEL SCHEDULES

ED503 EXISTING PANEL SCHEDULES

ED504 EXISTING PANEL SCHEDULES

ED505 EXISTING PANEL SCHEDULES

ED506 EXISTING PANEL SCHEDULES

ED507 EXISTING PANEL SCHEDULES

ED801 DEMOLITION ONE-LINE DIAGRAM PART 1

ED802 DEMOLITION ONE-LINE DIAGRAM PART 2

A EL101 LIGHTING PLAN - BASE BUILDING - FIRST FLOOR

EL111 LIGHTING PLAN - ATCT

EP100 POWER PLAN - BASE BUILDING - OVERALL

A EP101 POWER PLAN - BASE BUILDING - FIRST FLOOR

EP111 POWER PLAN - ATCT

EP121 POWER PLAN - BASE BUILDING - ROOF

E401 POWER PLAN - ENLARGED PLANS

E501 PANEL SCHEDULES

A E502 PANEL SCHEDULES

E503 PANEL SCHEDULES

A E504 PANEL SCHEDULES

E505 PANEL SCHEDULES

E506 PANEL SCHEDULES

E551 LUMINAIRE AND CONTROL SCHEDULES

E552 EQUIPMENT CONNECTION SCHEDULE

E601 DETAILS

E602 DETAILS

E801 ONE-LINE DIAGRAM PART 1

E802 ONE-LINE DIAGRAM PART 2

B

B

B

TRAILER

SMOKE

SHELTER

BASE BUILDING

ATCT

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

REV. APPROVED

DATE

DESCRIPTION JCN

REDLINE

DATE

APVD

REVIEWED BY SUBMITTED BY APPROVED BY

SUBMITTER'S TITLE APPROVER'S TITLE

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

P L O

T D

A T

E /T

IM

E

/2

/2

:2

:5

A

M

SAN ANTONIO TXSAN ANTONIO (SAT) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

TERMINAL

ENGINEERING

GROUP

07/26/2024 22004815

SAT - D - ATCT - G003

GENERAL NOTES, LOCATION & VACINITY MAPS, &

BUILDING CODE ANALYSIS

SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER

SAT ATCT MODERNIZATION

SS

CG

WS

SAN ANTONIO ATCT

SAN ANTONIO

TEXAS

GENERAL NOTES

A. DIMENSION LINES SHOWN ON ARCHITECTURAL SHEETS ARE FROM COLUMN CENTER LINES AND FACE OF

MASONRY, CONCRETE OR FINISHED FACE OF WALL, UNLESS OTHERWISE NOTED.

B. FIELD VERIFY EXISTING CONDITIONS & DIMENSIONS BEFORE DEMOLITION OF BUILDING SYSTEMS.

COORDINATE DEMOLITION WITH THE WORK AND NOTIFY COR OF CONFLICTS. NO DEMOLITION WORK MUST

PROCEED UNTIL CONFLICTS ARE RESOLVED TO SATISFACTION OF COR.

C. FINISHES & ASSOCIATED ADJACENT FINISHES AFFECTED BY THE WORK MUST BE PATCHED AND REPAIRED TO MATCH EXISTING ADJACENT FINISHES TO THE SATISFACTION OF COR. PATCHING AND REPAIRING MUST BE OF EQUAL OR BETTER CONSTRUCTION AND QUALITY TO THE IMPACTED SURFACES. PATCH AND REPAIR

METHOD MUST BE APPROVED BY COR.

D. VERIFY DEMOLITION REQUIRED TO FACILITATE ROUTING OF MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION SYSTEMS. FOR DEMOLITION REQUIRED OUTSIDE OF AREA SHOWN ON ARCHITECTURAL DRAWINGS, REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION FOR

ITEMS TO BE REMOVED.

E. FACILITY WILL BE OCCUPIED BY FAA DURING CONSTRUCTION. COORDINATE THE WORK IN ADVANCE WITH COR TO AVOID DISRUPTING FAA OPERATIONS. MAINTAIN MEANS OF EGRESS DURING ABATEMENT, DEMOLITION, AND CONSTRUCTION ACTIVITIES. IF AN EXIT IS TEMPORARILY PLACED OUT OF USE DURING THE WORK, COORDINATE WITH COR FOR TEMPORARY EGRESS MEASURES. PROVIDE NECESSARY SIGNAGE WARNING BUILDING OCCUPANTS OF THE CHANGE, AND THE DIRECTION TO THE NEAREST EXIT. WORK AFFECTING EGRESS MUST BE COORDINATED WITH AND APPROVED IN WRITING BY COR, A MINIMUM OF 30

CALENDAR DAYS PRIOR TO PERFORMANCE OF WORK.

F. CLEAN CONSTRUCTION AREAS DAILY. DO NOT LEAVE CONSTRUCTION DEBRIS & EQUIPMENT IN OCCUPIED

AREAS.

G. MAINTAIN FIRE RATINGS OF FIRE RATED ASSEMBLIES IN FLOORS, PARTITIONS, WALLS, CEILINGS, ROOFS OR SMOKE BARRIERS PENETRATED BY DUCTS, ELECTRICAL CONDUITS, PIPES AND OTHER PENETRATIONS CAUSED BY THE WORK OF THIS PROJECT WITH AN APPROVED U.L. SYSTEM. COORDINATE WITH COR TO VERIFY EXISTING CONDITION OF BUILDING SYSTEMS (INCLUDING EXTERIOR WALLS, PARTITIONS, FLOORS, CEILINGS AND ROOFS) BEFORE DEMOLITION OR CONSTRUCTION.

H. DO NOT SCALE DRAWINGS.

I. EXISTING FAA COMPUTER AND OTHER SENSITIVE EQUIPMENT MUST REMAIN OPERATIONAL DURING CONSTRUCTION. COORDINATE WITH COR DEMOLITION WORK THAT MAY CAUSE VIBRATION OR DISRUPTION TO EQUIPMENT IN THE WORK AREA. PROVIDE DUST PROOF PARTITIONS AND BARRIERS AS REQUIRED BY COR TO PROTECT ACTIVE EQUIPMENT. COORDINATE WITH COR NOT TO DISRUPT FAA OPERATIONS, TYP.

ACCOMODATE THE 24-HOUR OPERATIONAL FACILITY SCHEDULE AND REQUIREMENTS.

J. PROVIDE OPENINGS THROUGH EXISTING WALLS (GWB, MASONRY, AND CONCRETE) FOR PROVISION OF ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL & FIRE PROTECTION EQUIPMENT. COORDINATE SIZE

& LOCATION WITH MECHANICAL, PLUMBING, ELECTRICAL, AND FIRE PROTECTION.

K. AREAS ADJACENT TO WORK AREA AND BUILDING(S) CONTAIN HAZARDOUS MATERIALS (HAZMAT) - ACM AND LCC. IF HAZMAT IS ENCOUNTERED, CEASE WORK IN THAT AREA AND NOTIFY COR TO PLAN HOW TO PROCEED

WITH THE WORK.

L. AS REQUIRED, REMOVE, SAVE FOR REUSE, AND REINSTALL FURNITURE THAT IS AFFECTED BY THE WORK.

PROTECT FURNITURE FROM DAMAGE. DOCUMENT EXISTING FURNITURE CONDITIONS AND COORDINATE WITH

COR.

M. UNSCHEDULED INTERRUPTIONS TO BUILDING SERVICES/UTILITIES WILL NOT BE TOLERATED. WORK REQUIRING PERMANENT, TEMPORARY OR PARTIAL OUTAGES MUST BE SCHEDULED AND APPROVED IN

WRITING BY COR AT LEAST 10 WORKING DAYS IN ADVANCE OF PERFORMANCE OF THE WORK.

N. EXISTING BUILDING FLOOR PLANS AND SITE PLANS FOR THE EXISTING BUILDING CONSTRUCTION PRESENTED IN THIS DOCUMENT WERE OBTAINED FROM THE FAA. FIELD VERIFY EXISTING CONDITION PRIOR TO

CONSTRUCTION WORK REQUIRED.

O. PROVIDE TEMPORARY DUST PROOF PARTITIONS (DP) WITH ACCESS DOORS AS DIRECTED BY COR.

TEMPORARY DP PARTITIONS MUST BE ACCESSIBLE TO FAA PERSONNEL AND NOT RESTRICT EGRESS, MECH, ELEC, FAA, OR FIRE PROTECTION EQUIPMENT. TEMPORARY DP ARE SHOWN SCHEMATICALLY ON DRAWINGS.

PROVIDE TO COR DRAWINGS INDICATING LOCATIONS OF DUSTPROOF PARTITIONS FOR APPROVAL PRIOR TO THE WORK. VERIFY FINAL LOCATIONS & SPECIAL REQUIREMENTS WITH COR BEFORE INSTALLATION.

