J09 Section B Price Schedule (OFFEROR FILL-IN).xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 75H70122R00045
About this file
This solicitation package includes details for a construction project to install a water main crossing of Shitike Creek in Warm Springs, Oregon. The Indian Health Service seeks a firm fixed price contract for work including clearing, excavation, installing approximately 3,230 linear feet of 16-inch ductile iron water main and related valves, backfilling, resurfacing, erosion control, and relocating existing utilities. The project location is provided, and the performance period is specified as 150 calendar days from notice to proceed. The anticipated construction value is between $1 million and $5 million. This opportunity is set aside exclusively for small businesses, with preference given to Indian Economic Enterprise firms. The submission deadline is June 20, 2022, and registration in the System for Award Management database is required. Site visits are planned, and questions must be submitted in writing by the specified date.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT J09 SECTION B PRICE SCHEDULE (OFFEROR FILL-IN) |
| In accordance with Section L of the solicitation, this attachment must be submitted as part of Volume II - Price Proposal (Factor III: Price) |
| ITEM | DESCRIPTION | EST QTY* | UNIT | UNIT COST | TOTAL COST | |
| CLIN 0001 - SCHEDULE A | ||||||
| 1 | Mobilization | 1 | JOB | |||
| 2 | Construction Traffic Control and Erosion & Sediment Control | 1 | LS | |||
| 3 | Clearing and Grubbing | 3000 | SF | |||
| 4 | Dewatering | 1 | LS | |||
| 5 | Rock Removal | 25 | CY | |||
| 6 | Tree Removal | 2 | EA | |||
| 7 | Imported Gravel | 300 | CY | |||
| 8 | Excavation, Trenching, and Backfill | 2940 | LF | |||
| 9 | 16" Ductile Iron Water Main Class 350 | 2940 | LF | |||
| 10 | D.I. Butterfly Valve, 1" Diameter | 2 | EA | |||
| 11 | 2" Combination Air Valve | 2 | EA | |||
| 12 | Water Main Connections | 2 | EA | |||
| 13 | D.I. Butterfly Valve, 14" Diameter | 2 | EA | |||
| 14 | Blowoff Assembly | 1 | EA | |||
| 15 | Asphaltic Resurfacing | 2500 | SF | |||
| 16 | Concrete Resurfacing | 20 | SF | |||
| 17 | Permanent Erosion Control, Hydroseeding | 1 | LS | |||
| 18 | Relocation Project #1 - Salvaging PRV / 6" Main Capped | 1 | LS | |||
| 19 | Relocation Project #2 - Flush Hydrant / 4" Main Capped | 1 | LS | |||
| 20 | Relocation Project #3 - 6" Main Tie-in to New 3/4" Line | 1 | LS | |||
| 21 | Relocation Project #4 - 4" Main Capped | 1 | LS | |||
| TOTAL FFP (CLIN 0001) | ||||||
| CLIN 0002 - SCHEDULE B | EST QTY* | UNIT | UNIT COST | TOTAL COST | ||
| 22 | Mobilization | 1 | LS | |||
| 23 | Construction Traffic Control | 1 | LS | |||
| 24 | Erosion & Sediment Control | 1 | LS | |||
| 25 | Fabricated Pipe Support | 7 | EA | |||
| 26 | Thrust Block Mat Footing Restraint | 2 | EA | |||
| 27 | Excavation, Trenching, and Backfill | 146 | LF | |||
| 28 | Ductile Iron Water Main, 16" Diameter | 290 | LF | |||
| 29 | Water Main Bridge Installation | 1 | LS | |||
| 30 | D.I. Butterfly Valve, 16" Diameter | 2 | EA | |||
| 31 | Air Release Valve Assembly | 1 | LS | |||
| 32 | Pipe Insulation | 1 | LS | |||
| 33 | Permanent Erosion Control, Hydroseeding | 200 | SY | |||
| TOTAL FFP (CLIN 0002) | ||||||
| CLIN 0003 - NTE AMOUNT | QTY | UNIT | UNIT COST | TOTAL COST | ||
| 34 | Relocate existing fiber optic cable utilizing the cable owner (This is a Not-to-Exceed (NTE) line item amount) | 1 | JOB | N/A | $ 104,961.68 | |
| SUM TOTAL FFP | ||||||
| (CLIN 0001 + CLIN 0002 + CLIN 0003) | $ 104,961.68 | << Must match total amount listed in Block 17 of the SF1442 | ||||
| *NOTE: Items listed in estimated quantity (EST QTY) are provided in the price schedule for evaluation purposes only. The Government is not obligated to order the estimated amounts specified in the schedule. The estimates provided do not establish any minimum purchase limit for which the Government is obligated. The contractor shall not furnish quantities in excess of the specified amount without prior written consent from the Contracting Officer. |