ANCHORING DEVICES FOR DUSTPROOF CONSTRUCTIONS, INTO CONCRETE OR OTHER BUILDING SURFACES, MUST BE REMOVED UPON COMPLETION OF THE WORK. ANCHORING HOLES MUST BE PATCHED AND

REPAIRED TO MATCH ADJACENT SURFACES. DUSTPROOF PARTITION CONFIGURATION MUST BE INCLUDED IN

RISK MITIGATION PLAN AND TEMPORARY EGRESS PLAN.

P. SECURITY RELATED WORK, INCLUDING ACCESS CONTROL AND COORDINATING ELECTRICAL DOOR HARDWARE, MUST BE DONE BY THE FAA'S APPROVED SECURITY CONTRACTOR (SSDI) WHO MUST BE

RETAINED BY CONTRACTOR FOR THIS PROJECT.

Q. WORK SPECIFIED IN ROOMS/AREAS WITH BREAKLINES INCLUDES WORK FOR ENTIRE AREA, UNLESS

OTHERWISE NOTED.

R. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS OR PIPE VALVES. REQUEST PERMISSION IN WRITING OF FAA 10 WORKING DAYS IN ADVANCE FOR EACH CASE OF BREAKER OR PIPE VALVE OPERATION.

DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER OR PIPE VALVE. COORDINATE DE-ENERGIZING, AND ENERGIZING, OF PANELBOARDS FOR CIRCUIT BREAKER REPLACEMENT WITH COR.

S. WORK IN CONFINED SPACES OR AREAS MUST BE DONE IN ACCORDANCE WITH OSHA REQUIREMENTS, 29 CFR

1910.146 AND 1926.21(B)(6).

T. PRIOR TO CUTTING CONCRETE, USE MAGNETIC STEEL LOCATOR TO LOCATE ELECTRICAL CONDUITS EMBEDDED IN CONCRETE. AVOID CUTTING CONDUITS AS THEY MAY BE CRITICAL TO THE OPERATION OF THE

FACILITY. CONCRETE WORK MUST COMPLY WITH SILICA MANAGEMENT REQUIREMENTS.

U. DIMENSIONS (LAYOUTS, MOUNTING HEIGHTS, HEIGHTS ABOVE FINISH FLOOR, ETC.) AND CLEARANCES SHOWN ON THE DRAWINGS, IDENTIFIED IN SPECIFICATIONS, IDENTIFIED IN MANUFACTURERS' PRODUCT DATA, OR REFERENCED IN APPLICABLE ABA DOCUMENTS, CODES, AND CRITERIA FOR HANDICAPPED ACCESSIBILITY MUST BE HELD TRUE; PLUS OR MINUS TOLERANCES FROM THESE DIMENSIONS ARE NOT ALLOWED.

V. REFER TO OTHER DISCIPLINES FOR ADDITIONAL DEMOLITION REQUIRED. COORDINATE REMOVING EXISTING PARTITIONS AND ENCLOSURES TO ENABLE DEMOLITION OF CONCEALED SYSTEMS TO BE DEMOLISHED.

PATCH AND REPAIR DAMAGED FINISHES, AND/OR FIRE RATED ASSEMBLIES TO MATCH EXISTING ADJACENT

SURFACES.

W. ROOM NAMES AND NUMBERS AS INDICATED ARE FOR PROJECT DOCUMENTATION PURPOSES ONLY.

COORDINATE WITH COR FINAL ROOM NAMES AND NUMBERS AS ESTABLISHED BY SAT FACILITY IMPROVEMENT ANALYSIS FOR ANY ROOM SIGNAGE, BUILDING AUTOMATION INTEGRATION, FIRE ALARM SYSTEM INTEGRATION, OR OTHER SYSTEM INTEGRATION WHICH RELIES ON ACTUAL FACILITY ROOM NAMES AND

NUMBERS.

X. ACCESSIBILITY STANDARDS FOR THIS PROJECT ARE THE: ‘ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS (2015)’ (ABA-2015), AND THE LOCAL JURISDICTION’S ACCESSIBILITY REQUIREMENTS. CONSTRUCTION MUST C0MPLY WITH ABA-2015, OR LOCAL JURISDICTION'S ACCESSIBILITY REQUIREMENTS OF WHICHEVER IS

STRICTER.

Y. MODULAR OFFICE SPACE MANUFACTURER'S DESIGNATED PROFESSIONAL ENGINEER MUST DESIGN FOUNDATIONS, STAIRS, AND A RAMP IN ACCORDANCE WITH THE PERFORMANCE REQUIREMENTS INDICATED.

BUILDING CODE ANALYSISLOCATION MAP

KEY PLAN

NOTE:

BUILDING FLOOR PLANS ARE

DIVIDED INTO BUILDING DRAWING

PARTS. THIS DIAGRAM

REPRESENTS THE DIVISION

INTENDED FOR THE DIFFERENT

AREAS OF THE BUILDING.

NPROJECT LOCATION:

FEDERAL AVIATION ADMINISTRATION

SAT ATCT AND BASE BUILDING

SAN ANTONIO INTERNATIONAL AIRPORT

SAN ANTONIO, TX

PROJECT

LOCATION

APPLICABLE CODES AND REGULATIONS INTERNATIONAL BUILDING CODE (IBC), 2021 EDITION

INTERNATIONAL EXISTING BUILDING CODE (IEBC), 2021 EDITION

ICC (ANSI) A117.1-2017, STANDARD FOR ACCESSIBLE AND USABLE

BUIDINGS AND FACILITIES

ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS (2015)

OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION (OSHA) INDUSTRY

SAFETY & HEALTH STANDARDS (29 CFR 1910 AND 1926 - CURRENT ISSUE)

FAA TERMINAL FACILITIES DESIGN STANDARDS (TFDS),

AUGUST 2022 VERSION

INTERNATIONAL FIRE CODE, 2021 EDITION

INTERNATIONAL MECHANICAL CODE, 2021 EDITION

INTERNATIONAL PLUMBING CODE, 2021 EDITION

NFPA 70 (NATIONAL ELECTRICAL CODE (NEC)), 2020 EDITION

NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2022 EDITION

NFPA 75, STANDARD FOR THE FIRE PROTECTION OF INFORMATION

TECHNOLOGY EQUIPMENT, 2020 EDITION

NFPA 101 - LIFE SAFETY CODE, 2021 EDITION

CODE SUMMARY AIR TRAFFIC CONTROL TOWER

CONSTRUCTION TYPE: TYPE IB

IBC: MIXED USE; GROUP B AND GROUP S

NFPA 101: EXISTING BUSINESS AND ACCESSORY STORAGE

SPRINKLERED: NO

FIRE ALARM: YES

HEIGHT: 195 FT (ACTUAL) / 240 FT (ALLOWABLE)

AREA: 750 SQFT (ACTUAL) / UNLIMITED (ALLOWABLE)

TRACON BASE BUILDING:

CONSTRUCTION TYPE: IIB

OFFICE TRAILER CONSTRUCTION TYPE: IIB (EQUIVALENT)

IBC: MIXED USE; GROUP B AND GROUP S

NFPA 101: EXISTING BUSINESS AND ACCESSORY STORAGE

SPRINKLERED: NO

FIRE ALARM: YES

STORIES 1 (ACTUAL) / 3 (ALLOWABLE)

HEIGHT: 20 FT (ACTUAL) / 55 FT (ALLOWABLE)

AREA: 17,577 SQFT (ACTUAL) / 23,000 SQFT (ALLOWABLE)

OFFICE TRAILER AREA: 705 SQFT (TRAILER) + 17,577 SQFT (BASE

BUILDING) = 18,282 SQFT (TOTAL)

EGRESS REQUIREMENTS MAX TRAVEL DISTANCE: 200 FT (BUSINESS)

MAX COMMON PATH OF TRAVEL (BUSINESS): 75 FEET

MAX DEAD END (BUSINESS): 20 FT

MIN CLEAR WIDTH (CORRIDOR): 44 INCHES

MIN CLEAR WIDTH (EXIT DOOR): 32 INCHES

SEISMIC DESIGN CATEGORY A

07/26/2024

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

REV. APPROVED

DATE

DESCRIPTION JCN

REDLINE

DATE

APVD

REVIEWED BY SUBMITTED BY APPROVED BY

SUBMITTER'S TITLE APPROVER'S TITLE

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

P L O

T D

A T

E /T

IM

E

/2

/2

:2

:5

A

M

SAN ANTONIO TXSAN ANTONIO (SAT) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

TERMINAL

ENGINEERING

GROUP

07/26/2024 22004815

SAT - D - ATCT - G004

GENERAL ABBREVIATIONS

SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER

SAT ATCT MODERNIZATION

SS

CG

WS

SAN ANTONIO ATCT

SAN ANTONIO

TEXAS

GENERAL ABBREVIATIONS

A A AMPERE

AAV AUTOMATIC AIR VENT

AC ALTERNATING CURRENT, ASPHALT CONCRETE, AIR

COMPRESSOR

ACC AIR COOLED LIQUID CHILLER

ACD ADDRESSABLE CONTROL DEVICE

ACF ACCESS FLOOR SYSTEM

ACM ASBESTOS CONTAINING MATERIAL

ACP ACOUSTICAL CEILING PANEL

ACT ACCESS CONTROL TERMINAL, ACOUSTICAL CEILING TILE

ACU AIR CONDITIONING UNIT

A/C AIR CONDITIONING

AD AREA DRAIN, ACCESS DOOR

ADJ ADJACENT, ADJUSTABLE

ADR ACCESS DOOR

ADTN ADMINISTRATIVE DATA TRANSMISSION NETWORK

AED AUTOMATED EXTERNAL DEFIBRILLATOR

AF AMPERE FRAME, AIR FLOW SENSOR

AFF ABOVE FINISH FLOOR

AFMS AIR FLOW MEASURING STATION

AH AIR HANDLING UNIT

AHU AIR HANDLING UNIT

AIC AMPERES INTERRUPTING CAPACITY

AID ADDRESSABLE INTERFACE DEVICE

AIF AIR INTAKE FILTER

AL ALUMINUM

ALT ALTERNATE

AM AMP METER

AMM AMMETER

ANN ANNUNCIATOR

AO ANALOG OUTPUT

AP ANNUNCIATOR POINT

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATELY

ARCH ARCHITECT(URAL)

ARTCC AIR ROUTE TRAFFIC CONTROL CENTER

ARTS AUTOMATED RADAR TERMINAL SYSTEM

AS AIR SEPARATOR

ASSY ASSEMBLY

AT AMPERE TRIP, AIR TRAFFIC

ATB AIR TERMINAL BOX

ATS AUTOMATIC TRANSFER SWITCH

AUX AUXILIARY

AV ACID VENT

AVG AVERAGE

AWG AMERICAN WIRE GUAGE

AWP ACOUSTICAL WALL PANEL

AWR AUTOMATION WING REHABILITATION

& AND

@ AT

B B BOILER, BUILDING

BAT CHR BATTERY CHARGER

BC BARE COPPER

BD BOARD, BACK-DRAFT DAMPER, BLOWDOWN

BEL BELOW

BF BLIND FLANGE

BFP BACK FLOW PREVENTER

BFV BUTTERFLY VALVE

BFW BOILER FEED WATER

BHP BRAKE HORSE POWER

BKR BREAKER

BLDG BUILDING

BLKG BLOCKING

BLO BLOWER

BLV BALANCING VALVE

BM BENCH MARK, BEAM

BOCA BUILDING OFFICIALS AND CODE ADMINISTRATORS

INTERNATIONAL, INC

BOD BOTTOM OF DUCT, BASIS OF DESIGN

BOP BOTTOM OF PIPE

BOT, BOTT BOTTOM

BPU BREAKER PROGRAMMING UNIT

BRG BEARING

BSMT BASEMENT

BTU BRITISH THERMAL UNIT

BTU/H BRITISH THERMAL UNIT PER HOUR

BV BALL VALVE

BWP BACK WATER PREVENTER

BWV BACK WATER VALVE

C C CONDUIT

CA COMBUSTION AIR

CAB CABINET

CB CIRBUIT BREAKER

CC COOLING COIL

CCMS CENTRAL CONTROL AND MONITORING SYSTEM

CD CONTROL DAMPER, CEILING DIFFUSER, CONDENSATE

DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FOOT

CG CEILING GRILLE

CH CHILLER

CI CURB INLET, CAST IRON

CIP CAST IRON PIPE, CAST IN PLACE

CIR CIRCULATING

CKT CIRCUIT

CL CENTER LINE

CLF CURRENT LIMITING FUSE

CLG CEILING

CLR CLEAR

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT, CONDUIT ONLY

COL COLUMN

COMB COMBINATION, COMBINE, COMBUSTION AIR

COMM COMMUNICATIONS

COMP COMPRESSIBLE, COMPRESSED

CONC CONCRETE

COND CONDITION, CONDENSATE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS, CONTINUATION

CONTR CONTRACTOR

COORD COORDINATE

COR CONTRACTING OFFICERS REPRESENTATIVE

CP CONTROL PANEL, CIRCULATING PUMP

CPC CRITICAL POWER CENTER

CPDS CRITICAL POWER DISTRIBUTION SYSTEM

CPT CARPET

CPU CENTRAL PROCESSING UNIT

CR CEILING REGISTER, CONTROL RELAY

CRAC COMPUTER ROOM AIR CONDITIONING UNIT

CRAH COMPUTER ROOM AIR HANDLING UNIT

CRU COMPUTER ROOM UNIT

CS CONTROL SWITCH

CT CABLE TRAY, COOLING TOWER

CTR CENTER, COOLING TOWER WATER RETURN

CTS COOLING TOWER WATER SUPPLY

CU CONDENSING UNIT

CW DOMESTIC COLD WATER

CWR CHILLER WATER RETURN

CWS CHILLER WATER SUPPLY

CWV COMBINATION WASTE AND VENT

CU CONDENSING UNIT

CV CONTROL VALVE, CONSTANT VOLUME TERMINAL

CYD CUBIC YARD

D D DRAIN, DELTA CONNECTION, DIFFUSER, DAMPER

DB DIRECT BURIAL, DRY BULB

DBL DOUBLE

DC DIRECT CURRENT

DDCP DIRECT DIGITAL CONTROL PANEL

DEG DEGREE(S)

DET DETAIL

DGP DATA GATHERING PANEL

DI DROP INLET, DAMPER POSITION INDICATOR, DIGITAL

INPUT

DIA DIAMETER

DIAG DIAGONAL

DISC DISCONNECT

DISP DISPENSER

DIST DISTRIBUTION

DL DEAD LOAD

DM DEMAND METER

DN DOWN

DO DIGITAL OUTPUT

DOM DOMESTIC

DP DUSTPROOF PARTITION, DIFFERENTIAL PRESSURE

SWITCH

DPDT DOUBLE POLE DOUBLE THROW

DPNL DISTRIBUTION PANEL

DPST DOUBLE POLE SINGLE THROW

DR DOOR

DWG(S) DRAWING(S)

E EA EACH, EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECP ENGINE CONTROL PANEL

EDAM ELECTRICAL DATA ACQUISITION AND MONITORING

EF EXHAUST FAN

EFF EFFICIENCY

EG ENGINE GENERATOR, EXHAUST GRILLE

EH ELECTRIC HEATER

EHC ELECTRIC HEATING COIL

EL, ELEV ELEVATION, ELEVATOR

ELEC ELECTRIC(AL)

EMD ESTIMATED MAXIMUM DEMAND

EMERG EMERGENCY

EMT ELECTRICAL METAL TUBING

ENT, ENTR ENTRANCE

EOR ENGINEER OF RECORD

EP EXHAUST PIPE

EPMS ELECTRICAL POWER MONITORING SYSTEM

EPX EPOXY

EQ EQUAL

EQUIP EQUIPMENT

ER EXHAUST REGISTER

ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM

ES EXHAUST SILENCER

ESD ELECTROSTATIC DISSIPATIVE

ET ELECTRIC HEAT TRACE

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXH EXHAUST

EXIST, EX EXISTING

EXP EXPOSED

EXPN EXPANSION

EXT EXTERIOR

F F FILTER, FIRE LINE

FA FAN COOLED

FAA FEDERAL AVIATION ADMINISTRATION

FC FAN COIL UNIT

FCO FLOOR CLEANOUT

FCV FLOW CONTROL VALVE

FD FIRE DAMPER OR FLOOR DRAIN

FD/SD COMBINATION FIRE AND SMOKE DAMPER

FDR FEEDER

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FEPC FRONT END PERSONAL COMPUTER

FFE FINISHED FLOOR ELEVATION

FHC FIRE HOSE CABINET

FI FLANGE INSULATION, FLOW INDICATOR

FIA FACILITY IMPROVEMENT ANALYSIS

FIN FINISH

FIX, FIXT FIXTURE

FL, FLR FLOOR

FLA FULL LOAD AMPERES

FLEX FLEXIBLE DUCT

FLG FLANGE

FLUOR FLUORESCENT

FM FLOW METER, FIRE MAIN

FO FIBER OPTIC

FOL FUEL OIL LEVEL

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOT FIBER OPTIC TERMINAL

FOV FUEL OIL VENT

FPM FEET PER MINUTE

FPU FIELD PROGRAMMING UNIT

FRP FIBER GLASS REINFORCED PLASTIC

FS FLOW SWITCH

FT, ' FEET

FTR FINNED TUBE RADIATION

FV FULL VOLTAGE

FZ FREEZESTAT

G G GAS

GA GAGE, GAUGE

GALV GALVANIZED

GEN GENERATOR

GFE GOVERNMENT FURNISHED EQUIPMENT

GFM GOVERNMENT FURNISHED MATERIAL

GL GLASS

GND GROUND, GROUND CONNECTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GR GRILLE

GRV GRAVITY VENT

GS GAS SENSOR

GV GATE VALVE

GW GLYCOL WASTE

GWB GPYSUM WALLBOARD

GWH GAS WATER HEATER

H H HUMIDISTAT

HAZMAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HEATING COIL

HCS HOST COMPUTER ROOM

HDW HARDWARE

HE HEAT EXCHANGER

HERM HERMETIC

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HORSE POWER, HEAT PUMP, HIGH PRESSURE

HPL HIGH PRESSURE LAMINATE

HPS HIGH PRESSURE SODIUM, HIGH PRESSURE STEAM

HPT HIGH POINT

HR HOUR

HS HIGH STRENGTH, HUMIDITY SENSOR

HT HEIGHT

HTG HEATING

HTP HOT TAP (W/ STOPPLE FITTING)

HTR HEATER

HU HUMIDIFIER

HVAC HEATING/VENTILATING/AIR CONDITIONING

HW DOMESTIC HOT WATER

HWL HIGH WATER LEVEL

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HZ HERTZ

HWY HIGHWAY

I IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IEWH INSTANTANEOUS ELECTRIC WATER HEATER

IF INSIDE FACE, INTERNAL FILTER

IN, " INCH

INST INSTRUMENTATION

INSUL INSULATION

INT INTERIOR

INT'L INTERNATIONAL

INV INVERT

ITEA INFORMATION TECHNOLOGY EQUIPMENT AREA

ITER INFORMATION TECHNOLOGY EQUIPMENT ROOM

J J JUNCTION

JB JUNCTION BOX

JC JANITOR'S CLOSET

K KCMIL THOUSAND CIRCULAR MILS

KVA KILOVOLT AMPERE

KW KILOWATTS

L LAN LOCAL AREA NETWORK

LBP LEAD-BASED PAINT

LBS, # POUNDS

LCC LEAD CONTAINING COATING

LCP LOCAL CONTROL PANEL

LCV LEVEL CONTROL VALVE

LF LINEAR FEET

LG LEVEL GAUGE

LL LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LOD LIMIT OF DISTURBANCE

LONG LONGITUDINAL

LP LOW POINT

LPS LOW PRESSURE STEAM

LS LEVEL SWITCH

LT LIGHT

LTG LIGHTING

M M MOTOR

MAS MASONRY

MAT MATERIAL

MAX MAXIMUM

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MET METAL

MFG(R) MANUFACTURER

MG MOTOR GENERATOR

MIL MILLIMETER

MIN MINIMUM

MO MASONRY OPENING

MOD MODIFICATION

MS MOISTURE SENSOR

MTG MOUNTING, MOUNTED

N N/A NOT APPLICABLE

NAM NEGATIVE AIR MACHINE

NARACS NATIONAL RADIO COMMUNICATIONS SYSTEM

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO, # NUMBER

NOM NOMINAL

NPT NATIONAL PIPE THREAD

NTS NOT TO SCALE

O OA OUTSIDE AIR

OC ON CENTER

OD OUTSIDE DIAMETER, OPEN DRAIN

OF OUTSIDE FACE

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OFD OVERFLOW ROOF DRAIN

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OSHA OCCUPATIONAL SAFETY & HEALTH ADMINISTRATION

OSW OPERATIONS SUPPORT WING

P P PUMP, PHASE, POLE

PACM PRESSUMED ASBESTOS CONTAINING MATERIAL

PBX PRIVATE BRANCH EXCHANGE

PC PRESSURE CONTROL SWITCH

PCB POLYCHLORINATED BIPHENYLS

PCF POUNDS PER CUBIC FOOT

PD PRESSURE DIFFERENTIAL

PDI PRESSURE DIFFERENTIAL INDICATOR

PDS PRESSURE DIFFERENTIAL SENSOR

PH PHASE

PHC PREHEAT COIL

PI POINT OF INTERSECTION, PRESSURE INDICATOR

PIV POST INDICATOR VALVE

PL PROPERTY LINE, PLATE

PLAM PLASTIC LAMINATE

PLF POUNDS PER LINEAR FOOT

PNL PANEL

POC POINT OF CONNECTION

PRV PRESSURE REDUCING VALVE

PS PRESSURE SENSOR

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PSM POWER SYSTEMS MODIFICATION

PT PAINT, POINT OF TANGENCY

PTVC POINT OF VERTICAL CURVATURE

PVC POLYVINYL CHLORIDE

PVDS PORTABLE VISUAL DISPLAY SYSTEM

PVI POINT OF VERTICAL INTERSECTION

PVMT PAVEMENT

PVT POINT OF VERTICAL TANGENCY

R R RISER, RADIUS

RA RETURN AIR

RAD RADIUS

RCP REFLECTED CEILING PLAN

RCRA RESOURCE CONSERVATION AND RECOVERY ACT

RD ROOF DRAIN

RECEPT RECEPTACLE

REF REFERENCE

REG REGISTER

REINF REINFORCING

REQ'D REQUIRED

REV REVERSE, REVISION

RF RETURN FAN

RGS RIGID GALVANIZED STEEL

RHC REHEAT COIL

RM ROOM

RO ROUGH OPENING

RV REFRIGERANT VENT

S S SMOKE DETECTOR

SA SUPPLY AIR

SAN SANITARY

SAP SOUND ABSORBING PANEL

SCH, SCHED SCHEDULE

SCWD SOLID CORE WOOD

SD SMOKE DAMPER

SEC SECTION

SF SUPPLY FAN, SQUARE FEET

SHT SHEET

SIG SIGNAL

SIM SIMILAR

SM SPRINKLER MAIN

SP SUMP PUMP/SEWAGE PUMP, STATIC PRESSURE

INDICATOR

SPEC SPECIFICATIONS

SQ SQUARE

SRF SAFETY RUBBER FLOOR TILE

SRGG SIGNAL REFERENCE GROUND GRID

SRS SIGNAL REFERENCE STRUCTURE

SSDI SECURITY SYSTEMS DESIGN AND INTEGRATION

SSTL, SS STAINLESS STEEL

ST STEAM, STREET

STA STATION

STC SOUND TRANSMISSION CLASS

STD STANDARD

STE STANDARD TAPERED END

STGP SIGNAL TRANSPORT GROUND PLANE

STL STEEL

STOR STORAGE

STRUC STRUCTURAL, STRUCTURE

SUCT SUCTION

SUSP SUSPENDED

SW SWITCH

SYM SYMMETRICAL

T T THERMOSTAT, TREAD

TBD TO BE DETERMINED

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TC TEMPERATURE CONTROL SWITCH

TELCO TELECOMMUNICATION, TELEPHONE COMPANY LINE

TEMP TEMPERATURE

TI TEMPERATURE INDICATOR

TIC TEMPERATURE INDICATING CONTROLLER

TK TANK

TM&O TELECOMMUNICATIONS MANAGEMENT AND OPERATIONS

TOC TOP OF CONCRETE

TOS TOP OF STEEL

TOW TOP OF WALL

TRACON TERMINAL RADAR APPROACH CONTROL FACILITY

TRANS TRANSVERSE

TS TEMPERATURE SENSOR, TAMPER SWITCH

TYP TYPICAL

U UBC UNIFORM BUILDING CODE

UH UNIT HEATER

UL UNDERWRITER'S LABORATORIES, INC.

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SYSTEM

UTIL UTILITY

UV UNIT VENTILATOR

V V VOLT

VAT VINYL ASBESTOS TILE

VAV VARIABLE VOLUME TERMINAL

VB VINYL BASE

VBT VINYL BASE & TRIM COMPONENTS

VC VERTICAL CURVE

VCT VINYL COMPOSITION TILE

VD VOLUME DAMPER

VERT VERTICAL

VF VERTICAL FEET, VENTILATION FAN

VFD VARIABLE FREQUENCY DRIVE

VGWB VINYL SURFACED GYPSUM WALL BOARD

VIF VERIFY IN FIELD

VP VELOCITY PRESSURE, VACUUM PRODUCER

VS VIBRATION SWITCH

W W WATT

W/ WITH

WD WOOD

WG WATER GAGE

WJHTC WILLIAM J. HUGHES TECHNICAL CENTER

W/O WITHOUT

WP WEATHERPROOF

WT WEIGHT

X XFER, XFR TRANSFER

XFMR TRANSFORMER

Y Y WYE CONNECTION

YD YARD

TEMPORARY INTERIOR

WALL WITH DOOR

TEMPORARY DUSTPROOF

PARTITION WITH DOOR

DOOR NUMBER

WALL TYPE NUMBER

SUPPLY AIR DUCT

EMERGENCY SHOWER AND EYEWASH

FLOOR DRAIN

ELECTRICAL PANEL

SYMBOLS

LOUVER NUMBER

FLOOR SINK

FLOOR HATCH

ROOF HATCH

LADDER

SUMP

LOCKERS

FIRE EXTINGUISHER

CABINET

ACOUSTICAL BAFFLES

DPDP

2A

FIRE RESISTANCE RATING

PARTITION TYPE DESIGNATION

FD FD

FS

RH

SURFACE MOUNTED SEMI-RECESSED

MATERIALS

EARTH

EARTH, ETC

GRAVEL SAND

CONCRETE TER ASPH

CONCRETE, ETC

STEEL ALUMINUM OTHER

METALS

CMU

MASONRY

BRICK TILE

FINISH EL BLKG STUD

PARTITION

WOOD

GYPSUM

GYPSUM

PLYWOOD

LARGE SCALE SMALL SCALE

GLASS

BATT OR

LOOSE

RIGID

INSULATION

ELEVATION

SYMBOLS

CONTRACTOR'S ACCESS ROUTE

VEHICULAR TRAFFIC DIRECTION

RAISED FLOOR PANELS

WALL

DEMOLITION WALL

SUSPENDED CEILING SYSTEM

RECESSED

LIGHT FIXTURES

LIGHT FIXTURES

SUPPLY AIR

CEILING DIFFUSER

RETURN AIR

CEILING REGISTER

TRANSFER AIR GRILLE

REFER TO ELECTRICAL

DRAWINGS FOR SYMBOLS

REFER TO MECHANICAL

DRAWINGS FOR SYMBOLS

LAVATORY

URINAL

WATER CLOSET

ELECTRIC WATER

COOLER

ARCHITECTURAL LEGEND

2 X 2 2 X 4

EXISTING NEW CONSTRUCTION

DEMOLITION DOOR AND FRAME

REFERENCE

COLUMN LINE GRID DESIGNATION

CENTER LINES

MATCH LINE SYMBOL

BREAK LINES

ELEVATION SYMBOL

DRAWING/DETAIL TITLE

DETAIL TITLE REFERENCE

SECTION CUT

ELEVATION REFERENCE

PLAN NORTH/PROJECT NORTH

ROOM/AREA NUMBER

DEMOLITION

REVISION

REVISION DESIGNATION

SHEET NOTE NUMBER

DEMOLITION NOTE

HAZMAT NOTE, ASBESTOS

REFERTO HAZMAT DWGS FOR

SPECIFIC INFORMATION.

HAZMAT NOTE, LEAD PAINT

REFERTO HAZMAT DWGS FOR

SPECIFIC INFORMATION.

GRAPHIC SCALE

Name Elevation

A8 View Name

1/8" = 1'-0"AXXX

SHEET ON WHICH DETAIL

IS DRAWN OR SCHEDULED

DETAIL NUMBER

A1

A001

SHEET ON WHICH

DETAIL IS DRAWN

DETAIL DESIGNATION

A1

A001

A701

A7

A6

A5

A8 E1

A001

PROJECT NORTH

MAGNETIC NORTH

KEY NORTH

Room Name

BLS202BLS202

CLOUD TO ENCOMPASS

REVISED AREA

1 RFI-0000

04 8 16268

SCALE: 1/8"=1'-0"

GENERAL LEGEND

1,2,3

1,2,3

N

A1

A001

DETAIL DESIGNATION

SHEET ON WHICH

DETAIL IS DRAWN DETAIL

DESIGNATION

SHEET ON WHICH

DETAIL IS DRAWN

ABATE ACM MANAGE ACM

IN PLACE

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

REV. APPROVED

DATE

DESCRIPTION JCN

REDLINE

DATE

APVD

REVIEWED BY SUBMITTED BY APPROVED BY

SUBMITTER'S TITLE APPROVER'S TITLE

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

P L O

T D

A T

E /T

IM

E

/2

/2

:2

:5

A

M

SAN ANTONIO TXSAN ANTONIO (SAT) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

TERMINAL

ENGINEERING

GROUP

07/26/2024 22004815

SAT - D - ATCT - G005

GENERAL AND ARCHITECTURAL LEGENDS

SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER

SAT ATCT MODERNIZATION

SS

CG

WS

SAN ANTONIO ATCT

SAN ANTONIO

TEXAS

Twy T

Twy T

Skyplace Boulevard

Twy R W

I

N

D

S

O

C

K

RSA / OFZ

RSA / OFZ

RSA / OFZ

Runway 13L-31R

5519' X 100'

RSA / OFZ

RSA / OFZ

RSA / OFZ

RSA / OFZ

W

I

N

D

S

O

C

K

RSA / OFZ

RSA / OFZ

P

A

P

I

S

Twy R

Twy R

RSA / OFZ

Twy R

Twy J

W

I

N

D

S

O

C

K

RSA

RSA

RSA

RSA

Runway 13R-31L

8502' X 150'

P

A

P

I

S

RSA

RSA

RSA

Twy G

Twy H

Twy H

Twy H

Twy H

B7

B6

Twy N12

A17

A12

B8B5

A13

A9

Twy N11

B3

B4

A10

A8

Twy N2

B1

B2

A7

A11

Twy N10

Sandau Road

A6 A5

A4

Twy N9

A3

A2A1

Twy F

Twy N1

A15 A14

RSA

Twy G

W

I

N

D

S

O

C

K

Twy G

Twy N13

Twy N3

Twy E

RSA

RSA

RSA

RSA

Twy G

P

A

P

I

S

RSA

W

I

N

D

S

O

C

K

RSA

RSA

RSA

RSA

I-410

E Bitters Rd.

Twy D

Twy D

GS

RVR

REIL

REIL

BEACON

RTR

RTR

TERMINAL

B

ATC

CONRAC

LONG TERM

PARKING

TERMINAL

A

LOC

RVR

PCU

GS

IM

I-410

RED

PARKING LOT

IM

Northern Boulevard

GREEN

PARKING LOT

Dee Howard Way

RTR

ORANGE

PARKING LOT

QTA

RGL

RGL

GS

RGL

RVR

ILS

PURPLE

PARKING LOT

RGL

RTR

REIL

REIL

RVR

Twy D

Tw y Z

Tw y K

Tw y Y

Tw y J

Tw y S

Tw y S

Tw y A

Tw y A

Tw y A

Tw y D

Tw y D

G3

G2

G1 Tw y W

Tw y N

RSA

RSA

W

I

N

D

S

O

C

K

M

A

L

S

RSA

RSA

RSA

R

G

L

R

G

L

Run way

4-

' X

0'

RSA

Tw y N

Tw y N

RSA

Tw y N RSA

Tw y N

RSA

M c Allister Fwy.

(Hwy. 281)

Tw y P

Airport Boulevard

John Saunders D rive

John C ape

Jones-M altsberger R oad

NE Entr an ce Roa d

First Ave.

Paul Wilkins

W. Cargo

S. Terminal Drive

Twy J

Twy V

Twy M

Tw y L

Tw y B

Tw y B

A

R

P

REV. APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE APVD

REVIEWED BY SUBMITTED BY APPROVED BY

SUBMITTER'S TITLE APPROVER'S TITLE

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

PL

O

T D

AT

E/

TI

M

E:

SAN ANTONIO TXSAN ANTONIO (SAT) ATCT

CENTRAL SERVICE AREA FORT WORTH, TX

TERMINAL

ENGINEERING

GROUP

22004815

SAT-D-ATCT-G006

GENERAL LOCATION PLAN

SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER

SAT ATC MODERNIZATION

T. RECINE

T. MLSEK

S. BUTLER / S. DAVIS

G006

A8 GENERAL LOCATION PLAN

NTS

LEGEND

HAUL ROUTE

-SHEET NOTES

1. HAUL ROUTE FROM HWY I-410 WESTBOUND

2. HAUL ROUTE TO HWY I-410 EASTBOUND

3. HAUL ROUTE FROM HWY I-410 EASTBOUND

4. HAUL ROUTE TO HWY I-410 WESTBOUND

5. HAUL ROUTE FROM HWY 281 NORTHBOUND

6. HAUL ROUTE FROM HWY 281 SOUTHBOUND

7. HAUL ROUTE TO HWY 281 NORTHBOUND AND SOUTHBOUND

WORK SITE LOCATION

SAN ANTONIO ATCT

SAN ANTONIO

TEXAS

07/26/2024

TEXAS REGISTERED

ENGINEERING FIRM F-2966

THE RECORD

COPY OF THIS DRAWING

IS ON FILE AT THE OFFICES OF

FOR THE PURPOSES OF REFERENCE,

MANAGEMENT UNDER THE AUTHORITY OF

COORDINATION, AND/OR FACILITY

ARCHITECT/ENGINEER OF RECORD

THIS ELECTRONIC DOCUMENT IS RELEASED

NOT BE MODIFIED BY ANY PERSON

IT IS RELEASED.

UNDER WHOSE AUTHORITY

OTHER THAN THE PROFESSIONAL

THIS ELECTRONIC DOCUMENT MAY

JACOBS ENGINEERING GROUP INC

777 MAIN ST., FORT WORTH TX, 76102

11/17/23

TEXAS REGISTERED

ENGINEERING FIRM F-2966

TX94575

ANTHONY T. RECINE

THE RECORD

COPY OF THIS DRAWING

IS ON FILE AT THE OFFICES OF

FOR THE PURPOSES OF REFERENCE,

MANAGEMENT UNDER THE AUTHORITY OF

COORDINATION, AND/OR FACILITY

ARCHITECT/ENGINEER OF RECORD

THIS ELECTRONIC DOCUMENT IS RELEASED

NOT BE MODIFIED BY ANY PERSON

IT IS RELEASED.

UNDER WHOSE AUTHORITY

OTHER THAN THE PROFESSIONAL

THIS ELECTRONIC DOCUMENT MAY

JACOBS ENGINEERING GROUP INC

777 MAIN ST., FORT WORTH TX, 76102

11/17/23

TEXAS REGISTERED

07/28/2023 01/26/2024

7/

/2

:5 3:

P

M

F.H.

UGP

UGP

UGP

UGP

G.P.

G.P.

798.86

798.55

798.51

798.60

798.74

798.95

798.60

798.49

798.50

798.39

798.00

797.74 797.75

797.72797.82

798.07

797.46

797.89

797.73

797.73 797.98

798.24

798.08 798.03

798.08

798.27

797.53 797.52

797.24

797.72 797.63

797.65 798.02

798.37

799.31

799.32

799.30

799.65 799.60

799.63

799.28 799.24

799.45

799.61

799.64

799.47

799.91

799.96

799.87

800.24

800.12 800.02

799.34

799.45 799.40

799.28 799.30

798.38 798.57

798.56 798.38

798.40 798.34

798.25 797.95

797.76 797.77

797.67

797.83 797.82

797.90

798.32 797.90 797.95

798.18

798.40

798.30

798.14

798.71 798.72

798.92

799.26

798.39 798.27

798.92

798.43

799.69

799.50

799.21

798.13

797.62

798.47

798.54

798.54

798.45

798.44 798.05

797.98 797.97

798.11

798.92

798.70 798.54

798.88

798.09 798.24

798.31

798.01

797.79

798.00

2/ 3/

2:

:5

PM

SAN ANTONIO TXSAN ANTONIO (SAT) ATCT

CENTRAL SERVICE AREA

TERMINAL

ENGINEERING

GROUP

CONSTRUCTION PHASING AND

STAGING PLAN

G007

A8 CONSTRUCTION PHASING AND STAGING PLAN

1" = 30'

PHASES 1 THROUGH 6

STAGING AREA

ATC TOWER

PHASE 3: USE TECH OPS AND AIR TRAFFIC FOR

FLEX/SWING SPACES DURING BASE BUILDING WORK.

LEGEND

PHASE 2: PROVIDE TEMPORARY PORTABLE RESTROOMS

OUTSIDE, AND USE CONFERENCE ROOM IN TECH OPS FOR

TEMPORARY BREAK ROOM DURING THE PLUMBING WORK.

COMPLETE ALL WORK IN ROOM 41 BEFORE ANY WORK IN THE

EXISTING TSS ROOM (ROOM 39).

W

TER

M

IN

AL D

R

IVE

STAGING AREA

PHASE 7

STAGING AREA

A. GENERAL

A.1. THE FOLLOWING NOTES REPRESENT MANY OF THE MAJOR REQUIREMENTS STATED IN "DIVISION 1 GENERAL REQUIREMENTS" OF THE SPECIFICATIONS. THESE NOTES PARAPHRASE DIVISION 1 REQUIREMENTS AND ARE NOT INTENDED TO MODIFY OR REPLACE DIVISION 1 REQUIREMENTS. DIVISION 01 SPECIFICATIONS HAVE PRECEDENCE

OVER THESE NOTES.

A.2. CONSTRUCTION ACCESS, PARKING, OFFICES AND EXTENT/SIZE OF CONSTRUCTION STAGING AREA IF REQUIRED MUST BE COORDINATED WITH SITE PERSONNEL VIA COR; PARTICULARLY IN CONJUNCTION WITH ONGOING PROJECTS. LOCATION OF CONSTRUCTION STAGING AREA TO BE DETERMINED AT PRECONSTRUCTION

CONFERENCE.

A.3. COORDINATE CONSTRUCTION ACTIVITY WITH THE COR SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ATCT.

A.4. OFFICE TRAILER IS REQUIRED TO BE READY FOR INSTALLATION WITHIN 5 WORKING DAYS PRIOR TO THE REMOVAL

OF THE EXISTING TRAILER.

A.5. MOVE ALL FURNITURE AND APPLIANCES OUT OF (AND BACK INTO) ALL ROOM SPACES AS NEEDED TO PERFORM

WORK. CONTRACTOR IS RESPONSIBLE FOR TEMPORARY STORAGE OF FURNITURE AND APPLICANCES.

A.6. CONTRACTOR ACCEPTANCE INSPECTION IS REQUIRED AFTER EACH PHASE OF WORK. FAA WILL RE-OCCUPY

WORKSPACES ONCE FAA ISSUED PUNCHLIST IS CLEARED.

A.7. COORDINATE WITH THE COR FOR TEMPORARY BREAKROOM REQUIREMENTS.

B. RISK MITIGATION PLAN

B.1. DEVELOP A RISK MITIGATION PLAN TO ACCOMODATE REMOVING AND PROVIDING EQUIPMENT AS PART OF THE WORK. COORDINATE FINAL PLAN REQUIREMENTS WITH THE COR. RISK MITIGATION PLAN MUST AT A MINIMUM

ADDRESS PROTECTION OF BUILDING, OCCUPANTS, AND BUILDING SECURITY.

B.2. DEVELOP A RISK MITIGATION PLAN TO ACCOMMODATE REMOVAL OF EXISTING EQUIPMENT FROM BUILDING TO ALLOW FOR THE WORK AND TO MAINTAIN REQUIRED EGRESS FROM AREAS IMPACTED BY CONSTRUCTION.

B.3. THE RISK MITIGATION PLAN MUST IDENTIFY AND DOCUMENT RISKS/HAZARDS POSED BY THE WORK AND IDENTIFY ACTION REQUIRED TO REDUCE THE RISK.THE PLAN MUST INCLUDE DAILY CONSTRUCTION BRIEFINGS WITH THE THE COR AND REGULAR INSPECTIONS. RISK MITIGATION PLANS MUST ADDRESS, BUT IS NOT LIMITED TO, INFORMING OCCUPANTS AND VISITORS OF ANY CONSTRUCTION ACTIVITY THAT AFFECT THE FIRE PROTECTION AND LIFE SAFETY WITHIN THE FACILITY. RISK MITIGATION MUST ADDRESS ALTERNATE MEANS OF EGRESS FOR BUILDING OCCUPANTS, SIGNAGE, AND IF REQUIRED BY THE COR, TRAINING WHEN EGRESS ROUTES ARE REVISED

AS A RESULT OF THE WORK.

C. CONSTRUCTION ACCESS

C.1. VISITORS AND DELIVERIES TO SITE MUST BE THROUGH THE MAIN ENTRANCE SECURITY GATE IDENTIFIED BY THE

THE COR.

C.2. PROVIDE SIGNAGE TO INDICATE ACCESS ROUTE FOR CONSTRUCTION EMPLOYEES AND DELIVERIES ON SITE.

PROVIDE NECESSARY BARRICADES, LIGHTS, SIGNAGE AND FENCING TO PROTECT, WARN AND DIRECT PERSONS

NEAR CONSTRUCTION AREAS.

C.3. ACCESS TO BUILDING MUST BE LIMITED. COORDINATE WITH THE COR.

C.4. KEEP LOADING AREA ACCESSIBLE FOR FAA DELIVERIES.

C.5. DELIVERIES MUST BE SCHEDULED AND APPROVED IN ADVANCE WITH THE COR AND AT TIMES OTHER THAN FAA

EMPLOYEES SHIFT CHANGES TO AVOID CONGESTION. FAA SHIFT CHANGES OCCUR AT: 5:30AM - 6:45AM, 12:30PM-2:30PM, AND 10:15PM, VERIFY TIME WITH THE COR. DELIVERY VEHICLES MUST ONLY CONTAIN ITEMS BEING DELIVERED TO FAA. IF VEHICLE CONTAINS OTHER DELIVERIES, VEHICLE MUST NOT BE ALLOWED ON SITE.

C.6. DO NOT BLOCK ACCESS OR EGRESS FROM BUILDING EXITS. COORDINATE WITH THE COR AND THE RISK MITIGATION PLAN IF THE FOLLOWING EXITS WILL BE TEMPORARILY BLOCKED: EMPLOYEE ENTRANCE/EXIT, OR

AREAWAY.

C.7. COORDINATE WORK WITH THE CITY OF SAN ANTONIO FIRE DEPARTMENT TO ENSURE EMERGENCY ACCESS IS

MAINTAINED DURING ALL PHASES OF CONSTRUCTION.

D. CONTRACTOR PARKING

D.1. PARKING IS LIMITED TO THE CONSTRUCTION STAGING AREA AND AS NOTED. IF ADDITIONAL PARKING IS NEEDED, PROVIDE OFF-SITE. EXISTING PARKING SPACES AT ATCT ARE OFF-LIMITS FOR CONTRACTOR PARKING.

E. FAA SECURITY REQUIREMENTS

E.1. AN ADVANCE LIST AND WEEKLY LOG OF CONTRACTOR'S PERSONNEL MUST BE PROVIDED TO THE COR.

TEMPORARY SECURITY BADGES WILL BE ISSUED TO QUALIFIED CONSTRUCTION PERSONNEL. CONTRACTOR'S SUPERVISORY PERSONNEL MUST BE RESPONSIBLE FOR CONDUCT OF THEIR PERSONNEL. VEHICLES ASSOCIATED WITH CONTRACTOR'S WORK MUST BE MARKED. REFER TO DIVISION 1 FOR MORE DETAILED REQUIREMENTS.

E.2. SITE IS A SECURE AREA AND CONSTRUCTION PERSONNEL MUST REMAIN IN CONSTRUCTION AREAS AND COMPLY

WITH FAA'S SECURITY REQUIREMENTS.

E.3. FAA VISITORS BADGES ARE REQUIRED FOR CONSTRUCTION PERSONNEL WORKING WITHIN THE BUILDING. OBTAIN FAA SECURITY BADGES FOR PROJECT SUPERINTENDENT AND ONE REPRESENTATIVE FOR EACH SUB CONTRACTOR ON SITE FOR MORE THAN 60 WORKING DAYS. THE BADGED CONTRACTOR MUST ESCORT SUB CONTRACTORS AND OTHER WORKERS ON THE SITE. TEMPORARY BADGES ARE REQUIRED FOR CONTRACTORS

AND OTHER WORKERS FOR DURATION LESS THAN 60 WORKING DAYS.

E.4. USE GREAT CARE AND CAUTION WHILE WORKING ON THIS FACILITY. WORK MUST BE COORDINATED WITH THE

COR. DISRUPTION OF THIS FACILITY IS NOT PERMITTED.

E.5. EXISTING FAA AIR TRAFFIC EQUIPMENT MUST REMAIN OPERATIONAL THROUGHOUT DURATION OF THIS CONTRACT. ENSURE CONTINUOUS PROTECTION OF THIS EQUIPMENT FROM PHYSICAL OR ELECTRICAL DAMAGE AS A RESULT OF INCIDENTAL OR ACCIDENTAL NEGLIGENCE SUCH AS, BUT NOT LIMITED TO, DISRUPTION OF POWER TO UNITS. NOTIFY THE COR IMMEDIATELY OF DAMAGE OR DISRUPTION OF ELECTRICAL SERVICES.

REPAIRS AND RESTORATIONS ARE AT NO COST TO THE FAA.

F. CONSTRUCTION MATERIAL STORAGE

F.1. STORAGE OF CONSTRUCTION MATERIALS AND TRAILERS ON SITE IS LIMITED TO THE CONSTRUCTION STAGING AREA. THE CONSTRUCTION STAGING AREA MUST BE SURROUNDED BY A FENCE. MATERIALS MUST BE NEATLY STORED AND PROTECTED. LIGHTING MUST BE INSTALLED AT THE DISCRETION OF THE COR. DO NOT DIG WITHOUT PRIOR PERMISSION FROM THE COR. BURIED CABLES (UNDERGROUND UTILITIES) MAY RUN THROUGH STAGING AREA AND ELSEWHERE. INSTALL A PADLOCK ON GATE FOR CONSTRUCTION STAGING AREA. PROVIDE KEY TO THE

COR.

F.2. COORDINATE DELIVERY OF MATERIALS THROUGH THE COR. HAVE PERSONNEL ON SITE TO RECEIVE DELIVERIES.

G. CONSTRUCTION DEBRIS

G.1. PROVIDE ENCLOSED DUMPSTERS FOR DISPOSAL OF CONSTRUCTION DEBRIS WITHIN THE CONSTRUCTION STAGING AREA. COORDINATE LOCATIONS WITH THE COR. AREAS AROUND DUMPSTERS MUST BE KEPT CLEAN AND

FREE OF EXCESS DEBRIS AND DUST DURING CONSTRUCTION. REMOVE DEBRIS DAILY. DISPOSE OF WASTE IN AN

APPROVED OFF-SITE WASTE DISPOSAL FACILITY.

G.2. USING FAA DUMPSTERS IS NOT ALLOWED.

G.3. WATER WILL BE USED AS A DUST CONTROL MEASURE AS NEEDED OR AS DIRECTED BY THE CONTRACTING

OFFICER. IF, IN THE OPINION OF THE AIRPORT, DUST FROM CONSTRUCTION ACTIVITIES CREATES A NUISANCE OR LIMITED VISIBILITY CONDITIONS ON ADJACENT PAVEMENTS, CONSTRUCTION ACTIVITY WILL BE STOPPED AND NOT RESUMED UNTIL APPROPRIATE SPRINKLING HAS BEEN ACCOMPLISHED TO THE SATISFACTION OF THE AIRPORT.

TIME LOST DUE TO WORK STOPPAGE FOR THIS ACTIVITY WILL NOT CONSTITUTE AN EXTENSION OF CONTRACT

TIME.

G.4. ALL HAUL TRUCKS ARE TO BE CONVERED WHEN OPERATING IN THE AIRPORT.

H. CONSTRUCTION OFFICE

H.1. LOCATE MATERIALS AND EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREA. TEMPORARY POWER IS AVAILABLE AT ATCT. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATION WITH THE CPS ENERGY TO SET UP A TEMPORARY POWER SERVICE FOR THE CONSTRUCTION TRAILERS. NO TRAILER POWER CAN BE TAKEN

FROM WITHIN THE ATCT / TRACON FACILITY.

H.2. COMMERCIAL POWER IS AVAILABLE AT THE POWER PANEL, VERIFY LOCATION W/ THE COR. THE CONTRACTOR IS RESPONSIBLE FOR ELECTRICAL CONNECTION FROM THE POWER PANEL TO THEIR CONSTRUCTION TRAILERS.

H.3. COORDINATE WITH THE COR USE OF MOBILE CELL PHONE USE INSIDE AND OUTSIDE BUILDING. CERTAIN AREAS OF

THE FACILITY ARE SENSITIVE TO CELL PHONE USAGE.

I. DEMOLITION AND CONSTRUCTION HOURS (NORMAL WORK HOURS BETWEEN 6:00 AM TO 4:30 PM)

I.1. DO NOT INTERFERE WITH AIR TRAFFIC CONTROL FUNCTIONS OF THE ATCT AND BASE BUILDING. DEMOLITION AND CONSTRUCTION NOISE MUST BE MINIMIZED BETWEEN 5:00 AM - 12:00 AM FOR THE ATCT, AND BETWEEN 5:30 AM -

10:00 PM FOR THE BASE BUILDING.

I.2. COORDINATE WORK WITH THE COR ON CRITICAL EQUIPMENT WITHIN THE ATCT AND BASE BUILDING MODIFICATION WORK AREA. WORK ON CRITICAL EQUIPMENT MUST BE ACCOMPLISHED DURING ATCT OFF-HOURS 12:00 AM - 5:00

AM AND BASE BUILDING OFF-HOURS 10:00 PM - 5:30 AM, OR AS DIRECTED BY THE COR.

I.3. NOISY DEMOLITION (INSIDE OR OUTSIDE) AND OFF-HOURS CONSTRUCTION ACTIVITIES MUST BE SCHEDULED, COORDINATED AND APPROVED IN WRITING BY THE COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF THE WORK. DEMOLITION WORK CREATING DISRUPTIVE NOISE, DUST, ODORS, OR

FUMES WILL BE CONDUCTED DURING OFF-HOURS.

I.4. CONCRETE SAWING, CORE DRILLING, CONCRETE DEMOLITION AND ANCHOR DRILLING MUST BE ALLOWED ONLY AT PREARRANGED TIMES APPROVED BY THE COR. SCHEDULE, COORDINATE AND HAVE APPROVAL BY THE COR IN WRITING, A MINIMUM OF 10 WORKING DAYS BEFORE THE PERFORMANCE OF THE WORK IF ACTIVITY INTERUPTS NORMAL OPERATIONS. CONCRETE WORK PRODUCING EXCESSIVE NOISE ,DUST, ODORS, OR FUMES THAT CAN

DISRUPT OPERATIONS WILL BE CONDUCTED DURING OFF-HOURS.

J. EQUIPMENT PROTECTION

J.1. PROTECT FAA EQUIPMENT, BOTH INSIDE AND OUTSIDE BUILDING, FROM DAMAGE, INCLUDING BUT NOT LIMITED TO, DAMAGE CAUSED BY IMPACT, WATER, ASBESTOS, DEBRIS AND DUST, INCLUDING CORE DRILLING.

J.2. SHUTDOWNS AND SWITCH OVERS OF MECHANICAL AND ELECTRICAL SYSTEMS MUST BE ACCOMPLISHED DURING OFF-HOURS. FACILITY OFF-HOURS ARE IDENTIFIED IN NOTE J3. PREPARATORY WORK MUST BE COMPLETED PRIOR TO SHUTDOWN AND SWITCH OVER. SCHEDULE, COORDINATE AND HAVE APPROVAL IN WRITING BY THE COR WITH A MINIMUM OF 10 WORKING DAYS NOTICE IN ADVANCE OF PERFORMANCE OF WORK. ONLY FAA PERSONNEL MAY OPERATE CIRCUIT BREAKERS. REQUEST PERMISSION OF FAA IN ADVANCE AND IN WRITING FOR EACH CASE OF BREAKER OPERATION. DO NOT OPEN (DE-ENERGIZE) OR CLOSE (ENERGIZE) ANY CIRCUIT BREAKER AT ANY TIME.

J.3. ATCT IS A 24 HOUR 7 DAY PER WEEK OPERATING FACILITY. THE BASE BUILDING OPERATES UNDER NORMAL BUSINESS HOURS (5:30AM - 10:00PM, 7 DAYS A WEEK). SELECT CONSTRUCTION ACTIVITY WILL BE LIMITED TO OFF-HOURS WORK TO MINIMIZE RISK TO THE OPERATIONAL FACILITIES. ATCT OFF-HOURS WORK IS 12:00 AM - 5:00 PM, AND BASE BUILDING OFF-HOURS WORK IS 10:00 PM - 5:30 AM. IT WILL BE NECESSARY TO COORDINATE CONSTRUCTION ACTIVITY SO AS NOT TO INTERFERE WITH FUNCTIONS OF THE ATCT AND BASE BUILDING.

J.4. NO WELDING, OR ANY OTHER SPARK OR FLAME EQUIPMENT MUST BE POWERED BY THE FACILITY ELECTRICAL SYSTEM. WELDING MUST NOT BE PERMITTED IN FAA OCCUPIED AREAS UNLESS APPROVED IN WRITING BY THE COR. REVIEW WITH THE COR TYPE OF WELDING CUTTING TO BE PERFORMED AT FACILITY 10 WORKING DAYS PRIOR TO USE. OBTAIN A HOT WORK PERMIT FROM THE FACILITY MANAGER VIA THE COR PRIOR TO ANY WELDING, TORCHING, OR USE OF AN OPEN FLAME.

J.5. THE ATCT STANDPIPE SYSTEM AND SITE FIRE HYDRANTS WILL BE TEMPORARILY OUT OF SERVICE DURING THE REPLACEMENT OF THE EXISTING POST INDICATOR VALVES (PIVS) ON THE 6" FIRE SERVICE. FOLLOW THE PROCEDURES OUTLINED IN NFPA 25, SECTION 15.5 FOR THE PREPLANNED IMPAIRMENT OF THE FIRE SUPPRESSION SYSTEM BY NOTIFYING THE FAA, FIRE DEPARTMENT, ALARM COMPANY, OR OTHER AUTHORITIES HAVING JURISDICTION WITH REGARD TO THE IMPAIRMENT'S EXTENT, EXPECTED DURATION, AND MITIGATION MEASURES. A CONTINUOUS FIRE WATCH OF IMPAIRED BUILDING AREA(S) WILL BE CONDUCTED BY A DESIGNATED PERSON IF THE FACILITY SPRINKLER SYSTEM IS OUT OF SERVICE FOR MORE THAN 10 HOURS IN A 24-HOUR

PERIOD.

K. CONSTRUCTION TOILET FACILITIES

K.1. PROVIDE AND MAINTAIN PORTABLE CHEMICAL TOILETS AS REQUIRED AT THE TEMPORARY CONSTRUCTION

STAGING AREA. COORDINATE WITH THE COR FOR SCHEDULING OF SERVICE.

K.2. PROVIDE PORTABLE WASH STATIONS WITH FOOT-PEDAL ACTIVATED FAUCET, SOAP DISPENSER, AND A HAND

DRYING OPTION IN ADDITION TO PORTABLE TOILETS TO CONSTRUCTION STAGING AREA.

K.3. LOCATE PORTABLE TOILETS A MINIMUM OF 25 FEET AWAY FROM THE NEAREST STORMWATER INLETS.

L. TEMPORARY PORTABLE RESTROOM TRAILERS

L.1. PROVIDE TEMPORARY RESTROOM FACILITES FOR BUILDING STAFF DURING CONSTRUCTION HOUSED IN A PORTABLE TRAILER. THE 60' X 12' TRAILER WILL CONTAIN 3 TOILETS AND 2 URINALS FOR MEN, AND 5 TOILETS FOR

WOMEN, RUNNING PORCELAIN SINK, BATTERY, AND LIGHTING.

L.2. CLEAN THE TEMPORARY RESTROOMS ON A DAILY BASIS WHILE BUILDING TOILET FACILITES ARE OUT OF SERVICE.

L.3. CONNECT TEMPORARY RESTROOM'S SEWER SERVICE TO STUB UP ON NEW SANITARY SEWER LATERAL.

CONNECT POTABLE WATER SERVICE TO NEAREST 3/4" WALL HYDRANT; PROTECT SERVICE LINE FROM FREEZING

TEMPERATURES DURING WINTER MONTHS.

SAT-D-ATCT-G007

T. RECINE

T. MLSEK

S. BUTLER / S. DAVIS

FORT WORTH, TX

22004815

SAN ANTONIO AIRPORT TRAFFIC CONTROL TOWER

SAT ATC MODERNIZATION

SAN ANTONIO ATCT

SAN ANTONIO

TEXAS

FEET

Scale: 1 INCH = 30 FEET

60300 15

PHASE 1: TRACON WORK MUST BE PERFORMED

DURING THE NIGHT. COORDINATE WITH THE COR.

USE AF TECH OFFICE FOR TEMPORARY CBI LAB AND

AT COACH LAB DURING THE PLUMBING WORK.

REPLACE FREE-STANDING CANOPY**.

INTERIOR BUILDING

RENOVATION AND SITE

WORK PHASING SEQUENCE

7A

8B

8A

7B

7C

7D

7H

7F

REV. APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE APVD

REVIEWED BY SUBMITTED BY APPROVED BY

SUBMITTER'S TITLE APPROVER'S TITLE

DESIGNED BY

DRAWN BY

CHECKED BY

DATE

DRAWING NO.

JCN:

REV.

ISSUED BY

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

FOR OFFICIAL USE ONLY

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

8 7 6 5 4 3 2 1

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

8 7 6 5 4 3 2 1

JACOBS

1100 N GLEBE RD.

SUITE 500

ARLINGTON, VA 22201

PL

O

T D

AT

E/

TI

M

E:

PHASE 5: OFFICE TRAILER

PHASE 4: CORRIDORS

PHASE 8 (ALTERNATIVE #2): MILL, OVERLAY, AND STRIPE

ASPHALT PAVEMENT, AND REPLACE VERTICAL LIFT

GATES*.

PHASE 7 (ALTERNATIVE #2): MILL, OVERLAY, AND STRIPE

ASPHALT PAVEMENT. AND INSTALL CONCRETE

V-CHANNELS AND UTILITY TRENCH FOR PIV CAD READER

TELECOM CONDUIT.

TEMPORARY

BREAK ROOM

EXISTING BASE BUILDING

L.

M. MOBILE CRANE OPERATION

M.1. PROVIDE MOBILE CRANE EQUIPMENT CAPABLE OF LIFTING 305 LB LOAD

APPROXIMATELY 221 FEET TO THE ATC TOWER ROOFTOP FROM LOCATION

INDICATED ON THIS SHEET.

M.2. CRANE WILL MOBILIZED TWICE DURING CONSTRUCTION: ONCE TO LIFT

TEMPORARY HVAC EQUIPMENT ONTO ATC TOWER ROOF, AND ONCE TO

LIFT THE HVAC EQUIPMENT OFF THE ROOF.

M.3. SUBMIT CRANE LIFTING PLAN TO THE FAA FOR APPROVAL.

MOBILE CRANE

LOCATION

01/26/2024

PHASE 6: ATCT (INCLUDES ROOFTOP HVAC INSTALLATION

WITH CRANE), SMOKE SHELTER AND REPLACE VERTICAL LIFT

GATES* AND SIDEWALK** NEAR FLAGPOLE. CONSTRUCTION

ACTIVITY IN ATCT STAIR IS LIMITED TO OFF-HOURS WORK TO

ENSURE STAIR REMAINS OPEN AS A MEANS OF EGRESS

DURING OPERATIONAL HOURS.

7G

7E

TEMPORARY

PORTABLE

RESTROOM

TRAILER

3A 3B

2B

2C

4A

2A

6A 1A

1B

1D

1C

1E

3/4" WALL HYDRANT

7A

5A

1A

6B

6B

6B

6B

1A

1A

1A

B

ADDENDUM B06/20/25B

*VERTICAL LIFT GATES REPLACEMENT IS A BID ITEM THAT WILL OCCUR IN PHASE 8 IF

ALTERNATIVE #2 IS AWARDED.

**FREE-STANDING SHADE CANOPY AND SIDEWALK NEAR FLAG POLE REPLACEMENT

ARE ALTERNATIVE #3 ITEMS.

6B

B

B

UPUP UP

DN

LIFE SAFETY SYMBOLS:

TD = #FT

TRAVEL DISTANCE (MAX: 200 FT)

COMMON PATH OF TRAVEL (MAX: 75 FT)

DEA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .